Loading...
HomeMy WebLinkAbout20130496 Ver 1_401 Application_20130513NC DWQ 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699 NC Environmental Specialist DWQ: 20130496 May 6, 2013 Emily McBride Loraine Eidson 90 Oak Court # Fayetteville, GA 30214 Please find enclosed a Pre - Construction Notification Form with supporting documentation for the ford constructed at 1028 Compass Creek Drive, Clay County, Hayesville, NC. 28904, after the January 2013 flood destroyed our existing bridge accessing five properties. I have completed the required information to the best of my knowledge. If there is anything more you may need, please contact me at once at 770 - 461 -8353. Please except my apology for any violation committed in this matter. It was and is my sincere intention to protect and preserve the property and wildlife where this impact occurred. Regards, 4�jm_a� e Loraine Eidson Emily Fletcher McBride l @I MAY -82013 NR - WA N 1 �\ .1 ot W ALe'9 O T Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification (PCN) Form A. Applicant Information KI�Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number. 29 (After4he -Fact) or General Permit (GP) number. n/a 1c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No V,Project Information 2a. Name of project: Stream Ford at 1028 Compass Creek Road 2b. County: Clay 2c. Nearest municipality / town: Haysville 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Emily McBride Fletcher 3b. Died Book and P No O O W, # l 0 ?PC Q r-- ! wig 3c. Responsible Party (for LLC if applicable): 3d. Street address: 1028 Compass Creek Road UU1 3e. City, state, zip: Hayesville, NC28904 AY 3f. el no. 7 ll 0 -• 4(0 — $ 53 3g. Fax no.: r i n 0 - t-i (— a 53 Email r % r\ -.2. o n-ttQ ,+ . Ir12 -i° Page 1 of 11 nf�hl r..— 4 7 n..w....,r.... �A �fAAO ��.....:.... 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify. 4b. Name: Emily McBride Fletcher LO rdlht, E�ctsOfl 4c. Business name (if applicable): 4d. Street address: 10386 SE Banyan Way o (Day,- ULL& 4e. City, state, zip: Tequesta, FL 33469 dl, e.We- \1 1 d IQ 4f. ele hone no.1 353 °° X 2 9 5 I -° 3 65 4g. Fax no.: 4h. jEmail address I -+-Ire rj t0fMOIA7, M Y-at - r\e.iZXIQ Q, tip°rCAS�, 5. AgenNConsultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Plwww It wS •44 U q- -,e,+ B. Project Information and Prior Project History 1. Properly Identification la. Property identification no. (tax PIN or parcel ID) 56 .2 0® j 9 1b. Site coordinates (in decimal degrees): - if you can't get these, just include a very good vicinity map Latitude: 35.10191 Longitude: - 83.71331 (DD.DDDDDD) (- DD.DDDDDD) 1c. Property size: 13.66 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Compass Creek 2b. Water Quality Classification of nearest receiving water. C; Tr, HOW 2 http:// h2o.enr.state.nc.us/admin/maps/ c. River basin: map is available at Hiwassee (06020002) 3. Project Description 3a. Oescribe the existing conditions on the site and the general land use in the Vicinity of the project at the time of thi Opplication 3b. Ost the total estimated acreage of all existing wetlands on the ro NIA tJ o+ w elUna6) pg=r bavid 13r-001) List the total estimated linear feet of all existing streams intermittent and perennial) on th e ro e tinenar -Pee-,+ d. Ex lain the purpose of the proposed proj O_e_ee-55 O Ve_ r des-o�e�d fo f�ve, propeA41 ®wnem after Tao1u q ;ZoaB -Mood i?�i e. Describe the overall project in detail including the type of a ui ma 4 r'J tk5o �9 &Drw--e+e, , rcba,r^, a-nd- (d..i ma n+ IASe-d S ee- GV I e 6 a �- 63C 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: Yes ®No ❑Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary [3 Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Other. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Page 3 of 11 nerd c...... , n.........�.,. �n �nno �......:.,.. Project HFsto 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes ®No ❑Unknown b. If yes, e)Valn in detail aocordin to 'help file° instructions Future Pro ect Plan /q n Co rre. eh o r s -tv ev m e, i n 4-o Co m 1 Oa. Is this a phased pro* Yes Xf No Ob. If yes, a lain n...... A ..S 4 4 C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Temporary W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 []POT ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 []POT ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P [IT ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: Stream Inpacto If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a. 3b. 3c. 3d. 3e. ®f g Stream impact number - Type of impact Stream name Perennial (PER) or Type of jurisdiction (Corps - 404, 10 y �id ag Hemet Permanent (P) or intermittent DWQ — non -404, t Temporary (T) (INT)? other) feet S1 SPOT Fill for ford & road Compass Creek ® PER ❑ INT ® Corps ❑ DWQ tyel S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P [IT ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 [:]POT ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P [IT ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ Oh. Total stream and tributary impa ] 3i. Comments: n.--- C .-S 44 `iR ■ 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water Impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (awes) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: S. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse El Tar-Pamlico El Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required ? 131 ❑P ❑T El Yes ❑ No B2 ❑P [I Yes ❑ No B3 ❑P El Yes ❑ No 6h. Total buffer Impacts 6i. Comments: n--- 0-944 . Impact Justification and Miti atio Avoidance and Minimizatio a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing rc O o�I o� ssi ®ver �m % ° ems -POD.- ro �� V o r1 � IaLC.e �� d e> -th �,- P ago C� el'5+ry T n GZ If Specifically describe measures taken avoid or minimize the impacts through constriction techniques 15iAA L.'- a- ii-d ® V e-r LZ f'V1 Pa-55 C -r n3 a- Tk-a-P rr % o �C, +yO m r'® a-d 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this proj ❑ Mitigation bank ❑Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In4leu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool [_-]cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: Page 7 of 11 5. Complete If Using a Permittee Responsible Mitigation Plan 5a. if using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you will have to fill out this entire form — please contact the State for more information. ❑ Yes ❑ No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments. n...... 0 -844 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local governments jurisdiction is this project? ❑ Phase II 3b. Which of the following locally4mplemented sormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other. 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HOW 4a. Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply): ❑ Session Law'2006 -246 ❑ Other. 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 n^kl Lw...... 4 7 n...,....nL.... AA 7AAC ��.....:.,.. F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑ No use of public (federal/state) land? 1b. If you answered 'yes' to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered °yes° to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑ No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after- the-fact permit application? ® Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Placement of fill material in waters of the U.S. below the Ordinary High Water Mark. Unauthorized fill impacts of approximately 75 linear feet to Compass Creek. These stream impacts are associated with the installation of a concrete ford and road, in which the work occurred during the most recent trout spawning moratorium. Corps Action ED 2013400598 issued April 19, 2013. 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ❑ No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 10 of 11 n^kl G....... 4 A n........nr.... Af% I1nno % /-- *..... . , 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Corps map reflecting N.C. Natural Heritage Program data on occurrences of Federally endangered/threatened species, state listed species, and nature /rare communities. No listed species were located in/near project site and no suitable habitat exists based upon information submitted to date. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Corp map reflecting locations/occurrences of historic structures and districts as listed on the National Register of Historic Places (Register). No resources listed or eligible for listing on the Register are located on/near the project site and information provided to date does not indicate that further cultural resource investigations should be conducted. 8. Flood Zone Designation (Corps Requirement) ❑ Yes %No 8 Will this ro'ect occur in a FEMA -des nated 100- ear flood lain . 8b. f yes, ex lain how project meets FEMA re uirements 84 What sources did you use to make the flood lain determination. �� -��e�� rz Yi de—(L I h Pe, M L---110 r �' -149113 rr� �Cp U pplicant/Agenfs Signatu Mg-eats signature is valid only if an authorization letter ram the a llr� at licant/A ent's Printed Nam Is rovided. n--- 44 -S44 Ford Installation 1028 Compass Creek Drive Clay County Hayesville, NC 28904 COMPIkSS 0RrceW., V> P. tVF, FoRv r CREED.' COMPASS d- R(6LK, I- ®Gsmnin 5 0 0 0 0 ipl m Majonal 1 01 CoiMass Creek Ford 101 lob 8 a i I ovemmm f. I ovemmm 33e- C m Pti ss C R re opm ke-+t UZ b�'�aulc�eRS NT D s+ -f-euw , u 2uo (o0f � a o 0 ti g" Ono S W .M 42 y Cj` pso� E L FLErcHER A pvCo ,2 ', Rock Qa..Wn St -re,* n'n FMIS: North Carolina Floodptain Mapping Information System .r e�-h,b ►i- �' �� http://floodmaps.nc.gov/finis/Map.aspx?FfPS=043 FMCS Floodplain Mapping Information System NC Floodmaps I FAQs I Contact Us Hww Download Help About I oft 4/29/2013 1:04 PM is lap:// rfris. nc. gov /fris/Index.aspx ?user=General Public&address =1028. '" ht b i Cross Sections Cross Section Lines — Lettered Cross Sections Building Footprints with Risk Buildings Map Location Flood Zone: Minimal Flood Risk Flood Source: Flood model not available for this area. Base Flood Elevation: Not available for this area. County: Clay Political Area: Clay County CID: 370063 Panel: The most current effective panel is not available for this location in Clay Map Number: Panel Effective Date: Latitude: 35.10276 Longitude: - 83.71512