HomeMy WebLinkAboutSW5210603_Plansheet - Misc. Detail_20210622EROSION AND SEDIMENTATION CONTROL NARRATIVE
PROJECT DESCRIPTION
The purpose of this project is for the construction of a Gas Station.
The project Is owned by Herritage, LLC. The site is currently vacant.
Approximately 4.92 acres will be disturbed during construction.
The pro1'ect is scheduled to begin construction in Summer 2021 with project completion and final
stabilization by Winter 2021. The erosion and sediment control program for this project will include
the installation of a suitable construction entrance, silt fence, inlet protection with seeding.
ADJACENT PROPERTY
The adjacent property is vacant.
SOILS
The soil at this site is a sandy clay.
EROSION AND SEDIMENT CONTROL MEASURES
All vegetative and structural erosion and sediment control practices shall be constructed and
maintained by the contractor according to these plans and specifications and the minimum
standards of the Dept. of Environmental Management, Land Quality Section and Town of
Spring Hope. The contractor shall also follow any additional requirements as outlined by the Project
Engineer.
Structural Practices
1. Vehicle wheels shall be clean when leaving the site to prevent the tracking of mud on paved
roads.
2. Construction Road Stabilization: Construction traffic shall be limited to stabilized areas. At a
minimum, a temporary gravel construction entrance shall be provided as shown on this
drawing.
3. Silt Fence: Silt fences shall be provided where shown and as needed on the site Ian. These
barriers shall be used to contain sediment. P
4. Rip Rap/Gravel Filter Sediment Basins: Construct basin to the shape and dimensions shown in
the details. The basin is to be placed below the existing ditch flow line by 2' with the berm built
above as dimensioned.
Vegetative Practices (Ground Stabilization)
Site Area Description:
Stabilization Time Frame:
Stabilization Time Frame Exceptions:
Perimeter dikes, swales,
ditches & slopes.
7 Days
None
High Quality Water (HQW)
Zones.
7 Days
None
Slope steeper than 3:1
7 Days
None
Slopes 3:1 or flatter.
10 Days
7 Days for slopes greater than 50 feet
in length.
Seeding Schedule
Ongoing Activity Land left exposed shall be planted or otherwise provided with temporary ground cover, devices, or
structures sufficient to restrain erosion within the applicable time period after completetion of any phase of grading or
period of inactivity as follows. seven (7) days for steep slope or inclination. Ten (10) days for a moderate slope,
fourteen (14) days for land with no slope or inclinination. For purposes of this section, a moderate slope means an
inclined area, the inclination oif which is less than or equal to three (3) units of horizontal distance to one (1) unit of
vertical distance, and a steep slope means an inclined area, the inclination of which is greater than three (3) units of
horizontal distance to one (1) unit of vertical distance. No other criteria apply.
Completed Activity. For any area of land -disturbing activity where grading activities have been completed, temporary or
permanent ground cover sufficient to restrain erosion shall be provided as soon as practicable, but in no case later than
seven (7) days after completetion of grading.
Management Strategies
1. Perimeter measures are to be installed prior to grubbing or grading.
2. Tail Ditches shall be stabilized immediately following their construction. As an alternate, rock
check dams may be provided at their outlets and/or the terminal downstream end of
disturbance until ground cover is implemented.
3. Stockpile and/or waste areas must be maintained within the limits of the areas protected by the
proposed measures and otherwise temporarily seeded if to be left stockpiled over 15 days.
4. Construction shall be planned so that grading operations can begin and end as quickly as
ppossible.
5. Silt Fences shall also be installed prior to or as a first step in construction.
6. The Contractor shall be responsible for the installation and maintenance of all erosion and
sediment control practices.
Vegetative Ground Cover
Immediately following grading, all areas shall receive either permanent or temporary seeding, as
applicable, as follows:
TEMPORARY SEEDING SPECIFICATIONS
BETWEEN MAY 1 AND AUGUST 15, ADD 40 LB/ACRE GERMAN MILLET. PRIOR TO MAY 1 OR AFTER AUGUST 15, ADD
120 LB/ACRE RYE (GRAIN).
FALL IS BEST FOR TALL FESCUE AND LATE WINTER FOR LESPEDEZAS. OVERSEEDING OF KOBE LESPEDEZAS OVER
THE FALL SEEDED TALL FESCUE IS VERY EFFECTIVE. USE UNHULLED BERMUDAGRASS SEED IN FALL.
SOIL AMENDMENTS
APPLY LIME AND FERTILIZER ACCORDING TO TESTS, OR APPLY 2,000 LB/ACRE GROUND AGRICULTURE LIMESTONE
AND 750 LB/ACRE 10-10-10 FERTILIZER
MULCH
APPLY 4,000 LB/ACRE GRAIN STRAW, OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL.
ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING OR NETTING. NETTING IS THE PREFERRED ANCHORING
METHOD ON STEEP SLOPES.
MAINTENANCE
REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY
FOLLOWING EROSION OR OTHER DAMAGE.
PERMANENT SEEDING SPECIFICATIONS
FESCUE - 200 Lbs./Ac.
CENTIPEDE - 20 Lbs./Ac.
SOIL AMENDMENTS
APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST.
MAINTENANCE
IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE THE SECOND YEAR. ACCORDING TO SOIL TESTS OR
TOPDRESS WITH 500 LB/ACRE 10-10-10 FERTILIZER. MOW AS NEEDED.
REPLACE, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY.
Maintenance
1. Reseed and mulch bare spots larger than 9 square feet (limited to 5% maximum of site area.)
2. Maintain all seeded areas until uniform stand Is acceptable.
3. If growth is not established by final project inspection, continue specified attention until the
stand is acceptable.
4. Correct and repair all undue settling and erosion within 1 year after final inspection.
5. Remove from the site, all erosion control structures after complete stabilization at end of
construction period.
6. Remove silt from sediment pits and from behind check dams when silt is within half depth of
the pit or spillway. Dispose of in an area where silt cannot re-enter pit / trap.
Calculations
The practice utilized for the proposed site did require formal calculations. Calculations have
been provided.
OWNER
Herritage, LLC Chester Brantley, et al
PO Box 277 PO Box 697
Kinston NC 28502 Spring Hoe NC 27882
> P 9 Hope,
1-800-336-9921 252-904-3429
Maintenance Notes:
1. Follow chart for timelines of when to apply temporary seeding.
2. Maintain all erosion control measures daily and reseed disturbed areas as needed.
3. Inspect all erosion control measures weekly and after each rainfall event. Repair as needed
COMSTBUCT/ONENTRANCE
NOT TO SCALE
CONSTRUCTION SPECIFICATIONS:
1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION ROOTS AND OTHER OBJECTIONABLE MATERIAL
AND PROPERLY GRADE IT
2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH /T.
J. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET.
4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO
SEEPAGE OR HIGH WATER TABLE.
MAINTENANCE.•
MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION
SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY
STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL
OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS.
PIPE OUTLET TO FLAT AREA
NO WELL-DEFINED CHANNEL
n
l
� T
� a
PLAN VIEW
77
�La�
a
FILTER BLANKET II
OR (MIRAFI 140N) SECTION A -A
PIPE OUTLET TO FLAT AREA
NO WELL-DEFINED CHANNEL
I^ La
FILTER BLANKET
OR (MIRAFI 140N) SECTION A -A
PIPE OUTLET TO
WELL-DEFINED CHANNEL
GENERAL NOTES:
1. La = THE LENGTH OF THE RIP RAP APRON.
2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6".
J.IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS
TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE
TOP OF THE BANK, WHICHEVER IS LESS.
4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE
RIP RAP AND SOIL FOUNDATION.
5. FLARED END SECTION IS OPTIONAL. SEE PLANS FOR REQUIREMENT.
6. SEE PLAN AND PROFILES FOR ACTUAL DIMENSIONS.
MAINTENANCE.•
INSPECT RIP RAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (I INCH OR GREATER) RAINFALL
EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIP RAP HAS TAKEN PLACE, OR IF STONES HAVE
BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE.
PIPE OUTLET PROTECTION
SCALE: N.T.S.
CONSTRUCTION SEQUENCE
STAKE
10 MIL
LINING
STAPLE (2 PER BALE) SILT FENCE
10 MIL PLASTIC LINING STRAW BALE
METAL STAKE (2 PER BALE)
PLYWOOD PAINTED WHITE
BLACK LETTERS 6" TALL
CONCRETE
WASHOUT WOOD POST
T f GROUND LEVEL
CONSTRUCTION SPECIFICATIONS.•
1. CONCRETE WASHOUT SIGN SHALL BE INSTALLED NO FURTHER THAN 25' FROM THE
FACILITY AND SHALL BE VISIBLE TO ALL CONSTRUCTION TRAFFIC.
2. POLYETHYLENE SHEETING SHALL BE 10 MILS FREE OF HOLES, TEARS, OR LEAKS.
MAINTENANCE.•
FACILITY SHALL NOT BE FILLED MORE THAN 12" FROM THE TOP BEFORE DISPOSING OF
CONCRETE CONCRETE SHALL BE DISPOSED OF IN THE SAME MANNER AS OTHER
NON-HAZORDOUS MATERIALS FROM THE SITE OR MAY BE BROKEN UP AND USED AS
FILL IN NON-STRUCTURAL AREAS.
CONCRETETRf1ffW.Uff,,Wr
NOT TO SCALE
0, 4hKA9,EC11%M L
NOT TO SCALE
CAM
GENERAL NOTES:
1. NCDOT DITCH SIDE SLOPES TO BE 4:1 OR GREATER.
2. DEPTH TO BE 18" MINIMUM. SEE GRADING PLAN FOR INDIVIDUAL CHANNEL
SLOPE AND DEPTH SPECIFICATIONS.
3. AFTER INSTALLING, APPLY SEED, AND TACK WITH IRS OR CRS LIQUID
EMULSIFIED ASPHALT AT A RATE EQUAL TO 10 GAL. PER 1000 S.F.
COVER W/EXCELSIOR MATTING. SEE EXCELSIOR MATTING DETAIL FOR
SPECIFICATIONS AND MAINTENANCE REQUIREMENTS.
# 57 WASHED STONE
PLACED TO A HEIGHT
OF 12"-18" MINIMUM
ABOVE TOPOF BOX
Q-.000.V% mo...
1. Schedule and hold a pre -construction conference prior to beginning any land -disturbing activities. This conference should be
attended by a representative of the financially responsible party and/or the general contractor, grading sub -contractor, erosion control
sub -contractor and the Engineer.
2. Erosion and Sediment Control (E&SC) permit and a Certificate of Coverage (COC) must be obtained before and land disturbing
activities occur. The COC can be obtained by filling out the electronic Notice of Intent (e-NOI) form at deq.nc.gov/NCGO1. Please note,
the e-NOT form may only be filled out once the plans have been approved. A copy of the E&SC permit, the COC, and a hard copy of the
plan must be kept on site, preferably in a permits box, and accessible during inspection.
J. Per NPDES requirements, a rain gauge, self -inspections records, permit, Certificate of Coverage, and S&E plan are required to be
maintained on site and accessible during inspection. It is recommended that these items be placed in a permits box at the beginning or
entrance of project.
4. The contractor shall conduct self -inspections of the erosion and sedimentation control measures and compete the following combined
self -inspection form found on the DEMLR website https: Llfiles.nc.gov ncdecl Energy72OMineral720and72OLand720Resources/StormwaterZ
NPDES72OGenerol72OPermits/DEMLR-CSW-Monitoring-Form-Rev-August-8-2019.pdf . Twelve months of complete inspection forms shall be kept
on -site and available for inspection at all times. It is recommended a copy be kept in a permits box.
5. Self -inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and within
24 hours of every rain event of greater than 1 inch. Any needed repairs shall be made immediately to maintain measures as designed. All
ESC measures shall be maintained as specified in the construction details on this plan. A rain gauge shall be installed at the project site for
monitoring.
6. Contact the DEMLR Raleigh Regional Office at least 48 hours prior to commencing the land disturbing activity. The DEMLR Raleigh
Regional Office can be reached at (919) 791-4200.
7. Install construction egress/exit, silt fencing with outlets, skimmer sediment basins, and other initial erosion control measures as specified
in the plan. Remove only trees and ground cover necessary to install these devices.
8. Notify the NC DEQ site inspector after measures have been installed and project has started.
9. Begin demolition, clearing, grubbing and grading of site in accordance with the approved S&E control plan. Install temporary diversions
with excelsior matting.
10. Provide all disturbed areas with round cover as per round stabilization table or after completion of an phase of clearing, grubbing or
9 P 9 P y P 9� 9 9
grading. The seeding, seedbed preparation, mulch and/or rolled erosion control product installation must be in accordance with the seeding
schedule provided in this S&E plan. Per the NPDES Permit, ground stabilization will be applied within 14 calendar days from last land
disturbing activity. For steep slopes, that area must be stabilized within 7 calendar days.
11. Start installation of storm drain system beginning with outlet pipe and working uphill toward DI #3. Install inlet and outlet protections for
storm drain system immediately after pipe installation.
12. At the conclusion of grading or if land -disturbing activity is stopped temporary or permanent vegetative cover shall be installed in
accordance with ground stabilization table. Include excelsior matting as shown on plan. Permanent groundcover shall be established in 90
calendar days. However, NPDES groundcover requirements take precedence.
13. Perimeter measures must be left in place until all upland areas are permanently stabilized. After site is permanently stabilized, remove
all temporary erosion control measures and provide permanent seeding where temporary measures have been removed and ground cover is not
adequate. Sediment basins may not be removed or converted to permanent BMPs until all upland areas are permanently stabilized.
14. When DEMLR has approved removal of E&SC measures, remove sediment basins using dewatering silt bag. (See Detail)
15. When the project is complete, the permittee shall contact DEMLR to close out the E&SC Plan. After DEMLR informs the permittee of
the project close out, via inspection report, the permittee shall visit deq.nc.gov/NCGO1 to submit an electronic Notice of Termination (e-NOT).
A $'100 annual general permit fee will be charged until the e-NOT has been filled out.
16. Remaining measures must be removed and resulting bare areas stabilized before permit can be closed.
17. Remove all erosion control measures after the NC DEQ office approval of permanent stabilization.
GENERAL NOTES:
1. All Stockpile
areas shall be a minimum
of 100' away from surface waters and inside the perimeter EC Measures.
2. All Concrete
Washout areas shall be a
minimum of 100' away from surface
waters and inside the perimeter EC Measures.
3. If an offsite
soil spoil or borrow site is
utilized, then the disturbed area for
the spoil/borrow site must be included in the
land -disturbance plan and permit unless the spoil/borrow site already has
a land -disturbance permit.
S1VrFAF&CF
NOT TO SCALE
MIRAFI 10OX OR TREWRA S1115
1 r 11-1
11��� III
11°
S/L rFENCE OUTLET
NOT TO SCALE
12" OF #57 SILT FENCE
WASHED STONE
STANDARD METAL POSTS 2'-0" IN GROUND
GALVANIZED HARDWARE WIRE
EXTENDS TO TOP OF BOX
CONS TRUC PON SPECIFI CA TIONS:
1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD OR EXTRA STRENGTH
SYNTHETIC FILTER FABRICS.
2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24
INCHES ABOVE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF
WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE).
J. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE
LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY,
SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET
MINIMUM OVERLAP TO THE NEXT POST.
4. SUPPORT STANDARD FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO
THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE
BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON
THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLAS77C ZIP 77ES SHOULD
HAVE MINIMUM 50 POUND TENSILE STRENGTH.
5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF
8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE
GROUND A MINIMUM OF 24 INCHES.
6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT
REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN 7HE FILTER FABRIC
DIREC7ZY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50
POUND ]ENSILE STRENGTH.
Z EXCAVATE A TRENCH APPROXIMA TEL Y 4 INCHES WIDE AND 8 INCHES DEEP
ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM 7HE BARRIER.
8. PLACE 12 INCHES OF 7HE FABRIC ALONG 7HE BOTTOM AND SIDE OF THE
TRENCH.
9. BACKFILL 7HE TRENCH WIN SOIL PLACED OVER 7HE FILTER FABRIC AND
COMPACT. THOROUGH COMPACTION OF 7HE BACKFILL IS CRI77CAL TO SILT FENCE
PERFORMANCE.
10. DO NOT ATTACH FILTER FABRIC TO EXIS77NG TREES
"'Rir' MAIN TENANCE:
INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL.
- m MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD 7HE FABRIC OF A
SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE,
REPLACE IT PROMP7ZY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE
ADEQUA7E STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE
ON THE FENCE. TAKE CARE TO AVOID UNDERMINING 7HE FENCE DURING
CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS
AND BRING 7HE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING
DRAINAGE AREA HAS BEEN PROPERLY STABILIZED.
1'-8" MIN. SEE PLAN
CLASS B
EROSION CONTROL
STONE
2:1
�I
2' MIN. f
s
FILTER
` FABRIC
SILT FENCE SILT FENCE
r�
CROSS SECT ION
TOP VIEW
F RONT V IE%
CONS TRUC TION SPECS:
1. CLEAR & GRUB THE AREA AROUND THE SILT FENCE
OUTLET AND PROPERLY DISPOSE OF DEBRIS.
2. PLACE GRAVEL TO THE SPECIFIC GRADE AS SHOWN
PER THE DETAIL.
J. PROPERLY OVERLAP STONE BEYOND EDGES OF SILT
FENCE OPENING.
MAIN TENANCE.'
INSPECT OUTLETS WEEKLY AND AFTER EACH RAIN EVENT.
IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA
AND REPAIR AS NEEDED. CAREFULLY CHECK OUTLETS
FOR EROSION AND REPAIR IMMEDIA TEL Y. ENSURE THERE
IS NO SCOURING APPARENT DOWNSTREAM OF OUTLET
IMMEDIA TEL Y STABILIZE ANY AREAS THAT NEED REPAIR.
MAINTENANCE.- 6' TYP. DIMENSIONS OF TEMPORARY DIVERSION (GRASSED)
INSPECT THE BARRIER AFTER EACH RAIN AND MAKE REPAIRS AS NEEDED.
REMOVE SEDIMENT AS NECESSRY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SIDE SLOPES = 2:1
SUBSEQUENT RAINS WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN DEPTH = 2'
ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL, AND
EITHER SALVAGE OR DISPOSE OF IT PROPERLY. BRING THE DISTURBED AREA TO SLOPE = 0.50% MIN. (SPECIFIED BY GRADE)
PROPER GRADE, THEN SMOOTH AND COMPACT IT. APPROPRIATELY STABILIZE ALL
�O(i
BARE AREAS AROUND THE INLETo
H14,AO 4/RECLOT/f/& CONSTRUCTION SPECIFICATIONS:
o 1 REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER
ORA!/EL /NLETPROTECT/ON OBJECTIONABLE MATERIAL.
2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN
NOT TO SCALE REQUIREMENTS.
3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN
ELEVATION PLUS THE SPECIFIED SETTLEMENT.
4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND
CLEANOUT.
5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE
LESS THAN 30 WORKING DAYS.
MAINTENANCE:
INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY
REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY
CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS
PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE
NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT.
TE/19POWYAMERS/01
Installation and Use:
1. Place Dewatering Bag on the ground or on a trailer over a relatively level,
stabilized area.
2. Insert discharge pipe a minimum of 5ft. inside dewatering bag and secure
with a rope wrapped 6 times around the snout over a 6 inch width of the
bag.
3. Replace Dewatering Bag when half full of sediment or when the sediment
has reduced the flow rate of the pump discharge to an impractical amount.
Maintenance and Disposal:
1. Remove and dispose of accumulated sediment away from waterways or
environmentally sensitive areas. Slit open Sediment Bag and remove
accumulated sediment. Dispose of bag at an appropriate recycling or solid
waste facility. OR; as directed by engineer or inspector.
LET ME GET YOU SOMETHING TO EAT, SO YOU CAN BE REFRESHED AND THEN GO ON YOUR WAY...... GENESIS 18:5
DEWATERING BAG
SCALE: N.T.S.
NOT TO SCALE
ExcE1sioAAarriac
NOT TO SCALE
0
0
FLOW
TURNDOWN NETTING
MINIMUM BURY 6" AND
STAPLE EVERY 1 FT, JUST
BELOW ANCHOR SLOT.
FLOW
OVERLAP NETTING
-
MINIMUM OVERLAP 18"
�oI
AND STAPLING EVERY
18"
1 FT THROUGH BOTH
LAYERS.
A
L STAPLE
USE �6 GAUGE WIRE
USE
o
I
•
�00
xl
O
m lt
oN
. N
LO
W N
w
Z
O
D-
0
0
cj
Z_
D-
w
W
z_
Zz
w
U)
Y
0
O
W
WV
z
u7
0
00
Z N
= U
3::z
Z�w
U) J
Ww=
SV)
000 z
BLN=C-1874
N
Iec
J
' n� O
�..i/
■
L v
06
O
L / Z
vLJJ
V
v
C AR O
Q l
SEAL
19843
CNAEL
- 6 3 - 21
GENERAL NOTES.
EROSION
1. Apply seed, and tack with rs or crs liquid emulsified asphalt at o
CONTROL DETAILS
rate equal to 10 gal. per 1000 s. f. Cover w/excelsior matting.
2. Staple every 24" along perimeter edges and overlaps. Staple every
REVISIONS
36" to 48" randomly to secure netting.
J. Roll out netting in the direction of water flow. Do not stretch.
MAINTENANCE.'
1. Inspect rolled Excelsior matting at least weekly and after each
significant (�" or greater) rain fall event and repair immediately.
2. Good contact with the ground must be maintained, and erosion
must not occur beneath the matting.
J. Any areas of the matting that are damaged or not in close contact
with the ground shall be repaired and stapled.
FILE No. 2021-o1s
4. if erosion occurs due to poorly controlled drainage, the problem
HORZ. SCALE: 1" = 50'
shall be fixed and the eroded area protected.
VERT. SCALE: 1" = 5'
5. Monitor and repair the matting as necessary until groundcover is
established.
D-01