Loading...
HomeMy WebLinkAboutNCC213731_ESC Approval Submitted (2)_20210623ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality June 9, 2021 LETTER OF APPROVAL WITH MODIFICATIONS TWP PCP San Retail, LLC Attn: Matt Widmaier, agent 445 Bishop Street NW Atlanta, GA 30318 RE: Project Name: HWY 55 Acres Approved: 1.26 Project ID: LEE-2021-033 County: Lee City: Sanford Address: S. Horner Blvd. River Basin: Cape Fear Stream Classification: other Submitted By: Commercial Site Design, Brian Soltz Date Received by LQS: May 11, 2021 (complete) Plan Type: Commercial/New Dear Mr. Widmaier: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the eNOI form to Annette Lucas at Annette.Lucas(cr�,ncdenr.gov or Paul D_E Q'1 North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 Letter of Approval with Modifications TWP PCP San Retail, LLC June 9, 2021 Page 2 of 5 Clark at Paul.Clarkkncdenr. og_v. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.l(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Rev. 05222020 Letter of Approval with Modifications TWP PCP San Retail, LLC June 9, 2021 Page 3 of 5 Sincerely, &V L-::-O- Dylan Reinhardt Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Regional Office file Commercial Site Design, Brian Soltz (soltzkcsitedesign.com) Rev. 05222020 Letter of Approval with Modifications TWP PCP San Retail, LLC June 9, 2021 Page 4of5 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: HWY 55 Project ID: LEE-2021-033 County: Lee 1. Add the following statement to the construction sequence: "Erosion and Sediment Control (E&SC) permit and a Certificate of Coverage (COC) must be obtained before any land disturbing activities occur." The COC can be obtained by filling out the electronic Notice of Intent (e-NOI) form at deq.nc.gov/NCGOL Please note, the e-NOI form may only be filled out once the plans have been approved. A copy of the E&SC permit, the COC, and a hard copy of the plan must be kept on site, preferably in a permits box, and accessible during inspection. 2. Add a requirement to the construction sequence to contact the DEMLR Raleigh Regional Office at least 48 hours prior to commencing the land -disturbing activity. The contact number is (919) 791-4200. (15A NCAC 04B .106(b)) 3. Add the following statement to the construction sequence: "Per the NPDES Permit, ground stabilization will be applied within 14 calendar days from last land disturbing activity. For steep slopes, that area must be stabilized within 7 calendar days." (15A NCAC 04B .0106, NCGO1 Part II Section E (1)) 4. Add the following statement to the construction sequence: "Permanent groundcover shall be established in 90 calendar days. However, NPDES groundcover requirements take precedence." (GS 113A-57(2),15A NCAC 0413.0107, NCGO1 Part II Section E(2) 5. Add the following statement to the construction sequence, "Per NPDES requirements, a rain gauge, self -inspections records, permit, Certificate of Coverage, and S&E plan are required to be maintained on site and accessible during inspection. It is recommended that these items be placed in a permits box at the beginning or entrance of project." (NCGO1 Part III Sections A and B, 15A NCAC 04B .0131) 6. Add the following statement to the construction sequence: "Self -inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and within 24 hours of every rain event of greater than 1 inch. Any needed repairs shall be made immediately to maintain measures as designed. All ESC measures shall be maintained as specified in the construction details on this plan. A rain gauge shall be installed at the project site for monitoring." Rev. 05222020 Letter of Approval with Modifications TWP PCP San Retail, LLC June 9, 2021 Page 5 of 5 7. Self -inspection forms were updated on 07/01/2020. Please ensure new version of forms is used. (GS 113A-54.1 (e), 15A NCAC 0413.0131, NCGO1 Part III Sections A and B) 8. Add the following statement to the construction sequence, "When the project is complete, the permittee shall contact DEMLR to close out the E&SC Plan." After DEMLR informs the permittee of the project close out, via inspection report, the permittee shall visit deq.nc.gov/NCGO1 to submit an electronic Notice of Termination (e-NOT). A $100 annual general permit fee will be charged until the e-NOT has been filled out. 9. The NCG01 Ground Stabilization and Materials Handling Plan Sheet and NCG01 Inspection, Recordkeeping, and Reporting Plan Sheet must be added to the plans. A pdf and an AutoCAD version are located at deq.nc.gov/NCGOL 10. Provide copies of access/encroachment agreements from NCDOT and other public or private party entities. (GS 113A-54.I(a)) 11. Provide two copies of the plan set (one full-size and one half-size (or 11"x17" )), showing the modifications required for approval. To facilitate DEMLR review, bubble, highlight, or otherwise identify the changes to your resubmittal. Provide one copy of additional items (such as design calculations). Provide a cover letter referencing the project name, project ID, and purpose for submittal. (G.S. 113A-57(4)) Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities Rev. 05222020