Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0037508_Lab Certification Inspection_20041016
DEN1- -F.RO SEP - 2004 © V 134 Ms. Stephanie Brixey Moore Co. Water Pollution 1094 Addor Road Aberdeen, NC 28315- September 2, 2004 SUBJECT: Wastewater/Groundwater Laboratory Certification Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality Dear Ms. Brixey: We have scheduled an on -site inspection of your laboratory for approximately 8:30 a.m., September 23, 2004. The scope of the inspection will include all methods marked on Attachment I of the laboratory's current North Carolina Wastewater /Groundwater Certificate and /or marked on the application for NC Wastewater/Groundwater Laboratory Certification. A copy of the current Attachment I is enclosed for your reference. The purpose of the inspection will be to verify the laboratory's documented quality control/quality assurance procedures and adequacy in meeting the requirements of 15A NCAC 2H .0800. Enclosed are inspection checklists for the upcoming inspection. Prior to the on -site inspection, excluding the data review sections, please have your analysts complete each checklist. Any checklists that your laboratory is unable to complete, or any specific items that you do not understand, will be completed during the inspection. Completion of these checklists prior to the on -site audit, with comments by analysts relating to specific procedural differences, will help avoid any unnecessary interruption of the analyst's schedule. Hold these checklists at your laboratory for use at the time of the inspection. The data review portion of the inspection will require complete data packets including all of the supporting documentation for data analysis. This requires, but is not limited to: copies of final reports, instrument run logs, extraction/digestion logs, chromatograms, benchsheets, standard preparation logs, calibration curves and sample receipt/chain of custody forms. If the lab is analyzing samples for reporting to the State of North Carolina, the data packets for those samples should be readily available for review. For any parameters for which there is no North Carolina data to review, general examples of samples analyzed by the certified methods will be reviewed along with any documented allowances in the laboratory's quality system to meet North Carolina program specific requirements. Review your last inspection report (Inspection date: September 30, 2003), to assure that all deficiencies have been corrected. If the deficiencies cited in the 2003 inspection report have not been corrected, enforcement action will be recommended. Thank you for your time and cooperation. 1 can be contacted at (919) 733-3908 (extension 254), if you have questions. Sincerely, Ton j`a SprWiger Laboratory Section TS:ts Enclosures - cc: James W. Meyer Fayetteville Regional Office Preaudit-ltr.2004 Laboratory Section 1623 Mail Service Center; Raleigh, NC 27699-1623 4405 Reedy Creek Road; Raleigh, NC 27607 Phone (919) 733-3908 / FAX (919) 733-2496 / Internet: www.dwglab.org An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper No e Carolina aturally a October 6, 2004 134 Ms. Stephanie Brixey Moore Co. Water Pollution 1094 Addor Road Aberdeen, NC 28315- SUBJECT: Laboratory Certification Maintenance Inspection Dear Ms. Brixey: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director , Division of Water Quality DENR-FRO OCT 1,12004 DWO Enclosed is a report for the inspection performed on September 23, 2004 by Ms. Tonja Springer. Where deficiencies are cited in this report, a response is required as well as for all lettered comments and/or recommendations. Within thirty days of receipt, please supply this office with a written item for item description of how these deficiencies, comments and/or recommendations were corrected. If the deficiencies cited in the enclosed report are not corrected, enforcement actions will be recommended. For certification maintenance, your laboratory must continue to carry out .the requirements set forth in 15A NCAC 2H .0800. Copies of the checklists completed during the inspection may be requested from this office. Thank you for your cooperation during the inspection. If you wish to obtain an electronic copy of this report by email, or if you have questions or need additional information please contact us at 919-733- 3908. Sincerely, James W. MeyerLaboratory James W. M Laboratory Section Enclosure cc: Tonja Springer Fayetteville Regional Office Laboratory Section 1623 Mail Service Center; Raleigh, NC 27699-1623 4405 Reedy Creek Road; Raleigh, NC 27607 Phone (919) 733-3908 / FAX (919) 733-2496 / Internet: www.dwglab.org No�rthCarolina ,Naturally An Equal Opportunity/Affirmative Action Employer— 50% Recyclrp/10% Post Consumer Paper t"t On -Site Inspection Report LABORATORY NAME: Moore County Water Pollution ADDRESS: 1094 Addor Road Aberdeen, NC 28315 CERTIFICATE NO: #134 DATE OF INSPECTION: September 23, 2004 TYPE OF INSPECTION: Maintenance EVALUATOR: Ms. Tonja Springer LOCAL PERSON CONTACTED: Ms. Stephanie Brixey I. INTRODUCTION: This laboratory was inspected to verify its compliance with the requirements of 15A NCAC 2H .0800 for the analysis of environmental samples. II. GENERAL COMMENTS: This report reflects findings related to on -site inspection, application information and client reports. III. DEFICIENCIES, REQUIREMENTS, COMMENTS AND RECOMMENDATIONS,: General: A. Comment: The laboratory does not document process control samples on all the bench sheets. Requirement: Data used for "process control" must be clearly labeled as "uncertified data" and distinctions clearly noted on the benchsheets. "Uncertified data" shall be defined as any analytical result, including the supporting documentation, obtained'•using a method or procedure, which is not acceptable to the State Laboratory pursuant to these Rules. Reference: 15A NCAC 2H .0803 (16). "Process Control" work, by definition, is not sampled at a regulated compliance point. BOD: B. Comment: The laboratory has been qualifying data when the seeded blank is not when +/- 0.3mg/L of the calculated seed correction. Requirement: The seeded blank is not a requirement. It is recommended as a good way to check the quality of the seed material. The data does not have to be qualified. IV. PAPER TRAIL INVESTIGATION: A paper trail was conducted at this facility. This consisted of comparing laboratory bench data with DMR reports. There were no transcription errors detected. V. CONCLUSIONS: Correcting the above comments and implementing the recommendations should help this laboratory to produce quality data and meet certification requirements. Please respond to all lettered Comments cited in this report. Report prepared by: Tonja Springer Date: September 24, 2004