HomeMy WebLinkAbout20201696 Ver 1_Buffer Approval_20210622
June 22, 2021
DWR #20201696
Wake County
Martin Marietta Materials Inc.
Attn: Ron Kopplin
2700 Wycliff Road
Raleigh, NC 27607
(delivered via email to ron.kopplin@martinmarietta.com)
Subject: AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER
PROTECTION RULES (15A NCAC 02B .0714) WITH ADDITIONAL CONDITIONS
Martin Marietta Raleigh-Durham Quarry Overburden Storage
Mr. Kopplin,
You have our approval for the impacts listed below for the purpose described in your application
received by the Division of Water Resources (Division) on April 15, 2021. This letter shall act as your
Authorization Certificate Approval as described within 15A NCAC 02B .0611(b). This letter replaces that
which was issued on June 15, 2021. Please note that you should get any other federal, state or local
permits before proceeding with your project, including those required by (but not limited to) Sediment
and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This Authorization
Certificate shall expire five (5) years from the date of this letter.
This approval requires you to comply with the following conditions:
1. The following impacts are hereby approved provided that all of the other specific and general
conditions of the Buffer Rules are met. No other impacts are approved, including incidental impacts
[15A NCAC 02B. 0714].
Type of Impact
Amount Approved
(units)
Permanent
Amount Approved (units)
Temporary
Buffers – Zone 1 (Road Crossing) 5,673 (square feet) 0 (square feet)
Buffers – Zone 2 (Road Crossing) 3,308 (square feet) 0 (square feet)
2. Dispersed Flow
All stormwater must be directed and maintained as dispersed flow, as defined in 15A NCAC
02H .0100, at non-erosive velocities through the protected stream buffers such that it will not re-
concentrate before discharging into a stream. [15A NCAC 02B .0714 (9)]
3. No Zone 1 Impacts
No impacts (except for "Deemed Allowable" uses as identified within 15A NCAC 02B .0714 (11) shall
occur to Zone 1 of the protected riparian buffers unless otherwise approved by the DWR. No
impervious surfaces shall be added to Zone 1, unless otherwise approved by the DWR. [15A NCAC
02B .0714 (8)(a)]
4. The permittee shall report to the Raleigh Regional Office any noncompliance with this certification,
any violation of stream or wetland standards [15A NCAC 02B .0200] including but not limited to
sediment impacts, and any violation of state regulated riparian buffer rules [15A NCAC
02B .0200]. Information shall be provided orally within 24 hours (or the next business day if a
weekend or holiday) from the time the applicant became aware of the circumstances. A written
submission shall also be provided within 5 business days of the time the applicant becomes aware of
the circumstances. The written submission shall contain a description of the noncompliance, and its
causes; the period of noncompliance, including exact dates and times, if the noncompliance has not
been corrected, the anticipated time compliance is expected to continue; and steps taken or
planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may
waive the written submission requirement on a case-by-case basis.
5. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur [15A NCAC 02H .0501 and .0502].
6. Protective Fencing
All wetlands, streams, surface waters, and riparian buffers located within 50 feet of the construction
area on the project site shall be clearly marked (example- orange fabric fencing) prior to any land
disturbing activities and must be maintained on the property until the project phase is completed.
[15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H .0507 (c)]
This Authorization neither grants nor affirms any property right, license, or privilege in any waters, or
any right of use in any waters. This Authorization does not authorize any person to interfere with the
riparian rights, littoral rights, or water use rights of any other person and this Authorization does not
create any prescriptive right or any right of priority regarding any usage of water. This Authorization
shall not be interposed as a defense in any action respecting the determination of riparian or littoral
rights or other rights to water use. No consumptive user is deemed by virtue of this Authorization to
possess any prescriptive or other right of priority with respect to any other consumptive user regardless
of the quantity of the withdrawal or the date on which the withdrawal was initiated or expanded.
This Certification can be contested as provided in Chapter 150B of the North Carolina General Statutes
by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of
Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set
DocuSign Envelope ID: 321FF6C0-28FA-42EB-B663-51E2FD4E3B58
forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina
Administrative Code. Additional information regarding requirements for filing a Petition and Petition
forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk’s Office at (919) 431-
3000.
One (1) copy of the Petition must also be served to the North Carolina Department of Environmental
Quality:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division under the Neuse Riparian Buffer Rules as described in
15A NCAC 02B .0714. Please contact Rick Trone at rick.trone@ncdenr.gov if you have any questions or
concerns.
Sincerely,
Paul Wojoski, Supervisor
401 & Buffer Permitting Branch
cc: DWR 401 & Buffer Permitting Unit
DWR 401 & Buffer Permitting Branch Electronic file
Filename: 20201696 Ver 1_Martin Marietta Raleigh-Durham Quarry Overburden Storage
DocuSign Envelope ID: 321FF6C0-28FA-42EB-B663-51E2FD4E3B58