HomeMy WebLinkAboutSW5210603_Plansheet - Misc. Detail_20210622 (9)PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. IJ_1:ir11 SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the tmeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment e Within 24 hours, an oral or electronic notification. deposition in a e Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and a Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated e Within 24 hours, an oral or electronic notification. bypasses [40 CFR . Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance . Within 24 hours, an oral or electronic notification. with the conditions . Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(I)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 00LO orn �;_0 XI O mL0 . N n Lb N w Z O 0 Z W~ w w WV) Z00 oLQ • �(0 Z N = U Z Z �_J J Wa' () w= z 0000 O y z w w Z Z w U) Y U O H BLN=C-1874 N I J LO a/ V' v 00 Ln Z v� 0- �l T� V y V Z v C A R "0� =per�oFESS/4..��''�, Q � SEAL 19843 ''1�1CNAEL ... S We 6-3--21 NCO01 NOTES REVISIONS FILE NO. 2021-019 HORZ. SCALE: 1" = 50' VERT. SCALE: 1" = 5 D-03 LET ME GET YOU SOMETHING TO EAT, SO YOU CAN BE REFRESHED AND THEN GO ON YOUR WAY...... GENESIS 18:5