HomeMy WebLinkAboutU-5204 (5)April 26, 2013
Mr. Michael Pettyjohn, P.E.
Division 11 Engineer
N.C. Department of Transportation
Post Office Box 250
North Wilkesboro, North Carolina 28659
Subject: Follow -up Inspection
NCSR 1764 (New Farm Road)
TIP No. U -5204
Caldwell County
Dear Mr. Pettyjohn:
John E. Skvarla, III
Secretary
On April 25, 2013, I inspected the new construction project on NCSR 1764 (New Farm Road), TIP No.
U -5204, in Caldwell County. Construction activities include heavy grading and bridge construction.
Please ensure that all sediment and erosion control structures are maintained and seeding and mulching are
performed as required to protect State surface waters. Also, please refer to the attached inspection report for
any specific items noted during the inspections.
If you have questions, please call me at 828 - 296 -4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: David Poindexter, PE
Heath Slaughter, Division 11, DEO
Neal Trivette, Roadside Environmental
' Transportation Permitting Unit
Mike Parker, Asheville Regional Office
TIP No U -5204 April 2013 Inspection2 Letter
SURFACE WATER PROTECTION SECTION — Asheville Regional Office
2090 U.S 70 Highway, Swannanoa, NC 28778 -8211
Phone: 828 - 296 -45001 FAX: 828 - 299 -7043
Internet: www.ncwaterguality.org
An Equal Opportunity 1 Affirmative Action Employer
NorthCarolina
Naturally
s
k -
I
i
i
f
Site inspection Report
Site Number: WT000423
Site Name: NCSR 1764 U -5204
Site Address:
County: Caldwell
Directions:
Latitude:
Site Owner Name: NCDOT Division 11
Inspection Date: 04/25/13
Reason for Inspection: Follow -Up
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Michael R Parker
Secondary Inspector(s):
Facility compliance Status: ® Compliant
Program Area: 401 (includes isolated /non -404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Region: Asheville
Longitude:
n Not Compliant
Phone:
Phone: 828 -296 -4500
This was a follow up inspection to the inspection conducted on April 2, 2013.
The large sediment basin downstream of the high bridge needs to be cleaned.
Seed embankment on downstream side of bridge near MDI.
The small basin in front of the 57 stone check in the silt fence near Station 57 +00 should be cleaned.
Repair rills in cut and fill slopes. These are mainly on the east side of the project.
Continue to maintain sediment and erosion control measures.
Seed and mulch areas as required.
Page: 1
I
Site Number: WT000423 Owner: NCDOT Division 11
Inspection Date: 04/25/13 Inspection Type: Site Inspection (DOT) Reason for Visit: Follow -Up
Permit 401 WQC
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and /or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
Yes No NA NE
is 000
12 000
®000
Page: 2
J -