HomeMy WebLinkAbout740095_Plan of Action_2021062119ECEN PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES"vcbEN,, THIRTY (30) DAY DRAW DOWN PERIOD ✓lIN 212021 I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE Regio, 'ater, washin9t peratQions 1. Structure Name/Identifier (ID): — ,L Res/os�; 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) /6 f9 inches inches inches ft2 e. line c x line d x 7.48 gallons ?„Y7 gallons 12 ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design / 4 days g. volume of waste producedaccording to structural design ft3 h. actual waste produced = current herd # x line g = certified herd # ft3 i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design ,7�s,; 7c ft3 k. (lines h + i +i) x 7.48 x 30 days = '7 y, A.16 gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated1 i Z lb/1000 gal. m. (lines e + k) x line l = 9 7, 7 lb PAN 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 1 -.1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines 1 +2+3+4+5+6 = line m= A.7/ 7 lb PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN %, 7 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' V 7 6 a j'. / — t £.»,o e4-n,.1 4 q II 7 .ap ' -y 1 9 // 7 I �t ►`". S. -I, ., /)7 le, r3 /-A ,q 1/7 �\,. � 3 -Y .4 /17 // 7 G ‘P 9 e t , ., ,2v L 3 ../r. a. S n SWP 1 to. r ,v , ' A, z,.S J 2 2 , 7 ' 2,, . ,.2, .5 / 6 a,s )7,S 7 / .L ) , c.) 0 rX R ...., i e -/ / 0 �W, 1,.g.. 2,77 3/5 3 /i < 0,.=„) .1, 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period *P v. Total PAN available for all fields (sum of column t) = ,� 7 d ,.� ( Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = PoA (30 Day) 2/21/00 2 `1, 7 Ib. PAN --ix. Crop's remaining PAN balance (line v from section III) = �v £. y. Overall PAN balance (w - x) = /,, 7 Se Ib. PAN Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be. included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2/21/00 3