Loading...
HomeMy WebLinkAbout820326_Complete File - Historical_20020915OPERATION AND MAINTENANCE PLAN SHEET 1 OF 2 This lagoon is designed for waste treatment (permanent storage) and 180 days of temporary storage. The time required for the planned fluid level (permanent and temporary storage) to be reached may vary due to site conditions, weather, flushing operations, and the amount of fresh water added to the system. The designed temporary storage consists of 180 days storage for: (1) waste from animals and (2) excess rainfall after evaporation. Also included is storage for the 25 yr - 24 hr storm for the location and a heavy rain factor. The volume of waste generated from a given number of animals will be fairly constant throughout the year and from year to year, but excess rainfall will vary from year to year. The heavy rain factor and 25 yr rainfall will not be a factor to consider in an annual pumping cycle, but this storage volume must always be available. The waste produced by the animals shall be utilized an approved waste utilization plan.; Highly visible installed to mark the upper and lower elevations of storage (pumping volume). Pumping shall be done as maintain the liquid level between these markers. Pumping can be started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment in order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application.include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. in accordance with markers shall be the temporary necessary to The following items are to be carried out: 1. Before wastes are introduced, the waste treatment lagoon shall be charged to 1/2 its treatment volume to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. When precharging is complete, flush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin temporary storage pump -out of the lagoon when fluid level reaches the elevation 51.52 as marked by permanent marker. Stop pump - out when the fluid level reaches elevation 48.67 This temporary storage less 25 yr and heavy rain contains 776823 cubic feet or 5810635 gallons. C00101010743 { SHEET 2 OF 2 4. The recommended maximum amount to apply per irrigation and recommended maximum application rate is shown in the waste utilization plan. Refer to the 'waste utilization plan for further details. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. Repair areas of the embankment that settle below the design settled height or areas where cracking, sloughing, or "jug" holes develop. 8. Repair waste inlet pipes that develop cracks or separate at the joints. 9. Remove undesirable vegetative growth and floating or lodged debris. 10. All surface runoff is to be diverted from the lagoon to stable outlets when not included as part of the design temporary storage. 11. After five years the waste treatment lagoon shall be checked for sludge accumulation annually. If sludge has encroached into the treatment volume, the sludge will be removed and applied at agronomic rates based on analysis of the sludge. Treatment volume must have a minimum of 4 feet of depth *free of sludge at all times. 12. In December 1992, the Environmental Management Commission (EMC) in North Carolina revised water quality regulations that address animal operations. These rules became effective on February 1, 1993 (15A NCAC 2H .0200). This animal operation shall be operated within the requirements of these rules and regulations. 1 13. Pipes that are used for recycling effluent to use as flush water and irrigation intakes must be placed 18 inches below the surface and as far from the inlet discharge pipes as possible in order to provide a cleaner effluent for flushing and to reduce odors when irrigating on land. When these pipes are.placed through the embankment, they should be installed no more than two feet below top of embankment and not in the highest section of fill. The pipe trench shall be compacted with clayey material or other material as approved by an engineer. C 00101010744