Loading...
HomeMy WebLinkAbout20211018 Ver 1_I-5972_Permit Drawings_BUFFER_20210602_20210621-RPA- -L- -RPA- -L- TO US 70 (SR 1007) TO BROGDEN RD. TO RALE IGH -Y1- Sta. 37+94.08 END BRIDGE ENGLISH ENGLISH SITE 4B SITE 4A SHEET 1 OF 5 BUFFER DRAWING 7 4 98 6 5 STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 09/08/996/1/2021R:\Hydraulics\PERMITS_Environmental\Drawings\I5972_Hyd_tsh_BUFFER .dgnFkeys0 0 0 PROFILE (HORIZONTAL) DESIGN DATAGRAPHIC SCALES PLANS PROFILE (VERTICAL) 0 00 50 25 50 100 50 25 50 100 10 5 10 TYPE OF WORK: LOCATION: 50 MPH 4 % * 55 % 8 % 17,600 13,600 * ( TTST 1% + DUALS 3%)NAD 83/ 95 PROJECT LENGTH SIGNATURE: SIGNATURE: P.E. P.E. HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN ARTMEN N ASO H DEPT O F TRA SPORTTIONTATEOFNRTCAR O LI NANC LICENSE NO. F-0112 RALEIGH, NORTH CAROLINA 27609 900 RIDGEFIELD DRIVE, SUITE 350 RUMMEL, KLEPPER & KAHL, LLP DEPARTMENT OF TRANSPORTATION FOR NORTH CAROLINA PREPARED IN THE OFFICE OF: NCDOT CONTACT: B. KEITH SKINNER, P.E. LETTING DATE: PROJECT ENGINEER PROJECT DESIGN ENGINEER DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA RIGHT OF WAY DATE:CONTRACT: C20399150 V = T = D = K = ADT 2040 = ADT 2017 = DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N.T.S.VICINITY MAP JOHNSTON COUNTY -RPD- -Y2--RPA--RPC--RPB- GRADING, DRAINAGE, PAVING, BRIDGE, I-5972 TIP PROJECT: I-5972CITY LIMITS SMITHFIELD TOWN OF Begin Project End Project 70 BUS 70 BUS 301 301 70 70 BYP 95 College Rd. (SR 2560)Mal l ard Rd. (SR 2507)Stevens Sausage Rd. (SR 2508)Yelverton Church Rd. (SR 2508)Br o g d e n Rd. (SR 1 0 0 7 ) Outlet Center Dr. E Peedin Rd. (SR 2403) SMITHFIELD MICHAEL T. MERRITT, P.E. M ARKET ST. -Y1- US-70 BUS-L- I-95 -L-MALLARD RD. -Y1- Sta. 35+83.00 BEGIN BRIDGE -Y2- Sta. 10+10.00 BEGIN CONSTRUCTION D A B C SIGNING AND SIGNALS RUSSELL BROADWELL, P.E. -L- Sta. 27+94.86 BEGIN CONSTRUCTION -L- Sta. 82+40.82 END CONSTRUCTION 44989.1.1 95 FROM OUTLET CENTER DR. TO WEST OF YELVERTON GROVE RD. CITY LIMITS SMITHFIELD TOW N OF OUTLET CENTER DRIVE LENGTH OF STRUCTURE PROJECT I-5972.......................0.038 mi * LENGTH OF ROADWAY PROJECT I-5972........................0.628 mi * BASED ON -Y1- TOTAL LENGTH OF PROJECT I-5972...............................0.667 mi MALLARD RD. NHP-0095(045)PE R/W, UTILITIES CONST. NHP-0095(045) NHP-0095(045) 44989.2.1 44989.3.1 I-95 I-95 AND US-70 BUSINESS, (E. MARKET STREET), EXIT 95 INTERCHANGE ARTERIAL FUNC. CLASS =MINOR PROJECT ENGINEER DIVISION 4 -Y1- Sta. 21+33.00 BEGIN PROJECT I-5972 BEGIN CONSTRUCTION -Y1- Sta. 56+50.00 END PROJECT I-5972 END CONSTRUCTION CITY LIMITS SMITHFIELD TOWN OF 2018 STANDARD SPECIFICATIONS -Y3- Sta. 23+91.75 END CONSTRUCTION/OVERLAY - PROPOSED SIGNALS -Y3- Sta. 13+50.00 BEGIN CONSTRUCTION/OVERLAY December 14, 2021 1. THIS IS A CONTROLLED-ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. NOTE: -L- -Y1- -RPB--RPA-EXIST. R/W+87.00FENCEOF WW END RELOCATION EXIST. R/W+50.41FENCEOF WW BEGIN RELOCATION 75'+30.00FENCEWW -L- -Y1- -RPB- -RPA- EXIST. R/W+87.00FENCEOF WWEND RELOCATION EXIST. R/W+50.41FENCEOF WWBEGIN RELOCATION 75'+30.00FENCEWW BUFFER IMPACTS CA MERA CAMERA48" W/W 48" W/W SBSTBSTBST24" C&G24" C&GBSTS 48" W/W48" W/ W 48" W/W MT L M TLSS RIP-RAP SWOODS WOODS WOODS WOODS W O O DSWOODS MTL MTL 48" W/W48" W/W 1S B L K B US 1SBLK BUS24" C&G24" C &G5' CONC5' CONC 27' BST50' BST CONC 1SBLK BUS CONCCONCBST 45' BS T3 6" MTLS S 19' BSTBLKI SBLK BUSCARPORTCONC24" C&G72" VINYL4' CONC48" VIN YL48" VINYLS PL AY GR OU NDWOO DS S 48" W/W 48" W/ W 48" W/W CONC6" CURB6" CURB 6" CURB6" CURB6" CURB 6" CURB6" CURB 6" CURB6" CURB 4' CONC 7 2" CHLBS T2 1' BS TS 6" CURBCONC ISLCONCP ORTCAR-5' CONC2SBLK BUS2SBLK BUS1SBLK BUS 2 S BLK BUS 30 " C&G 30 " C&G 16' BST 30" C&G 30" C&G 84" C H L 84" CHLMTLMT LMT L MTL MTL MTL MTLMTL MTL MTL MTL MTL MTL MTL MTL MTL 24" C&G CONC 9 6" CHLS S LP TANKCONCGR10' GR 10' GRS BST BS T BST 6" CURBCONC CONCCONC4' CONC CONCCONC3 6 " BLKCANOP YMTL6" CURB WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS C O N C C O N C S EQUITY DR VAR BSTBS T C O NC ISL ISL C O NC CONC ISL C O NC ISL CONC ISL C O N C ISLCONC IS L CONC ISL ISL C O N C CONC I SLISLCONC CONC ISL 36" C & G 36" C & G 36" C & G 36" C & G 30" C&G30" C&G30 " C&G30" C&G3 0" C&G30" C&G3 0" C&G3 0" C&G3 0" C&G3 0" C&GON RAMP TO I-95 ON RAMP TO I-95 4 8 " CONC4 8 " CONCMWFULL OF SEWAGETOP=147.33' S 8" PVC 10" DIP10" DIP10" PVC10" PVC10" PVC8" P VC6" P VC6" PVC 6" PVC10" PVC10" OUT=139.67' 10" IN=139.70' TOP=148.75' 10" OUT=139.48' 10" IN=139.56' TOP=148.24'. 10" OUT=138.62' 10" IN=138.72' 8" IN=138.82' TOP=150.47' CAMERA GR 48" W/W 48" W/W CONC10" OUT=140.34' 10" IN=140.44' TOP=147.08' 10" OUT=140.80' 8" IN=141.29' 6" IN=141.89' TOP=148.69' GAZEBO WD 8" OUT=142.15' 8" IN=142.19' 6" IN=142.40'-S 6" IN=142.55'-N TOP=148.19' LT S S SFULL OF SEWAGE TOP=148.72' CONC S S SSS S WOODS BST BST BST 1SF BUS CONC FULL OF SEWAGE TOP=147.38' GREASE TRAP BST BST FULL OF SEWAGE TOP=147.66' CONC 8" OUT=142.67' 8" IN=142.72' 6" IN=142.77' TOP=147.47'S BK 8" PVCB S T RI P-RAPRIP-RAP2 4" C&G2 4" C&GRI P-RAPRI P-RAP6" PVC24" BLK TCTTTTVAULTS HHHHHHEM EM EM THHCTTHHHHHHTTTTHHHHHHHHHHHHELEC BOXCVAULTEND OF SI GNALS S S S S S STS2" STEEL2" STEEL2" PLASTI C2 " PLASTIC 2" PLASTIC4 " P L AS T IC 2" PLASTIC2" PLASTI CIRONTS-LPCAB"23 9 8" "70 ER15" "7 0 E2 NNR3" CAB CABBOOSTERB OOS TER6" IRON6" IRON6" IRON6" IRON 6" IRON 6" IR ON 6" IRON 6 " I RON6" IRON6" I RON8" IRON 8" IRON 8" IR O N 8" IRON MOTAPARTHY PROPERTIES, LLC REBECCA L. GUIN50' WETLAND EASEMENTAGREEMENTCROSS ACCESSPB 57 PG 466 10' X 70' S.D. SIGN EASEMENT PB 75 PG 156 5' PO WER EASE ME NT 20' ACCESS EASEMENT 24' ACCESS & UTILITY EASE MENT 10' DRAINAGE & UTILITY EASEMENT10' DRAI NAGE & UTI LI TY EASEMENT10' DRAINAGE & UTILITY EASEMENT10' DRAINAGE & UTILITY EASEMENT 20' DR AIN AGE & UTILITY EASE ME NT 20' DRAINAGE & UTILITY EASEMENT30' DRAINAGE & UTILITY EASEMENT20' DRAINAGE & UTILITY EASE MENT DB 1552 PG 813 DB 1745 PG 673 DB 1105 PG 30 DB 5194 PG 95 DB 2444 PG 534 PB 50 PG 419-420 20' SEWER EASEMENT 20' WATER EASEMENTDRAI NAGE EAS E MENT;; ; 20' UTILITY EASEMENT 20' UTILITY EASEMENT R/W MONEIP EIP R/ W MON R/W MON EIP EIP EIP EIPEIPEIPEIP EIP EIP EIP EIP EIP EIP R/W MON R/W MON EIP EIP NAIL DB 5305 PG 598 PB 88 PG 277 SHRI SAIBABA, LLC DB 3632 PG 843 MARK S. RYAN DB 1948 PG 608 ; ; ;; R/W MON ECM R/W MON R/W MON ; R/W MON R/W MON EIP EIPEIP R/W MON EIP EIP EIP I N R/WEIP 0.25' R/W MON R/W MON EIP EIP EIP EIPEIPEIPEPKEIPEIPEIPR/W MONR/W MONSI GN EASEMENT10' DRAI NAGE & UTI LI TY EASEMENTR/W MONGAZEBO WD B EIP E XIS TIN G R/W150.00' E XISTIN G R/WE XIS TIN G R/WEXISTING R/WEXISTING R/WEXISTING R/W EXISTING R/W R/W MONOUTLET CENTER DR VAR PAVED ROADWAYE XIT R AMP T O US 70 B US VAR P AVE D ROADWAYEXI T RAMP TO US 7 0 BUS 21' PAVED ROADWAYMALLARD RD VAR PAVED ROADWAYRAMP TO I 95 20' PAVED ROADWAY RAMP TO US 70 BUS 20' PAVED ROADWAY U S 70 B U S 34' P A V E D R O AD WA Y US 70 B US V AR P A VE D R O A D WA Y US 70 B US/E MAR KET ST V AR P A VE D R OAD WA Y N EQUITY DR VAR PAVED ROADWAYVENTURE DR VAR PAVED ROADWAY20' PAVED ROADWAY ON RAMP TO I-95 21' PAVED ROADWAY I-95 SBL 39' PAVED ROADWAY I-95 NBL 39' PAVED ROADWAY I-95 SBL 38' PAVED ROADWAY I-95 NBL 39' PAVED ROADWAY 21' PAVED ROADWAY OUTLET CENTER DR VAR PAVED ROADWAYDB 1745 PG 673 REBECCA L. GUIN SMITHFIELD HOTEL INVESTORS LLC DB 5265 PG 549 PB 86 PG 6 ROSELLE BUILDING CO. INC AMBA MATA, LLC DB 5201 PG 802 907 VENTURE DR, LLC DB 5185 PG 371 OLD BROGDEN FARMS II, LLC PB 84 PG 451 DB 5203 PG 650 198 MALLARD INC. DB 5178 PG 843 OLD BROGDEN FARMS, LLC DB 5265 PG 549 PB 86 PG 6 BUILDING CO. INC ROSELLE SMITH NC POOH, LLC DB 5254 PG 565 PB 86 PG 6 PB 75 PG 156 DB 2444 PG 534 PROPERTIES, LLC MOTAPARTHY PARTNERSHIP DANBAR LIMITED CONC.GREAS E TRAP S CONC. CONC. 30"C & G CONC.30"C&G BST L T. v vvv36" RCP WD15" RCPCONC CONC WD 15" R C P C O N C BRID GE N O. 66 COLUMNS BRIDGE COLUMNS BRIDGE COLUMNS BRIDGE 15" RCP15" RCP24" RCP18" RCP18" RCP CONC 30" RCP18" R CP CONC 4 2 " RCP12" CMP15" RCP15" RCP18" R CP TOP =14 8.05'DI I NV=143.93' 3 0 " RCP15" R CP 15" RCP 15" RCP15" RCP 15 " RCP12" OUT=146.6 2'12" CMP15" RCP15" RCP15" R C P I NV=14 5.16' I NV=146.36' I NV=14 6.4 8' 15" RCP 18" RCP CONC CONC CONC 18" RCP24" RCP 24" RCP2 4" RCP18" CMP 18" CMP 18" CMP 18" CMP 18" RCP 15" RCP15" RCP 15" RCP15" RCP15" RCP15" RCP15" RCP 15" RCP4 2 " RCP 18" R C P18" RCP 4 2 " RCP 4 2" R C P 4 2 " RCP 15" RCP15" RCP3 6 " RCP 15" RCP15" RCPINV=143.74' TOP=149.95' 24" RCP INV=144.31' INV=143.75' INV=143.85' DI INV=144.43' TOP=147.29' 15" OUT=145.19' INV=144.79' DI TOP=149.46' 15" OUT=146.23' 15" IN=145.56' 15" OUT=145.54' DI TOP=148.23' INV=145.43' INV=147.06' INV=145.47' INV=146.28' 18" OUT=167.05' TOP=169.72'18" OUT=166.72' TOP=169.53'DIDI DI DI INV=144.82' DI TOP=148.97' 18" IN=144.88' 18" OUT=144.82' CONC INV=144.25' INV=143.89' INV=144.95' TOP=169.65' 18" OUT=167.05'TOP=169.68' 18" OUT=166.91' INV=145.04' INV=144.25' IN=145.16' INV=145.32' DI TOP=148.93' 24" IN=144.95' 15" IN=145.11' 30" OUT=144.88' INV=145.50' DI TOP=149.06' 15" IN=145.92' 15" OUT=145.83' DI TOP=147.95' 15" OUT=145.74' DI TOP=147.65' 15" IN=145.62' 15" OUT=145.39' DI TOP=148.17' 15" OUT=146.31' INV=145.70' INV=145.58' INV=142.90' DI 42" OUT=143.41' 42" IN=143.46' TOP=146.81' INV=144.46' INV=145.34' DI TOP=148.05' 12" OUT=145.74' DI C/L INV=143.29' TOP=146.79' 42" OUT=143.31' 42" IN=143.36' 18" IN=144.18' TOP=146.78' DI INV=142.30' INV=141.71' INV=141.75'INV=141.40' INV=141.89' POSSIBLE JB INV=143.02' INV=143.39' INV=143.31' INV=144.05' INV=144.90' DI TOP=147.13' 15" IN=145.02' 15" OUT=144.95' CONC18" OUT=142.37' 15" IN=142.77' TOP=145.87' DI INV=143.36' IN V =143.31' DI 15" OUT=142.46' 15" IN=143.11' TOP=146.34' DI15" OUT=143.30' 15" IN=143.39' TOP=146.70' INV=145.16' INV=145.77' INV=145.61' TOP=146.95' 15" IN=144.83' 15" OUT=144.74' DI INV=141.28' INV=141.75'18" RCP18" R C P POSSIBLE JB DI T O P =148.66' 15" I N =145.02' 15" O U T =144.83' I N V =144.11' IN V=146.87' 24" OUT=146.80'24" IN=146.90'TOP=151.70'INV=146.48'CB IN V=146.26' I NV=14 5.5 3'CONCI NV=14 5. 7 9' 2 4" OUT=14 5. 8 8' 2 4" I N=14 5.9 8'TOP=14 9.6 8'CB2 4" OUT=14 6.3 2' 2 4" I N=14 6.3 7'TOP=15 0.5 2'CBI NV=14 6.5 3' 3' CONCI NV=14 7. 7 4' I NV=14 8.0 3' 3' CONCRCP15"15" OUT=14 7.9 0' 15" I N=14 7.9 5'TOP=15 1.2 0' 15" OUT=14 8.3 5' 15" I N=14 8.4 0'TOP=15 0. 7 0' 15" OUT=14 8. 3 0' 15" I N=14 8. 3 2'TOP=15 0.7 2' 15" OUT=14 7.7 7' 15" I N=14 7.8 2'TOP=15 1.0 7' 15" OUT=14 9.3 1' 15" I N=14 9.3 6'TOP=15 1.3 6' 15" OUT=14 9.5 6'TOP=15 2.3 6' 15" OUT=14 8. 5 0' 15" I N=14 8.5 5'TOP=15 1. 4 5' 15" OUT=14 9. 6 6'TOP=15 1.5 6'15" OUT=14 8.3 2' 15" I N=14 8.3 7'TOP=15 0. 8 2' 15" OUT=14 7.9 9 15" I N=14 8.0 9'-W15" I N=14 8.14'-ETOP=15 0.6 9'CBCB15" OUT=14 8. 6 3'TOP=15 1.0 3'CBCBCBCBCBUNKENDCONC CONCCONC CONCCONC 64.8'131.9'123.4'I NV=14 7.70' 15" OUT=14 7.5 3' 15" I N=147.58'-E15" I N=14 7.5 8'-NTOP =15 0.68'CB18" OUT=14 7.5 0'-E18" OUT=147.7 0'-N15" I N=147.70'-W15" I N=14 7.60'- STOP =150.5 0'CB18" RCP 18" RCP18" RCP18" RCP18" IN=144.31' 18" OUT=144.09' CORRECT CHECKED INV=143.69' 15" RCP I NV. OUT=14 8.9 2'TOP =15 1.2 2'I NV. OUT=14 8.7 1'CB15" RCPI NV. I N=14 7.14'TOP=15 0.9 5' I NV.I N=147.96TOP=15 2.0 1 24" RCPResponsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560POOL P OOL POND SA 2.11% 1.87 %LEGEND ENGLISH SHEET 2 OF 5 BUFFER DRAWING ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 INSET 1SEE 6/1/2021R:\Hydraulics\PERMITS_Environmental\Drawings\I5972_Hyd_PSH05_buffer.dgnFkeysLOCATION: DESIGNED BY: CHECKED BY: COUNTY:TIP NO.: DATE: PLANS 0 GRAPHIC SCALE REVISIONS HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/2/99TO PLOT 34"(HALF SIZE)TO PLOT FULL SIZE 62"X34"TO PLOT FULL SIZE 62"X34"TO PLOT 34"(HALF SIZE) DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MATCHLINE -L- STA. 70+00 SEE SHEET 6MATCHLINE -L- STA. 42+00 SEE SHEET 4-Y1- STA. 29+00 SEE SHEET 7 MATCHLINENAD 83/ 2011SEE SHEET 8 -Y1- STA. 47+00 MATCHLINE 50 1005025SEE SHEET 9-Y3- STA. 20+50MATCHLI NEwww.rkk.com Engineers | Construction Managers | Planners | Scientists 15+0050+00 20+00 30+00 55+00 35+00 40+00 60+00 45+00 25+00 15+0065+00 20 +00 30+00 15+00 20+00 25+00 20+00 15+00 45+00 -Y1- PT Sta. 31+24.01 -RPC- CS Sta. 15+15.33 -RPD- SC Sta. 12+00.00 -RPD- CS Sta. 18+17.51 -RPD- SRS Sta. 20+17.51 -RPD- SC Sta. 22+17.51 -RPD- PT Sta. 30+36.72 -Y1- PC Sta. 43+75.59 -RPA- ST Sta. 20+35.71 -RPA- CS Sta. 18+35.71 -RPA- SC Sta. 12+00.00 -RPB- SC Sta. 12+00.00 -RPB- CS Sta. 17+53.87 -RPB- SRS Sta. 19+53.87 -RPB- SC Sta. 21+53.87 -RPB- PT Sta. 27+09.33 -RPC- PT Sta. 24+40.28 G REU TL-3 GREU TL-3 WCR WCR WCR G RE U TL-3 GREU TL-3 Sta. 17+15.33 -RPC- ST 25+00 -Y3- PC Sta. 21+24.82Sta. 25+09.94 -Y3- PT Sta. 24+12.97 -Y3- PCC 25+00 -RPC- -L- -RPD- - Y1- -RPB- -RPA- LENGTH 390' DECELERATION -Y3-GREU TL-3 TS Sta. 21+36.77 -RPC- SC Sta. 23+36.77 -RPC- -RPB- POT Sta. 27+43.93 -Y1- POT Sta. 31+76.39 = -RPC- POT Sta. 25+46.35 -Y1- POT Sta. 31+84.50= -RPD- POT Sta. 31+21.09 -RPA- POT Sta. 22+46.36= -Y1- POT Sta. 43+00.00= -RPD- POS Sta. 20+69.67 -Y3- POT Sta. 25+32.95 = -L- POT Sta. 69+78.99 (39' LT) -RPB- ST Sta. 10+00.00= F C F F F F F F F FF F F F F F F F F F F F F F F C C C C C C C C F F F F F C C F F F F C F F C F F C C C F C52C C F C C F F F F F F C F EXIST. R/W +40.00 1 2 3 EXIST. ROW +90.00 EXIST. R/W +09.00 65' +30.00 67.24' 92' +40.00 CACACAC A 8 11 12 14 10 EXIST. R/W+33.00 EXIST. R/W+12.32 +10.00 108' 15CAC A 13 SITE 4A HP -Y1- STA. 36+85.52 RE MO VE GRADE TO DRAIN 1 5 " FILL W/FLOWABLE PLUG & FILL GRADE TO DRAIN GRADE TO DRAIN GRADE TO DRAIN 24" WELDED STEEL TRENCHLESS INSTALLATION FILL W/FLOWABLE PLUG & FILL FILL W/FLOWABLE PLUG & FILL REMOVE DI W/FLOWABLE FILLPLUG & FILL W/FLOWABLE FILL PLUG & FILL RETAINRETAIN P P SEE DETAIL S TOP ELEV.=148.0' 10' WIDE BERM SEE DETAIL M TOE PROTECTION DI CB-GREMOVE FS 30" RCP-III FS @ 147.6'REMOVEREMOVE CB-F CB-G TB 2GI TB 2GI CB-F CB-G CB-G 15" CSP 15" CSP P P SEE DETAIL N STANDARD BASE DITCH SEE DETAIL N STANDARD BASE DITCH SEE DETAIL G CUT DITCH SEE DETAIL G CUT DITCH RETAINRETAIN RETAI NDRAIN GRADE TO RCP-IV2@30"42" WELDED STEEL 2 @ TRENCHLESS INSTALLATION TO DRAIN GRADE 30" WELDED STEEL TRENCHLESS INSTALLATION DRAIN GRADE TO 15" RCP-III 2GI-D 15" RCP-III 15" RCP-III 15" CSP CB-F TO DRAIN GRADE RETAIN GRADE TO DRAIN GRADE TO DRAIN SEE DETAIL W LATERAL V DITCH SEE DETAIL X ROCK FILL IN WETLAND 2GI-D 2GI-B FILL W/FLOWABLE PLUG & FILL REMOVE REMOVE RETAIN RETAINRETAIN RETAIN REMOVER E MOV E R E MO V E 18" R CP-III 2 @ 42" RCP-III 15" RCP-III 15" CSP 15" CSP 15" CSP 2GI-A 15" RCP-III REMOVE REMOVE R E MOV E REMOVE HP -Y1- STA. 36+85.52 RE MO VE GRADE TO DRAIN 1 5 " FILL W/FLOWABLE PLUG & FILL GRADE TO DRAIN GRADE TO DRAIN GRADE TO DRAIN SEE DETAIL A SP. CUT DITCH SEE DETAIL G SP. CUT DITCH SEE DETAIL H SP. LATERAL DITCH SEE DETAIL G SP. CUT DITCH SEE DETAIL I LATERAL BASE DITCH SEE DETAIL F SP. LATERAL DITCH SEE DETAIL D SP. LATERAL DITCH SEE DETAIL C SP. CUT DITCH SEE DETAIL C SP. CUT DITCH SEE DETAIL C SP. CUT DITCH SEE DETAIL D SP. LATERAL DITCH SEE DETAIL G SP. CUT DITCH SEE DETAIL L TAIL DITCH SEE DETAIL K SP. LATERAL BASE DITCH SEE DETAIL K SP. LATERAL BASE DITCH SEE DETAIL G SP. CUT DITCH SEE DETAIL B LATERAL V DITCH SEE DETAIL F SP. LATERAL DITCH 24" WELDED STEEL TRENCHLESS INSTALLATION FILL W/FLOWABLE PLUG & FILL FILL W/FLOWABLE PLUG & FILL REMOVE DI W/FLOWABLE FILLPLUG & FILL W/FLOWABLE FILL PLUG & FILL RETAINRETAIN P P SEE DETAIL U TAIL DITCH SEE DETAIL L TAIL DITCH SEE DETAIL S TOP ELEV.=148.0' 10' WIDE BERM SEE DETAIL M TOE PROTECTION DI CB-GREMOVE FS 30" RCP-III FS @ 147.6'REMOVEREMOVE CB-F CB-G TB 2GI TB 2GI CB-F CB-G CB-G 15" CSP 15" CSP SEE DETAIL E LATERAL BASE DITCH P P SEE DETAIL N STANDARD BASE DITCH SEE DETAIL N STANDARD BASE DITCH SEE DETAIL E LATERAL BASE DITCH SEE DETAIL P LATERAL BASE DITCH SEE DETAIL O LATERAL BASE DITCH SEE DETAIL O LATERAL BASE DITCH SEE DETAIL O LATERAL BASE DITCH SEE DETAIL O LATERAL BASE DITCH SEE DETAIL G CUT DITCH SEE DETAIL G CUT DITCH RETAINRETAIN RETAI NDRAIN GRADE TO RCP-IV2@30"42" WELDED STEEL 2 @ TRENCHLESS INSTALLATION TO DRAIN GRADE 30" WELDED STEEL TRENCHLESS INSTALLATION DRAIN GRADE TO 15" RCP-III 2GI-D 15" RCP-III 15" RCP-III 15" CSP CB-F TO DRAIN GRADE SEE DETAIL L STANDARD BASE DITCH SEE DETAIL J SP. LATERAL BASE DITCH RETAIN SEE DETAIL A SP. CUT DITCH SEE DETAIL H SP. LATERAL V DITCH GRADE TO DRAIN GRADE TO DRAIN SEE DETAIL W LATERAL V DITCH SEE DETAIL X ROCK FILL IN WETLAND SEE DETAIL D SP. LATERAL DITCH SEE DETAIL J SP. LAT. BASE DITCH 2GI-D 2GI-B FILL W/FLOWABLE PLUG & FILL REMOVE REMOVE RETAIN RETAINRETAIN RETAIN REMOVER E MOV E R E MO V E SEE DETAIL V STANDARD DITCH 18" R CP-III 2 @ 42" RCP-III 15" RCP-III 15" CSP 15" CSP 15" CSP 2GI-A 15" RCP-III REMOVE REMOVE R E MOV E REMOVE EIP 3 0" RCPINV=141.75'INV = 14 1 .4 0' Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021R:\Hydraulics\PERMITS_Environmental\Drawings\I5972_Hyd_PSH05_buffer_inset.dgnFkeys8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I-5972 PSH 5 INSET 25 50 100050 SCALE 0 SCALE FOR INSET 12.56.2512.5 www.rkk.com Engineers | Construction Managers | Planners | Scientists INSET 1 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 ENGLISH SHEET 3 OF 5 BUFFER DRAWING INSET 1SEE 105' +45.00 SEE DETAIL V STANDARD DITCH 48" W/W 48" W/W48" W/W 48" W/W48 " W /W 48" W/W 72" VINYL9' SOIL 9 ' SOIL GR 10' CONC CONC 1SFD CARPORT B CONC 48" W/WLT 5' CONC CONC WOODS WOODSWOODS-EY3-BY3-4021SFD PORTCAR-48" W/WRIP-RAP ECMT T S 06°42'18" W150.74'N 86°58'43" E 612.15' S 89°44'57" W 303.90' N 89°44'40" E 369.83' S 89°43'29" W 370.18'S 07°44'53" E62.05' S 86°57'03" W 135.01'S 21°55'09" W80.39'N 01°17'59" W88.80'N 24°40'17" W74.21'N 10°17'13" W146.72'N 20°55'31" W195.62'N 08°24'43" E196.00'N 07°34'01" EEIP EIP EIP EIP EIP EPKR/W MON JEAN H. GRICE JERRY R. GRICE DB 1153 PG 544 JEAN H. GRICE JERRY R. GRICE DB 1077 PG 603EXISTING R/W60.00'EXISTING R/WMALLARD RD 20' PAVED ROADWAYIS PROERTY LINECENTERLINE OF CREEKDB 5178 PG 843 OLD BROGDEN FARMS, LLC DB 5178 PG 843 PB 43 PG 163 OLD BROGDEN FARMS, LLC DB 5178 PG 843 OLD BROGDEN FARMS, LLC DB 5178 PG 843 OLD BROGDEN FARMS, LLC DB 5178 PG 843 PB 43 PG 163 OLD BROGDEN FARMS, LLC12" RCPINV=142.64'INV=143.38'INV=143.26'IN V =142.27'36" RCPINV=140.33' INV=140.05' 18" RCP 15" HDPE15" HDP E INV INACCESSIBLE TOP=146.18' 30" RCPINV=142.54' INV=142.41' DI Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 141.39 141.74 142.33 142.80 143.17 141.39 141.34 141.39 141.74 142.33 142.80 143.17 141.39 141.34 SA.025.00736'18'21'100' TRANSITION+09.03(TYP.) 26.66 '.00.01.025.02(TYP) 26.66'.01.02.025.02.01.00.01.02.03.04.05.06.025R=75' R=75'18'20' 0.30% LEGEND SHEET 4 OF 5 BUFFER DRAWING MITIGABLE IMPACTS ZONE 1 MITIGABLE IMPACTS ZONE 2 ENGLISH DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/1/2021R:\Hydraulics\PERMITS_Environmental\Drawings\I5972_Hyd_PSH09_buffer.dgnFkeys8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I-5972 9 NAD 83/ 2011S EE S HEET 8 -Y2- S TA. 2 3 +5 0MATCHLINESEE SHEET 5 -Y3- STA. 20+50 MATCHLINE SR 2507 MALLARD RDwww.rkk.com Engineers | Construction Managers | Planners | Scientists 15+0020+00-Y2- PC Sta. 18+69.27 15+00 20+00 -Y2- -Y2- Sta. 10+10.00 BEGIN CONSTRUCTION-Y3--Y3- Sta. 13+50.00 BEGIN CONSTRUCTION/OVERLAY -Y3- POT Sta. 15+21.14 -Y2- POT Sta. 10+00.00 = F C C C F F C CF C C F C 80'8 8 9 9 SA INLET CHANNEL IMPROVEMENTS LOOKING DOWNSTREAM (NTS) LENGTH=19' CHANNEL NATURAL 8'+/- VARIES 2' 1.0' BENCH2:12:118" BENCH TOP OF FLOODPLAIN MATTING COIR FIBER W/ GEOTEXTILE FAB CLASS I RIP RAP EXCAVATION LOW FLOW CHANNEL W/ GEOTEXTILE FAB CLASS I RIP RAP EXCAVATION 1.0' BURY GROUND NATURAL 0'-8' VARIES W/ GEOTEXTILE FAB CLASS I RIP RAP INLET CHANNEL IMPROVEMENTS LOOKING DOWNSTREAM (NTS) LENGTH=19' CHANNEL NATURAL 8'+/- VARIES 2' 1.0' BENCH2:12:118" LOOKING DOWNSTREAM (NTS) LENGTH=28' OUTLET CHANNEL IMPROVEMENTS2:12:118" 2' 8'+/- VARIES CHANNEL NATURAL 0'-8' VARIES 1.0' BENCH BENCH TOP OF FLOODPLAIN BENCH TOP OF FLOODPLAIN MATTING COIR FIBER MATTING COIR FIBER W/ GEOTEXTILE FAB CLASS I RIP RAP W/ GEOTEXTILE FAB CLASS I RIP RAP EXCAVATION EXCAVATION LOW FLOW CHANNEL LOW FLOW CHANNEL W/ GEOTEXTILE FAB CLASS I RIP RAP W/ GEOTEXTILE FAB CLASS I RIP RAP EXCAVATION EXCAVATION 1.0' BURY 1.0' BURY GROUND NATURAL GROUND NATURAL 0'-8' VARIES W/ GEOTEXTILE FAB CLASS I RIP RAP W/ GEOTEXTILE FAB CLASS I RIP RAP SITE 4B 18" RCP-IV SEE DETAIL M TOE PROTECTION SEE DETAIL D SP. LATERAL DITCH SEE DETAIL E LATERAL DITCH 0901 SEE DETAIL C SP. CUT DITCH SEE DETAIL C SP. CUT DITCH SEE DETAIL C SP. CUT DITCH SEE DETAIL D SP. LATERAL DITCH 10 SY GEO FAB 3 TONS CL B RIP RAP (1' BURY) 8' X 5' RCBC (1' BENCH) (1' BURY) 8' X 5' RCBC IMPROVEMENTS INLET CHANNEL IMPROVEMENTS OUTLET CHANNEL 29 CY DDE 23 SY COIR FIBER MATTING 80 SY GEO FAB 55 TONS CL I RIP RAP CHANNEL IMPROVEMENTS TOTALS:2@8'x5' RCBC (BURY 1') 18" RCP-IV SEE DETAIL M TOE PROTECTION SEE DETAIL D SP. LATERAL DITCH SEE DETAIL E LATERAL DITCH 0901 SEE DETAIL C SP. CUT DITCH SEE DETAIL C SP. CUT DITCH SEE DETAIL C SP. CUT DITCH SEE DETAIL D SP. LATERAL DITCH 10 SY GEO FAB 3 TONS CL B RIP RAP (1' BURY) 8' X 5' RCBC (1' BURY) 8' X 5' RCBC (1' BENCH) (1' BURY) 8' X 5' RCBC (1' BENCH) (1' BURY) 8' X 5' RCBC IMPROVEMENTS INLET CHANNEL IMPROVEMENTS OUTLET CHANNEL 29 CY DDE 23 SY COIR FIBER MATTING 80 SY GEO FAB 55 TONS CL I RIP RAP CHANNEL IMPROVEMENTS TOTALS:2@8'x5' RCBC (BURY 1') Site Station StructureNo. (From/To) Size / Type4A-RPD- 28+40-29+50 RTBANK STABILIZATIONX 1361 181 15424B-Y2- 17+50 CULVERT PLACEMENTX11717 7804 195211361 181 1542 11717 7804 19521 0 0NOTES:Revised 2018 Feb SHEET 5 OF 5BUFFER REPLACEMENTIMPACTSRIPARIAN BUFFER IMPACTS SUMMARYNC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYSTOTALS*:ROAD CROSSINGBRIDGEPARALLEL IMPACTZONE 1(ft2)ZONE 2(ft2)TYPEJOHNSTONI-5972ALLOWABLE MITIGABLEJUNE 2021ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)ZONE 2(ft2)ZONE 1(ft2)TOTAL(ft2)