HomeMy WebLinkAboutSW4210302_Supplement EZ_20210621SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
:OJECT INFORMATI N
1 Project Name
2 Project Area ac
3 Coastal Wetland Area
ASU Poplar Grove Child Development Center
3.9
4 1 Surface Water Area ac 0.117 wetlands
5 Is this project High or Low Density? High
6 Does this project use an off -site SCM? No
COMPL E WITH 02H .1003(4)
7
Width of vegetated setbacks provided (feet)
30
8
Will the vegetated setback remain vegetated?
Yes
9
Is BUA other that as listed in .1003 4 c-d out of the setback?
Yes
10
Is streambank stabilization proposed on this project?
No
BER AND TYPE
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
0
14
Stormwater Wetland
0
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-FS
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0
25
Ba filter
1
26
Filterra
0
FORMS LOADED
SIGNER CERTIFICATION
27
Name and Title:
Michael Cain, PE
28
Organization:
Civil Design Concepts
29
Street address:
168 Patton Avenue
30
City, State, Zip:
Asheville, NC 28801
31
Phone numbers :
828-252-5388
32
Email:
mcain@cdcdgo.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
O� 0 E AOOl2
=o°QO �9°
SEAL 1.=
047788
o
�Oo �N01 NE�-�°°���
tiq EMI J\\G
Signatur of Design
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
ite
1
4
Type of SCM
r
5
Total BUA in project (sq ft)
r467718f
6
New BUA on subdivided lots (subject to permitting)
(sq ft
7
New BUA outside of subdivided lots (subject to
permitting) (so
8146 sf
8
Offsite - total area (sq ft)
sf
9
Offsite BUA (sq ft
sf
10
Breakdown of new BUA outside subdivided lots:
Parkin (sq ft
1620 sf
Sidewalk (sq ft
242 sf
Roof (sq ft
5324 sf
Roadway s ft
960 sf
Future (sq ft
Other, please specify in the comment box
below (sq ft
8146 sf
11
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
12
New infiltrating permeable pavement outside of
Isubdivided lots (sq ft
sf
13permitting)
Exisitng BUA that will remain (not subject to
s ft
38572 sf
14
Existing BUA that is already permitted (sq ft
38572 sf
15
Existing BUA that will be removed (sq ft
sf
16
Percent BUA
28%
17
Design storm inches
1 in
18
Design volume of SCM cu ft
NA
19
1 Calculation method for design volume
NA
ADDITIONAL INFORMATION
20
Please use this space to provide any additional information about the
drainage area(s):
One drainage area consisting of the impervious portion of the developed site
will drain to a Bayfilter system
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
NA
5
Total BUA from project (sq ft)
6
1995 rules
SL 2006-246
2008 rules
2017 rules
7
New BUA on subdivided lots (subject to
permitting) (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
8
New BUA outside of subdivided lots (subject to
permitting) (sf)
1995 rules
SL 2006-246
2008 rules
2017 rules
9
Offsite - total area (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
10
Offsite BUA (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
11
Design storm (inches)
1995 rules
SL 2006-246
2008 rules
2017 rules
12
Breakdown of new BUA:
Parking (sq ft
Sidewalk (sq ft)
Roof (sq ft
Roadway (sq ft)
Future (sq ft)
Other, please specify in the comment box
below (sq ft
13
New infiltrating permeable pavement on
Isubdivided lots (sq ft
14
New infiltrating permeable pavement outside of
subdivided lots (sq ft
15
Exisitng BUA that will remain (not subject to
permitting) (sq ft)
16
Existing BUA that is already permitted (sq ft
17
Existing BUA that will be removed (sq ft)
18
Percent BUA
19
Design volume of SCM (cu ft)
20
Calculation method for design volume
ADDITIOWAL INFORKMtION
21
Please use this space to provide any additional
information about the drainage area(s):
BAYFILTER
1
Drainage area number
1
2
1 Design volume (cu ft) or peak treatment rate (cfs) of SCM
0.43 cfs
GENERAL
MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build-
out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
NA
6
Does the SCM have retaining walls, gabion walls or other
engineered side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from
erosion (10-year storm)? Yes
Is there an overflow or bypass for inflow volume in excess of
the design volume? Yes
What is the method for dewatering the SCM for maintenance? Other
8
9
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat
comply with General MDC (10)?
Yes
14
Is there an O&M Agreement that complies with General MDC
(11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
Yes
16
Does the SCM follow the device specific MDC?
17
Was the SCM designed by an NC licensed professional? Yes
BAYFILTER MDC FROM THE STORMWATER DESIGN MANUAL
18
If Volume Design is used, what is the volume from the
drainage area (cubic feet)?
NA
19
Is an upstream detention used?
No
20
Volume of the upslope detenion system (cubic feet)
NA
21
Percent of the design volume contained in the upslope
detention system (%)
NA
22
If Rate Based Sizing is used, for 1 inch or 1.5 inch (Coastal
areas). Water Quality flow rate for drainage area (cfs)
0.43 cfs
23
Number of cartridges
4
24
Cartridge height (inches)
36 in
25
SHWT elevation (fmsl)
NA
26
Elevation of bottom of BayFilter vault (fmsl)
3308.65
27
Clearance from the SHWT (feet)
NA
28
BayFilter Media Flow Rate (GPM/ft2 of Media Surface)
gpm/sf
29
Does the system includes a sediment sump?
No
30
If yes, the diameter of the sump (feet)
NA
31
If yes, the depth of the sump (feet)
NA
32
Time to drain the sump (hours)
NA
33
Time to drain the BayFilter (hours)
NA
34
Is an off-line flow splitting device used?
No
35
Type of media used (EMC or GAC-metals)
EMC
36
Will maintenance be performed by Certified Maintenance
providers per instructions?
Yes
ADDITIONAL INFORMATION
37
Please use this space to provide any additional information
about the BayFilter system(s):