Loading...
HomeMy WebLinkAboutSW5210201_Essex Townes - Revised Pond Detail Sheet_20210623v " x-%x -'x-'x-'xX x^\Y-c \ L ' \ l ) \ \ ` \� \ \ \ 1 1 X X X X X X 1- / x�x X X X x�x x X- `�,} X. X� - - x x x x ` y ` \ \ \ \ 1 x Xrx _x , x x x x x x X X XXXXXX X XX %%%%XXXXXX XXX 1 + XxX/xXXX xX xX xX XX XX XX XX xX X X X' x xXxXxxxXX / bxc x �x x x x x x x x x x x x x x x X X X / "7e�-r X X X X X X X X X X X X X X X X X X X X X : x 7. X�i�x X xx x XXXXx cX�XXXXXXXXXXXX x X x�f x?xxxxxxxxxX xXz XXX x XXX'cXXXXX% X X X X X X X X X X XXx XXXXx x x x x x x Xx X Zcxx X X X x X X X X X X X X x x x xxxx xxXxX X X X X ✓��- ~� \ \ \ \\\_ _ \ _J X X X X x X X X X X X X x x x x x x x xXXX %%%%% %. \ \ + , X X x x X X X xL�X X X x X x x x x x x X X X X X X x X \ \ y - - •x•x x x X X X X Lac X X B -srix x x x x x x X X X X X X X X. ^--- xx,, x z z e r, x z--x 'x x, x x x x x •may, x x x x x\ \ �y X '� - - - ��� EDGE OF SCM ACCESS x x v x x x x XxYXYxXXXX X \ I 1 + PROPOSED PUMP STATION /\EASEMENT - o z (PLANS BY OTHERS) EDGE OF SCM \ ACCESS EASEMENT \ D 100-YEAR FLOODPLAIN z o f /I L LITTORAL SHELF FOR PLANTINGS MIN. 6' WIDE 'L 6H:1V MAX SLOPE + F � � N 1 A. A. 1 �I 1' wWw ,-4 1 1 N 1 �0 N SS • \1 ss 1 � � 1 ( x „ x - �Cri X XX X X X X 1 + xx 1 .01 XXX 0 ✓X x x > x > p 1 x, x 1 x x x 1 X K X 1 J o x x x 1 x I xX X x POND GRADING SCALE: 1"=50' CONSTRUCTION DESIGN DATA DESIGN PARAMETER DESIGN VALUE AS -BUILT VALUE TOP OF DAM ELEVATION 326.0 XXX SEDIMENT CLEANOUT ELEV. 314.0 XXX BOTTOM OF POND ELEVATION 313.0 XXX RISER CREST ELEV. 323.0 XXX RISER SIZE 48"x48" LD SQUARE XXX NORMAL POOL ELEVATION 318.0 XXX ORIFICE ELEVATION 318.0 XXX ORIFICE DIAMETER 2.5 INCHES XXX BARREL DIAMETER 18 IN XXX BARREL UPSTREAM INV. 315.0 XXX BARREL DOWNSTREAM INV. 314.0 XXX BARREL LENGTH 70FT XXX ANTI -FLOTATION BLOCK SIZE 8'X8'X1.5' XXX ANTI -SEEPAGE COLLAR SIZE 6'x6' XXX CALCULATED POND DATA SURFACE AREA REQUIRED 13,735 SF XXX SURFACE AREA PROVIDED 16,196 SF XXX WQ RAINFALL VOLUME 32,142 CF XXX ELEV. AT WQ VOLUME 319.8 XXX Q(1) DISCHARGE 0.4 CFS XXX Q(1) ELEV. 320.8 XXX Q(2) DISCHARGE 0.5 CFS XXX Q(2) ELEV. 321.9 XXX Q(10) DISCHARGE 3.6 CFS XXX Q(10)ELEV. 323.1 XXX Q(25) DISCHARGE 13.8 CFS XXX Q(25) ELEV. 323.4 XXX Q(100) DISCHARGE 23.5 CFS XXX Q(100) ELEV. 324.6 XXX CONTOUR DATA CONTOUR ELEV DESIGN AREA AS -BUILT AREA 318 16,196 SF XXX 320 20,226 SF XXX 322 24,483 SF XXX 324 53,468 SF XXX 326162,659 SFIXXXSFIXXX AQUATIC SHELF PLANTINGS SYMBOL TOTAL BOTANICAL NAME COMMON NAME ° 229 PONTEDERIA CORDATA PICKERELWEED } { 229 IRIS VIRGINICA BLUE FLAG IRIS 267 JUNCUS EFFUSUS var SOFT RUSH SOLUTUS 229 HIBISCUS COCCINEUS SCARLET ROSE MALLOW NOTES 1. BLUE FLAG IRIS AND SOFT RUSH PERFORM BEST WHEN PLANTED IN 0" TO 2" OF WATER. THEREFORE THESE TWO VARIETIES SHOULD BE PLANTED CLOSE TO THE NORMAL POOL ELEVATION BUT STILL BELOW THE NORMAL POOL ELEVATION. 3X PIPE O.D. 3X PIPE O.D. � � � 6" ANTI -SEEPAGE COLLAR NOT TO SCALE NOTES 1. THE CONCRETE COLLAR SHALL HAVE A MINIMUM 28-DAY STRENGTH OF 3000 PSI. 2. ANTI -SEEPAGE COLLARS SHALL BE CONNECTED TO THE BARREL PIPE WITH A WATERTIGHT JOINT. 3. INSTALL ANTI -SEEPAGE COLLAR AT THE CENTER OF THE EMBANKMENT. 4. ANTI -SEEPAGE COLLARS SHALL BE INSTALLED AT LEAST 2 FEET FROM ANY PIPE JOINT. AREA OF SHELF 3,804 SF REQUIRED PLANTING RATE 50 PER 200 SF OF SHELF AREA PLANTINGS REQUIRED 951 PLANTINGS PROVIDED 954 TYPICAL 200 SQUARE FOOT AQUATIC SHELF PLANTINGS NOT TO SCALE HANDWHEELTO^BE EXTENDED CLCVHI IVIVJ, 3ILC3 HIVU VIIVICIVJIVIVJ ur I ELEMENTS SHOWN ON THIS SECTION TYPICAL DAM CROSS SECTION NOT TO SCALE TOP OF AQUATIC SHELF (AT NORMAL POOL ELEVATION) MIDDLE OF AQUATIC SHELF (6" BELOW NORMAL POOL) BOTTOM OF AQUATIC SHELF (12" BELOW NORMAL POOL) COMPLETE GRADING BEFORE PREPARING SEEDBEDS, AND INSTALL ALL NECESSARY EROSION CONTROL PRACTICES SUCH AS, DIKES, WATERWAYS, AND BASINS. MINIMIZE STEEP SLOPES BECAUSE THEY MAKE SEEDBED PREPARATION DIFFICULT AND INCREASE THE EROSION HAZARD. IF SOILS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 INCHES USING A RIPPER, HARROW, OR CHISEL PLOW. SEEDBED PREPARATION GOOD SEEDBED PREPARATION IS ESSENTIAL TO SUCCESSFUL PLANT ESTABLISHMENT. A GOOD SEEDBED IS WELL -PULVERIZED, LOOSE, AND UNIFORM. WHERE HYDROSEEDING METHODS ARE USED, THE SURFACE MAY BE LEFT WITH A MORE IRREGULAR SURFACE OF LARGE CLODS AND STONES. LIMING -APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE PH (ACIDITY) OF THE SOIL IS NOT KNOWN, AN APPLICATION OF GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 1 TO 1 1/2 TONS/ACRE ON COARSE -TEXTURED SOILS AND 2-3 TONS/ACRE ON FINETEXTURED SOILS IS USUALLY SUFFICIENT. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. FERTILIZER -BASE APPLICATION RATES ON SOILTESTS. WHEN THESE ARE NOT POSSIBLE, APPLY A 10-10-10 GRADE FERTILIZER AT 700-1,000 LB/ACRE. BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. SURFACE ROUGHENING -IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE, ADDITIONAL ROUGHENING MAY NOT BE REQUIRED, EXCEPT TO BREAK UP LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING RAKING HARROWING OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING (PRACTICE 6.03, SURFACE ROUGHENING). PLANT SELECTION SELECT AN APPROPRIATE SPECIES OR SPECIES MIXTURE FROM TABLE 6.10A FOR SEEDING IN LATE WINTER AND EARLY SPRING, TABLE 6.1013 FOR SUMMER, AND TABLE 6.10C FOR FALL. IN THE MOUNTAINS, DECEMBER AND JANUARY SEEDINGS HAVE POOR CHANCES OF SUCCESS. WHEN IT IS NECESSARY TO PLANT AT THESE TIMES, USE RECOMMENDATIONS FOR FALL AND A SECURELY TACKED MULCH. SEEDING EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. USE SEEDING RATES GIVEN IN TABLES 6.10A-6.10C. BROADCAST SEEDING AND HYDROSEEDING ARE APPROPRIATE FOR STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS NOT RECOMMENDED BECAUSE OF THE DIFFICULTY IN ACHIEVING A UNIFORM DISTRIBUTION. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN 1 INCH DEEP, AND GRASSES AND LEGUMES NO MORE THAN 1/2 INCH. BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGING, AND THEN LIGHTLY FIRMED WITH A ROLLER OR CULTIPACKER. HYDROSEEDED MIXTURES SHOULD INCLUDE A WOOD FIBER (CELLULOSE) MULCH. MULCHING THE USE OF AN APPROPRIATE MULCH WILL HELP ENSURE ESTABLISHMENT UNDER NORMAL CONDITIONS, AND IS ESSENTIAL TO SEEDING SUCCESS UNDER HARSH SITE CONDITIONS (PRACTICE 6.14, MULCHING). HARSH SITE CONDITIONS INCLUDE: SEEDING IN FALL FOR WINTER COVER ( WOOD FIBER MULCHES ARE NOT CONSIDERED ADEQUATE FOR THIS USE), ), SLOPES STEEPER THAN 3:1, EXCESSIVELY HOT OR DRY WEATHER ADVERSE SOILS (SHALLOW ROCKY OR HIGH IN CLAY OR SAND AND )� AREAS RECEIVING CONCENTRATED FLOW. IF THE AREA TO BE MULCHED IS SUBJECT TO CONCENTRATED WATERFLOW, AS IN CHANNELS, ANCHOR MULCH WITH NETTING (PRACTICE 6.14, MULCHING). FROM: DEMLR EC MANUAL SECTION 6.10 REVISED 5113 - 1' (TYP) TRASH RACK DETAIL NOT TO SCALE NOTES 1. THE TRASH RACK SHALL BE CONSTRUCTED OF #4 REBAR 2. THE TRASH RACK SHALL BE ATTACHED TO THE RISER WITH FOUR EQUALLY SPACED HOT -DIPPED GALVANIZED STEEL CLAMPS. 3. THE TRASH RACK WILL BE PROVIDED WITH A HINGED ACCESS HATCH PROVIDED BY THE FABRICATOR. POND CERTIFICATION REQUIREMENTS THE CONTRACTOR SHALL NOTE THAT THE FOLLOWING DOCUMENTATION IS REQUIRED FOR CERTIFICATION OF THIS POND. ADDITIONAL ITEMS MAY BE REQUIRED DEPENDING ON THE REVIEWING AUTHORITY. 1. AN AS -BUILT SURVEY WITH BARREL PIPE INVERTS AND DIAMETER, RISER DIMENSIONS AND CREST ELEVATION, ORIFICE ELEVATION(S) AND DIAMETER(S) 2. AN AS -BUILT TOPOGRAPHIC SURVEY OF THE POND AT ONE FOOT CONTOUR INTERVALS, INCLUDING THE TOP OF EMBANKMENT AND DOWNSTREAM SLOPE(S) OF THE EMBANKMENT 3. COMPACTION TESTS PERFORMED PER THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS. THIS SHOULD INCLUDE COMPACTION TESTS OF SOIL UNDER THE BARREL PIPE IF THE CONCRETE CRADLE WAS NOT USED. 4. VERIFICATION OF ANTI -SEEPAGE COLLAR SIZE AND INSTALLATION 5. VERIFICATION OF ANTI -FLOTATION BLOCK DIMENSIONS AND INSTALLATION PERMANENT SODDING ALL SOD SHOULD BE PLACED IN ACCORDANCE WITH SECTION 6.12 OF THE NC DENR EROSION CONTROL MANUAL. SPECIES: HYBRID BERMUDAGRASS SOIL PREPARATION: APPLY LIME AT A RATE OF 100 LB PER 1,000 SF. APPLY FERTILIZER AT A RATE OF 25 LB PER 1,000 SF OF 10-10-10 IN FALL OR 5-10-10 IN SPRING. SOD INSTALLATION: 1. PRIOR TO LAYING SOD, CLEAR SURFACE OF SOIL OF ALL TRASH AND DEBRIS. FILL ALL LOW SPOTS TO AVOID STANDING WATER. 2. PRIOR TO INSTALLATION, STORE ALL SOD IN SHADE AND MOISTEN TO MAINTAIN VIABILITY. DELIVERY AND INSTALLATION OF SOD SHOULD TAKE PLACE WITHIN A PERIOD OF 36 HOURS. 3. DURING SUMMER, LIGHTLY IRRIGATE SOIL IMMEDIATELY BEFORE LAYING SOD. 4. LAY FIRST ROW OF SOD IN A STRAIGHT LINE WITH SUBSEQUENT ROWS PLACED PARALLEL TO AND BUTTING TIGHTLY AGAINST EACH OTHER. STAGGER STRIPS IN A BRICK -LIKE PATTERN. ENSURE THAT THE SOD IS NOT STRETCHED OR OVERLAPPED. TRIM AND FIT IRREGULARY AREAS WITH A KNIFE OR SHARP SPADE. 5. INSTALL STRIPS OF SOD WITH THEIR LONGEST DIMENSION PERPENDICULAR TO THE SLOPE. ON SLOPES 3:1 OR GREATER, OR WHEREVER EROSION MAY BE A PROBLEM, SECURE SOD WITH PEGS OR STAPLES. 6. AFTER SODDING OF AREAS IS COMPLETE, ROLL SOD TO PROVIDE FIRM CONTACT BETWEEN ROOTS AND SOIL. 7. IRRIGATE UNTIL THE SOIL IS WET 4 INCHES BELOW THE SOD. KEEP SODDED AREAS MOIST TO A DEPTH OF 4 INCHES UNTIL GRASS TAKES ROOT. 8. NO MOWING SHOULD OCCUR UNTIL THE SOD IS FIRMLY ROOTED, USUALLY 2-3 WEEKS. MAINTENANCE: WATER AS NECESSARY TO MAINTAIN ADEQUATE MOISTURE. GRASS HEIGHT SHOULD BE MAINTAINED BETWEEN 1 AND 2 INCHES. APPLY FERTILIZER ANNUALY AT A RATE OF 5-6 LB NITROGEN PER 1,000 SF. PERMANENT SEEDING FOR GENTLE SLOPES, SUN OR SEMI -SHADE, HIGH -MAINTENANCE, MINIMUM CARE LAWNS SEEDING MIXTURE SPECIES RATE (LB/ACRE) TALL FESCUE BLEND (EQUAL PARTS OF TWO OR PREFERABLY THREE TURF -TYPE TALL FESCUES) 200-500 BEST POSSIBLE BELOW 2,500 FT AUG 15 - SEPT 1 JULY 25 - SEPT 15 MAR 1 - APR 1 MAR 1 - MAY10 ABOVE 2,500 FT JULY 25 - AUG 15 JULY 15 - AUG 30 MAR 20 - APR 20 MAR 5 - MAY 15 SOIL AMMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY 4,000 LB ACRE GROUND AGRICULTURAL LIMESTONE AND 4,000 LB ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT AT400 GAL/ACRE, NETTING, OR ROVING OR BY ROLLING AND WATERING MAINTENANCE THE BUNCH -TYPE HABIT OF TALL FESCUE RESTRICTS ITS SPREAD INTO DAMAGED AREAS. RESEED BARE SPOTS IN THE FALL. REFERTILIZE ANNUALLY IN LATE WINTER AND AGAIN IN FALL. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. NOTE: PERMANENT SEEDING NOTED ABOVE IS ONLY FOR AREAS NOT COVERED WITH SOD 750 PSI CONCRETE CRADLE DETAIL NOT TO SCALE CONCRETE CRADLE NOTES 1. EXCAVATE TRENCH FOR THE CONCRETE CRADLE AND BARREL PER THE DIMENSIONS ON THE CONCRETE CRADLE DETAIL. 2. PLACE BARREL PIPE ON CONCRETE BLOCKS TO ACHIEVE SLOPE AND INVERTS NOTED ON THE POND DETAIL SHEET. 3. PLACE 2 FOOT WIDE STRIPS OF FILTER FABRIC OVER PIPE JOINTS BEFORE PLACING FLOWABLE FILL 4. PLACE FLOWABLE FILL AS ONE LIFT UP TO THE SPRINGLINE OF THE PIPE. 5. ALLOW CRADLE TO CURE FOR AT LEAST 7 DAY SBEFORE USING ANY VIBRATING EQUIPMENT IN THE VECINITY OF THE PIPE. CONCRETE CRADLE ALTERNATE THE CONTRACTOR MAY CHOOSE TO ELIMINATE THE CONCRETE CRADLE AND USE COMPACTED BACKFILL. IF THE CONCRETE CRADLE IS NOT USED THE COMPACTED BACKFILL MUST BE PLACED PER THE GEOTECHNICAL ENGINER'S RECOMMENDATIONS. 50 0 25 50 100 SCALE: 1"=50' PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION co iLo ti au N ° z -I O W U � o = =U .� U a 0 CC Z �� oM U 00 Lo� o O J W m , �m a a) z U J I� ViwLr) Z Z I , O Q N ,~-n C7 z w z Z) d H Lu LT) Lu v k-i w or Q(70 Z O w w O z0 Y < LL O w Q U K z Z LL a o > o w a g o d z u z z a0 0 O 0 3:0 ¢ Z z z L) z O z 0 z a¢ z a z a a In o LL � LL LL LL o a m w d a a o d 0 LL � VI F ZVI ✓1 ✓1 _ X Z Z z Z Z Z O O O O O - w w w w a w l0 N 1.0 O 1.0 M -i Ln Ln 1.0 0 0 0 0 0 0 0 rq rq rq rq N N N N N N N 0000000 ci N M Ln lD n z w w Lu J zo z Q z W Oz F- �0 J o w U Y z0 < N LL- L°I°°I D z O O cn U PROJECT NO: DESIGN BY: JPE DRAWN BY: JPE SCALE: 1"=50' DATE: 01/26/2021 SHEET NO: PD1.1