HomeMy WebLinkAboutNCG140490_Cover Letter_20210621ROY COOPER
Governor
JOHN NICHOLSON
Interim Secretary
BRIAN WRENN
Director
Andrew Owen
Project Engineer
FIuor-United Asheville LLC
5200 Hendersonville Road
Fletcher, NC 28732
Dear Andrew Owen:
NORTH CAROUNA
Environmental Quality
June 21, 2021
Subject: General Permit No. NCG140000
Fluor -United Concrete Batch Plant
COC No. NCG140490
Henderson County
In accordance with your application for a discharge permit received on October 20, 2020 we are
forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state -
NPDES general permit. This permit is issued pursuant to the requirements of North Carolina
General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US
Environmental Protection Agency dated October 1S, 2007 (or as subsequently amended).
In order to comply with the conditions of NCG140000 to which you are now subject, you are
required to do the following:
➢ Implement a SWPP before beginning operations.
➢ Download and print a copy of the NCG140000 Permit from the General Permits page on the
NPDES Industrial Stormwater Program web site, which can be reached by typing
"deq.nc.gov/SW-industrial" into your browser and hitting enter.
➢ When you receive an invoice for your annual permit fee each year, pay it promptly.
Electronic payment is convenient and quick, you can access the ePayment web site at:
httl2s://deq.nc.gov/about/divisions/water-resources/water-resources-permits/wQ-
enavments.
➢ Enroll in electronic Data Monitoring Reports (eDMR) when instructed to do so by the
DEMLR Stormwater Program. You will be contacted in 2021 to begin the eDMR steps. You
can read about eDMR at https://deq.nc.goviabout/divisions/energy-mineral-land-
resources/stormwater/ereporting-rule.
➢ Keep information about your facility name, ownership, legally responsible person, address,
and stormwater outfalls up to date. See the Industrial Stormwater Program web site for
instructions.
North Carolina Department of Environmental Quality 1 Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
777 m cnxxer.,c,� q:sary 919.707.9200
Additionally, please see guidance on our website [httl2s:lldeq.nc.gov/about/divisions/energy-
mineral-Iand-resources/energy-mineral-land-rules/stormwater-program/post-construction) for
mines located in Phase II Post -Construction areas. This guidance clarifies the applicability of
Session Law 2006-246 to mines located in Phase II Post -Construction areas. You may be required to
apply for a separate Post -Construction stormwater permit from the State or local government.
PIease take notice that this certificate of coverage is not transferable except upon approval of the
Division of Energy, Mineral and Land Resources (Division). The Division may require modification
or revocation and reissuance of the certificate of coverage.
This permit does not affect the legal requirements to obtain other permits which may be required
by the Division of Water Resources, the Coastal Area Management Act, or any other federal or local
government permit that may be required.
If you have any questions concerning this permit, please contact Michael Meloy at telephone number
(919) 707-3647 or by email michael.meloy@ncdenr.gov.
Sincerely,
for Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
cc: Asheville Regional Office / S. Riddle
Stor>nwater Program Files
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh, North Carolina 27699-1612
E:'CiSiH NA �
be«arrreM ctereircnr :natuwiry 919.7o7.92Uo