HomeMy WebLinkAbout20121049 Ver 1_Staff Comments_20130516Strickland, Bev
From: Lucas, Annette
Sent: Thursday, May 16, 2013 2:09 PM
To: Homewood, Sue
Cc: Strickland, Bev
Subject: 12 -1049 Honda Connector Road — TAKE 2
Attachments: 12 -1049 Honda Connector Road TAKE 2.docx
Sorry Sue —
I misunderstood how they were using the proposed dry detention pond. I initially thought it was in line with the
proposed sand filter (great design). However, it is actually a stand -alone device to treat the entire 23.7 ac MRO Facility
portion of the site (not acceptable). So it is another hold letter, not an approval as we'd both hoped. I think they may
have an option to do infiltration though in the same footprint (much like the Ashley site).
Thanks,
Annette
Annette M. Lucas, PE
Environmental Engineer
NCDENR I DWQ I Wetlands and Stormwater Branch
1650 Mail Service Center, Raleigh, NC 27699 -1650 (.N`la.i.l.)
512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (Location &, Parcels)
Phone: (919) 807 -6381 1 Fax: (919) 807 -6494 1 Email: l nnetLe.1 -u as'(rLL(- Uicnr.��t-ry
Website: http: / /portal.ncdenr.org /web /wq /swp /ws /401
Before printing this email, please consider your budget and the environment.
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
12 -1049 Honda Connector Road —TAKE 2
AML comments
May 16, 2013
The proposed dry detention pond for the MRO Facility portion of the project is not sufficient to
meet the stormwater standard of 85% TSS removal required per GC 3886/3890. Please provide
a stormwater management plan that removes 85% of the TSS from the entire MRO site. The
DWQ highly recommends that you contact Annette Lucas DWQ at (919) 807 -6381 to discuss the
options available for treating stormwater on the MRO portion of the site.