HomeMy WebLinkAboutSWA000106_Design Calculations_20210621Culvert Calculations For Pinewood Subdivision CESI PROJECT NO. 210113.000 Client: Olde South Land, LLC Client Representative: David Tibbals P: 704.995.2808 david(a)charlottecommercialuartners.com Preparer's Name: Kate Underwood, PhD, PE CESI NCBELS Corporate License Number C-0263 PO Box 268 Concord, NC 28026-0268 P.704.786.5404 F.704.786.7454 M.704.902.6169 kateunderwood@cesic4s.com `,,,•�.� `CAR, ES L n = 033470 - O0 ��A ' �FHGINE��•: O` rW. UTA, 05/25/2021 Flow Calculation Recommended Runoff Coefficients Applicable Areas Description of Area Runoff Coefficient 1 RE - max 1 du/ac 0.35 * Ref. Table 2-4 Character of Surface Runoff Coefficient 2 Pavement 0.95 * Ref. Table 2-5 Area Calculations Applicable Areas (sf) (ac) 1 5,737 0.132 2 89,414 2.053 Total 95,151 2.184 Calculated Runoff 0.39 Coefficient C = Frequecy Factor for 1.10 25 Year Interval Cf = * Ref. Table 2-6 Assumed Time Concentration Tc = 5 (mins) Ave Rainfall Intensity (i) (duration equal to Tc) = 8 (in/hr) * Ref Table 2-3 Q = 7.42 cfs 2.3.1 Rational Method The Rational Method is an empiricalrunoff formula that has gained wide acceptance because of its simple, intuitive treatment of peak storm runoff rates for small drainage basins. This method relates runoff to rainfall intensity, surface area, and surface characteristics by the formula: where: Q = Cf CiA (2-1) Q — peak runoff rate, in cubic feet per second Cf = frequency factor to adjust the runoff coefficient for less frequent, high intensity storms C = runoff coefficient I average rainfall intensity, for a duration equal to the time of concentration, in inches per hour A — drainage area of the tributary to the point under consideration, in acres Adapted January 10, 2008 2-6 Technical Standards Manual Stormwater Culvert Minimum RCP Diameter Calculation For circular pipes flowing just full_ the Manning equation can be reformulated as- QL 3. S D = 16 [(4-2) where: D = Theoretical pipe diameter (in) for just -full flow. Q = Discharge (cfs). n = Manning roughness coefficient (dimensionless). s = Longitudinal slope (Wft). Q= 7.423 (FlowCalc) n = 0.012 * Ref Table 7-3 s = 0.0448 (4.48% slope) D = 11.57 (in) RCP minimum diameter 15" RCP > 11.57" RCP therefore use 15" RCP References Tables Utilized in Culvert Calculations are in Reference to City of Concord Stormwater Technical Manual irks] 10 8 � g 0 N 4 ct� = 2 .T N a�i 1 0.8 0.6 w cu 0.4 IY 0.2 0.1 +- 0.1 SECTION 2 STORMWATER RUNOFF 0.2 0.4 0.6 0.8 1 2 4 6 8 10 Duration -Hours Figure 2-2 Intensity -Duration -Frequency Curves for Concord, NC 20 TABLE 2-3 ORDINATES OF THE iDF CURVES FOR CONCORD, NC Duration Return Period (years) Hours Minute 1 2 5 10 5o 1 (0) 0 5 4.80 5.66 6.60 7.26 8.00 8.52 898 10 3.83 4.54 5.29 5.81 6.39 6.79 7.13 15 3.19 3,80 4.46 4,90 5.39 5,72 6,01 30 2.19 2,62 3.17 3.55 3.99 4.31 4,60 1 1.36 1,65 2.03 2.31 2.66 2.92 3.17 2 0.79 0,96 1.19 1.36 1.59 1.75 1.92 3 0.56 0.68 0.85 0.98 1.15 1.29 1.42 6 0.34 0,41 0.51 0.59 0.70 0.79 0.87 12 020 0,24 0.31 0,35 0,42 0.48 4.53 24 i?. 1 3 0,14 0.18 0.21 0.25 0,28 fl. ; 1 ldnpted Januor 10.2068 2-5 Technical Slandards Manual SECTION 2 STORMWATER RUNOFF TABLE 24 RECOMMENDED RATIONAL METHOD RUNOFF COEFFICIENTS FOR LAND USE Runoff Coefficient Description of Area {t p to 10-Year Design Storm) Business. Downtown 0.70 to 0.95 Neighborhood 0.50 to 0.70 Residential RE - maximum of 1 dulac 0AS RL maximum of 2 dulac 0.45 RM-1 and RM-2 - maximum of du/ac 0.50 RV - maximum of 8 dulac 0.57 RC - maximum of 15 dulac 0.65 industrial: Light 0.50 to 0.80 Heavy 0.60 to 0.90 Parks and Cemeteries 0.10 to 0.25 Playgrounds 0.20 to 0.40 Railroad Yard 0.20 to 0A Unimproved 0.10 to 0.30 TABLE 2-5 SUGGESTED RATIONAL METHOD RUNOFF COEFFICIENTS FOR SURFACE TYPES Character of Surface Runoff Coefficient (Up to 10-Year Design Storm) Pavement : Asphaltic and Concrete 0.95 Brick 0.85 Wooded 0.25 Packed gravel areas 0.55 Unpacked gravel areas 0.85 Driveways and Walkways 0.95 Roofs 0.95 Turf Slopes: Fiat, 0 Lo I percent 0.25 Average, 1 to 3 percent 0.35 Hilly, 3 to 1.0 percent 0.40 Steep, 10 percent + 0.45 Cultivated Ground: Flat, 0 to 1 percent 0.10 Average, 1 to 3 percent 0.20 Hilly, 3 to 10 percent 0.25 Steep, 10 percent 0.30 Adapted January la. 2008 2-8 Technical Standards Manual SECTION 2 STORMWATER RUNOFF TABLE 2-5 FREQUENCY FACTORS FOR THE RATIONAL METHOD Recurrence Adjustment Interval (years) Factor, Cr 1 to 10 1.00 25 1.10 50 1.20 100 1.25 Rainfall Intensity,1 Rainfall intensity, i, is the average rate of rainfall in inches per how, intensity is selected on the basis of design frequency of occurrence, a statistical parameter established by design criteria, and time of concentration. Rainfall intensity can be determined for the 1-, 2-, 5-, 10-, 25-, 50-, and 100- year return periods from Figure 2-2 and Table 2-3. Note that the total design storm depth (or volume) is not used in the Rational Method. This method determines only the peak discharge rate not the total runoff volume. Travel Time, Tt Travel time, T, is the time required for water to travel from one location to another in a watershed. Tt is a component of time of concentration (.), which is the time for runoff to travel from the hydraulically most distant point of the watershed to the point of design. T, is computed by summing all the travel times for consecutive components of the drainage conveyance system. T, influences the shape and peak of the runoff hydrograph. Urbanization usually decreases T., thereby increasing the peak discharge; but T. can be increased as a result of (a) ponding behind small or inadequate drainage systems, including storm drain inlets and road culverts; or (b) reduction of land slope through grading. T, is the sum ofT, values for the various consecutive flow segments. where: T, = TEl + Ta +. .. Tt. T� = time of concentration, in minutes m = number of flow segments T, travel time, in minutes (2-2) Note: For application within the City, a minimum time of concentration of 5 minutes shall be used for each area or sub area to which the Rational Method is applied. Adapted January la. 2008 2-9 Technical Standards Manual wol a41 s 11 i910 noF 3210338 I103 nxx .nz�mm aarow aaa nioiz ax uaona en 3 0 fibBb-Zf9 009tl 1 IIVO 1191X3 N011VV101V01tl3A10J vnu�n�xy xasuzn amen �z srt w oo� aalua0 11op—au0 oulloao0 4VoN NOISIAloanS OOOM3NId """' z� u _ __--- - ---- -- ---- ------------ -- --- ---------------- - ----------------------- - —_ —_ — --_----_ ___--- -� — - _- --- — - _ - -------- - _ ---- ----' _ - _ � — - --- �/ — `'- - -------------- ------------------- -- - -- i -- _ _ -- JLLI ---- \ - - - - - - - - - - - _ -- — —— Riprap User Input Data Calculated Value Reference Data Designed By: SAT Date: 04.19.2021 Checked By: KWU Company: CESI Project Name: Pinewood Subdivision Project No.: 210113.000 Site Location (City/Town) Midland, NC Culvert Id. FES-2 Step 1. Determine the taihw-ater depot fi-om channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classified mi' in,um tallwater condition. If it is greater than half the pipe diameter, it is classified maximtmi condition. Pipes that outlet onto wide flat areas «71th no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise. Outlet pipe diameter, Do (in.) 15 Tailwater depth (in.) 0 Minimum/Maximum tailwater? Min TW (Fig. 8.06a) Discharge (cfs) 7.42 See 10 year Hydraulic Gradeline Calculation results Step 2. Based on the tailwater conditions determined in step 1, enter Figure 8.06a or Figure 8.06b, and determine d50 riprap size and minimum apron length (L). The d50 size is the median stone size in a well -graded riprap apron_ Step 3. Determine apron width at the pipe outlet, the apron shape, and the apron width at the outlet end from the same figure used in Step 2_ Minimum TW Maximum TW Figure 8.06a Figure 8.06b Riprap d50, (ft.) 0.4 Minimum apron length, La (ft.) 8 Apron width at pipe outlet (ft.) 3.75 3.75 Apron shape Trapezoidal Apron width at outlet end (ft.) 9 1 �r« a. Determine the inavainumm stone diameter: d,aR = 1.5 x d,,o Minimum TW Maximum TW Max Stone Diameter, dmax (ft.) 0.6 0 Step 5. Determine the apron thickness: CLASS SELCTION: Apron thickness = I F, x d Apron Thickness(ft.) Minimum TW Maximum TW 0.9 0 B RIP RAP CLASS MINIMUM MIDRANGE MAXIMUM A 2 IN 0.17 FT 4 IN 0.33 FT 6 IN 0.5 FT B 5 IN 0.42 FT 8 IN 0.67 FT 12 IN 1 FT 1 5 IN 0.42 FT 10 IN 0.83 FT 17 IN 1.42 FT 2 1 9 IN 0.75 FT 14 IN 1.17 FT 23 IN 1.92 FT Step 6. Fit the riprap apron to the site by making it level for the minimum length, La, from Figure 8.06a or Figure 8.06b_ Extend the apron farther downstream and along channel banks until stability is assured. Keep the apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of riprap where protection of the channel side slopes is necessary (Appendix 8.05), Where overfaUs exist at pipe outlets or flows are excessive, a plunge pool should be considered, see page 8.06.8. 30 Outlet IW • Do + La pipe i diameter (Ob) La F- 0 3 5 20 50 1D0 200 500 100U 7.42 -1 Discharge (ft3/sec) Curves may not be extrapolated. Figure 0.06a Design of outlet protection protection from around pipe flowing full. minimum tailwaier condition (Tw c 0.6 diameter). Rev. 12 93 8.06.3