HomeMy WebLinkAboutSW8130208_Approved Plans_201305174 L-7 NOT( \ \
I /
( ( I I 99
0()0' SE 64 \ \
7 F, VfF � _41IF-1 IRAC Pd:)tep
1XI
k, o- IVY MB 2g, pG �� �•�%�
106)
N 5 F,�'YA
SEC�10 / SE01,ON Y1. / / 's /i .� � -�2 ' B p ASS�R�EpWI ZS� ED -d
WOOL' G 24 W000, G 1�� \ ,- .�i"`'.� z �p8av5EY�ED 3°.5°
31, P IVY Mg 29, P \ (116) I_
-- \ \ot
ssw
(12 9) \ \ \ (12 7) ` _ / - -% / SEE a Ev 8 3O . \ \\ \\ \ \ �,\
W00� 311 / �� i / /r3 ' i ( SAY 25
PG i\\ \\\♦ \ �'�\
(141) i \ \�i�� G j: o v BASIN
- (128) \ \ i / EX�s11N #2
RY \
'SEZS �gAY #1 � \ � ♦ \ \ \
SEDVV (742
0000
000
X
.IINTV. 30.4/ `� •..- `-.—" ,-- '' \\ '`' C s'". I \ \ ,.r�° '"•
145
0000
r
YRO
ppSED
5p01L ARC + \\ r 0000 LZ1�SI 5 /
0000
-
_' 2
0 y \ A \ \ I 000 i
�_ _ _ �. - I N W i I �, \ .. "'• '' 73 60EDSZL�YR y C
1 I
• v-_` "4 I \ 0000
#3y.2° „ED• ''�' 0.00 o
1 n,.
..........
� ii p rtoviNt�!'
t. 1
e �
I �.r rT
pzel
_
i
FOREBAY
0 AS4�
2
TO"PLJ GRyD USE
BURIED g
1 1
i �, M� �! , PROPOSED`
I , w FUTURE
DEVELOPMENT \
S
LVE
CNEI 1. G 6a3P pG
P PR OF BY, 2
2A
RCY \
\\\ F$S #32,35
\\\\
`t \\\
XA
PROPERTY LINE
PROPOSED BUILDING
EXISTING PAVEMENT
Designer's Plan Certification:
EASEMENT
"I hereby certify that this plan has been prepared in accordance with the latest
PROPOSED WATER
New Hanover County Ordinances and Storm Water Design Manual."
PROPOSED SEWER
Signature:
LIMITS OF DISTURBANCE
TEMPORARY SILT FENCE
Printed Name and Title:
RUNOFF DIRECTION
3:1 GRASSED SWALE
Date:
Registration Number: SEAL
PROPOSED STORM PIPE
20.o SPOT ELEVATION
Property Owner Certification:
ENERGY DISSIPATER
" I (We) hereby certify that I (we) am (are) the current owner of the property and that upon
receipt of "Authorization -To -Construct" any clearing, grading, construction or development,
will be performed in accordance with this plan and that the applicable ordinances and rules of
VEGETATED SHELF
New Hanover County, the State of North Carolina and the Federal Government and its
agencies which are hereby made part of this plan. As the owner, I (we) accept full
responsibility for the construction and operation and maintenance of the proposed facilities. I
(We) will not attempt to transfer of this responsibility without written authorization of
New Hanover County."
Signature:
Printed Name and Title:
Date:
SITE DATA
PROPERTY AREA:
PIN # :
CURRENT ADDRESS:
EXISTING ZONING:
PROPOSED ZONING:
USE:
DEED:
SETBACKS:
BUFFER:
Adjacent to any Residential Zoning
PARKING CALCULATIONS:
PROPOSED IMPERVIOUS:
17.94 Acres
R033o8-oO2-009-000
R03300-003-001-000
312o Alex Trask Drive
R-2o
R-20
CHURCH
DB:4976 PG:566
DB:2683 PG: 396
FRONT 30'
REAR 25'
SIDE 15'
SIDE 20'
Proposed: too Space
TOTAL: too Spaces
PARKING - 34,903 s.f.
DRIVE - 28,619 s.f.
TOTAL - 63,522 s.f.
REVISIONS
2/20/13 Wet Pond Revisions added Basin #2
Tnt- TAndscape areas shown.
3/21/13 Revised Entrance Drive, added center
O
bA
00
� N
N
o
INC
O
U
o
W
4:ioU
U O
Z
Wa�oQ)
�Z
tjo a
U
t ~
�
U
'/
'�
• CC3
W-'11
rT�
S E A L =
032555
INTERIOR LANDSCAPING:
4
TOTAL PARKING AREA:
34,832 s.f.
REQUIRED 8 % INT. ISLANDS:
2,786 s.f.
CLIENT INFORMATION:
PROPOSED INT. ISLANDS: 3,443 s•f•
TOTAL IMPERVIOUS:
59,931 s.f. (1.376 Ac.)
NEW BEGINNING
IMPERVIOUS:
7.67 %
CHRISTIAN CHURCH, INC.
;11 F
3120 ALEX TRASK DRIVE
LIMITS OF DISTURBANCE:
5.5o Ac.
A I
CASTLE HAYNE, NC 28429
n0 fi-
-
(910) 341-7984
NOTE
1. NO WETLANDS EXIST ON SITE PER SOUTHERN
ENVIRONMENTAL GROUP, INC. ENVIRONMENTAL
INVESTIGATION DATED OCTOBER 18th, 2012.
i• 40ofio 6•
DRAWN: EAS
SHEET SIZE: 24X36
CHECKED: CDC
DATE: 01-31-13
APPROVED: CDC
SCALE: 1:80
PROJECT NUMBER: 100-083
DRAWING NUMBER:
C-2
2 of 11
I
R
`f
` bJ0 13
Cam.
\-?moo'
t \ \ \ { 98
D,
'yam Mg 29, 40 6� r r �� r r f =:s_=
.-.... _ \
\\�34
115
( 107106
)
J� ..- ..--,-,.,.,,_,..• _.-.r.-- YARD \\ \
pD, 5� 2� / wpOD17
M, S� ''' --•- _ ...--.._. �.�
\ l 1VY g 31' 40 tuY MB 2g' 4G
�p\ / { 116
10,
�,,.,,,. ._,,._ i'- ... ..✓ \\ ter„ �' ,,.,,, ...-33 2 ��.� r +_ -,.` \\ Qi
o014 i — -- 1 { 129) \� \ { 127)yd
1 \BAST—141
{ 144) \ { 128) \ \ r r r r r �X I
-- — ® \
2.0 r OPEN SPACE 1 \ \ \ rr .rrir r
000
143
ol
- F.ILr\r.3o.40 -'r ✓� -'"' \, / 1 / jA `\`\\\ y r I ` `5r / -- / ♦
--_
2 a Gu rb & ttet ' 4\ r i i 1\
♦ .a
♦
�` t y�oPOS�D o�
-6 \° \ \�t r , SPOIL ARC' , r ••
(P Dos
01
*.
000 000
{ r \ i t Ex. PARKING i�Yt t R 1,A000 ,►W ♦ , Z 4Rp40SE
� oN
It .00
M
N
t 7Tl
t� -T
i FOREBAy 1 GONSAL 3gg
I, \ :':ti \ �� ' pNtil.<. � • 6g3, pp
s
.......................
................ �IT
,. tt t1
$X..... - 3 KIltGIAI t 1
.............f xx. F A
.............
R
.............
.R ... ......... ....... ..+ } ..�— ROy N.M.
i .. ...... ............... 111
RX.D 6a 1
i
1'� t 24 tier
j
1
t i
1 t
t t 1
1
,.'�. w 'lPl. Ij•CRA
won
--0, r"t �'�
Y VP u
-�4�- r+r 1- 30" �7.31.50
..�34r"r
t t t ` _ �• /' "'3 . '�"r TORE I BEUSE
3 BURIED FOR FU TU'
29 E
t �tlt I
{ t t tt ' —35---
�ul�wJ�yl
2�
r
6' BE PLUGGF & USE
TO
BURIED F(�R FUTURE
f �
s
Os
t�t�1t tlo
eta
t tt t ttrn '
t� tt ttw ,' PROPOSED
' � t � 1t w,tt � � FUTURE �
X 1�•t t 1 � 1
DEVELOPMENT \ i
N32 33'47"W
3.42
\ 1
O \�` N15 49'01 "W
,CH.265.69,
--�� R-462.90
► P11
r
—if
r
\ \ \ \ \\\ \ r3 3""♦ � r
r
LEGEND
PROPERTY LINE
PROPOSED BUILDING
EXISTING PAVEMENT
EASEMENT
PROPOSED WATER
PROPOSED SEWER
LIMITS OF DISTURBANCE
TEMPORARY SILT FENCE
RUNOFF DIRECTION
3:1 GRASSED SWALE
PROPOSED STORM PIPE
20.o
SPOT ELEVATION
ENERGY DISSIPATER
W W
N W W
VEGETATED SHELF
4R�pFIRIN �K-
SITE DATA
- PROPERTY AREA:
PIN #
CURRENT ADDRESS:
EXISTING ZONING:
PROPOSED ZONING:
USE:
DEED:
Designer's Plan Certification:
" i hereby certify that this plan has been prepared in accordance with the latest
New Hanover County Ordinances and Storm Water Design Manual."
Printed Name and Title:
Date:
Registration Number: SEAL
Property Owner Certification:
"I (We) hereby certify that I (we) am (are) the current owner of the property and that upon
receipt of "Authorization -To -Construct" any clearing, grading, construction or development,
will be performed in accordance with this plan and that the applicable ordinances and rules of
New Hanover County, the State of North Carolina and the Federal Government and its
agencies which are hereby made part of this plan. As the owner, I (we) accept full
responsibility for the construction and operation and maintenance of the proposed facilities. I
(We) will not attempt to transfer of this responsibility without written authorization of
New Hanover County."
Signature:
Printed Name and Title:
Date:
SETBACKS:
BUFFER:
Adjacent to any Residential Zoning
PARKING CALCULATIONS:
PROPOSED IMPERVIOUS:
17.94 Acres
R033o8-o02-009-000'
R03300-003-001-000
312o Alex Trask Drive
R-2o
R 20
CHURCH
DB:4976 PG:566 NORTH C
DB:2683 PG:396 MMA
DIASI
FRONT 30'
REAR 25°
SIDE 15'
SIDE 20'
Proposed: too Space
TOTAL: too Spaces
PARKING - 34,832 s.f
DRIVE - 25,099 s.f.
TOTAL - 5%931 s.f.
INTERIOR LANDSCAPING:
TOTAL PARKING AREA:
34,832 s.f.
REQUIRED 8% INT. ISLANDS:
2,786 s.f.
PROPOSED INT. ISLANDS:
3443 s.f.
TOTAL IMPERVIOUS:
592931 s.f. (1.376 Ac.)
% IMPERVIOUS:
7.67 %
LIMITS OF DISTURBANCE:
5.5o Ac.
Y 2 @ 5 4n i 'U
NOTE
1. NO WETLANDS EXIST ON
SITE PER SOUTHERN
ENVIRONMENTAL GROUP, INC. ENVIRONMENTAL
INVESTIGATION DATED OCTOBER 18th, 2012.
VICINITY MAP (NOT TO SCALE):
OLD MILL RD ALEX TRASK OR
i
N o
a
IT o
v �
J
REVISIONS
12/20/1.'A Wet Pond Revisions. added Basin #2
•
•
•
Ya
x ram
syh.^o�n".
C.
S E A L
032555
���rrtilitt���`
CLIENT INFORMATION:
NEW BEGINNING
CHRISTIAN CHURCH, INC.
3120 ALEX TRASK DRIVE
CASTLE HAYNE, NC 28429
(910) 341-7984
DRAWN: EAS
SHEET SIZE: 24X36
CHECKED: CDC
DATE: 01-31-13
APPROVED: CDC
SCALE: 1:80
PROJECT NUMBER: 100-083
DRAWING NUMBER:
C-2
2 of 6
-M- C 142 )
'__ C 1 4,3 ) � --
145 EX.INV- 30.40
1
FES #5 -\
INV. 30,00'
8'x lo'x 18" E.D.
/ DITCH PLUG
!(SEE DETAIL)
20' MERGENCY
SPILLWAY ELEV. 3t.50'
4 EX. DROP INLET CONC. FLUME w/
4 `{
TOP 34.08 /� } i !
s ' x 6' x 12" E.D. (Typ.)
fill
_._.mi
LIMITS OF DISTURBANCE /
34 -�
3011 INV. 31.50'
t TO BE PLUGGED &
RE USE I BURIED FOR FUTURE 1 � ,
1
1�
ji�l i
I
►-, ,jj� U
I N w w
cI t a
LL /
i �
c
W
II
n
FES #2
III
{ INV.32.20
j b' 1o' :� 18" E.D.
1 U. 0 4.00
Lm
35.50 35.00
35 LIMITS OF DISTURBANCE
1 .... ..... �.r.......� ..... �....... .�.�. SF wood/ ... .�. �. _. .,._ ..... _...� ...
cn
SF�
H LEGEND
ot
/-~
,.,0 - -
''" PROPERTY LINE
PROPOSED BUILDING
--- �-- "---. --"" ._,_ . -� --� .-=� "~ ►�} EXISTING PAVEMENT
EASEMENT
--^---' PROPOSED WATER
PROPOSED SEWER
CIF
�
---""--- ��� LIMITS OF DISTURBANCE
M.r � ____ --"' 2 9c TEMPORARY SILT FENCE''
�t� �---- RUNOFF DIRECTION
•1 GRASSED ALE 3. G SS SW
1 1 �
' PROPOSED STORM PIPE
SF
SF 20.o SPOT ELEVATION
11 .�
i
ENERGY DISSIPATER
VEGETATED SHELF
W W W
INTERIOR LANDSCAPING AREA
I
W/ S.F.
'' 1 GRASSED I SWALE #4
3:„�
SWALE # 3 1
30tt INV. 31.15'
TO BE PLUGGED &
BURIED FOR FUTUF'.F�.. USE
11 \_4
TEMPORARY
DIMENT TRAP #1
34•bo
�........ "" 3:1 GRASSED SWALE #1
SITE DATA
PROPERTY AREA:
17.94 Acres
PIN #:
R033o8-oO2-009-000'
R03300-003-001-000
CURRENT ADDRESS:
312o Alex Trask Drive
EXISTING ZONING:
R-20
PROPOSED ZONING:
R 20
USE:
CHURCH
DEED:
DB:4976 PG:566
DB:2683 PG:396
SETBACKS:
FRONT 30'
REAR 25'
SIDE 15'
BUFFER:
SIDE 20'
D•
*Adjacent to any Residential Zoning
PARKING CALCULATIONS:
Proposed: loo Space
TOTAL: too Spaces
PROPOSED IMPERVIOUS:
PARKING - 34,832 s.f.
DRIVE - 25,099 s.f.
TOTAL - 59,931 s.f.
INTERIOR LANDSCAPING:
TOTAL PARKING AREA:
3032 s.f.
REQUIRED 8% INT. ISLANDS:
2,786 s.f.
�.,..•� "'"�
PROPOSED INT. ISLANDS:
3,443 s.f.
VC?
TOTAL IMPERVIOUS:
59,931 s.f. (1.376 Ac.)
�00
% IMPERVIOUS:
7.67 %
0-
ISV.LIMITS OF DISTURBANCE: 5.5o Ac.
11`
CLEAN OUT EXISTING DITCH
TO ASSURE POSITIVE DRAINAGE �
TO BE LINED WITH EXCELSIOR
MATTING &SEEDED IMMEDIATELY
INV.3o.50'
5'Xio'Xi2" E.D.
MATCH EX.
ASPHALT 36.39'
CONSTRUCTION
CE
OUTLET STRUCTURE
(SEE DETAIL SHEET C5/ �
10' EMERGENCY 15 RI ; ;,,
SPILLWAY INV 33.25
�34.00 \
/ 3410 FES #3�,, �1
INV. 30.25.
4 t O
s5 00 0 20 ASPHALT DRIVE 0
NI \� I N
20' BUFFER YARD o
6.00
\ N 0IR PI
S CF' SF C ' SF
•�SF C� .. •w - _E,rrw Fier •w�
.10 24" RCP 6.0o N 6 0 a17' 02" W % 35.50 12 73. 6 0 35,0o LIMITS OF DISTURBANCE 34.50
1f � 3
1 {�
j FES #1 \ � �
I
PROPOSED SILT FENCE (Typ.)
1 INV. 32.35 � /
1
1 �
II� RACHEL T. GONSALVES
k
PART OF BK 2683, PG 396
MATCH EX. tit b
Q�
ASPHALT 36.16 ,.�
40 20 0� 40' 8o'
DRAWING NUMBER:
Scale: 1"=40' C-3
3 of 6
VICINITY MAP (NOT TO SCALE):
OLD MILL RD ALEX TRASK DR
Ln
a ITE
Al
o
J<v
�v
REVISIONS
12/20/1.q Wet Pond Revisions, added Basin #2
o
�
� N
o�
aU�o�
W
_ O
�
U
•
S E A L
032555
D.
JJltflitl
CLIENT INFORMATION:
NEW BEGINNING
CHRISTIAN CHURCH, INC.
3120 ALEX TRASK DRIVE
CASTLE HAYNE, NC 28429
(910) 341-7984
En i
" o- ill 6
DRAWN: EAS
SHEET SIZE: 24X36
D: CDC
DATE: 01-31-13
APPROVED: CDC I
SCALE: 1 : t} O
PROJECT NUMBER: 100-083
EX. R/W
EX. E
EX. R/W
0
o�
ID
FM
CLEAN OUT 55 Lf. OF EXITING DITCH
TO ASSURE POSITIVE DRAINAGE
TO BE LINED WITH EXCELSIOR
MATTING & SEEDED IMMEDIATELY
BLUE CLAY ROAD
(6o' PUBLIC R/W)
N �°c 15" FES —
INV. 30.50'
5'x10'x12" E.D.____
1 t
30,
VL/tYll nVlt-.V JVVVI�r�V�
zo' ASPHALT DRIVE SECTION
NTS
PROPOSED
ASPHALT DRIVEWAY
36" RCP -
MATCH EX.
ASPHALT 36.37'
. FORCEMAIN 36
31
FES#3
INV. 30.25
34.
'5
2" LAYER
TYPE SF 9.5A
8" ABC
- 51
A
H
0
N
20. n
R_25'
ZMAP BOOK 29, PAGE 64 �
MATCH EX.
ASPHALT 36.16'
EX. R/W
EX. EOP
N O
N \'-0
EX. EOP
FM
EX. R/W
FES#4
INV. 30.10
101X12'X18"E.D.
35•85
35.55
LEGEND
PROPERTY LINE
PROPOSED BUILDING
EXISTING PAVEMENT
EASEMENT
PROPOSED WATER
PROPOSED SEWER
LIMITS OF DISTURBANCE
TEMPORARY SILT FENCE
RUNOFF DIRECTION
3:1 GRASSED SWALE
PROPOSED STORM PIPE
20.o
SPOT ELEVATION
ENERGY DISSIPATER
y
W Y W
VEGETATED SHELF
NOTE:
1. NO EXISTING DRIVEWAYS WITHIN 500' OF PROPOSED
20' ASPHALT DRIVE.
SITE DATA
PROPERTY AREA:
17.94 Acres
PIN #:
R033o8-002-009-000
R03300-003-001-000
CURRENT ADDRESS:
312o Alex Trask Drive
EXISTING ZONING:
R 20
PROPOSED ZONING:
R 20
USE:
CHURCH
DEED:
DB:4976 PG:566
DB:2683 PG:396
SETBACKS:
FRONT 30'
REAR 25'
SIDE 15'
BUFFER:
SIDE 20'
'Adjacent to any Residential Zoning
PARKING CALCULATIONS:
Proposed: too Space
TOTAL: 10o Spaces
PROPOSED IMPERVIOUS:
PARKING - 3032 s.f.'
DRIVE - 25,099 s.f.
TOTAL - 59,931 s.f.
INTERIOR LANDSCAPING:
TOTAL PARKING AREA: 34,832 s.f.
REQUIRED 8% INT. ISLANDS: 2,786 s.f.
PROPOSED INT. ISLANDS: 3,443 s.f.
TOTAL IMPERVIOUS: 5%931 s.f. (1.376 Ac )
IMPERVIOUS• 6
VICINITY MAP (NOT TO SCALE):
OLD MILL RD ALEX TRASK DR
s
a
2
ITE
Q
;:0 v
o �
J
451
o
� N
N
M
G-�
ct °
Z
Z
.
o.
at
LLB
�
CAROB
Q
` S E A L
• 032555
p.
r
sj
CLIENT INFORMATION:
NEW BEGINNING
CHRISTIAN CHURCH, INC.
3120 ALEX TRASK DRIVE
CASTLE HAYNE, NC 28429
(910) 341-7984
o
7.70
LIMITS OF DISTURBANCE: 5.5o Ac. NX
DRAWN: EAS SHEET SIZE: 24X36
`} CHECKED: CDC DATE: 01-31-13
FEE APPROVED: CDC SCALE: 1:30
PROJECT NUMBER: 100-083
301 151 01 30' 6o'
DRAWING NUMBER:
Scale: 1"=30' C-4
4of6
LATE WINTER & EARLY SPRING
TEMPORARY GRASSING DETAIL
SEEDING MIXTURE
SPECIES
Rye (grain)
Annual Iespedeza (Kobe in
Piedmont and Coastal Plain,
Korean in Mountains)
Omit annual Iespedeza when duration of temporary cover is not to extend
beyond June.
SEEDING DATES:
Mountains - Above 2500 ft: Feb. 15-May 15
Below 2500 ft: Feb. 1-May i
Piedmont - Jan. 1-May 1
Coastal Plain - Dec. 1-Apr.15
SOIL AMENDMENTS
Follow recommendations of soil tests or apply 2,000 lb/acre ground agricul-
tural limestone and 75o lb/acre 10-10-10 fertilizer.
MULCH
APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING,
OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE
USED AS A MULCH ANCHORING TOOL.
MAINTENANCE
Refertilize if growth is not fully adequate. Reseed, refertilize and mulch im-
mediately following erosion or other damage.
TEMPORARY SUMMER GRASSING DETAI
SEEDING MIXTURE
SPECIES RATE (lb/acre)
GERMAN MILLET 40
IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUNDANGRASS MAY BE
SUBSTITUTED AT A RATE OF 5o LB/ACRE.
SEEDING NOTES
MOUNTAINS - MAY 15-AUG. 15
PIEDMONT - MAY 1-AUG.15
COASTAL PLAN - APR. 15-AUG. 15
SOIL AMENDMENTS
FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICUL-
TURAL LIMESTONE AND 75o LB/ACRE 10-io-lo FERTILIZER.
MULCH
APPLY 4,Ooo LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING,
OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE
USED AS A MULCH ANCHORING TOOL.
MAINTENANCE
REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IM-
MEDIATELY FOLLOWING EROSION OR OTHER DAMAGE.
TEMPORARY FALL GRASSING DETAIL
SEEDING MIXTURE
SPECIES RATE (lb/acre)
Rye (grain) 120
SEEDING NOTES
MOUNTAINS - AUG.15-DEC.15
COASTAL PLAN and PIEDMONT - AUG. 15-DEC 30
SOIL AMENDMENTS
FOLLOW SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL
LIMESTONE AND i,000 LB/ACRE io-io-lo FERTILIZER.
MULCH
APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING,
OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE
USED AS A MULCH ANCHORING TOOL.
MAINTENANCE
Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre
of nitrogen in March. If it is necessary to extend temporary cover beyond
June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain)
or Korean (Mountains) lespedeza in late February or early March.
SPRING -SUMMER
PERMANENT GRASSING DETAIL
SEEDING MIXTURE
SPECIES RATE (lb/acre)
PENSACOLA BAHIAGRASS 50
SERICEA LESPEDEZA 30
COMMON BERMUDAGRASS 10
GERMAN MILLET 10
TALL FESCUE 50
SEEDING NOTES
1. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA.
2. USE COMMON BERUDAGRASS ONLY ON ISOLATED SITES WHERE IT CANNOT BE-
COME A PEST. BERMUDAGRASS MAY BE REPLACED WITH 5 lb/acre CENTIPEDEGRASS.
SEEDING DATES
APRIL 1- JULY 15
SOIL AMENDMENTS
APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 3,000 lb/acre
GROUND AGRICULTURE LIMESTONE AND Soo lb/acre 10-10-10 FERTILIZER.
MULCH
APPLY 4,000 lb/acre GRAIN STRAWOR EQUIVALENT COVER OF ANOTHER SUITABLE
MULCH. ANCHOR BY TACKING WITH ASPHALT, ROVING, OR NETTING OR BY CRIMPING
WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE
USED AS A MULCH ANCHORING TOOL.
MAINTENANCE
REFERTILIZE THE FOLLOWING APRIL WITH 50 lb/acre NITROGEN. REPEAT AS GROWTH
REQUIRES. MAY BE MOWED ONLY ONCE A YEAR. WHERE A NEAT APPEARANCE IS
DESIRED, OMIT SERICEA AND MOW AS OFTEN AS NEEDED.
FALL -WINTER
PERMANENT GRASSING DETAIL
SEEDING MIXTURE
SPECIES RATE„ (,lb/acre)
TALL FESCUE (BLEND OF TWO OR
THREE IMPROVED VARIETIES) 200
RYE (GRAIN) 25
SEEDING DATES
JANUARY - APRIL
AUGUST - DECEMBER
SOIL AMENDMENTS
APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 3.000-51
000 lb/acre
GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND
1,000 lb/acre 10-io-lo FERTILIZER.
MULCH
APPLY 4,000 lb/acre GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE
MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, ROVING, OR NETTING OR BY CRIMP-
ING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN
BE USED AS A MULCH ANCHORING TOOL.
MAINTENANCE
FERTILIZE ACCORDING TO SOIL TESTS OR APPLY 40 lb/acre NITROGEN IN JANUARY
OR FEBRUARY, 40 lb IN SEPTEMBER AND 40 lb IN NOVEMBER, FROM A 12-4-8,
16-4-8, OR SIMILAR TURF FERTILIZER. AVOID FERTILIZER APPLICATIONS DURING
WARM WEATHER, AS THIS INCREASES STAND LOSSES TO DISEASE. RESEED, FERTILIZE,
AND MULCH DAMAGED AREAS IMMEDIATELY. MOW TO A HEIGHT OF 2.5-3.5 INCHES
AS NEEDED.
GROUND STABILIZATION CRITERIA
SITE AREA
STABILIZATION
STABILIZATION
TIMEFRAME
DESCRIPTION
TIMEFRAME
EXCEPTIONS
* Perimeter dikes,
swales, ditches
7 Days
None
and slopes
* High Quality
Water (HQW)
7 Days
None
Zones
If slopes are 10' or
* Slopes Steeper
7 Days
less in length and
are not steeper than
than 3:1
2:1, 14 days are
allowed
* Slopes 3:1 or
7-days for slopes
flatter
14 Days
greater than 50 ft.
in length
* All other areas
None
with slopes flatter
14 Days
(except for perimeters
than 4:1
& HQW Zones
Note: Ground Stabilization chart may be required by NPDES permit.
STABILIZE SLOPES AS PER
MI SEEDING SPECS
6"
2„ - 3„ 30' MIN PLUG w/APPROVED FILL
COARSE AGGREGATE MATERIAL
ti
GEO FABRIC LINER FLOW
2
NOTE:
CONSTRUCTION ENTRANCE TO BE 12'OR ENTIRE WIDTH OF
ENTRANCE. WHICHEVER IS GREATER.
TEMPORARY GRAVEL
CONSTRUCTION ENTRANCE-
3�
Ilr.a z.
� = 2
TEMPORARY SILT
FENCE. (SEE DETAIL)
DITCH PLUG DETAIL.
n-rs
i i l I I i I I I -I I IT- I
NOTE: SWALES #2, #32 & #4 TO BE LINED WITH EXCELSIOR MATTING.
TYPICAL 3:1 GRASS SWALE.,
NTS
SUPPORT ROPE TO WIRE
TO PREVENT SAGGING
STEEL SUPPORT POST STAKE TO
240 INTO BOTTOM OR SIDE TSUPPORT WIRE
`-COIR MESH OR SIMILAR, STAPLED OR
TRENCHED INTO BOTTOM OR SIDE.
POROUS BAFFLE CROSS SECTION
NTS
POROUS BAF
(SEE DETAIL)
FLOW
15%
35%
25%
257.
SA
SA
SA
SA
POROUS BAFFLES_/ PLAN
(SEE DETAIL)
12" MIN NCDOT #5
OR #57 WASHED -
STONE
`::
I_1
SEDIMENT TRAP FILTER
SPILLWAY
/--- RIP RAP
L:
M- I A
J
SUMP \-' UNDISTURBED
BOTTOM CHANNEL BOTTOM
CROSS SECTION
STONE SECTION A -A
TEMPORARY SEDIMENT TRAP TABLE NOTES:
REQ D FRONDED L W D 1. SUMPESECODLYwILL BE CONSTRUCTED FIRST,
ACRES 2. SEDIMENI. TRAP HEIGHT TO BOTTOM OF SPILLWAY
2 0.88 970 7,535 N A N A 2.25 WILL BE NO LESS THAN TWO FEET.
SEE PLAN SHEET FOR LOCATION 3. SPILLWAY DEPTH SHALL BE ONE FOOT.
4. STONE FACE SHOULD BE NO LESS THAN 6 INCHES
MEASURED PERPENDICULARLY FROM THE FACE
OF THE LARGE STONE.
5. SUMP DIMENSIONS SHOULD ALLOW FOR A MINIMUM OF
3600 CF/ACRE OF SEDIMENT STORAGE.
6. DEPTH OF SEDIMENT IN SUMP WILL B CHECKED AFTER EACH
STORM AND CLEANED AS NECESSARY F(MIN. ONCE EACH 6 MONTHS).
7. REMOVAL OF -SEDIMENT TRAP WILL BE DONE IN SUCH A WAY
AS TO LIMIT SILTATION.
TEMPORARY SEDIMENT TRAP DETAIL-
NO.
BASIN
TOE OF DITCH
NTS
SFF PT.AN
SECTION A - A
i
I�
SEE PLAN
FTT.TFR FARA
ENERGY DISSIPATOR
NTS
SITE WORK NOTES:
1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS BOTH ON AND ADJACENT TO THE SITE.
2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE
DESIGNATED TO REMAIN.
3. GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES
ABOVE AND BELOW GRADE, ORGANIC MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION.
4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL REPRESENTATIVE TO COORDINATE REMOVAL
OF ANY SOFT AREAS.
5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A
PROPERLY PERMITTED FACILITY.
6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL RECOMMENDATIONS.
7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED EARTHWORK CONDITION. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES.
8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE PROPERLY PERMITTED FACILITY AS REQUIRED.
9. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT ELEVATIONS AND LOCATIONS OF ALL EXISTING UTILITIES AT ALL
CROSSINGS PRIOR TO COMMENCING TRENCH EXCAVATION. IF ACTUAL CLEARANCES ARE LESS THAN INDICATED ON PLAN, THE
CONTRACTOR SHALL CONTACT THE DESIGN ENGINEER BEFORE PROCEEDING WITH CONSTRUCTION. ANY CONDITION DISCOVERED'' OR
EXISTING THAT WOULD NECESSITATE A MODIFICATION OF THESE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN
ENGINEER BEFORE PROCEEDING WITH CONSTRUCTION.
1o. NO CONSTRUCTION IS TO BEGIN BEFORE LOCATION OF EXISTING UTILITIES HAS BEEN DETERMINED. CALL "NC ONE -CALL" AT LEAST 48
HOURS BEFORE COMMENCING CONSTRUCTION.
11. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION.
BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS,
THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10
DAYS PRIOR TO EXCAVATING.
12. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL
EXISTING UTILITIES WITH APPROPRIATE PERSONNEL.
13. CONTRACTOR SHALL ADJUST ALL MANHOLES, VALVE & CURB BOXES TO FINAL GRADE UPON COMPLETION OF ALL CONSTRUCTION.
ANY BOXES DAMAGED OR OTHERWISE DISTURBED BY THE CONTRACTOR SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR.
14. EXISTING SURVEYING PERFORMED BY C.I. GLOVER COMPANY, P.C.
15. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE THE CONTRACTOR SHALL REPORT ALL
DISCREPANCIES OR QUESTIONS TO THE ENGINEER PRIOR TO INSTALLATION.
16. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK UNLESS OTHERWISE DIRECTED BY
OWNER.
17. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL, STATE, AND CFPUA CODES. METERS, TAPS, MATERIALS,
WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS.'
18. ALL BACKFILL FROM UTILITY INSTALLATION MUST BE COMPACTED OR AMENDED TO PROVIDE TRAFFIC BEARING CAPACITY.
GEOTECHNICAL ENGINEER TO BE CONSULTED AT CONTRACTORS COST AS NECESSARY.
i9. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR
TO INSTALLATION. ALL AREAS SHALL BE SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES.
20. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI @ 28 DAYS - AIR
ENTRAINED.
21. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR BY THE OWNER. FURTHER TESTING REQUIRED
DUE TO A FAILED TEST WILL BE PAID FOR BY THE CONTRACTOR.
22. ALL SIDEWALKS SHALL BE FREE OF CRACKS, BREAKS, OR ANY OTHER DEFECT PRIOR TO RECEIVING A CERTIFICATE OF OCCUPANCY.'
CONSTRUCTION SEQUENCE:
CONSTRUCTION OF SITE TO START WITH INSTALLATION OF CONSTRUCTION ENTRANCE AND SILT FENCE ALONG ALL LOCATIONS PER
PLANS. UPON INSTALLATION OF SILT FENCE, TREES SHOULD BE REMOVED IN LOCATIONS AS NECESSARY. ALL SLOPED AREAS SHOULD
BE SEEDED IN ACCORDANCE TO SPECIFICATIONS. SLOPE STABILIZATION IS WITHIN 21 CALENDAR DAYS OF ANY PHASE OF
CONSTRUCTION. ALL OTHER AREAS MUST BE STABILIZED WITH IN 15 WORKING DAYS.
1. GENERAL CLEARING AND GRADING OF THIS SITE WILL NOT BE DONE UNTIL THE TEMPORARY SILT FENCE, CONSTRUCTION
ENTRANCE, AND INLET PROTECTION HAS BEEN INSTALLED.
2. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (1 VERTICAL TO 3
HORIZONTAL).
3. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND
AFTER CONSTRUCTION.
4. INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELED
CONSTRUCTION ENTRANCE, SILT FENCE, TREE PROTECTION FENCE, SEDIMENT TRAP & INLET PROTECTION. INSTALL ALL SECONDARY'
EROSION CONTROL MEASURES AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION.
5. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. SILT FENCE AND INLET PROTECTION TO BE CLEANED WHEN
HALF FULL.
6. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED.
7. MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PROJECT IS COMPLETE.
8. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS PLAN PROVE TO BE LESS EFFECTIVE.
9. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. ALL PERMANENT MEASURES
SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION.
L N7ENANCE PLAN
1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY
RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH
RAINFALL.
2. ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL BE PERIODICALLY TOP -DRESSED WITH AN ADDITIONAL 2
INCHES OF 2-3 INCH STONE TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO PREVENT MUD OR
SEDIMENT FROM LEAVING THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL SPILLED, WASHED OR TRACKED ONTO THE
CONSTRUCTION ENTRANCE OR ROADWAYS.
3. SEDIMENT WILL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL INLET PROTECTION, ROCK DOUGHNUT INLET PROTECTION,
SEDIMENT TRAP BAFFLES, AND ROCK PIPE INLET PROTECTION WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED
WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS AS DESIGNED. DEBRIS
WILL BE REMOVED FROM THE ROCK AND HARDWARE CLOTH TO ALLOW PROPER DRAINAGE. SILT SACKS WILL BE EMPTIED ONCE A
WEEK AND AFTER EVERY RAIN EVENT. SEDIMENT WILL BE REMOVED FROM AROUND BEAVER DAMS, DANDY SACKS AND SOCKS ONCE
A WEEK AND AFTER EVERY RAIN EVENT.
4. CHECK SEDIMENT BASIN AND BAFFLES WEEKLY & AFTER EACH RAINFALL EVENT. REMOVE SEDIMENT FROM TRAP & BAFFLES AND
RESTORE TO ORIGINAL VOLUME WHEN SEDIMENT ACCUMULATES TO ABOUT / THE DESIGN VOLUME. REPAIR / REPLACE BAFFLES IF
TORN, COLLAPSED, OR INEFFECTIVE.
5. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE
DIVERSION RIDGES WILL ALSO BE REPAIRED. SWALES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF
ANY PHASE OF ACTIVITY ASSOCIATED WITH A SWALE.
6. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL
BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL BE 6 FEET MAX. WITH THE USE
OF EXTRA STRENGTH FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAX WHEN STANDARD STRENGTH FABRIC
AND WIRE BACKING ARE USED. IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE IN THE SEDIMENT FENCE THE ROCK WILL
BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED.
VARIES (64MIN.)
AS DIR. BY ENG.
MIN. 12-1/2 GA. i
INTERMEDIATE WIRE
1611 F
0
NOTES: Li Li
1. FENCE FABRIC SHALL BE A MIN. OF 32" IN WIDTH AND
SHALL HAVE A MIN. OF SIX LINE WIRES WITH 12" STAY
SPACING.
2. FABRIC SHALL BE FOR EROSION CONTROL AND MIN. OF
36" IN WIDTH. FABRIC SHALL BE FASTENED
ADEQUATELY TO THE WIRE FABRIC AS DIRECTED BY THE
ENGINEER.
3. STEEL POST SHALL BE 5'-o IN HEIGHT AND BE OF THE
SELF -FASTENER STEEL ANGLE TYPE.
TEMPORARX"Y SILT FENCE
NTS
STEEL POST
WIRE FABRIC
FILTER FABRIC
ANCHOR FABRIC SKIRT
AS DIRECTED BY ENGINEER
7E_ �55 2013
VICINITY MAP (NOT TO SCALE):
OLD MILL RD ALEX TRASK DR
s
N
9
rFj*t O
n ITE
Al
o
J�v
�V
Io
\\\\0 \ l l l
CAROBESS
S E A L
• 032555
//llltll 11
CLIENT INFORMATION:
NEW BEGINNING
CHRISTIAN CHURCH, INC.
3120 ALEX TRASK DRIVE
CASTLE HAYNE, NC 28429
(910) 341-7984
DRAWN: EAS
SHEET SIZE: 24X36
CHECKED: CDC
DATE: 01-31-13
APPROVED: CDC
SCALE: NTS
PROJECT NUMBER: 100-083
NTS
DRAWING NUMBER:
1_ C-
5
5 of 6
VICINITY MAP (NOT TO SCALE):
LLLD MILL RO / c-ALEX TRASK DR /
TOP OF BANK
EL. 35.0
10' EMBANKMENT
FLOOD POOL EL. 33.0
w z SF
NORMAL POOL EL. 31.5
o
v v
30.25 55'x10'x12" a 29.00
CLASS "B" RIP RAP NON - WOVEN
FOREBAY � GEOTEXTILE
15 BOTTOM EL.29.5 1' MIN. FABRIC MAIN POOL
3 CLEAN OUT 27.25 TUCK
(TYP.) 3
BOTTOM EL. 26.2"
CLEAN OUT 25.25
* POND SLOPE TO BE SEEDED IN ACCORDANCE TO SEEDING SPECIFICATIONS
* 10:1 VEGETATED SHELF TO BE PLANTED WITH WETLAND SPECIES:
BOTTOM HALF OF SHELF: SOFTSTEM BULRUSH, BROADLEAF ARROWHEAD, PICKEREL WEED.
TOP HALF OF SHELF: SWAMP MILKWEED, JOE PYE WEED, CARDNAL FLOWER.
EITHER HALF OF SHELF: COMMON RUSH, WOOLGRASS
* VEGETATED SHELF SHALL BE PLANTED WITH PLUGS OR POTS AT 24" O.C.
IN A CHECKERBOARD PATTERN.
* ALL LANDSCAPE MATERIAL SHOULD BE PLANTED IN GOOD TOPSOIL. IN -SITU SOIL
MAY BE USED IF TILLED WITH 4" OF TOPSOIL.
* A PUMP WILL BE PROVIDED TO DRAIN THE BASIN FOR MAINTENANCE AND
EMERGENCIES
DETENTION POND & FOREBAY SECTION
NTS
A
L15"
A:
RCP
TilN
6" ORIFICE
INV. 31.25
Ll co
Lsaa V 30-011 4s» V
PLAN
GALV. BAR GRATING - 1 is
PVC END'
x 1 8" BEARING BARS
/
(MAX OPENING 4"),
ATTACH GALVANIZED WIRE -c
FASTEN WITH TYPE J
TOP - 32.9 ATTACH GALVANIZED WIRE
CLIPS. ATTACH TO 1-1 /4"
CLOTH OVER 6 ORIFICE
x 1-1/4 or x1 /4"
(8 MESH .020 WIRE) PVC TEE -
GALVANIZED ANGLE FRAME.
15"
ROP 12" MIN NCDOT #5
MORTAR FRAME TO TOP
OR #57 WASHED
OF OUTLET STRUCTURE.
v �ivivc.
� OTTOM 31.25
g" 3'-07 L6
Al
6" ORIFICE RIP RAP
INV. 31.25
SECTIONA -A
BASIN*2 OUTLET STRUCTURE
NTS
TOP OF BANK
EL. 33.50
1�
3
SPILLWAY 33.25
BOTTOM EL-31.25
* SLOPE TO BE SEEDED IN ACCORDANCE TO SEEDING SPECIFICATIONS
* ALL LANDSCAPE MATERIAL SHOULD BE PLANTED IN GOOD TOPSOIL. IN -SITU SOIL
MAY BE USED IF TILLED WITH 4" OF TOPSOIL.
BASIN # 2
NTS
VViYI"w I ".w Vw"dwi 71V�
20' ASPHALT DRIVE SECTION
ARM ASSEMBLY
�1
3
"C" ENCLOSURE
PROSEPECTIVE VIEW "- WATER ENTRY UNIT
scEHDULE 40
PVC PIPE VENT PVC PIPE
PVC ELBOW
WATER SURFACE
6" SCHEDULE 40
PVC END CAP PVC PIPE ORIFICE PLATE
PVC PIPE (8) 1" HOLIES PVC TEE
IN UNDERSIDE
FLEXIBLE HOSE
CONNECTED TO
OUTLET STRUCTURE ORIFICE
EN D VI EW FRONT VIEW
NOTES:
1. SKIMMER TO BE USED IN WET POND AND REMOVED AFTER SITE IS PEPMANENTLY STABLE.
F.AIRCLOTH SKIMMER DETAIL
3
(MAX)
2" LAYER
TYPE SF 9.5A
8" ABC
3 �
TOP OF SHELF 32.00
BOTTOM OF SHELF 31.00
M
.7VU '`- vHERE CENTER gECm am is REmm_ED
GUTTER SIMLI. SLOE AWAY AS SFOMN
STANDARD 6" CURB SECTION
TYPE "A" SD -01
7
NTS
2" SF9.5A
BOTTOM OF
SPILLWAY EL
Im
I I EL. 35.0
EL. 34.5
3 S
OF BANK
55.0
EMERGENCY SPILLWAY DETAIL
NTS
24" WEIR
INV 32.75
co
A Aw
L3091 RCP o
d'
1.0" I.D.
STEEL PIPE[E-7
Ls,> L 4*-0 91 s„
PLAN
GALV. BAR GRATING - 1 " x 1 /8" BEARING BARS (MAX
OPENING 49'). FASTEN WITH TYPE J CLIPS. ATTACH TO
1-1/4 or x 1-1/4" xl /4" GALVANIZED ANGLE FRAME.
MORTAR FRAME TO TOP OF OUTLET STRUCTURE. ATTACH GALVANIZED WIRE
_ 3 CLOTH OVER SMALL DIAMETER
--� 1 ORIFICE (8 MESH .020 WIRE)
COUNTY
TOP OF BANK .� FLOOD POOL 33.50
MSTATE
30" RC
NV. 31.5 NORMAL POOL 31.50
• w
NV. 31.0
w
3 c
L-} 1 w I
��- BOTTOM 25.25
SECTION A - A �--� _ -
NOTE: 24" WEIR TO BE CUT AT TIME OF SKIMMER REMOVAL.
DETENTION POND OUTLET STRUCTURE
14TS
o z VALLEY
CURB(BEYOND)
uj � rr%Klf%oc-rc
CONCRETE FLUME SECTION A -A
NTS-------
4-0»
s„ 3,_0» 4 s„
�- 3" MIN. COMPACTED STONE
CONCRETE FLUME DETAIL
COMPACTED
I=III=III=III=III-�-III-III-III-III-III- SUBGR4DE NTS
PAVEMENT SECTION
hn
REVISIONS
12/20/13 Revised Wet Pond and Outlet
o
N
� N
4r\
O ct
4!
Z
'z�'�
a�
U
r r l
E
CAROB
L r
S E A L
032555
:Oop-16
CLIENT INFORMATION:
NEW BEGINNING
CHRISTIAN CHURCH, INC.
3120 ALEX TRASK DRIVE
CASTLE HAYNE, NC 28429
(910) 341-7984
DRAWN: EAS
SHEET SIZE: 24X36
CHECKED: CDC
DATE: 01-31-13
APPROVED: CDC
SCALE: NTS
PROJECT NUMBER: 100-083
NTS
DRAWING NUMBER:
-6
C
6 of 6