HomeMy WebLinkAboutNC0023001_Compliance Evaluation Inspection_20210623 (2)DocuSign Envelope ID: 3B24A50A-C889-42D3-A6A3-D2CE19E74622
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction
1 IN
21IIIIII
Code NPDES yr/mo/day Inspection
I 2 IL I 3 I NC0023001 111 121 21/06/17 117
Type
1810I
IIIIIIIIIII
Inspector Fac Type
19I S I 2011
IIIIIIIIIIIIIIIIII I IIIIII
P6
Inspection
671
Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
I 7° I I 711 1 72 I N I 73I 1 74 71
I I
I I I I I I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Bear Paw WWTP
Lower Hiwassee Dam Rd
Murphy NC 28906
Entry Time/Date
10:OOAM 21/06/17
Permit Effective Date
17/09/01
Exit Time/Date
12:OOPM 21/06/17
Permit Expiration Date
22/08/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Phillip K Murphy/ORC/828-644-5066/
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Phillip Murphy,PO Box 240908 Charlotte NC 282240908//704-525-7990/7045258174
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Flow Measurement Operations & Maintenar Facility Site Review Effluent/Receiving Wate
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)
Timothy
and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
H Heim DWR/ARO WQ/828-296-4665/ 6/22/2021
Docu•SJigned b�yL:
K101{u1 C1t,uN4
'-08281105A3CA418...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
Sg d by
6/22/2021
R
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
DocuSign Envelope ID: 3B24A50A-C889-42D3-A6A3-D2CE19E74622
31
NPDES yr/mo/day
NC0023001 111 121 21/06/17
117
Inspection Type
18LI
(Cont.)
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Tim Heim of the Asheville Regional Office performed a Compliance Evaluation Inspection on June 17,
2021. Philip Murphy (ORC) was present at the time of the inspection.
The system is aging, but appeared well maintained and operated at the time of the inspection, and
record keeping appeared thorough and up to date.
The ORC reported that although flows have increased slightly due to increased occupancy from
COVID, this has not impacted the facility's ability to maintain compliance the permit.
The weirs were leveled following the last inspection in 2017 and are still in good operating condition.
Page# 2
DocuSign Envelope ID: 3B24A50A-C889-42D3-A6A3-D2CE19E74622
Permit: NC0023001
Inspection Date: 06/17/2021
Owner - Facility: Bear Paw WWTP
Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable II ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Bar Screens
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment:
Yes No NA NE
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots? • ❑ ❑ ❑
Are surface aerators and mixers operational? • ❑ ❑ ❑
Are the diffusers operational? • ❑ ❑ ❑
Is the foam the proper color for the treatment process? • ❑ ❑ ❑
Does the foam cover less than 25% of the basin's surface? • ❑ ❑ ❑
Is the DO level acceptable? ❑ ❑ ❑ •
Is the DO level acceptable?(1.0 to 3.0 mg/I) ❑ ❑ ❑ •
Comment:
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
▪ ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
Page# 3
DocuSign Envelope ID: 3B24A50A-C889-42D3-A6A3-D2CE19E74622
Permit: NC0023001
Inspection Date: 06/17/2021
Owner - Facility: Bear Paw WWTP
Inspection Type: Compliance Evaluation
Secondary Clarifier Yes No NA NE
Is scum removal adequate? • ❑ ❑ ❑
Is the site free of excessive floating sludge? • ❑ ❑ ❑
Is the drive unit operational? ❑ El • El
Is the return rate acceptable (low turbulence)? • ❑ ❑ ❑
Is the overflow clear of excessive solids/pin floc? • ❑ ❑ ❑
Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) • ❑ ❑ ❑
Comment: The weirs were leveled following the last inspection in 2017 and are still in good
operating condition.
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Yes No NA NE
• ❑ ❑ ❑
Comment: The effluent pipe is not visible and is either under water or covered by the bank.
Page# 4