Loading...
HomeMy WebLinkAboutNC0037508_WWTP Inspection_20030320AT& NCDENR North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor March 20, 2003 Mr. Dennis Brobst Moore County Public Works Director PO Box 1927 Carthage, NC 28327 SUBJECT: Compliance Evaluation Inspection Moore County Water Pollution Control Plant NPDES Permit No. NC0037508 Moore County Dear Mr. Brobst: William G. Ross, Jr., Secretary Alan Klimek, P.E., Director Division of Water Quality Enclosed is a copy of the Compliance Evaluation Inspection conducted March 14, 2003. As part of the inspection a tour of the Wastewater Treatment Plant was conducted. All observations and recommendations are in Part D. Summary of Findings/Comments of this inspection report. The cooperation of Mr. Delmo Frye, Grade IV ORC, Mr. Jeffery Corder, Grade IV Backup ORC, and Ms. Lillian Stephens, Laboratory Supervisor was appreciated. During the inspection a copy of the NPDES Compliance Reminders were reviewed and left with facility staff. As a reminder preservation of the Waters of the State can .only be acquired through consistent NPDES permit compliance. Please review the attached report. If you or your staff have any questions do not hesitate to contact me at 910-486-1541. Sincerely, Belinda S. Henson Environmental Chemist /bsh Enclosures cc: Mr. Delmo Frye, ORC, Moore County Water Pollution Plant Fayetteville Regional Office 225 Green Street — Suite 714, Fayetteville, North Carolina 28301-5043 Phone: 910-486-1541/FAX: 910-486-07071 Internet: www.enr.state.nc.us/ENR An Equal Opportunity \ Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper - United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98• Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/molday Inspection 1 Lid 2 t I 3I NC0037508 111 12 I 03/03/14 117 LJ LJ Type Inspector Fac Type 18 i t 19 1 -,' 20 J u U Remarks 21IIIIIIIIIIIIIIII111111IIIII•IIIIIIIIIIII111111166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA - -------------Reserved----------- 67 I 2.0 169 70 U t, I 71 tr,l 72 1�,tLJ 73I I 1 74 75I 1 I I I I I (80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Moore County WWTP 1060 Addor Road Pinebluff NC 28373 Entry Time/Date 08:35 AM 03/03/14 Permit Effective Date 00/06/01 Exit Time/Date 01:10 PM 03/03/14 Permit Expiration Date 04/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Delmo Frye//910-281-3146/ Delmo Frye//910-281-3146/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Gary Frick,PO Box 813 Pine Bluff NC 28373//910-281-3146/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program Sludge Handling. Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The automatic bar screen appeared to be operational. Screenings are disposed of through the Uwharrie Environmental landfill. The facility continues to accept septage from various sites. The septage is discharged into a manhole at the headworks of the plant. The grit removal system was operational but problems still occur with the pump clogging as per staff. (cont.) Plans are to have a new system in place next fiscal year. The influent composite sampler temperature was 4 degrees C. The acceptable Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Belinda S Henson 1�""" • 4. `/`Y2oFiY� FRO WQ//910-468-1541/910-486-0707 J— 2l/ C)v Signature of Man ement A R • wer Agency/Office/Phone and Fax Numbers Date Paul E Rawls vV 910-468-1541/910-486-0707 3-- Zi — O y EPA -Form 3560-3 (Rev 9-94) Previous editions are obsolete. NPDES 3I NC0037508 I11 12I yr/mo/day 03/03/14 117 Inspection Type 18 j (cont.) 2 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The facility does the following process control: F,/M ratios, sludge ages, MLSS, wasting rates and etc. Facility staff generate work orders when maintenance is needed and regular preventive maintenance is also tracked through a computer system. A compliance evaluation report for the period January 2002 through December 2002 did not reveal any NPDES permit limt violations. 3I NPDES NC0037508 111 12 yr/mo/day 03/03/14 117 Inspection Type 18 Lc j • (cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) temperature range of samples during storage and stored samples extracts, is 1.0 - 4.4 degrees C. Both blowers at the headworks of the plant appeared to be operational. The facility has two (2) primary clarifiers. They appeared to be operating adequately. The first stage aeration basin was operational with Mixed Liquor Suspended Solids (MLSS) results of 2700 mg/L.. The MLSS is monitored weekly by the onsite certified laboratory and each day by the Royce Model 711 meter. The third bay (section) was offline due to repairs at the time of the inspection. The two (2) intermediate clarifiers appeared to be operating adequately. The second stage aeration basin was opearational with MLSS results of 2300 mg/L. Lime is added to this area when additional treatment is needed. Polymer is added at the end of the aeration to assist with solids settling. There appeared to be a small leak from the polymer feed system. As per Mr. Frye, plans are to repair this as soon as possible. The two (2) final clarifiers appeared to be operating adequately. The sludge depth on #1 was 1.foot with a tank depth of 15 feet. #2 was not checked at the time of the inspection due to the location of the skimmer arm. ***THE RAILINGS AND THE CATWALKS OF THE CLARIFIERS APPEARED TO HAVE SOME (NOT EXCESSIVE) PAINT WORN FROM THE SURFACES. IT WOULD BE A RECOMMENDATION IN THE NEAR FUTURE TO REPAINT THESE AREAS TO ELIMINATE FURTHER COSTS IN THE'FUTURE.**** - The effluent is disinfected with chlorine. ***A RECOMMENDATION WOULD BE TO INCORPORATE A FLOW PROPORTIONAL CHLORINE FEED SYSTEM TO ASSIST WITH CONSISTENT DISINFECTION AND COULD BE A COST SAVINGS TO THE COUNTY.*** The sludge depth was less than (>) 1 foot in the chlorine contact tank. A recommendation is when the sludge depth reaches >/= 1 foot, then the chlorine contact tank should be cleaned. The effluent is dechlorinated with sulfur dioxide. The temperature of the effluent composite sampler refrigerator was 1 degree C at the time of the inspection. The sampler is flow proportional based on pulses, the more flow the faster the pump will operate to collect sample. The DAF unit is not utilized at this time since it is not needed. Solids are consistently wasted from the system to the anaerobic digesters. Sludge from the primary, intermediate and final clarifiers flow to the primary digester where it is heated up to 97 degrees C and travels to the top of the digester. The by product methane from the process is used to warm the sludge. New heaters for sludge had been installed since the last inspection dated December 20, 2001 After the sludge is heated it is pumped to the secondary digester where it goes to the drying beds. From the drying beds it is diposed of in the Uwharrie Environmental Landfill. The facility has 36 drying beds. Some (not excessive) vegetative growth was noted in some of the drying beds. The growth should be removed to ensure proper maintenance of the drying beds. The facility has -a permit (#WQ0018018) to land apply sludge but presently the facility does not utilize it. The influent flow meter was calibrated January.29, 2003 by Instrumental Services, Inc. The facility has a certified laboratory on site which analyzes most NPDES required parameters. All other parameters are analyzed by the commercial laboratory TBL. A brief inspection of the laboratory was completed and found to be very well organized and clean. Laboratory records were reviewed for the months of March and June 2002 and compared to Discharge Monitoring Reports (DMRs). All records reviewed appeared to be accurate and very. well organized. Section D: Su tnnary otF dings/Comments Brief Facility Description: The facility operates a 6.7 MGD WWTP consisting of preaeration, grit removal. primary clarification, first stage activated sludge, intermediate clarification, second stage aeration. final clarification. anaerobic sludge digestion, sludge drying beds (36), post aeration. chlorination and dechiorination. FACILITY SITE REVIEW s No N/A 1 Treatment units properly operated and maintained. e No N/A 2. Standby power or other equivalent provision provided. es No N/A 3. Adequate alarm system for power or equipment failure available. 4.. Sludge disposal procedures appropriate: Cie i No N/A a. Disposal of sludge according to regulations 'e) No N/A b. State approval for sludge disposal received. No N/A 5. Sufficient sludge disposed of to maintain treatment process equilibrium. Yes) No N/A 6. The ORC and Backup Operator are officially designated with NCDENR/DWQ Training and Certification Unit. TomNo N/A 7. Adequate spare parts and supplies inventory maintained. Yes ` No N/A 8. Plant has general safety structures such as rails around or covers over tanks, pits, or wells. es No N/A 9. Plant is generally clean, free from open trash areas. 10. Screening: Yes No N/A a. Manual No N/A b. Mechanical Yes N/A c. Buildup of debris �YNo N/A d. Screenings properly disposed of. 11. Grit Removal: Yes N/A a. Excessive organic content in the grit chamber Yes N/A b. Excessive odors Yes lo' N/A c. Grit properly disposed of. Page 2 Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No N/A Yes. No . N/A Yes No N/A Yes No 'N/A: Yes No N/A Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes (l ' N/A No WA' Th N/A N/A N/A sib N/A Noy N/A 12. Primary clarifier: n N/A .` a:: Excessive gas bubbles =':N/A `' -'b,`. Black and: odorous wastewater c: Poor suspended:. solids, removed 0)...•N/A d.. Excessive. buildup of solids in center well of circular clarifier No N/A e. Weirs level N/A f. Weir blockage N/A g.. Evidence•of short, circuiting' No N/A h. Lack of adequate scuni removal 'N N/A is `:Excessive floating sludge C N/A j. Broken sludge scraper.' 13. Trickling Filter: No k" 'Ia.- ;Trickling filter ponding(indicating: clogged media) No N/A b. Leak at center column of trickling filter's distribution arms No : N/A : Uneven ;:distribution of flow -on trickhng filter surface Uneven or: discolored growth Excessive: sloughing.of growth Odor. Clogging of trickling filter:'s distribution arm orifices Filter flies, worms, or. snails. c. d. ,e. g: h. 14.... Activated Sludge Basins/Oxidation-Ditches: 15. No S A No N/A No N/A No N/A a. Dead spots b. Failure 'of -surface aerators: c. Air rising in clumps d: Dark foam orbad color e. Thick billows of white, sudsy foam . f. Air rising unevenly g. Excessive air_ leaks in compressed air piping.. Stabilization Ponds/Lagoons: a. Excessive weeds including duckweed`in stabilization ponds , b. Dead fish or aquatic organisms c.. Buildup of solids around influent pipe d. Excessive scum on surface: Page 3 Yes •(go N/A No N/A Yes Kt) N/A Yes TO N/A Yes 00 N/A Yes ND N/A es;..No : N/A Yes - N/A Yes g N/A Yes ga N/A Yes No. (i%l. Yes No N/A Yes No N/A Yes No N/A Yes . No N/A Yes No N/A 1 Secondary Clarifier: a. Excessive gas bubbles on surface. b. Level overflow weirs c. Weir blockage _ .d. Evidence of short circuiting e. Excessive buildup of solids in center well of circular clarifier f. Pin floc in overflow g. Effective scum rake h. Floating sludgeon, surface i. Excessive high sludge blanket j. Clogged sludge withdrawal ports on secondary clarifier. 17. Filtration: a. Filtersurface clogging b. Short filter run c.. Gravel displacement of filter media d: Loss of filter media during backwashing e. Recycled filter backwash water in excess of 5 percent f. Formation of mudballs in filter media. 18. Yes N/A Yes ®o N/A Yes Nb N/A Vs No N/A Yes' No N/A CYa No N/A No N/A CANo N/A Yes No A' 19. Cltit No .N/A Q��-' No N/A Yes. No N/A Chlorination Unit: . a. Sludge buildup in contact chamber b. Gasbubbles. c. Floating, scum and/or solids d. Adequate ventilation of chlorine feeding room and storage area e. NIOSH-approved 30 minute air pack f. .All standing chlorine cylinders chained in place g. All personnel trained in: the use of chlorine h.. Proper chlorine feed, storage, and reserve supply. Ultraviolet radiation disinfection present and in use. 20. Dechlorination: a. Proper storage of sulfur dioxide cylinders b. Adequate ventilation of sulfur dioxide feeding room c. Automatic sulfur dioxide feed or feedback control operating properly. 21. Aerobic Digester: Yes No (NA a. Excessive foaming in tank Yes No N/A b. Noxious odor Yes No N/A c. Mechanical aeration failure Yes No N/A d. Clogging of diffusers. Page 4 Yes Ni) N/A des No N/A 22. Anaerobic Digester: a. Floating cover tilting b. Gas burner operative 23.. Sludge Drying and/or disposal: Yes N/A , a. Poor sludge distribution on drying beds 'esi No N/A , b: Vegetation in drying beds so me Yes VA N/A c. Dry sludge remaining in drying beds No N/A d. Dry sludge stored on site e No N/A e. Filtrate from sludge drying beds returned to front of plant Y No N/A f. Sludge disposal through county landfill. Yes . No N/A g. Sludge land applied. Yes No ga Yes No N/A Yes No N/A Yes No N/A 24. Filter Press: a. High level of solids in filtrate from filter presses or vacuum filters b. Thin filter cake caused by poor dewatering c. Sludge buildup on belts and/or rollers of filter press d. Excessive moisture in belt filter press sludge cake. 25. Polishing Ponds or Tanks: Yes No a. Objectionable odor, excessive foam, floating solids, or oil sheens on water surface Yes No N/A b. Solids or scum. accumulations in tank or at side of pond Yes No N/A c. Evidence of bypassed polishing ponds or tanks because of low capacity. Yes a- N/A Yes Rd N/A ems% No N/A CYes No N/A No N/A Yes N/A Yes Vo N/A Yes No N/A Yes No N/A Yes No N/A 26. Plant Effluent: a. Excessive suspended solids, turbidity, foam, grease, scum, color, and other macroscopic particulate matter present b. Potential toxicity (dead fish, dead plant at discharge) c. Outfall discharge line easily accessible. 27. Flow Measurement: a. Proper placement of flow measurement device b. Flow meter calibrated c. Buildup. of solids in flume. or weir d. Broken or cracked flume or weir e. Clogged or broken stilling wells f. Weir plate edge corroded or damaged g. Flow measurement error less than 10%. Page 5 IftsiNo N/A No N/A (res) No N/A Vs No N/A 28. Sampling: a. Sampling and analysis completed on parameters specified by permit b. Composite sample temperatures maintained at 4 degrees Celsius or less (but above freezing) during sampling, c. Contract laboratory used for sample analysis d. Effluent composite sarnples obtained are flow proportional. RECORDKEEPING AND REPORTING Yes No N/A 1. Records and reports maintained as required by permit. des No N/A 2. All required information available, complete, and current. Ye) No N/A 3. Records maintained for 3 years and all sludge records maintained for 5 years. YeC No N/A 4. Analytical results consistent with data reported on DMRs. 5. Sampling and analyses data adequate and include: No N/A a. Dates, times, and location of sampling es) No N/A b. Name of individual performing sampling &es) No N/A c. Results of analyses and calibration test No N/A d. Dates of analyses Yes No N/A e. Name of person performing analyses. 6. Monitoring records adequate and include: a. Monitoring charts kept for 3 years b. Flowmeter calibration records kept for 3 years. des' No N/A ems) No N/A CY s' No N/A 7. The pH meter is calibrated daily with two buffers and checked with a third buffer and properly documented. No N/A 8. Expiration dates of pH buffers adequate. es` No N/A 9. .. All thermometers used in NPDES permit reporting is calibrated annually with an NIST certified thermometer or a traceable thermometer annually and documented. Yes% No N/A 10. The following NPDES permit required parameters are analyzed on site: pH, Temperature, Dissolved Oxygen and Chlorine Residual. Page 6 e No N/A (e)No N/A -No N/A e:s,No N/A Na.) No N/A Tel) No N/A Yes No Yes No No N/A Yes No No N/A Ws-) No N/A Y s No N/A Yes) No N/A 21. (Yes No N/A 22. ej No N/A 23. EYes No N/A 24. 11. The NPDES permit required parameter Total Chlorine Residual is analyzed by approved method. 12. BOD incubator temperature maintained at 20 +/- 1 Degrees Celsius and the temperature maintained in a log for every day of operation. 13. Fecal coliform incubator maintained at 44.5 +/- 0.2 Degree Celsius and the temperature maintained in a log for every day of operation. 14. Plant records adequate and include: a. O & M Manual b. "As -built" engineering drawings c. Schedules and dates of equipment maintenance repairs d. Equipment data cards. 15. Permittee is meeting compliance schedule. 16. DMRs complete and include all NPDES permit required parameters. N/A 17. The facility has a permitted flow greater than 5 MGD and is required to operate seven days per week 24 hours a day. 18. ORC visitation logs available and current. 19. ORC certified at a level equal to or greater than the classification of the wastewater facility. 20. Backup Operator certified at one level less than the classification of the wastewater facility or greater. Current copy of the complete NPDES permit on site. Facility description verified as contained in NPDES permit. Facility analyzes process control parameters for example: MLSS, MCRT, Settleable Solids and others that are applicable. Industrial Waste Surveys (1WS) sent to all possible Significant i3c Industrial Users (SIUs) within the last five years (especially new i +A.1 e.L5 F industries). o o 3 Revised 7/16/01 by Belinda Henson Regional Field Inspectors Check List for Field Parameters ame of site to be Inspected: Moor e eId certification # (if applicable): (s� PDES#: fliCr003`7565( Circle the parameter or parameters performed at this site. esidual ChlorirneAettleable Solids,CgructivitgLeraturp� ere Instrumentation: . Does the facility have the equipment necessary to analyze field parameters as circled above? A pH meter A Residual Chlorine meter DO meter A Cone for settleable solids A thermometer or meter that measures temperature. . Conductivity meter I. Calibration/Analysis'. . Is the pH rneter calibrated with a 2 buffers and checked with athird buffer each day of use? !. For Total Residual Chlorine, is a check standard analyzed each day of use? I. Is the air calibration of the DO meter performed each day of use? I•. For Settleable Solids, is 1 'liter of sample settled for 1 hour? 5. Is the temperature measuring device calibrated annually against a certified thermometer? 5. For Conductivity, is a calibration standard analyzed each day of use? Yes 3 s) es es Yes h. pdys11se% No (j5r 5 No No No c.Lr bf1. isJ IV. Documentation: 1. Is the date and time that the sample was collected documented? 2. Is the samplesite documented? 3. Is the samplecollector. documented? 4. Is the analysis date and time documented? 5. Did the analyst sign the documentation? 6. Is record of calibration documented? 7. For Settleable Solids, is sample volume and 1 hour time settling time documented? 8. For Temperature, is the annual calibration of the measuring device 'documented? Comments: kaiU t )q.4 Te Yes Yes: No No very ..�,c� f� o tit' 2-ed 4„1 c legit) Please submit a copy of this completed form to the Laboratory Certification Program. DWQ Lab Certification Chemistry Lab• Courier # 52-01-01 FIELD INSPECTOR CHECKLIST REV. 04/23/2002