Loading...
HomeMy WebLinkAboutNCC213690_ESC Approval Submitted (2)_20210622DEPARTMENT OF PUBLIC UTILITIES Post Office Box 2263 SMITHFIELD, NC 27577 (919)989-5075 June 10, 2021 Matt Widmaier Track West Partners 445 Bishop Street NW Atlanta, GA 30318 Re: Hwy 55 — McGee's Crossroads (21-018-P) Stormwater Management Plan To Whom It May Concern: We have reviewed the Stormwater Management/Erosion Control Plan and calculations submitted for the above referenced project. Based upon the information submitted, the plans have been APPROVED with the following conditions: 1. Please indicate all drainage easements, riparian buffers, jurisdictional wetlands, and flood hazard areas on the Final Plat if a plat is recorded. 2. A stormwater certification by the engineer of record will be required at the completion of the project prior to CO. Please be reminded that no land disturbing activities may begin on this site until a stormwater management plan is approved and all other necessary approvals are obtained. A copy of this letter will be forwarded to the Planning Office for their files. If you have any questions or need additional information, please contact me at (919) 209-8333 or by email at j ej a ssica.batten(a�ohnstonnc.com. Sincerely, Jessica Batten, EI Development Engineer/Stormwater Manager