Loading...
HomeMy WebLinkAboutNC0037508_Pretreatment Compliance Insp_20000713NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY F AYETTEVILLE REGIONAL OFFICE July 13, 2000 Lisa Adams Pretreatment Coordinator Moore County Water Pollution Control Plant P.O. Box 1927 Carthage, NC 28327 SUBJECT: Pretreatment Compliance Inspection Moore County Water Pollution Control Plant NPDES Permit No. NC0037508 Moore County Dear Ms. Adams: Enclosed you will find a copy of the Pretreatment Compliance Inspection Report for the inspection conducted on May 10, 2000. The report indicates that Moore County Water Pollution Control Plant continues to meet the pretreatment requirements as outlined in 15A NCAC 2H .0900 for Local Pretreatment Programs. You are commended for your success in maintaining your. program in such a manner that has ensured the best water quality possible to the stream as well as maintaining the NPDES permit limits. The report is self-explanatory and contains observations and recommendations. If you or your staff have any questions or require clarification, please do not hesitate to contact me at (910) 486-1541 extension 340. Sincerely, Lam_ Dale Lopez Environmental Specialist II /di Enclosures cc: DWQ Pretreatment Unit 225 GREEN STREET, SUITE 714 / SYSTEL BLD. FAYETTEVILLE, NORTH CAROLINA 28301-5043 PHONE 910-486-1541 FAX 910-486-0707 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER - 5O% RECYCLED/10% POST -CONSUMER PAPER NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT FAYETTEVILLE REGIONAL OFFICE BACKGROUND INFORMATION 1. Control Authority (POTW) Name: Moore County Water Pollution Control Plant 2. Control Authority Representative: Lisa Adams . 3. Title(s): Laboratory Supervisor/Pretreatment Coordinator ^� 4. Last Inspection Date: 6/3/99 Inspection Type (Circle One): PCI L"udtt) 5. Has Program Completed All Requirements from the Previous Inspection or Program Info Sheet(s)? 6. Is POTW under an Order That Includes Pretreatment Conditions? Order Type And Number: Are Milestone Dates Being Met? Yes / No PCS CODING Trans.Code JNJ Program NPDES Number 1NICIO 1013171510181 MM/DD/YY 05 / 10 / 00 (DTIA) Inspec.Type JP1 (TYPI) Inspector JSI (INSP) es% No Yes /6) Fac.Type J1J (FACC) 7. Current Number of Significant Industrial Users (SIUs)? 3 S1US 8. Current Number of Categorical Industrial Users (CIUs)? 2 CIUS 9. Number of SIUs Not Inspected by POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled by POTW in the Last Calendar Year? 0. 11. Enter the Higher Number of 9 or 10. 01 NOIN 12. Number of SIUs With No IUP or With an Expired IUP? 0 NOCM 13. Number of SIUs In SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi -Annual Periods (Total Number of SIUs in SNC). 0 PSNC 14. Number of SIUs. in SNC for Reporting During Either of the Last 2 Semi -Annual Periods. 0 MSNC 15. Number of SIUs. in SNC for Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 SNPS 16. Number of SIUs in SNC for Both Reporting and Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What' are the parameters and how are these problems being addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How Are These Problems Being Addressed? 19. Which Industries have been in SNC during either of the Last 2 Semi - Annual Periods? Have any Industries in SNC (During Either of the Last 2 Semi -Annual Periods) not been Published for Public Notice? (May refer to PAR if Excessive SIUs in SNC) SNC for Limits: None SNC for Reporting: 0 Not Published: 0 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed copy of the Order been sent to the Division? None 21. Are any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? YES NO PRETREATMENT PROGRAM ELEMENTS REVIEW - Please review POTW files and complete the following: Program Element Date of Last Approval Date Next Due, If Applicable Headwork Analysis (HWA) 07/10/98 04/01/03 Industrial Waste Survey (IWS) 03/01/99 Sewer Use Ordinance (SUO) 10/07/97 Enforcement Response Plan (ERP) 04/27/98 Long Term Monitoring Plan (LTMP 09/02/98 22. Is the LTMP Monitoring Being Conducted at Appropriate Locations and Frequencies? 23. Should any Pollutants of Concern be Eliminated From or Added, to the LTMP? If Yes, which ones? Eliminated: Added: s /INo Yes i 24. Are Correct Detection Levels being used for all LTMP Monitoring? Yff No 25. Is the LTMP Data Maintained in a Table or Equivalent? Yes No Is the Table Adequate? Yes No INDUSTRIAL USER PERMIT (UP) FILE REVIEW 26. User Name 1. Indersoll-Rand 2. Erico 3. Intek sr 1 ..f. }}QQ(( . DUOS File Contain CLlI1CIIt PeLIn. 7 Permit Expiration Date? . 06/30/03 06/30/03 06/30/03 30. Categorical Standard Applied (I.E. 40 CFR 413, Etc.) or N/A 433 433 N/A 31. Does the File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? Yes /0 Latest is 2/10/93 es o Mar 24, 1998 esGNo Apr 3, 199 32. Does the File Contain an Inspection Completed Within Last Calendar Year? No April 30, 1999 e o May 21, 1999 lY '/No May 24,'9 33. a. Does File Contain A Slug Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a. &/ No b. Yes / No �4� a/No b. Yes/No �AJ a. 57N b. Yes/N A 34. For 40 CFR 413 And 433 TTO Certifiers, Does The File Contain A Toxic Organic. Management Plan (TOMP)? Ye.)/ No N/A L-� Yes& Yes �� 35. a. Does the File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? J 17, 1998 as)/ No b. es No N/A rJ,,,uc/7;z a. es ' o b.eo a. e b. 36. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP? es' No No es o 37. Does File Contain POTW Sampling Chain -Of -Custody's? es / No Yes/No &s/No 38. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required By IUP? es No N/A es/No es\)No 39. Does Sampling Indicate Flow or Production? e;1 No N/A Ye/,,No GNo 40. . During the Most Recent Semi -Annual Period, Did the POTW Identify All Non -Compliance from Both POTW and SIU Sampling? Yes / No ,1/4 l (�/ Yes/N p ' � 9) Yes i * j 41. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations b. Did Industry Resample Within 30 Days? .YesY No/ N/A .Yes; No/ N/A02) Yes/No/ 0 N/A ) /) 42. Was the SIU Promptly Notified of any Violations (Per ERP)? Yes)/ No . N/A Yes/N /.9., /N A 43. During the Most Recent Semi -Annual Period, Was the SIU in SNC? YesOfn Yes/No e/P Ye No 44. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTWs ERP? Yes /No/ / Yes/No 0 N/A 45. Does the File Contain Penalty Assessment Notices? Yes / N N/ Yes/No //9 g N/A 46. Does the File Contain Proof of Penalty Collection? Yes / No N/A Yes/No < ' j N/A ) 47. a. Does the File Contain any Current Enforcement orders? b. Is SIU in Compliance with Order? a.Yes / No b.Yes / No /A Yes/No / d Ufa 44)9 48. Did the POTW Representative Have Difficulty in Obtaining any of this Requested Information for You? Ye / No Yes Tom Ye No FILE REVIEW COMMENTS PCI SUMMARY AND COMMENTS PCI Comments: This facility has a well -organized pretreatment program. Files are neat and organized. Requirements: Recommendations: NOD: YES NO NOV: YES NO QNCR: YES NO POTW Rating: Satisfactory X Marginal Unsatisfactory PCI COMPLETED BY: Dale Lopez, Environmental Specialist II Date: 05/10/00