Loading...
HomeMy WebLinkAboutNC0037508_Pretreatment Inspection_20061009VVH;J.`l`" Michael F. Easley, Governor October 9, 2006 James Delmo Frye Operator in Responsible Charge (ORC) 1094 Addor Road Aberdeen,NC 28315 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality SUBJECT: Pretreatment Compliance Inspection Moore County Water Pollution Control Plant NPDES Permit No. NC0037508 Moore County Dear Mr. Frye: Enclosed you will find a copy of the Pretreatment Compliance Inspection Report for the inspection conducted on October 5, 2006 with Stephanie Brixley, Pretreatment Coordinator. The report indicates that Moore County Water Pollution Control Plant meets the pretreatment requirements: as outlined in 15A NCAC 2H .0900 for the Pretreatment Programs. Please' send this office a written response by December 13, 2006 concerning the following requirements that resulted from the Pinnacle Furnishings, Inc. site inspection; this is in conjunction with your requirements that were addressed in the October 6, 2006 Annual Inspection Review letter from the POTW to Pinnacle Furnishings, Inc. 1. To prevent release of a major spill to the environment, adequate, spill containment must be constructed and maintained. Wood is not adequate material for containment, as observed by this inspection. If .spill containment leaks, then it does not satisfy the definition of containment. For additional information, please see #1 in the Industrial Inspection Comments of this report. 2. Concerning the missing pH calibration log since July 2006, the SIU permit states, in part, that: "The permittee shall retain records of all monitoring information, including all _ calibration and maintenance records...". Part II, 11. 3. - Concerning the calibration of the pH meter, the SIU permit states, in part, that: "Test procedures .for the analysis of pollutants shall be performed in accordance with the techniques prescribed in 40 CFR part 136...". Part .II, 3. For additional information, please see #3 in the Industrial Inspection Comments of this report. 4. The manhole cover may be in the open position only when discharging from the equalization tank; it should not be opened for long periods of time. It should be closed during a rain event. o One hCarolin Na �V�aturally North Carolina Division of Water Quality 225 Green Street — Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 Customer Service Internet: ncwaterquality.org FAX (910) 486-0707 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Mr. Frye October 9, 2006 Page 2 We appreciate your co-operation and your continued efforts with the pretreatment program. If you have any questions concerning this report, please do riot hesitate to contact me at (910) 433- 3312. Dale Lopez Environmental Specialist Enclosure: , Pretreatment Compliance Inspection Report EPA Water Compliance Inspection Report cc: Deborah Gore, PERCS -Pretreatment Unit Stephanie Brixley, Pretreatment Coordinator, Moore County WPCP NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT FAYETTEVILLE REGIONAL OFFICE BACKGROUND INFORMATION 1. Control Authority (POTW) Name: Moore County Water Pollution Control Plant 2. Control Authority Representative: Stephanie Bixley . 3. Title(s): Laboratory Supervisor/Pretreatment Coordinator 4. Last Inspection Date: 08/18/05 Inspection Type (Circle One): PCI Audit 5, Has Program Completed All Requirements from the Previous Inspection or Program Info Sheet(s)? 6. Is POTW under an Order That Includes Pretreatment Conditions? Order Type And Number: Are Milestone Dates Being Met? Yes / No PCS CODING Trans.Code Program NPDES Number MM/DD/YY Inspec.Type J N I JNICIO 10[3171510181 10 /05 /06 1Pl (DTIA) ., (TYPI) . • 7. Current Number of Significant Industrial Users (SIUs)? 8. Current Number of Categorical Industrial Users (CIUs)? 9. Number of SIUs Not Inspected by POTW in the Last Calendar Year? Both have been performed for the year 10. Number of SIUs Not Sampled by POTW in the Last Calendar Year? 11. Enter the Higher Number of 9 or 10. 12. Number of SIUs With No IUP or With an Expired IUP? 13. Number of SIUs In SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi -Annual Periods (Total Number of SIUs in SNC). 14. Number of SIUs in SNC for Reporting During Either of the Last 2 Semi -Annual Periods. 15. Number of SIUs in SNC for Limits Violations During Either of the Last 2 Semi -Annual Periods? 16. Number of SIUs in SNC'for Both Reporting and Limits Violations During Either of the Last 2 Semi -Annual Periods? POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the parameters and how are these problems being addressed? Whole Effluent Toxicity failure in June 2006 was attributed to overdosing the dechlor, andl 18. has now been corrected Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, , Etc.)? If Yes, How Are These Problems Being Addressed? Inspector (INSP) Yes / No Yes / No Fac.Type 111 (FACC) 2 2 0 0 0 0 0 0 0 0 SIDS CIUS NOIN NOCM PSNC MSNC SNPS Yes No 19. Which Industries have been in SNC during either of the Last 2 Semi -Annual Periods? Have any Industries in SNC (During Either of the Last 2 Semi -Annual Periods) not been Published for Public Notice? (May refer to PAR if Excessive SIUs in SNC) 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed copy of the Order been sent to the Division? 21. Are any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? SNC for Limits: 0 SNC for Reporting: 0 Not Published: 0 0 No PRETREATMENT PROGRAM ELEMENTS REVIEW - Please review POTW files and complete the following: Program Element Date of Last Approval Date Next Due, If Applicable Headwork Analysis (HWA) 11/04/05 11/01/10 Industrial Waste Survey (IWS) 03/19/04 09/01/08 Sewer Use Ordinance(SUO) 10/07/97 07/01/07 Enforcement Response Plan (ERP) . 04/27/98 Long Term Monitoring Plan (LTMP) 07/13/04 22. Is the LTMP Monitoring Being Conducted at Appropriate Locations and Frequencies? 23. Should any Pollutants of Concern be Eliminated From or Added to the LTMP? 24. Are Correct Detection Levels being used, for all LTMP Monitoring? 25. Is the LTMP Data Maintained in a Table or Equivalent? 'Yes Is the Table Adequate? 'Yes 'No 'Yes Yes INDUSTRIAL USER PERMIT (UP) FILE REVIEW 26. User Name Erico ' Pinnacle 27. IUP Number A005 A007 28. Does File Contain Current Permit? - Yes Issued 07/31/03 Yes Issued 07/31/03 29. Permit Expiration Date? 06/30/08 06/30/07 30. Categorical Standard Applied (I.E. 40 CFR 413, Etc.) or N/A 433 433 31. Does the File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? Yes 12/30/02 Yes 05/24/06 32. Does the File Contain an Inspection Completed Within Last Calendar Year? Yes 10/03/06 Yes 10/05/06 33. a. Does File Contain A Slug Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a.Yes rev. 03/15/05 b. N/A Yes a. 34. For 40 CFR 413 And 433 TTO Certifiers, Does The File Contain A Toxic Organic Management Plan (TOMP)? Yes Yes 35. a. Does the File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a.Yes, rev. 12/03/04 b. Yes Yes 08/30/06 Yes 36. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP? Yes Yes 37. Does File Contain POTW Sampling Chain -Of -Custody's? Yes Yes The SIU is sampled monthly by the POTW 38. • During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required By IUP? Yes Yes 39. Does Sampling Indicate Flow or Production? Yes Yes (water meter) SIU sends POTW a monthly sheet with the daily flows 40. During the Most Recent Semi -Annual Period, Did the POTW Identify All Non -Compliance from Both POTW and SIU Sampling? Yes Yes 41. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations b. Did Industry Resample Within 30 Days? No Violations For this year. N/A a. Yes b. Yes 42. Was the SIU Promptly Notified of any Violations (Per ERP)? N/A Yes 43. During the Most Recent Semi -Annual Period, Was the SIU in SNC? No No 44. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTWs ERP? N/A Yes 45. Does the File Contain Penalty Assessment Notices? N/A No 46. Does the File Contain Proof of Penalty Collection? N/A No 47. a. Does the File Contain any Current Enforcement orders? b. Is SIU in Compliance with Order? N/A N/A No N/A 48. Did the POTW Representative Have Difficulty in Obtaining any of this Requested Information for You? No No FILE REVIEW COMMENTS The POTW records and files were well maintained: PCI SUMMARY AND COMMENTS Industrial Inspection Comments (Pinnacle Furnishings, Inc., IUP --- A007): 1) At least three sections of the 2 x 4 inch wood containment boards showed signs of warping to such a degree that they did not exhibit the ability to retain a liquid spill. 2) The calibration log for the effluent pH meter could not be located. The last entry into the calibration log was during July 2006. Please note that this meter was routinely used for pH testing of the industry's process control. 3) The instruction manual for the pH meter could not be located in order to answer the question of how to calibrate the pH meter. The label on the back of the pH meter describes the meter as a one -point and two - point calibration type. This differed from the operator's procedure, as he said that he routinely performed a three-point calibration of the pH meter. Requirements: (Concerning the Industrial Inspection Comments (Pinnacle Furnishings, Inc., IUP --- A007) 1) To prevent release of a major spill to the environment, adequate spill containment must be constructed and maintained: Wood is not adequate material for containment, as observed during this inspection (see #1 in the Industrial Inspection Comments, above). If spill containment leaks, then it does not satisfy the definition of containment. 2) Concerning the missing pH calibration log since July 2006, the SIU permit states, in part, that: "The permittee shall retain records of all monitoring information, including all calibration and maintenance records...". Part II, 11. 3) Concerning the calibration of the pH meter, the SIU permit states, in part, that: "Test procedures for the analysis of pollutants shall be performed in accordance with the techniques prescribed in 40 CFR part 136...". Part II, 3. 4) The manhole cover may be in the open position only when discharging from the equalization tank; it should not be opened for long periods of time. It should be closed during a rain event. PCI Comments: 1. Gulistan Carpet Corp. Textile, Ingersoll-Rand, and Kainos Technologies are on local permits. 2. In the future, Thermal Metals will fill out the long form (with application) and begin discharging to the POTW. They will probably be treated as a CIU (since they perform a phosphoric acid dip in their process). 3. The POTW sends all of its outside testing to Meritech. 4. Erico sends all of its outside testing to Carolina Environmental. NOD: NOV: QNCR: NO INO IrTO POTW Rating: Satisfactory ✓ Marginal Unsa PCI COMPLETED BY: Dale Lopez, Environmental Specialist ;, Name and Signature of Reviewer Agency/Office/Telephone Belinda S. Henson -�• �naor� NCDENR/Fayetteville/(9 1 0) 486-1541 Date / 0/13/o INDUSTRY INSPECTION CODING; Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac.Type 1 NI CIO 1013171510I81 10 /05/ 06 U J S J f_2J (DTIA) (TYPI) (INSP) (FACC) 1.Industry Inspected: Pinnacle Furnishings Inc. 2.Industry Address: 10570 NC Hwy 211 E. Aberdeen, NC 28315 3.Type of Industry/Product: Manufacturing /Casino Furniture 4.Industry Contact: Jeff Turner Title: Plant Manager Orlando Malave' `Title: Anodizing/Metal Dept. Phone: 910- Fax: 910- 5.Does the POTW use The Division Model Inspection Form or Equivalent? Yes / No 6.Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview B Plant Tour 4 C. Pretreatment Tour J D. Sampling Review E. Exit Interview '1 Industrial Inspection Comments: 1) At least three sections of the 2 x 4 inch wood containment boards showed signs of warping to such a degree that they did not exhibit the ability to retain a liquid spill. 2) ..The calibration log for the effluent pH meter could not be located. The last entry into the calibration log was during July 2006. Please note that this meter was routinely used for pH testing of the industry's process control. • - 3) The instruction manual for the pH meter could not be located in order to answer the question of how to calibrate the pH meter. On the back pH meter unit, the description was that the meter was a'one-point and two -point calibration type. This differed from the operator's procedure, as he said that he routinely performed a three-point calibration of the pH meter. United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040 0057 Approval expires 8-31-98 Section A: National Data System Coding (Le., PCS) Transaction Code NPDES yr/mo/day Inspection 1 I NI 2 1 51 31 NC0037508 1 11 121 06/10/05 1 17 Type Inspector. Fac Type 181 1>1 191 g I . 20I 11 Remarks 211111111111111111111111111111111111111111111111166 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 2.0 1 69 701 31 71 11 721 N I 731 1 174 751 1 1 1 1 1 1 1" Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Moore County WPCF 1060 Addor Rd ,Aberdeen NC 28315 Entry Time/Date 10:30 AM 06/10/05 Permit Effective Date 05/07/01 Exit Time/Date 03:00PM 06/10/05 Permit Expiration Date 09/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// James Delmo Frye/ORC/910-281-3146/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Mi.chae.l. Hoiden, PO Box 905 Carthage NC 28327//910-947-6403 / No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Pretreatment Section D:' Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s d Signature(s) of Insp Agency/Office/Phone and Fax Numbers Dale Lopez ' FRO WQ//910-433-3300 Ext.712/ Date l !!!/// 6 Siignny�ature of Management Q0A Reviewer Agency/Office/Phone and Fax Numbers Date -LaU EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page # 1 NC0037508 NPDES yr/mo/day Inspection Type 11 121 06/10/05 .I 17 18 II (cont.) Section:D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Thermal Metals will become a CIU in the future. It will soon fill out the IWS long form and PT.application. The POTW pretreatment records and files were well maintained. The annual pretreatment inspection of Pinnacle Furnishings (a CIU) revealed that the containment walls around the 24 chemical and rinse tote containers were not sufficient to contain a liquid spillin the event of a spill. •. Also, pH calibration records were not well maintained. There was question that the correct manufacturer's pH calibration procedure was not being followed. The pH instruction manual could not be located during the inspection. Page# 2 Department of Public Utilities Wastewater Treatment Plant 1094 Addor Road Aberdeen, NC 28315 Waaotty a/ Plioaxe December 11, 2006 Telephone: (910) 281-3146 Facsimile: (910) 281-2047 Mr. Dale Lopez DWQ/DENR DEAR----FR 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 bEC 13100s Re: Pretreatment Annual Inspection Response DWQ Moore County Water Pollution Control Plant NPDES Permit No. NC0037508 Moore County Dear Mr. Lopez: This letter is in response to the requirements set forth following the Pretreatment Annual Inspection. The inspection was conducted at Moore County WPCP on October 5, 2006 and an on -site inspection at Pinnacle Furnishings, Inc followed on October 5, 2006. A follow up inspection at Pinnacle Furnishings, Inc was conducted by Jeff Corder, Lead Operator, and Janna Scherer, Pretreatment Coordinator, on December 4, 2006 and again on December 8, 2006. The following is an explanation of what was found. 1. The wood containment wall, which was not adequately containing all spillage from the anodizing line, has been replaced by a permanent brick wall. The wall measures three inches high on all sides and six inches high on both ends taking into account the slope of the floor. The bricks are mortared to the floor, to one another, and completely encased in concrete. The new wall will adequately contain any spillage and will be inspected routinely for any signs of defect. 2. On the December 4 visit, there was no progress on the pH calibration or, operation log. As of the December 8 visit, a calibration log has been established and the pH meter is being calibrated correctly daily with a 2-point calibration and a buffer check. The instruction manual for the meter is located in the log book. New buffers have been ordered and Pinnacle's management is discussing ordering a new meter. Sampling procedures and correct record Department of Public Utilities Wastewater Treatment Plant 1094 Addor Road Aberdeen, NC 28315 Woamty a/ alooxe Telephone: (910) 281-3146 Facsimile: (910) 281-2047 keeping procedures were explained and will continue to be checked during visits. 3. On numerous visits following the Annual Inspection, the manhole cover has been in the closed position prior to discharge. This issue has been sufficiently resolved. 4. All the tanks are labeled as of the December 8 visit to Pinnacle. Pinnacle Furnishings, Inc has been cooperative in completing the requirements set forth by the Moore County WPCP. They will be monitored to prove continued compliance. Please contact me with any questions or concerns at (910) 281-3146. Sincerely Janna L. Scherer, Lab Supervisor/Pretreatment Coordinator, Moore County WPCP Cc: Mr. Marcus Jones, Director, Moore County Public Works Mr. James Frye, Superintendent, Moore County WPCP Ms. Deborah Gore, DWQ PERCS Unit Mr. Dale Lopez, Inspector, DWQ Fayetteville Regional Office