Loading...
HomeMy WebLinkAboutNC0037508_Pretreatment Inspection_20041021NCIEP:.R North Carolina Department of Environment and Natural. Resources Michael F: Easley, Governor October 21, 2004 • Phillip Boles. • Moore County Public Works Director P.O. Box 756 Carthage, NC 28327 SUBJECT: . Pretreatment Compliance Inspection Moore County Water Pollution Control Plant NPDES Permit No. NC0037508 Moore County William G. Ross Jr:, Secretary Alan W. Klimek, P.E., Director Coleen H. Sullins, Deputy Director Division of Water Quality Dear Mr. Boles: Enclosed you will find a copy of the Pretreatment Compliance Inspection Report for the inspection conducted on September 8, 2004. The report indicates that Moore County Water Pollution Control Plant meets the pretreatment requirements as outlined in 15A NCAC 2H .0900 for the Pretreatment Programs. The report is self-explanatory and contains observations and recommendations. We appreciate the co- operation of Stephanie Brixley, Pretreatment Coordinator. This report is self-explanatory and contains observations and recommendations. If you or your staff have any questions or require clarification, please do not hesitate to contact me at (910) 486-1541. Sincerely, Dale Lopez Environmental Specialist /dl Enclosure: Pretreatment Compliance Inspection Report cc: Stephanie Brixley, Pretreatment Coordinator, Moore County WPCP Jon Risgaard, DWQ Pretreatment Unit 225 Green Street — Suite 714, Fayetteville, North Carolina 28301-5043 Phone: 910-486-15411 FAX: 910-486-07071 Internet: www:enr.state.nc.us/ENR/ An Equal Opportunity / Affirmative Action Employer - 50 % Recycled \ 10 % Post Consumer Paper NorthCarolina Naturally NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT FAYETTEVILLE REGIONAL OFFICE BACKGROUND INFORMATION 1. Control Authority (POTW) Name: Moore County Water Pollution Control Plant 2. Control Authority Representative: Stephanie Bixley . 3. Title(s): Laboratory Supervisor/Pretreatment Coordinator 4. Last Inspection Date: 04/14/04 Inspection Type (Circle One): PCI 5. Has Program Completed All Requirements from the Previous Inspection or Program Info Sheet(s)? 6. Is POTW under an Order That Includes Pretreatment Conditions? ' Order Type And Number: Are Milestone Dates Being Met? Yes / No Audit PCS CODING Trans.Code Nl Program NPDES Number J NI CI,O 10 13 17 15 10 18 1 MM/DD/YY 09 / 08 / 04 (DTIA) Inspec.Type JPl (TYPI) Inspector ISI (INSP) IYes / No Yes / No Fac.Type J11 (FACC) 7. Current Number of Significant Industrial Users (SIUs)? 1 SIUS 8. Current Number of Categorical Industrial Users (ClUs)? 1 CIUS 9. Number of SIUs Not Inspected by POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled by POTW in the Last Calendar Year? 0 11. Enter the Higher Number of 9 or 10. 0 NOIN 12. Number of SIUs With No IUP or With an Expired IUP? 0 NOCM 13. Number of SIUs In SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi -Annual Periods (Total Number of SIUs in SNC). 0 PSNC 14. Number of SIUs in SNC for Reporting During Either of the Last 2 Semi -Annual Periods. 0 MSNC 15. Number of SIUs in SNC for Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 SNPS 16. Number of SIUs in SNC for Both Reporting and Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the parameters and how are these problems being addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How Are These Problems Being Addressed? No No 19. Which Industries have been in SNC during either of the Last 2 Semi -Annual Periods? Have any Industries in SNC (During Either of the Last 2 Semi -Annual Periods) not been Published for Public Notice? (May refer to PAR if Excessive SIUs in SNC) 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed copy of the Order been sent to the Division? 21. Are any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? SNC for Limits: SNC for Reporting: Not Published: 0 No PRETREATMENT PROGRAM ELEMENTS REVIEW - Please review POTW files and complete the following: Program Element Date of Last Approval Date Next Due, If Applicable Headwork Analysis (HWA) 10/06/03 04/01/08 Industrial Waste Survey (IWS) 03/16/04 09/01/08 Sewer Use Ordinance (SUO) 10/07/97 Enforcement Response Plan (ERP) 04/27/98 Long Term Monitoring Plan (LTMP) 07/13/04 22. Is the LTMP Monitoring Being Conducted at Appropriate Locations and Frequencies? 23. Should any Pollutants of Concern be Eliminated From or Added to the LTMP? 24. Are Correct Detection Levels being used for all LTMP Monitoring? 25. Is the LTMP Data Maintained in a Table or Equivalent? 1Yes Is the Table Adequate? Yes No Yes IYes AL USER PERMIT (UP) FILE REVIEW 26. User Name Erico 27. IUP Number A005 28. Does File Contain Current Permit? Yes Issued 07/31/03 29. Permit Expiration Date? 06/30/08 30. Categorical Standard Applied (I.E. 40 CFR 413, Etc.) or N/A 413 31. Does the File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? Yes 12/30/02 32. Does the File Contain an Inspection Completed Within Last Calendar Year? Yes 04/06/04 33. a. Does File Contain A Slug Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a.Yes rev. 02/10/99 b. N/A a. 34. For 40 CFR 413 And 433 TTO Certifiers, Does The File Contain A Toxic Organic Management Plan (TOMP)? Yes 35. a. Does the File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a.Yes, 09/17/03 b. Yes 36. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP? Yes 37. Does File Contain POTW Sampling Chain -Of -Custody's? Yes The SIU is sampled monthly by the POTW 38. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required By IUP? Yes 39. Does Sampling Indicate Flow or Production? Yes SIU sends POTW a monthly sheet 40. During the Most Recent Semi -Annual Period, Did the POTW Identify All Non -Compliance from Both POTW and SIU Sampling? Yes 41. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations b. Did Industry Resample Within 30 Days? N/A N/A 42. Was the SIU Promptly Notified of any Violations (Per ERP)? N/A 43. During the Most Recent Semi -Annual Period, Was the SIU in SNC? No 44. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTWs ERP? N/A 45. Does the File Contain Penalty Assessment Notices? N/A 46. Does the File Contain Proof of Penalty Collection? N/A 47. a. Does the File Contain any Current Enforcement orders? b. Is SIU in Compliance with Order? N/A N/A 48. Did the POTW Representative Have Difficulty in Obtaining any of this Requested Information for You? No FILE REVIEW COM1VIENTS PCI SUMMARY AND COMMENTS PCI Comments: 1. Intek closed at approximately the end of March 2004; it contributed approximately 5% of the flow to the POTW. The Drop Approval letter was dated 06/28/04 from the Pretreatment Unit. 2. Gulistan Carpet Corp. Textile are on a local permit. 3. Ingersoll-Rand is on a local permit. 4. In the future, if Thermal Metals would discharge to the POTW, they will probably be treated as a CIU (since they perform a phosphoric acid dip in their process). 5. Kainos is on a local permit, they have not started business yet. Their products are silver glass fiber, silver 200, and glass spheres. 6. The POTW sends all of its outside testing to Meritech. Requirements: Recommendations: 1. Recommend that the Slug Control Plan be reviewed and updated. The date on the Slug Control Plan was 11/10/98, and Richard Macary (the plant manager) is no longer there. 2. Please refer to the IUP and to the NC Comprehensive Guidance for the possibility that a TTO certification letter wou be sufficient, instead of sampling. The certification letter would state that there were no organic solvents discharged from the SIU to the POTW during the required time period. NOD: NOV: QNCR: NO NO liVO POTW Rating: Satisfactory ✓ Marginal Unsattory PCI COMPLETED BY: Dale Lopez, Environmental Specialist Name and Signature of Reviewer Agency/Office/Telephone t /21/04 Date NCDENR/Fayetteville/(910) 486-1541 10/21/04 INDUSTRY INSPECTION. CODING: No Industrial Inspection was conducted during the PCI Inspection Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac.Type JN( 1 NI CI0 10 1 1 1 1 1.Industry Inspected: 2.Industry Address: 3.Type of Industry/Product: 4.Industry Contact: Title: Phone: /-/- 111 1S1 LJ (DTIA) (TYPI) (1NSP) (FACC) Fax: 5.Does the POTW use The Division Model Inspection Form or Equivalent? Yes / No 6.Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview B Plant Tour C. Pretreatment Tour D. Sampling Review E. Exit Interview Industrial Inspection Comments: United States Environmental Protection Agency EPA ^ Washington, D.C. 20460 f /�. Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES - yr/mo/day Inspection 1 II.JI 2 U 3 I NC0037508 111 121 04/09/08 117 Type Inspector Fac Type 18 [21.1 19 U 20 U Remarks 2111111111111111111111111I11I1111111111111.111111166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 67 I 169 70 U 71 u 72 U 731 1 174 751 I I I I III 80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Moore County WPCF 1060 Add.oi Rd Aberdeen NC 28315 Entry Time/Date 10:00 AM 04/09/08 Permit Effective Date 00/06/01 Exit Time/Date 02:00 PM 04/09/05 Permit Expiration Date 04/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Jeffery W Corder/ORC/910-281-3146/ /1/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Gary A Frick,PO Box 813 Pinebluff NC 28373//910-281-3146/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Pretreatment ® Other Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Dale Lopezt at. � 0 FRC AQ//910-486-1.5e1/ 910-48E-0707 Numbers Date f / � y; Signature of Mansngement i er Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. NPDES NC0037508. 11 121 yr/mo/day 04/09/08 Inspection Type 117 18 I n I (cont.) 1 Section D: Summary of Finding/Comments (Attach additional_ sheets of narrative and checklists as necessary) . Satisfactory PCI. PCI Comments: 1) Intek closed on approximately the end of March 2004; it contributed aproximateiy 5 of the flow to the POTW. The Drop Approval letter was dated 05/28/04 for the Pretreatment Unit. 2) Gulistan Carpet Corporation:Textile is on a local permit. 3) Ingersoll-Rand is on a local permit. 4) In the future, if Thermal Metals would discharge to the POTW, they will probably be treated as a CIU (since they perform a phosphoric acid dip.in their process)-. 5) Kainow is.on a local permit,' they have not started business yet. Their,products are silver glass fiber, silver 200, and glass spheres. 6) The POTW sends all of its' outside testin to Meritech. Recommendations: 1)" We recommend that the Slug Control Plan be reviewed and updated.' The date on the Slug Control Plan was 11/10/98, and Richard Macary , the plant manager, is no longer working there. 2)'Please refer to the 1UP and to the NC Comprehensive Guidance for the possibility that a certification letter would be sufficient, instead of sampling for TTO. The certification letter would state that there were.no organic solvents discharged from the SIU to the POTW during the required time.period. • Department of Public Utilities Wastewater Treatment Plant 1094 Addor Road Aberdeen, NC 28315 aunty a/ aaxe November 3, 2004 Mr. Dale Lopez N.C. Division of Water Quality Fayetteville Regional Office 225 Green Street — Suite 714 Fayetteville, NC 28301-5043 Mr. Lopez, fidt59. 740' ) 910 Telephone: 281'-3146 P ( Facsimile: (910) 281-2047 DENR-- R NOV 8 - 2004 \,,t 0 I received a copy of the Pretreatment Compliance Inspection Report for the inspection conducted on September 8, 2004 on October 27. A response was not requested but I felt it appropriate to respond to your recommendations. The first recommendation was that the Slug Control Plan be reviewed and updated for ERICO Industries. Please find attached a letter that was sent to Jarvis McDaniel, Plant Manager, requesting this update: The second recommendation was to refer to ERICO's IUP and to the NC Comprehensive Guidance for the possibility that a TTO certification letter would be sufficient instead of sampling. I have discussed this matter with Jon Risgaard, DWQ-PERCS Unit. The TTO minimum requirement is annual sampling unless they wish to use a Certification statement. I am looking into this issue to see if it is a requirement in Moore County's SUO. I will make a determination on this issue after I have looked through the SUO and Pretreatment Standards. If you have any questions or concerns please contact me at 910-281-3146. Sincerely, 054.haold cortA Stephanie A. Brixey Chemist/IPP Coordinator Cc: Mr. Phillip Boles, Moore County Public Works Director Mr. James Frye, Moore County WWTP Superintendent Stephanie A. Brixey Chemist/IPP Coordinator Department of Public Utilities Wastewater Treatment Plant 1094 Addor Road Aberdeen, NC 28315 Wounty 7 tcLa-xe October 21, 2004 Mr. Jarvis Daniel, Plant Manager ERICO, Incorporated 188 Carolina Road Aberdeen, NC 28315 Mr. Daniel, Telephone: (910) 281-3146 Facsimile: (910) 281-2047 ....4.--.:,,t . -.,-,1) -ve• •••• 0 Permit # A005 From my understanding there has been a change at ERICO in personnel. Due to this the Emergency Contact information on the Sludge Management Plan and Slug/Spill Control Plan will need to be revised. I am requesting the new revisions of these two plans. Recently in a Pretreatment Inspection conducted by DENR at the Moore County Water Pollution Control Plant a few questions were asked concerning the sampler and flow meter at ERICO. Please find the questions of interest attached. Joe Holt may be the one who needs to answer these. If so, please ask him to send me the answers as soon as possible. If you have questions or concerns please feel free to contact me. Sincerely, 0 Department of Public Utilities Wastewater Treatment Plant 1094 Addor Road Aberdeen, NC 28315 �p 0€1M't a/ C�(0axe Telephone: (910) 281-3146 Facsimile: (910) 281-2047 Questions of interest: I. When sampling, how much and how often does the composite sampler pick up? 2. Who calibrates your flow meter? 3. How is your flow meter calibrated? 4. Why does all of the flow numbers end with---000? 5. How do you determine the flow numbers? (Is it from potable water, etc.?)