HomeMy WebLinkAbout20110424 Ver 4_R-4416_roadside stream UT Muskrat Branch_monitoring 2021_20210623SAW 2011-01145, DWQ 2011-0424v4 - US 64 Clay County Climbing Lane
(Project Complete – 5 year visual monitoring requirement)
Site 2 Oct 2016 before construction
Site 2 June 2018 after construction in April 2018 – channel relocated, and rock steps added.
1st year photo July 2019. Channel stable - no appreciable instability
2nd year photo (Site was surveyed however photo documentation lost with camera)
3rd year photo – March 2021 – channel stable