Loading...
HomeMy WebLinkAboutNC0021644_Response (NOV-2021-LV-0055 and NOV-2021-LM-0002)_20210202Response for NOV-2021-LV-0055 and NOV-2021-LM-0002 Facility: La Grange WWTP Permit: NC0021644 Mr. Tankard, This letter is in response to the NOV's received by the Town of La Grange WWTP dated January 26, 2021. In reference to the NOV for the July 2020 monitoring report (Total Flow). I have corrected the DMR by inserting the Total Flow into its column, the DMR has been revised and uploaded to the eDMR monthly report. Sorry for the oversight. In reference to the NOV's for (Total Phosphorus) May 16-July 4, during this period we were having a difficult time trying to keep the Phosphorous under control biologically. I had several conversations with Mr. Mays to keep him updated and for technical assistance. Throughout the process he was helpful in making suggestions as to our next steps to remedy the problem. Unfortunately, we were unable to perform in house analysis and it takes a couple weeks for us to get our results back for this parameter. As we made operational changes we had to wait a couple of weeks to see if what we were doing was having a positive effect. Eventually, we were able to find a way to get an estimated Total Phosphorous reading on a daily basis with a color wheel test. By making operational changes, the addition of Liquid Alum, and with having estimated daily test results we were able to get the Total Phosphorous within the acceptable limits. As of today, we haven't had a Phosphorous reading outside of acceptable limits since the unacceptable July 4th results. Thanks, Wesley Sutton Town of La Grange Copy of Email Below [External] NOV Town of La Grange 410 Wesley Suttonv djwsutton@Iagangenccom, To 0May,,Paul Crart John P vpMan wiio„-up Mr. Tankard, This letter Is in response to the NOV, received by the Town of la Grange WIMP dated January PG 2021. In reference to the NOV for the 1 my 2020 monitoring report (Total flow). bake corrected the DMR by inserting the Total Flow Into rts column, the OMR has been revised and uploaded to the eDMR monthly report. Sorry for the oversight. In reference to the NOVs for (Total Phosphorus) May 16-Julyel, during this period we were having difficult time trying to keep the Phosphorous under control biologically. I had several conversations with Mr. Mays to keep him updated and for technical assistance. Throughout the process he was helpful In making suggestions as to our neat steps to remedy the problem unfortunately, we were unable to perform in house analysis and stakes a couple weeks for us to get our results backfor this parameter. As made operational changes we had to wait a couple of weeks w see If what we were doing was having a positive effect. Eventually, we were Alen find a way to get an estimated Tots l Phosphorous reading on a daily basis with a color wheel test. By making operational changes, the addition of Liquid Alum, and with having estimated daily test results we were able to get the Total Phosphorous within the acceptable hints. Asoftoday, we haven't had a Phosphorous reading outside of acceptable limits since the unacceptable July 4' results. Thanks, Wesleysutton Town of la Grange