Loading...
HomeMy WebLinkAboutNC0037508_Pretreatment Inspection_20021115ATA NCDENR North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor November 15, 2002 Dennis Brobst Moore County Public Works Director P.O. Box 1927 Carthage, NC 28327 SUBJECT: Pretreatment Compliance Inspection Moore County Water Pollution Control Plant NPDES Permit No. NC0037508 Moore County Dear Mr. Brobst: William G. Ross, Jr., Secretary Alan Klimek, Director Division of Water Quality Enclosed you will find a copy of the Pretreatment Compliance Inspection Report for the inspection conducted on October 24, 2002. The report indicates that Moore County Water Pollution Control Plant meets the pretreatment requirements as outlined in 15A NCAC 2H .0900 for the Pretreatment Programs. The report is self-explanatory and contains observations and recommendations. We appreciate the cooperation of Lillian Stephens, Pretreatment Coordinator. This report is self-explanatory and contains observations and recommendations. If you or your staff have any questions or require clarification, please do not hesitate to contact me at (910) 486-1541. Dale Lopez Environmental Specialist /dl Enclosure: Pretreatment Compliance Inspection Report cc: Lillian Stephens, Pretreatment Coordinator, Moore County WPCP Dana Folley, DWQ Pretreatment Unit Fayetteville Regional Office 225 Green Street— Suite 714, Fayetteville, North Carolina 28301-5043 Phone: 910-486-1541/FAX: 910-486-07071 Internet:" www.enr.state.nc.us/ENR An Equal Opportunity \ Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT FAYETTEVILLE REGIONAL OFFICE BACKGROUND INFORMATION 1. Control Authority (POTW) Name: Moore County Water Pollution Control Plant 2. Control Authority Representative: Lillian Stephens • 3. Title(s): Laboratory Supervisor/Pretreatment Coordinator 4. Last Inspection Date: 04/30/02 Inspection Type (Circle One): PCI Audit 5. Has Program Completed All Requirements from the Previous Inspection or Program Info Sheet(s)? 6. Is POTW under an Order That Includes Pretreatment Conditions? Order Type And Number: Are Milestone Dates Being Met? Yes / No PCS CODING Trans.Code JNI Program NPDES Number JNICIO 101317151018f MM/DD/YY 10 /24 /02 (DTIA) Inspec.Type l_13_1 ITYPI) Inspector 1_3_1 (INSP) Yes / No Yes / No Fac.Type LU (FACC) 7. Current Number of Significant Industrial Users (SIUs)? 3 SIUS 8. Current Number of Categorical Industrial Users (CIUs)? 2 CIUS 9. Number of SIUs Not Inspected by POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled by POTW in the Last Calendar Year? 0 11. Enter the Higher Number of 9 or 10. 0 NOIN 12. Number of SIUs With No IUP or With an Expired IUP? 0 NOCM 13. Number of SIUs In SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi -Annual Periods (Total Number of SIUs in SNC). 0 PSNC • 14. Number of SIUs in SNC for.Reporting During Either of the Last 2 Semi -Annual Periods. 0 MSNC 15. Number of SIUs in SNC for Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 SNPS 16. Number of SIUs in SNC for Both Reporting and Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the parameters and how are these problems being addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How Are These Problems Being Addressed? No No 19. Which Industries have been in SNC during either of the Last 2 Semi -Annual Periods? Have any Industries in SNC (During Either of the Last 2 Semi -Annual Periods) not been Published for Public Notice? (May refer to PAR if Excessive SIUs in SNC) 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed copy of the Order been sent to the Division? 21. Are any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? SNC for Limits: 0 SNC for Reporting: 0 Not Published: 0 0 No PRETREATMENT PROGRAM ELEMENTS REVIEW - Please review POTW files and complete the following: Program Element Date of Last Approval Date Next Due, If Applicable Headwork Analysis (HWA) 07/10/98 04/01/03 Industrial Waste Survey (IWS) 03/01/99 Sewer Use Ordinance (SUO) 10/07/97 . Enforcement Response Plan (ERP) 04/27/98 Long Term Monitoring Plan (LTMP) 09/02/98 22. Is the LTMP Monitoring Being Conducted at Appropriate Locations and Frequencies? 23. Should any Pollutants of Concern be Eliminated From or Added to the LTMP? 24. Are Correct Detection Levels being used for all LTMP Monitoring? 25. Is the LTMP Data Maintained in a Table or Equivalent? Yes Is the Table Adequate? Yes No Yes 1Yes 26. User Name 1. Indersoll-Rand 2. Erico 3. Intek 27. IUP Number SP01 II A005 I . A004 28. Does File Contain Current Permit? Yes Yes Yes 29. Permit Expiration Date? 06/30/03 06/30/03 06/30/03 30. Categorical Standard Applied (I.E. 40 CFR 413, Etc.) or N/A '433 433 N/A 31. Does the File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? Yes 04/14/98 Yes 03/24/98 Yes 03/27/98 32. Does the File Contain an Inspection Completed Within Last Calendar Year? Yes Yes Yes 33. a. Does File Contain A Slug Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a. Yes Rev. 05/18/98 b. N/A a.Yes rev. 02/10/99 b. N/A a. Yes rev.04/30/96 b. N/A 34. For 40 CFR 413 And 433 TTO Certifiers, Does The File Contain A Toxic Organic Management Plan (TOMP)? Yes Yes Yes 35. a. Does the File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a.Yes b.Yes a.Yes b. Yes a. Yes b. Yes 36. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP? Yes Yes Yes 37. Does File Contain POTW Sampling Chain -Of -Custody's? Yes Yes Yes The SIUs are sampled monthly by the POTW 38. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required By IUP? Yes Yes Yes 39. Does Sampling Indicate Flow or Production? Yes Yes Yes SIUs send POTW a monthly sheet 40. During the Most Recent Semi -Annual Period, Did the POTW Identify All Non -Compliance from Both POTW and SIU Sampling? None None None 41. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations Did Industry Resample Within 30 Days? a. N/A b. N/A N/A N/A N/A N/A 42. Was the SIU Promptly Notified of any Violations (Per ERP)? N/A N/A N/A 43. During the Most Recent Semi -Annual Period, Was the SIU in SNC? No No No 44. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTWs ERP? N/A N/A N/A 45. Does the File Contain Penalty Assessment Notices? N/A N/A N/A 46. Does the File Contain Proof of Penalty Collection? N/A N/A N/A 47. a. Does the File Contain any Current Enforcement orders? b. Is SIU in Compliance with Order? a. N/A b. N/A N/A N/A N/A N/A 48. Did the POTW Representative Have Difficulty in Obtaining any of this Requested Information for You? No No No FILE REVIEW COMMENTS PCI SUMMARY AND COMMENTS PCI Comments: 1. Intek might close; it contributes approximately 5% of the flow to the POTW. Possibly the phase out will occur by fi- end of 2003. If so, please send an SIU drop request letter to Dana Folley, Pretreatment Unit. 2. The PT Coordinator had excellent SIU correspondence logs. Requirements: Recommendations: 1. Upgrading the computer tracking of data would enhance productivity. 2. Intek is not a 40 CFR 413 or 433. Since only the 413's and 433's are required to have TTO, Intek probably did not need TTO on their IUP. Please check with Dana Folley, Pretreatment Unit. NOD: N� NOV: QNCR: NOI NOI POTW Rating: Satisfactory ✓ Marginal PCI COMPLETED BY: isfactory, Dale Lopez. Environmental Specialist ate: 11/15/02 Name and Signature of Reviewer Agency/Office/Telephone Belinda Henson .,Q 2rrK>t.>'+J Date NCDENR/Fayetteville/(910) 486-1541 11/15/02 INDUSTRY INSPECTION CODING: No Industrial Inspection was conducted during the PCI Inspection Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac.Type 1 N 1 LNI CI0 Io 1 1 1 1 1 1 // 1I l 1_a_l (DTIA) (TYPI) (INSP) (FACC) 1.Industry Inspected: 2.Industry Address: 3.Type of Industry/Product: 4.Industry Contact: Title: Phone: Fax: 5.Does the POTW use The Division Model Inspection Form or Equivalent? Yes / No 6.Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview B Plant Tour C. Pretreatment Tour D. Sampling Review E. Exit Interview Industrial Inspection Comments: