Loading...
HomeMy WebLinkAbout20130492 Ver 1_Stormwater Info_20130507DESIGN CALCULATIONS CIVIL/SITE WORK DUNN ROAD COMMUNITY CENTER AND W CPSS E-20 ELEMENTARY SCHOOL. RALEIGH, NORTH CAROLINA NOVEMBER, 2012 . • y` C _l-5(74 "o LS,J.ti` �� 77717ii1 w ' CLH design, . a. p Regency Fart k, 400 Regeticy Forest Drive, Szrrte 120 Cary, North Carolina 27518 Fhonc: (919) 319 --6716 Fax: (.91 9) 3l9 --7516 Stormwater Management Narrative Dunn Road Community Center and WCPSS E -20 Elementary School November, 2012 Site Description The site of the proposed City of Raleigh Dunn road Community Center and Wake County Public School System E -20 Elementary School is located off Durant Road in Raleigh is adjacent to the North Wake Landfill. The site was formerly used as the borrow site for the landfill and is located on the north sine of Durant Road approximately 1.3 miles west of US -1 across the road from the existing Durant road Elementary School. The Site consists of four existing parcels currently owned by Wake County that will be recombined into three lots that are to be owned by Wake County, the City of Raleigh, the Wake County Public School System. The stormwater analysis will include a portion of the adjacent Wake County Landfill site (designated as Area 4) For a total of 48.16 acres. Area 4 will remain in Wake County's Planning Jurisdiction and will be reviewed concurrently by Wake County Stormwater. The site is located in the Secondary Urbana Water Supply Watershed and is located in the Neuse River Basin. Stormwater Manaeement Stormwater management is proposed to meet the Stormwater Management Regulations of the City of Raleigh and Wake County. These regulations generally consist of Water Supply Watershed Protection and the Neuse Rivet' Nutrient Management Strategy regulations. The recombined lots share the various Best Management Practices (BMPs) located throughout the site, with lot subareas allocated to each BMP. Storm water Detention shall be analyzed at four discharge points for the entire subdivision. Secondary Water Supply Watershed Protection allows a maximum of 70% impervious areas per lot. Stormwater devices, or BMPs within the development shall treat the first one inch of rainfall in excess of 24 percent from the lots shall be detained for a minimum of 12 hours om- captured by a wet pond in accordance with Raleigh regulations. Ncuse River Basin regulations require Total Nitrogen (TN) to be at or below 3.6 lbslaclyr- to be achieved through Best Management Practices (BMP), offset buy downs or combination of both. BMPs shall detain water between 2 -5 days and provide 85% Total Suspended Solid(TSS) removal. TN and TP calculations will be provided with Construction Plan Submittal. Stormwater Treatment -- Nitro =en Removal: Two Detention Wetlands and a 90 %TSS Wet Detention Pond will provide removal of Total Nitrogen (TN) to rates less than the required limi€ of 10- lbslaclyr. The Detention Wetlands will remove 40% of the TN from runoff, and the 90% TSS Wet Detention Pond will remove 25 °Ire of the TN from runoff. TN is calculated using Method 2 from the City of Raleigh Stormwater Design Manual. Lots 1 and Proposed Public RIW — City of Raleigh Site Area: Base N Loading Rate: TN Export: Target N Loading Rate: N to be Off -set by Payment: Payment Maint. Duration: Total N to be Offset by Payment: Lot 2 and Proposed Public RIW - WCPSS Site Area: Base N Loading Rate: TN Export: Target N Loading Rate: N to be Off -set by Payment: Payment Maint. Duration: Total N to be Offset by Payment: Lot 3 — Wake County 27.91 -ac 4.48 - lbs /ac /yr 125.09 - lbslyr 3.60 - lbslaclyr 0.88 - lbslaclyr 24.62 - lbslyr 30.00 -yrs 738.48 -1bs x $20.29= $14,983.76 12.51 -ac 7.00 - lbslaclyr 87.60 - lbslyr 3.60 - lbslaclyr 3.40 - lbslaclyr 42.56 - lbslyr 30.00 -yrs 1276.80 -lbs x $20.29= $25,906.27 Lot 3 is greater than one acre and will be reviewed separately with future development submittal to the City of Raleigh. This lot is not a part of this review. Area 4 — Wake Count — Leased by Raleigh per Letter of Agreement Area 4 will be reviewed by Wake County under separate review. TN calculations are not required for City of Raleigh review. Site Area: Base N Loading Rate: TN Export: Target N Loading Rate: N to be Oft -set by Payment: Payment Maint. Duration: Total N to be Offset by Payment: -2- 6.44 -ac 1.44 - lbslaclyr 9.28 - lbslyr 3.60 - lbslaclyr 0 - lbslaclyr 0 - lbslyr 30.00 -yrs 0.00•lbs x $20.29= $0.00 Wet Detention Pond Design Elements: I , Sizing shall take into account all runoff at the ultimate build -out including off -site drainage. 2. Side slopes stabilized with vegetation shalt be no steeper than 3:1. 3. Wet Pond shall be located in a recorded drainage easement with a recorded access easement to a public right -of -way. 4, Wet Pond meets 90% TSS removal and does not require a filter strip. 5. The Wet Pond will be used for Sedimentation and Erosion Control and shall be cleaned out and constructed to design state. 6. The design storage is above the permanent pool. 7. Discharge rate of the treatment volume shall completely draw down between 2 and 5 days. 8. The average depth of the permanent pool shall be a minimum of 3 feet. 9. Permanent pool surface area shall be determined using NCDENR DWQ Table 10 -3. 10. The flow with the BMP shall not short- circuit the pond. IL . Wet Pond shall have a forebay. 12. Wet Pond shall be stabilized with vegetation above the permanent pool. 13. Wet Pond side slopes below the 10 foot shelf shall be 3:1 maximum. 14. Wet Pond shall provide sufficient temporary sediment storage to allow for proper- operation between scheduled cleanouts. 15. Wet Fond shall not produce adverse impacts to adjacent wetlands. 16, A minimum 10 foot wide vegetated shoulder shall be installed around the perimeter. The inside edge of the shelf shall be 6" below the permanent pool elevation; the Outside edge of the shelf shall be 6" above the permanent pool elevation. 17. The forebay volume shall be about. 20 percent of the total permanent pool volume, leaving about 80 percent of the design volume in the plain pool. 18. Freeboard shalt be a minimum of 1 foot above the maximum stage of the basin ( 100 year 24 hour Design Storm), 19, The permanent pool is not within 6" of the Seasonal High Water Table, but will provide an impervious material layer below the topsoil with no more than 0.01 inlhr infiltration rate. 20. Outflow of barrel enters an existing drainage channel and is not required to meet diffuse flow requirements if outflow is non- erosive. Detention Wetland Desi n Elements: 1. Sizing shall take into account all runoff at the ultimate Build -out including off -site drainage. 2. Side slopes stabilized with vegetation shall be no steeper than 3:1. 3. Wet Pond shall be located in a recorded drainage easement with a recorded access easement to a public right -of -way. 4. Discharge rate of the treatment volume shall completely draw down between 2 and 5 days, 5. The flow with the BMP shall not short - circuit the wetland. 6. Wetland shall have a forebay. 7. A vegetated fitter strip is not required for overflows or discharges from a storlrswater wetland. 8. Sizing of the wetland is per NCDENR -DWQ volume requirements. 9. The treatment volume is greater than 3,360 square feet. 10. Maximum shallow land depth (temporary pool) shall be one foot. it. Minimum length to width ratio shall be greater than 1,5:1. 11 Wetland shall be stabilized with 14 days of construction. 13. The permanent pool is not within 6" of the Seasonal High Water Table, but will provide an impervious material layer below the topsoil with no more than 0.01 in/hr infiltration rate. 34. Cattails shall not be planted. 15. The Wet Pond will be used for Sedimentation and Erosion Control and shall be cleaned out and constructed to design state. -3- Stormwater Detention: Two Detention Wetlands and a 90 %TSS Wet Detention Pond will provide adequate, temporary stormwater runoff Storage volume to attenuate the peak storsnwater discharge rates to levels less than the pre - development conditions on the site for the 1 -yr, 2 -yr and 10 -yr design events. There are four primary discharge points for the entire 48.15 acre properties. Point A is located at the northeast corner of Area 4. Run -off from this portion of the site drains in Bounce Branch which then enters the Neuse River downstream. Point B is located on the eastern line of Lot 2. Run -off from this portion of the site drains into an unnamed tributary to Bounce Branch. Point C is located on the eastern right -of -way of the future Dunn Road Extension. Run -off at this location enters another unnamed tributary to Bounce Branch. Point D is located at the southwest corner of Lot 3, which discharges into the existing Durant Road storm drainage system. " includes upstream offsite run -off. -4- Design Storm Event Pre- Development Post Development Managed Post Development Best Management Practice Drainage Q l (cfs) 6.74 18.56 4.32 Wet Detention Analysis Q2 (cfs) 14.72 30.44 8.73 Pond Point `A' Q10 (cfs) 43.43 66.81 26.29 Drainage Q1 (cfs) 3.52 * 31.17 1.81 Wet Detention Area B Q2 (cfs) 7.20 * 45.24 3.94 Pond & 3 Bio- Q 10 (cfs) 21.61 85.70 17.54 Retention Areas Drainage Q 1 (cfs) 1.13 0.71. None Area C Q2 (cfs) 2.76 1.55 Q10 (cfs) 8.99 4.45 Drainage Q 1 (cfs) 0.17 0.05 None Area D Q2 (cfs) 0.56 1 0.12 Q 10 (cfs) 2,22 0.35 " includes upstream offsite run -off. -4- DUNN ROAD COMMUNH Y CENTER & E20 ELEMENTARY SCHOOL DAM 8- 25--11 PROJECT NO. ,8 -138 & 10� -134 DRAWN BY KAL USGS AD hW s U esr. 1987 v SCALE 1" = 2000' GLH DESIGN, P.A. Regency Park 400 Regency Forest Drive Suite .120 Cary, North Carolina 27518 Phone. (919) 319 -8718 Fax: (919) 319 -7516 :: �.. "''''a; fib.; �:„4t . ��•� . - t'r i q� r rr S' 5• w. !' E• An 'l. y a JV fn i' �a y ' 4'. •L • ".Cr . y f• `a y. 3 •:r�. •� d r .:7 E 5, a y� 1r y ;'. •,tom,•: �'• �+` .: {.iC S �' �• •r i'c .r Ay, �; , -� 4i: i• ' "�'��1? Ci'T .l �Y: c- `' -,.�• ..�c,'y:��f• "( :'f'' `��` -•�r y ".1f }[�}�y-�!''•:: t .�„L.. L ,a. •.. 'N• :'4%R•.,.x... {° fe y •. SAS LS�oY � - „.. �',� . `awl•.. YT � S:i.. �.:; �!•.�:�r.;.[4 %;. : %'� =�`� '+.i ::. �.:.,; � � _ ' may'• ..:i�•'.��''' <'•�z ro ' l �:;•:�,�-` � ��'' �l �.a . . A t.�[,::A ��4,' : P' r�yS • ` �e�Z, . ' �. �..[•'� !'`� r �'i„ �'.�' ��. '�.•.,' syay V �� r`il,r'! , "� [.iy ..5:: v- 1�F;= ••r: ^.:�•n ':.i. ,.l � i•r -,+: 51,x:” '::�.;� _ :"G: �:' •�`C,; ;t= :vim. a'•i!r y a S 3 •F:•: � tti, ,.'.Fr"" S" STS �i.0 "::.Yi: C;. •.;�a�r��� : S� ^.:�;•'• ,�?;? . r,.. .air., _�•..:� rj _ ..�� �k =.':-.�'� = %':�: I��c.r • , F x• 'c ti. %S. .rr y ry .,,fig. -;.•. r' ` .'.'. a :.. .. -.rye }} f.•,. '`(^•:i• .�V. f� .':�( Vim. �'»�• r. d- ��yy S�.:11:..C:.'•'� vra`a ,!a.,•:'.:� ?:_d -ii �tit:�w,?�'��. .,,[•, !. i�r j � EjiE32 E . ':::. :M.'� i• Y' m. SCALE T` 100(Y DUNN ROAD COMMUNITY CENTER & CLH DESIGN P.A. E20 ELEMENTARY SCHOOL DATE 8 -25 -11 PROJECT Na- 8 -138 & 10 --134 DRAWN BY X4L 400 Regency Forest Drive Suite 120 SOILS, C AMP AM Cary, North Carolina 27518 Phone: (919) 319 --6716 REFFRF,NW. WAKE COUNTY SOIL SU12WY (F970) Fax: (919) 819.7516 PFDS: Contiguous US d.;i 4111 114n'A 5n4 IA�p r7cws nrgAnlxntl ¢a L'O:rEh ?: N;VS ".A4r N0AA G0 (i­,Allnl¢ NOAA ATLAS 14 POINT PRECIPITATION FREQUENCY ESTIMATES: NC 7lOrlcpa 6¢ arrcnr 1 +ro; :¢rs FAD DATA DESCHIPTION Ff Prcc'v'� cva Wit lYPa: prodpllai+on doplh Vnlra: 0 I fih T[ma w710%IYPQ: paflia[ COraflpn FF D.C. So, v r Fwr t SELECT LOCATION . Pr• h+sps Trmpv.AI Dwr. 1. }41snuR }ly: Ynry Z;., o ow a) enlar woolion IdCLI Rl deQNws. 4*o • fp 5 and WY 3¢LtWO: f¢n ft d¢: $r�.n„ PFn$ Ycnrm. Pr pOCUn1c11t8 6y Bek6 a74LLan olkk harp EOr a 41 51 W ]l;Wn] uaad 4n I,agu9 cy A"IysIa fax NC1: S6190 Sf61;pn Pw0,bm}Aax l;riu[n 2,UH map: Yrr : llrlirrl [n ASP} PA1P ()¢Ln�li: nif i• ?A P do la rc1 5'u di.a =ivcPar•uw n yw6>e� 1'rcCi n�:�0� L Ccnlaci Va :mn:•rr LI alo.rrer qx :;.:}i,�w'•}:'i � r�'.. :;w� ,i� �� k• r•� llaAiGCa" G]nr'.vn� --------- ••• i { o a3h0r Or aayyq tlY k 1 ty . �.1'�' '•}. < c4 Icon a1a17on 0 n 1 Cild ,:h11se.LR� rR ..:Sh[rx 6lalfMaonm . - :. 1111... ..:. •. . 111:1 1111_.. iaoD 0.85 10.756.0.906} oDralloR 0min m 7 _ _ BA81 [6.96] - 42.4381 .'T 9i J ye 5 0595 !0.891. 0,584! { 10-min �� '.�✓E= ,`�:._�.:_.� 4'1:11.:;:" (� S. Fn x.746 [0.6550.8161 oas7 f9- 160- 6.0$51 o.9s4 7.05 Iak13 -1.0{1 [x.068.1 -i9! 7.19 [1.02 -1.231 1.19 (1.07.1.29] s.29 [ +•1E1.961 ,.SD P.f6V -dpj 7.33 Ir,19•s.ATj 15•miR f..." 7 . �:} ::•'•�`:' .`; 4::111 i �: ":�••'-:•'�' ":'��:`.�:.: :'S ' •�� . E < fit.:'. ^ :::..:..�,. . Yr 1. � r4 yr LOCAY70N IHf0 R/AAT [O N: R � H rC Narn4. A700 rm C8 g �, 1}S' . ..t�.��'�•, f ':F ':� ' % i9LLtvda: 35.9137 Lon IWaa:•76.0282 .�[ ;rl'cces�,. 1111 si L4il as V% _ {f. -: R:ier<•1i ::.. 'f•'s V.::�,.. ](', S�f. ��: "'��. �'..:�^•n'.' .: R.i�r r. ..'µ;,Y'. : ^�:. ¢ E14Ym1lon: 85241• ::�:• ":¢ne J,r �.�J;'�• is ,ne- - •ec :�.'�: :. Cis y;..�� ]s '�.... fe• %� 1.54 NII.AB -1.791 1.69 (1.&9.1,671 _. f-�• -.. ik 6min e:•i�adui II.799i0.42] iml 'SF,'•.• }•' C.tl12Z4i .•v: C✓.�Oa:4 M6P1 .c�'�' 1111. _ f2097xS1J�[Y.+9! POINT PH EC I PITATION FREOLIENCY (PF) ESTIMATES WJH W%CON4:10MCE INYERVALS AND SI)PPLE1AFftr•AnY INFORMATION 110AA Alt-0 K VOW" 2, V4ra90n 3 PF ladulmr P[' ,:.7ph•c:8' , 4pgl ^in -wary nruf mrticn Fnr.i Yxgo rage L of 'L wvnv.nw6- rgaa,gov r http: / /hdsc.nws.noaa. goy /hdsc /pfdslpfds_map._cont.html ?bkmrk =nc 7/23/2012 POs• based reel Itatlon f uency estlmstes with 90% confidence �..__.. so 0.706 (9.651 -0 -7691 Intervals ers np 0.748 t0.675.0.014y in Inches), zoa 0.701 f0.7M0.0551 _SOD 0.628 10.753- 0-8491 1111_.. iaoD 0.85 10.756.0.906} oDralloR 0min m 7 _ _ BA81 [6.96] - 42.4381 x 6.467 (0 ?28- 0.510} 5 0595 !0.891. 0,584! Rvme rocurronca�interva 79 _ zs 6397 0.699 10516 - 0.6501 [0.601. 0.7161 10-min 6.1.5E [8.586- p.690j x.746 [0.6550.8161 oas7 f9- 160- 6.0$51 o.9s4 7.05 Iak13 -1.0{1 [x.068.1 -i9! 7.19 [1.02 -1.231 1.19 (1.07.1.29] s.29 [ +•1E1.961 ,.SD P.f6V -dpj 7.33 Ir,19•s.ATj 15•miR 0.800 f0J32- 0.874] 9&38 [0.861 - 1.03] 7A6 i0�995. .... �1 -27 5.53 If.ft 71$21 Ir.21 45] L^- rj3 1A2 L.�1 -2d -1 -551 7.50^ [1361aM11 :-- 5.57 f1,ef -1.71) 1.54 NII.AB -1.791 1.69 (1.&9.1,671 _. f-�• -.. ik 6min .- .....,-- r- --r.Tw [1.4242'10.242} II.799i0.42] .. - • . . .- { 1,< r. i3On1�?... x•.vear..d --_- :1111 @.GO76911WV.it.66315} Y :xeo-.. 11.952]x1 93.(2.W-3A5) 1111. _ f2097xS1J�[Y.+9! -. 7777 42:26285] [ 7 2��_ -- (7.+177.001 YL_.6r}inlrt ;I...._..,._ LLL Ii ^tr3>A51 111E 6s]SF 251 1 [i.si 1 [2.Oa2Ba91 12.y962867 f7.6a .• 1111 (2.W .. IS:aA3.731 {5.33 091 {3.63 0?! [ &hx lr l �k61 i +.[+SA237i m Iz.2c >91 P 2.6199] {].90x3 43.0­261 3 4331 5�28� [4,7 .5.751 14.2 54) 5-87 IS.r9 -6.561 [471 5.09} 6.85 (581.7 %3} IS.390 8)1 7.84 IB 3P -].96) 2.D3 {1166 -2.23] 2.95 W [P.29.2.661 It- 42.79 -0J.! 3.50 4-16 !3.20-3.671 W "77 -a.59] 6.72 {4.25 -5.1 a} 1241E 2 -qQ Pep -2.65] 2.87 {Y.6<•SIq 8.35 4 -78 5.OVr 5.75 6.46 (6.'1, -6.97] 7.21 16.35 -7.70] 6.25 {116.802} 9170 [7.85 -993} 26•hl' {2106 -3.00} Ia.z2 -3.78) {a,p2.8 4.96 5.92 {L65 -5.381 IS- 506.361 6.66 f8 -17-] -131 7.110 (B.BC•.7.4y 6.17 {7.55 - &77} 8.22 f6.Ae -9.91! 10.0 Ii 1.+0.10.65 TAAy 3.30 (505.5585 979E 10.72 -4.27J 9.98 [5.64 -5.311 7 5.70 l'S.01.a.F71 {0.28 -7.22} 7,52 (1196.8&71 am {7.70 -5.95} 9.17 {a -k -9.86} 10.3 19.u•11.1i ; 11.2 [10.2-12.1] $•day a 7•d0y 13.21 -5151 7 C4 C¢•2a.671 i5: 3xs.501� 4A3 Ix•09'S -<+1 Id-80 ?5.671 6140 E5.& alAUl -6.71 155 -aA11 O.S$- -7.555 7.39 I6. 058] j7.74-#44t i]]2•�8.+5j als 10.6 -9.881 1&0679.37} 9.16 19�A50 � ?91 I .- 010.31 10,1 ro� 2.421 [9.910 -.B1 11.3 f +�-6- Ta] (10.7 12.51 12.3 `(r 2.5.6 6j 10doY ` '72 20 -0By 95795] {1.75.0 (0.56 068] 9.580.9} (91 i1 {9711 -9. [ 3191 4w7 Gaj I156g 161}^ [407 951 �........r 30-day s.7o = - 42.65.8.60! 7.sa 6.90 -10.41 �I......fi:� 1111 -1.... {19A It g! iz:s._�i-- ..- ..is: "e' {Itb -13.01 Ip I +3.0•rq> jr s5. . -..� IS [14.1 -16.0} 7171 X6.3.- ....i. 57.11 -a1 ...77.6 -=I 1rB1 -IBb} s9.7 (17.6.20.47 lF •aua' ...j IE n6.e -yr.n j, rage L of 'L wvnv.nw6- rgaa,gov r http: / /hdsc.nws.noaa. goy /hdsc /pfdslpfds_map._cont.html ?bkmrk =nc 7/23/2012 rrt)a: L.ontxguous uz� �5dly I 10-7 17.1 I !€ 36.2 ' i6.9 f ties 19.6 20.9 226 23.6 1r95;22Ai f21.1_23:9 }. In.z.Y5.2j 12.4 445 56.3 }7.B 19.6 21.3 22.4 23.7 25,0 26,7 S069y (11.6 -15.01 I +5.6 -r5.aj f55.5 -i7� {i89.16.7J f1B.6.2f1.7j {18.9.22.21 [2+.2•Y3Rj 12xA -xA47 I25.B -26.8} p5. + -xe.y +Pradti+arbn hegw.cy[v}}oxdnam¢%Z,"" ran'n ao W don lra4—npy ar,ayrk 7• ww dW4a WA. IPO51. - N[uwmYnaa � V arn PnIaC ro 'nY+] l ,WWIrI D eO"" MmIyM r vr0w Daum tvIb S 614 n 'ho=' W) 4 5 %-(!Q in T efThi n at u;pM e ii1'OUI P+ woWdUO9ualM1mYlOW i [r-vk wN P,.6P ii]Mn {AaWMPra7 e 90 r 1"Mnand' q KgW 6Uncw My mW F'9P vcues r':aaSe rkor b NOAA AK S 14 oxxxranr IV nM n"m W- I ESEnIa[og Iron Ina tepid In Wviprmol' prvCiplalion lrOqu6rlCy Cs4md165 'i j•Su6rW ' T MNA Lank Calog.r 110mv I rniu •ass c:r:-rr+:: ••;,�.�,r rage Lot z http:ll hdsc. nws. noaa. govl hdscl pfds /pfds_map_cont.html ?bkmrk =nc 7/23/2012 DRAINAGE AREAS TE 4 - - 8128112 PROJECT NAME PROJECT NO North Wake County E5 & Community Center Campus 09 -116 LocATm BY Raleigh, NC KAL 11 Site Area Wooded Area LOT IA- 18.94 ac 1.40 ac Drains to Analysis Point A 0.89 ac LOT 1B: 5.59 ac 4.80 ac Drains to Analysis Point B 0.65 ac LOT 1C: 1.53 ac 0.40 ac Drains to Analysis Point C 2.30 ac LOT 1D: 1.55 ac 1.00 ac Drains to Analysis Point D Total Lot 27.91 ac 7.60 ac pious Area Lawn Area 0.10 ac 17.44 ac 0.00 ac 0.89 ac 0.23 ac 1.00 ac 0.00 ac 0.65 ac 0.33 ac 19.98 ac Site Area Wooded Area Impervious Area Lawn Area LOT 2A: 3.38 ac 0.00 ac 0.00 ac 3.38 ac Drains to Analysis Point A LOT 2B: 4.63 ac 2.30 ac 0.10 ac 2.23 ac Drains to Analysis Point B LOT 2C: 4.50 ac 2.00 ac 0.03 ac 2.47 ac Drains to Analysis Point C Total Lot 12.51 ac 4.30 ac O. 13 ac 8.08 ac Site Area Wooded Area LOT 3D: 1.30 ac 1.20 ac Drains to Analysis Point ❑ Total Lot 1.30 ac 1.20 ac Imperious Area i.awn Area 0.05 ac 0.05 ac 0.05 ac 0.05 ac Site Area Wooded Area Impervious Area Lawn Area AREA 4A: 5.33 ac 2.50 ac 0.00 ac 2.83 ac Drains to Analysis Point A AREA 4B: 1.1 I ac 0.40 ac 0.00 ac 0.71 ac Drains to Analysis Point B Total Area 6.44 ac 2.90 ac 0.00 ac 3.54 ac Site Area Wooded Area Im )ervious Area I.,awn Area TOTAL SITE 48.16 ac 16.00 ac 0,51 ac 31.65 ac Page 1 1:4�'� ,a ,Y' S,f :Ya. ?,• fR4 :.y Fi;A_ri 1� DATE Future Imp. Area Lawn Area LOT 2A: 1.44 ac yI $128112 0.05 ac 0.21 ac 1 f 1r J PROJECT NAME PROJECT NO North Wane County ES & Community Center Campus LOT 2B: 7.68 ac 49 -116 3.36 ac 0.20 ac {S Drains to Wet Pond I LOCATION BY Raleigh, NC LOT 2B: 1.21 ac KAL 0.55 ac 0,10 ac 1 Drains to Wetland 3 LOT 2B: 0.35 ac 3 0.21 ac 0.00 ac 0.14 ac Offsite to Wetland 3 Site Area Wooded Area fm pervious Area Future Imp. Area Lawn Area LOT 1A: 9.54 ac 0.00 ac 3.21 ac 0,20 ac 6.13 ac Drains to Wetland 2 LOT IA: 7.39 ac 0.00 ac 0.00 ac 0.00 ac 7.39 ac ByPass to Analysis Point A LOT IB: 4.08 ac 0.00 ac 2.21 ac 0.15 ac 1.72 ac Drains to Wet Pond 1 LOT 113: 2.66 ac 0.00 ac 1.58 ac 4.10 ac 0.98 ac Drains to Wetland 3 LOT IB: 3.67 ac 0.00 ac 0.07 ac 0.00 ae 3.60 ac ByPass to Analysis Point B LOOT IB: 0.96 ac 0.00 ac 0.39 ac 0.00 ac 0.57 ac Olf- -Site Area to Wet fond I LOT 1C: 0.43 ac 0.00 ac 0.04 ac 0.00 ac 0.39 ac Drains to Analysis Point C LOT ID: 0.14 ac 0.00 ac 0.00 ac 0.00 ac 0.14 ac Drains to Analysis Point D Total Lot 27,91 ac 0.00 ac 7.11 ac 0.45 ac 20.35 ac Includes Dunn Read Extension Public RIW and Excludes Offsite Area) Site Area Wooded Area Impervious Area Future Imp. Area Lawn Area LOT 2A: 1.44 ac 0.00 ac 1.18 ac 0.05 ac 0.21 ac Drains to Wetland 2 LOT 2B: 7.68 ac 0.00 ac 3.36 ac 0.20 ac 4.12 ac Drains to Wet Pond I LOT 2B: 1.21 ac 0.00 ac 0.55 ac 0,10 ac 0.56 ac Drains to Wetland 3 LOT 2B: 0.35 ac 0.00 ac 0.21 ac 0.00 ac 0.14 ac Offsite to Wetland 3 LOT 213: 0.58 ac 0.00 ac 0.00 ac 0.00 ac 0.58 ac ByPass to Analysis Point B LOT 213: 0,39 ac 0.00 ac 0.27 ac 0.05 ac 0.07 ac Offsite to Wet Pond 1 LOT 2C: 1.60 ac 0.00 ac 0.01 ac 0.00 ac 1.59 ac Drains to Analysis Point C Total Lot I2.51 ac 0.00 ac 5.10 ac 0.35 ac 7.06 ac Includes Dunn Road Extension Public RIW and Excludes Offsite Area Page 2 Site Area Wooded Area Impervious Area Future Imp. Area Lawn Area AL SITE 48.16 ac 0.00 ac 12.44 ac 0.90 ac � 34.82 ac Lot 3 and Area 4 are excluded from Watershed calcuIations Lot 3 will be retained by Wake County and will reviewed by the City of Raleigh in a future review submittal. Area 4 is within Wake County's jurisdiction Site Area Wooded Area Ini ervious Area Future Imp. Area Lawn Area Lot I 27.41 ac 0.00 ac 7. t 1 ac 0.45 ac 20.35 ac Percent Impervious- 27.43 % ¢70% Site Area Wooded Area hi )ervious Area Future Imp. Area Lawn Area Lot 2 12.51 ac 0.00 ac 5.10 ac 0.35 ac 7.06 ac Percent Impervious: 43.57 % <70% Page 3 DATE PROJECT NAME PROJECT NO North Wake County ES & Community Center Campus 09 -116 LOCATION BY ` Raleigh. NC KAL Site Area Wooded Area Impervious Area Future Imp. Area Lawn Area LOT IA: 9.54 ac 0.00 ac 3.21 ac 0.20 ac 6.13 ac Drains to Wet Pond 2 LOT 2A: 1.44 ac 0.00 ac 1.18 ac 0.05 ac 0.21 ac Drains to Wet Pond 2 ARFA 4A: 3.76 ac 0.00 ac 0, 18 ac 0.10 ac 3.48 ac Drains to Wet Pond 2 Total Area 14.74 ac 0.00 ac 4.57 ac 0.35 ac 9.82 ac Site Area Wooded Area Im erVious Area Future imp . Area Lawn Area LOT 1S: 4.08 ac 0.00 ac 2.21 ac 0.15 ac 1.72 ac Drains to Wet Pond I LOT IP: 0.96 ac 0.00 ac 0.39 ac 0.05 ac 0.52 ac Off -Site Area to Wet fond I LOT 2B: 7.68 ac 0.00 ac 3.36 ac 0.20 ac 4.12 ac Drains to Wet Pond I LOT 2B: 0.39 ac 0,00 ac 0.27 ac 0.05 ac 0.07 ac Offsite to Wet fond I Total Area 13. l 1 ac 0.00 ac 6.23 ac 0.45 ac 6.43 ac Site Area Wooded Area Im eFvious Area Future Imp. Area Lawn Area LOT II3: 2.66 ac 0.00 ac 1.58 ac 0.10 ac 0.98 ac Drains to Wet Pond 3 LOT 2B: 1.21 ac 0.00 ac 0.55 ac 0.10 ac 0.56 ac Drains to Wet Pond 3 I.OT 2B: 0.35 ac 0.00 ac 0.21 ac 0,00 ac 0.14 ac Offsite to Wet Pond 3 Total Area 4.22 ac 0.00 ac 2.34 ac 0.20 ac 1.68 ac Page 4 DATE }•:, ` } ,' � ' ,`n�t:. -h, w =`3 fflow6mmm, 8/28/12 r r • // �f !'� PROJECT NAME ra PROJECT NO North Wake County ES & Community Center Campus 09 -118 LOCATION BY Raleigh, NC KAL Pi•e- Development: Site Aiva — 27.65 ac Tc 19A0 ttiin Wt. CN 62.3 Site Soils: 90% Type B Cecil, 10% Type D Worsham Weighted CN Wooded Area: 3,90 ac CN= 57 C= 0.20 Impervious Area: 0.10 ac CV- 98 C= O.95 Lawn Area: 23.55 ac CN= 63 C= 0.30 Weighted C: 0.29 Weighted CN: 62,3 Past - Development: Site Area = 24.67 ac Tc = 14.90 min Wt. CN = 70.0 Site Soils: 90% TYpe B Cecil, I01X? Type D Worsham Weighted CN Wooded Area: 0.00 ac CN= 57 C= 0.20 Impervious Area: 4.57 ac CN= 98 C= 0.95 Future Imp. Area: 0.35 ac CN= 98 C= 0.95 Lawn Area: 19.75 ac CN= 53 C= 0.30 Weighted C: 0.43 Weighted CN: 70.0 ;} r ". - •i� - y;''?::,' �:a' %��v�';: �r�V,'w }3z�z .v��K d �.:fI' -,V� hs��j, l � _ � : "•` :y Y.' ''� � •m�,� ro DA'Z'E CN= 57 Wooded Area: 8128112 PROJECT NAME 55 C= PROJECT NO North Wake County ES & Communit Center Campus CN= 09 -116 LOCATION 0.95 Future Impervious Area: BY Raleigh, NC 98 C= KAL Post - Development: Site Area = 14.74 ac Tc _ 6.40 min Wt. CN - 73.4 Site Soils: 100% Type B Cecil - Development: Site Area - 0.00 ac 'T'c 7.20 mist Wt. CN - 0.0 Site Soils: 100 %n Type B Cecil Weighted CN Weighted CN CN= 57 Wooded Area: 0.00 ac CN= 55 C= 0.20 Impervious Area: 4.57 ac CN= 98 C= 0.95 Future Impervious Area: 0.35 ac CN= 98 C= 0,95 Lawn Area: 9.82 ac CN= 61 C= 0.95 Weighted C: 0.95 Weighted CN: 73.4 - Development: Site Area - 0.00 ac 'T'c 7.20 mist Wt. CN - 0.0 Site Soils: 100 %n Type B Cecil Vi'' i a �g, x '� a d " r �Ycii' a'f Post -Dove lopmenu Site Area = 9,93 ac To 9.80 min Wt. CN = 63.0 Site Soils: 80% Type B Cecil, 20 % Type ❑ Worsham Wooded Area: Impervious Area: Future Impervious Area Lawn Area: Wcig11ted C: Weiblited CN: Weighted CN Weighted CN CN= 57 Wooded Area: 0.00 ac CN= 57 C= 0.20 Impervious Area: 0,00 ac CN= 98 C= 0.95 Future Impervious Area: 0.00 ac C:N= 98 C= 0.95 Lawn Area: 0.00 ac CN= 63 C•- 0.95 Weighted C: 0.00 Weighted CN: 0.00 Vi'' i a �g, x '� a d " r �Ycii' a'f Post -Dove lopmenu Site Area = 9,93 ac To 9.80 min Wt. CN = 63.0 Site Soils: 80% Type B Cecil, 20 % Type ❑ Worsham Wooded Area: Impervious Area: Future Impervious Area Lawn Area: Wcig11ted C: Weiblited CN: C= C= C= C= I 0.20 0.95 0.95 0,95 Weighted CN 0.00 ac CN= 57 0.00 ac CN= 98 0,00 ac CN= 98 9,93 ac CN= 63 0,95 63.0 C= C= C= C= I 0.20 0.95 0.95 0,95 aj' si.., ., �'r i�g 'a j •��+:��; (��`."`'r ••F "-`�''S� 'fie` `• - ' h �'" ;.I „s.:¢s a,�' �i DATE - !i , � ,Nrrs�iH' 8128112 PROJECT NAME PROJECT NO North Wake CountK ES & CommunitV Center Campus 09 -116 LOCATION BY Raleigh, NC KAL o OEM Pre - Development: Site Area - 11.43 ac Te - 14.50 min Wt. CN - 57.4 Site Soils: 100 %n Type B Cecil Weighted CN Wooded Area: 7.50 ac CN= 55 C= 0.20 Impervious Area: 0,10 ac CN= 98 C= 0.95 Lawn Area: 3.93 ac CN= 61 C= 0.301 Weighted C: 0.24 Weighted CN: 574 Post - Development: Site Area = 20.02 ac Te 7.20 min Wt. CN - 76.4 Site Sails: 100% Type B Cecil Weighted CN Wooded Area: 0.00 ac CN= 55 C= 0.20 tinpervious Area: 7.77 ac CN= 98 C= 0.95 Future Impervious Area: 0,55 ac CN= 98 C= 0.95 Lawn Area: 11.70 ac CN= 61 C= 0.30 Weighted C: 0,57 Weighted CN: 76.4 {;jfj t?''ti � a3 "'aF;` "a': d;w' ::s3 ^..• ATE ,`•'• - °"Y L�`L �� `nom 8/28/12 PROJECT NAME PROJECT NO North Wake County ES & Community Center Campus 09 -116 LOCATION BY Raleigh, NC KAL iI i1 � A � A A � O , Y • � 6 � 6 Past - Development: Site Area - 11.76 ac Te W 6.30 min Wt. CN - 79.6 Site Soils: 100% Type B Cecil Weighted CN_ Wooded Area: 0.00 ac CN= 55 C= 0.20 Impervious Area: 5.57 ac CN= 98 C= 0.95 Future Impervious Area: 0.35 ac CN= 98 C'= 0.95 Uwn Area: 5.84 ac CN= 61 C= 0.95 Weighted C: 0.95 Weighted CN: 79.6 a rtrt Post - Development: Site Area - 1.35 ac Te 5.00 min Wt. CN 80.5 Site Soils: 100% Type B Cecil Weighted CN Wooded Area: 0.00 ac CN= 55 C= 0.20 Impervious Area: 0.66 ac CN= 98 C= 0,95 Future Impervious Area: 0.05 ac CN= 98 C= 0.95 I_.awn Area: 0.64 ac CN= 61 C= 0.95 Weighted C: 0.95 Weighted CN: 80.5 Op • '� a A A • A I t i i e J Post- Development: Sitc Arca = 4.39 ac Tc - 7.20 min Wt. CN = 61.6 Sitc Soils: 100% Type B Cecil Weighted CN Wooded Area: 0.00 ac CN= 55 C= 0.20 Impervious Area: 0,07 ac CN= 98 C:= 0.95 Future Impervious Area: 0.00 ac CN= 98 C= 0,95 lawn Area: 4.32 ac CN= fit C= 0.30 Weighted C: 0.31 Weighted CN: 61.6 PROJECT NAME North Wake County RS & Community Center LOCATION Raleigh, NC - Development: Site Area — 3.87 ac Tc Wt. CN = 83.3 Site Soils; 100% Type B Cecil us DATE 8128112 PROJECT NO 09 -116 BY KAL — 5.00 mio evelepment: Site Area — 0.35 ac Tc = 5,00 min Wt. CN — 83.2 Site Soils: 100% Type B Cecil Weighted CN Wooded Area; 0.00 ac CN= 55 C= 0.20 Imperious Area: 2.13 ac CN= 98 C= 0.95 Future Impervious Area: 0.20 ac CITE= 98 C= 0.95 [.awn Area: 1.54 ac CN= 61 C= 0.95 Weiblated C; 0.95 Weighted CN: 83.3 evelepment: Site Area — 0.35 ac Tc = 5,00 min Wt. CN — 83.2 Site Soils: 100% Type B Cecil Weighted CN_ _ Wooded Area: 0.00 ac CN= 55 C= 0.20 Impervious Area: 0.21 ac CN= 98 C= 13.95 Facture Imperious Area: 0.00 ac CN= 98 C= 0.95 Lawn Area: 0.14 ac CN= 61 C= 0.95 Weighted C. 0,95 Weighted CN: 83.2 iy;,,1 .ryti [ .,) ...3 • .c- ......... ........,_...� . :T.: i :i i.i s` ." - �r Wl. '� DATE .. T ti rMEN, 8128132 PROJECT NAME PROJECT NO North Wake County ES & Community Center Campus 09 -116 : L LOCATION BY Raleigh, NC KAL tI >N�4�� G��7� '",.�r��.: � _ DATE r ,�{3��, ��■ .lJ.r;�`.1 �" r..r • ''S `1 P ti .! u...� a 'gyp �, 8128112 = I I PROJECT NAME PROJECT NO Notch Wake Couoy ES & Community Center Campus 09 -116 LOCATION BY Raleigh, NC IKAL ■ s a 4 Pre - Development: Site Area = 1.65 ac Tc — 13.60 min Wt. CN -- 57.4 Site Soils: 100 %r. Type B Cecil Wei, hted Wooded Area: 1.00 ac CN= 55 C= 0.20 Impervious Area: 0.00 ac CN= 98 C= 0.95 Lawn Area: 0.65 ac CN= 61 C= 0.30 Weighted C: 0.24 Wcighted CN: 57.4 Post - Development: Site Area = 0.14 ac Tc = 5.00 min Wt. CN — 61.0 Site Sails: 100 %r. Type B CeciI Weighted CN Wooded Area: 0.00 sic CN= 55 C= 0.20 Impervious Area: 0.00 ac CN= 98 C= 0.95 Future Impervious Area: 0.00 ac CN= 98 C= 0.95 Lawn Area: 0.14 ac CN= 61 C= 030 Weighted C: 0.30 Weighted CN: 61.0 BMP DESIGN LEE .. ..., DATE SG 3! aT Q� L� w • 1 i 115112 % i 1J PROJECT NAME PROJECT NO �'" f '•'ll North Wake Landfill Comm unit Center & ES 09 -116 LOCATION BY Raleigh, NC KAL 1F Drainage Area, (DA) = 13.11 ac 610 Impervious Area cm 0.95 6.68 ac includes 0.45 ac Pervious Area c= 0.30 6.43 ac future imp. Area Cc = 0.63 1 -00 Permanent Water Quality Pool 30 1 -90 % Impervious = 54.95 % 1.30 Permanent Pool Design Depth = 4.00 it 2.00 SA 1 DA Ratio = 2.53 (from TN. 1.1) Required Surface Area = 14,440 sf 2.00 Permanent Pool Volume Req.= 57,761 cf 3.50 Temporary Water Quality Pool 2.50 2.20 Design Storm Rainfall 1.00 in (Typically 1 -in) Runoff Coeff. (Rv = 0.05 + 0.009 ( % Imperv.)) = 0.51 in /in 80 Required Volume (design rainfall)(Rv)(DA) = 24,203 of 3.30 Surface Area Provided: 90 5.00 Permanent Pool Max. Depth = 5.50 it 3.00 Area of Pond Bottom (Above PSS) = 6,970 sf (ESL= 300.5) Area at Bottom of Shelf = 14,530 sf (EL= 305.5) Area of Permanent Pool = 17,500 sf (EL= 306.0) Area at Top of Shelf = 20,600 sf (EL= 306.5) Perm. Pool Volume Provided= 61,758 cf a 57,761 OK Avg. Perm. Pool Depth Provided = 4.157 ft > 4.00 OK Surface Area at 1" Storage Volume 21,990 sf (EL= 307.6) 1" Storage Volume Provided = 24,432 of 24,203 OK Temp. Storage Depth above Dewatering Hole = 1.20 it Diameter of Dewatering Hole = 2.25 in Detention (Draw -Down) Time = 3.5 days (2 -5 days Required) T days = (Temp. Storage Vol 1(0.6 . A * (2`g *(h))A112) * 86400 Clays (where h = one third temp. storage depth measured to centroid of orifice) Permament Pool - Baffle Volume = Forehay Volume Required = Porebay Volume Provided = Table 1.1 58,555 of > 57,761 C K 11,711 of 12,280 of 21 °I Impervious SA 1 DA Ratios 901 TSS efficiency Permanent Poo! Depth (ft) 3.0 4.0 5.0 610 10 0.90 "o 0.60 0.50 20 1.50 1.10 1 -00 0.90 30 1 -90 1.70 1.40 1.30 40 2.50 2.00 1.80 1.60 50 3.00 2.50 2.00 1.90 60 3.50 2.80 2.50 2.20 70 4.00 3.30 2.80 2.50 80 4.50 3.80 3.30 2.80 90 5.00 4.00 3.50 3.00 Page 1 of 2 Drawdown (Routing) (To verify Detention Drawdown Cale on Pg. 1) Time Inc. Elev. Above inv. Q Flaw (cf S) SA (sf) Vol (Cf) (hrs) Total tars 1.2 it 4.15 21,990 2189,5 4.176 1.1 tt 014 21,800 2170 4.3229 8.50 1.0 it 0.13 21,690 2150.5 4.4931 12.99 0.9 ft 0.13 21,410 2131 4.6932 17.69 0.8 ft 0.12 21,210 2111,5 4.9324 22.62 0.7 ft 0.11 21,020 2092 5.2242 27.84 0.6 ft 0.10 20,820 2072.5 5.5902 33.43 0.5 ft 0.09 20,630 2031 61.0012 39.43 0.4 ft 0.08 19,990 1967.5 6.4997 45.93 0.3 ft 0.07 19,360 1904.5 7.2649 5120 0.2 ft 0.06 18,730 1842 8.6057 61.80 0.1 ft 0.04 18,110 1780.5 11.764 73.57 0.0 ft 0.00 17,500 875 Detention (thaw -Down) Time M 3.1 days Forebay Volume Elevation Area (sf) Bottom: 300.50 690 Bottom of Shelf: 305.50 3,410 Permanent Pool: 306.00 4,710 Forebay Volume Provided = 12,280 cf Forebay Baffle Volurne Elevation Area (sf) Voids: Bottom: 300.50 1,470 30% Bottom of Shelf: 305.50 360 Forebay Volume = 3,203 of Anti - Floatation Invert of Riser: 300.54 ft Crest of Riser: 306.09 ft Inside Width of Riser 4.00 ft Inside Length of Riser: 4.00 ft Riser Wail Thickness: 5.00 in Volume of Riser: 128.49 cf Volume of Riser Walls: 40.49 cf Weight of Concrete: 150 €bslcf Buoyancy Force: 624 lhslcf Weight of Riser Walls: 6,073 lbs Buoyancy Force of Riser: 8,018 lhs Weight of Riser minus Buoyancy Force 1,945 Ibs (weight required) Width of Anchor extension 6 in Thickness of Anchor extension 6 in Weight of Water acting on anchor extension 3661 Ibs Weight of extension required (concrete) = Ibs Safety Factor (SF) 1.3 Weight of extension required with 5F -2,231 Ibs Anchor Length: 5.83 It Anchor Width: 5.83 ft Volume of Anchor: 17 cf Weight of Proposed Anchor 2,552 Ibs Is Anchor sufficient? Total Downward Force: 12,286 Ibs Total Boyancy Force: 8,018 Ibs Total Safety Factor: 1.5 Page 2 of 2 �Jd DATE s:, r l: �: '�? �." , ; ;} L.... ^rr,•33.5���,•. NEW." , 11/14/12 e F: rr 7 PROJECT NAME PF40JECT NO North Wake Count IBS & Community Center Campus 09 -116 ;j , f =1 LOCATION BY Raleigh, IBC KAL WETLAND 2 Drainage Area, (DA) = 14.74 ac Impervious Area c= 0.95 4.92 ac 0.35 Future Imp Pervious Area c= 0.30 9.82 ac Cc = 0.52 Wetland Surface Area [Drainage area % impervious = 33 % Design Storm Rainfall 1.00 in (Typically 1 -in) Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) - 0.35 in /in Required Volume (design rainfall) (Rv)(DA) = 18,749 cf (3,630 cf minimum req.) Depth of Temporary fool (Op€ants) m 12 in (12 -in max) Required Surface Area = 18,749 sf Surface Area Provided= Surface Area at 1" Storage Volume= 1" Storage Volume Provided= 19,670 sf 21,690 sf 30,515 cf Temp, Storage Depth above Dewatering Hole = 1.0 ft Diameter of Dowatering !-Tale = 2.00 in Detention (Draw -Down) Time 3.7 days (Typcially 2 -5 days) T days=(Req. Temp. Storage Vol 1(0,6 . A ' (2'g *(h))A112) * 86400 (where h = one third temp. storage depth measured to centrold of orifice) Wetland Zones Required Elevation % of SA Forebay surface area required 1967 sf 36" deep 10% Deep pool at outlet required = 1967 sf 18 -36" deep 10% Shallow water flow marsh) required = 7868 sf 0 -6" deep 40% Shallow land (high marsh) required = 5901 sf 12" above perm. 30 -40% Wetland Zones Provided Elevation % of SA Forebay surface area = 1,970 sf 286 -289 10% [jeep pool at outlet = 1,980 st 286 -289 10% Shallow water (low marsh) = 7,900 sf 288.5 -289 40% Shallow land (high marsh) = 7,820 sf 289 -290 40% s:113194001icafcslo9 -1113.- Pond&zo- Wotlaad.XLS prSntcd: 111201PG123:17 PV Page 1 of 2 Drawdown (Routing) (To verify Detention Drawdown Calc on Pg. 1 ) Time ]lc. 278.50 ft Elev. Above inv. Q Flow (cf5) SA (sf) Vol ( ) (Iii;s) Total Hr5 1.0 it 0.11 21,690 2158.9 5.70883 103.82 cf 0.9 it 0.10 21,488 2138.7 5.96134 11,67 0.8 ft 0.09 21,286 21l&5 6.26323 17.93 03 It 0.09 21,084 2098.3 6.63183 24.57 0.6 it 0.08 20,882 2078.1 7.09424 31.66 0.5 it 0,07 20,680 2057.9 7.69581 39.361 0.4 ft 0.07 20,478 2037.7 8.51972 47.87 0.3 it 0.06 20,276 2017.5 9.7402 57.02 02 it 0.05 20,074 19973 11.8098 09.43 4.1 it 0.03 19,872 993.6 8.30857 77.73 Detention (Draw -Down) Time w 3.2 days Anti - Floatation 7.17 it Invert of Riser: 278.50 ft Crest of Riser: 290.00 ft Inside Width of Riser 5.00 it Inside Length of Riser: 5.00 ft Riser Wail Thickness: 5.00 in Volume of Riser: 391.32 cf Volume of miser Walls: 103.82 cf Weight of Concrete: 150 Ibslcf Buoyancy Force: 62.4 Ibslcf Weight of fuser Walls: 15,573 lbs Buoyancy Force of Riser: 24,418 lbs Weight of Riser minus Buoyancy Force 8,845 lbs (weight required) Width of Anchor extension 8 in Thickness of Anchor extension 8 in Weight of Water acting on anchor extension 12438 lbs Weight of extension required (concrete) f' • :i Y" - lbs Safety Factor (SF) 1.3 Weight of extension required with SF -4,671 lbs Anchor Length: 7.17 it Anchor Width: 7.17 it Volume of Anchor: 34 of Weight of Proposed Anchor 5,136 lbs is Anchor sufficient? r :5 Total Downward Force: 33,147 lbs Total Boyancy Force: 24,418 lbs Total Safety Factor: 1.4 s:IS:i791000 }?caicslU9 -i 16„ Pondli2e- Wotland.xt.s pnntod: I V2012052 3:17 PIM Page 2 of 2 iC •�) 7 = b,t'}n.�? �ti4ti•� . S��r. i� Avg.. _ :: WN DATE 11/14/13 I r PROJECT NAME= PROJECT NO North Wake County ES & Community Center Campus 09 -116 LOCATION BY Ralei h, NC KAL WETLAND 3 Drainage Area, (DA) = 4.22 ac Impervious Area c= 0.95 2.54 ac 0.20 ac Future Imp Pervious Area c= 0.30 1.68 ac Cc = 0.69 Wetland Surface Area Drainage area % Impervious = 60% Design Storm Rainfall 1.00 in (Typically 1 -in) Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) W 0.59 in /in Required Volume (design rainfall)(RV)(DA) W 9,064 of (3,634 cf minimum req.) Depth of Temporary Pool (Dplants) = 12 in (12 -in max) Required Surface Area = 9,064 sf Surface Area Provided= 14,760 sf Surface Area at 1" Storage Volume= 12,480 sf 1" Storage Volume Provided= 17,000 of Temp. Storage Depth above Dewatering Hole = 1.0 ft Diameter of Dewatering Hale = 1.50 in Detention (Draw- [town) Time = 12 days (Typcially 2 -5 days) T days =(Req. Temp. Storage Vol 1(0.6 . A * (2 *g *(h))�112) * 86400 (where h = one third temp. storage depth measured to centroid of orifice) Wetland Zones Required Elevation % of SA Forebay surface area required m 1076 sf 36" deep 1O% Deep pool at outlet required = 1076 sf 18 -36" deep 1O% Shallow water (low marshy required = 4304 sf 0 -6" deep 40% Shallow fand (high marsh) required = 3228 sf 12" above perm. 30 -40% Wetland Zones Provided Elevation % of SA Forebay surface area = 1,090 sf 286 -289 10% Deep pool at outlet = 11100 sf 286 -289 10% Shallow water (low marsh) = 4,400 sf 288.5 -289 41% Shallow land (high marsh) _ 4,170 sf 289 -290 39% s:It3t91C00s1catcsti69.1 sG i�gndSitC•WCtl�nd.)CLS printed; 111201 ?.012 3:17 PM Page 1 of 2 Drawdown (Routing) (To verify Detention Drawdown Calc on Pg. 1) Time lac. 273.00 ft Elev. Above Inv. Q Flow (cfs) SA (sf) Vol (cl) (hrs) 'fatal Ws 1.0 ft 0.46 12,480 1239.4 5.82645 96.81 cf 0.9 ft 0.06 12,308 1222.2 6.05638 11.88 0.8 ft 0.05 12,136 1205 6.33330 18.22 0.7 ft 0.05 11,964 1187.8 647401 24.89 0.6 ft 0,05 11,792 1170.6 7.10437 31.99 0.5 ft 0.04 11,620 1153.4 7.66809 39.66 0.4 ft 0.04 11,448 1136,2 8.44534 4811 03 ft 0.03 11,276 1119 9,60421 57,71 0.2 ft 0.03 11,104 1101.8 11.5819 69.29 0.1 ft 0,02 10,932 546.6 8.12572 77.42 Detention (Draw -Down) Time M 3.2 days Anti- Floata tion 4.83 ft Invert of Riser: 273.00 ft Crest of Riser: 290.00 ft Inside Width of Riser 3.00 ft Inside Length of Riser: 3.00 ft Riser Wall "thickness: 5.00 in Volume of Riser: 249.81 cf Volume of Riser Walls: 96.81 cf Weight of Concrete: 150 ibslcf Buoyancy Force: 62.4 lbs /ef Weight of Riser Walls: 14,521 Ibs Buoyancy Force of Riser: 15,588 Ibs Weight of Riser minus Buoyancy Force 1,067 Ibs (weight required) Width of Anchor extension 6 in Thickness of Anchor extension 6 in Weight of Water acting on anchor extension 9194 Ibs Weight of extension required (concrete) :3 ' .-'; Ibs Safety Factor (SF) 1.3 Weight of extension required with SF - 10,565 Ibs Anchor Length: 4.83 ft Anchor Width: 4.83 ft Volume of Anchor: 12 cf Weight of Proposed Anchor 1,752 lbs Is Anchor sufficient? V � `•3 Total Downward Force: 25,467 Ibs Total Boyancy Force: 15,588 Ibs Total Safety Factor: 1.6 SA 1319%0001 ICa IC&M -116„ AwidSizr.•Woaiad. x LS pxin;ed: 1112012012 3 =17 PM Page 2 of 2 STORMWATER QUANTITY Hydrograph Summary Rep,r ydra ow Hydrographs Extension for AutoCAl3®Civil 3Dp 2008 by Autodesk, Inc. v6A52 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used {cull) Hydrograph description 1 SCS Runoff 6142 1 728 35,083 - - - - -- - - - - -- - - - - -- Area A Pre 2 SCS Runoff 1.183 1 727 8,805 - - - - -- - - - - -- - - - - -- Area 6 Pre (On Site) 3 SCS Runoff 2.108 1 722 5,727 - - - - -- - - - - -- - - - - -- Offsite to Wet Pond 4 SCS Runoff 0.872 1 718 1,756 - - - - -- - - - - -- - - - - -- Offsite to Wetland 3 5 Combine 3.518 1 723 16,288 2, 3, 4 - -• -- - - - - -- Total Adjusted Area B Pre 6 SCS Runoff 1.127 1 728 5,432 - - - - -- - - - - -- - - - - -- Area C Pre 7 SCS Runoff 0.171 1 727 1,271 - - - - -- - - - - -- - - -• -- Area D Pre 9 SCS Runoff 18.56 1 723 56,646 - - - - -- - - - - -- - - - - -• Area A Post 10 SCS Runoff 31.17 1 719 66,349 ------ ------ Area B Post 12 SCS Runoff 21.03 1 718 43,347 - - - - -- - - - - -- Area A to Wetland 2 13 SCS Runoff 4.248 1 721 13,404 - - - - -- - - - - -- - - - - -- Area A Bypass 14 Reservoir 0.549 1 1016 28,057 12 290.31 27,789 Route Wetland 2 15 Combine 4,324 1 721 41,461 13,14 - - - - -- - - - - -- Total Post Dev To Point A 17 SCS Runoff 24.43 1 718 49,084 - - - - -- - - - - -- - - - - -- Area B to Wet Pond 1 18 SCS Runoff 2.941 1 718 5,906 - - - - -- - - - - - -- Offsite to Wet Pond 19 Combine 27.37 1 718 54,990 17,18 - - - - -- - - - - -- Total to Wet Pond 20 Reservoir 0.681 1 941 37,659 19 307.66 35,234 Route Wet Pond 1 21 SCS Runoff 9.586 1 718 19,509 - - - - -- - - - - -- - - - - -- Area to Wetland 3 22 SCS Runoff 0.872 1 718 1,756 - - - - -- - - - - -- - - - - -- Offsite to Wetland 3 23 Combine 10.56 1 718 21,265 21,22 - - - - -- - - - - -- Total to Wetland 3 24 Reservoir 0.363 1 838 13,817 23 290.12 13,262 Route Wetland 3 25 SCS Runoff 1.642 1 720 5,095 - - - - -- - - - - -- - - - -- Area B Bypass 26 Combine 1.812 1 721 56,571 20, 24, 25 - - - - -- - - - - -- Total Post Dev to Point B 28 SCS Runoff 0.707 1 722 2,439 - - - - -- - - - - -- - - - - -- Area C Post 30 SCS Runoff 0.054 1 720 162 - - - - -- - - - - -- - - - - -- Area D Post 09 -116- pre - post- rev.gpw Return Period: 1 Year Tuesday, Nov 20, 2012 Hydrograph Report Hyd rafIow Hydrographs Extension for AutoCADD Civil 3D® 2008 by Aut ode sk, Inc. v6.052 Hyd. No. I Hyd. volume = Area A Pre Cure number = Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 27.650 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 2.85 in Storm duration = 24 hrs Q (cfs) 7.00 C +► IX ., f t' 3.00 2.00 1M Area A Pre Hyd. No. 1 -- 1 Year 6 Tuesday, Nov 20, 2012 Peak discharge = 5.742 cfs Time to peak = 728 min Hyd. volume = 35,483 cuft Cure number = 62.3 Hydraulic length = 0 ft Time of conc. (Tc) = 19.10 min Distribution = Type 11 Shape factor = 484 Q (cfs) 7.40 WE 5.00 4.00 CM r We �iIta 0.00 0.00 0 120 240 380 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) h. .. Hyd No. 1 Y 9 3 ) Q (cfs) 7.40 WE 5.00 4.00 CM r We �iIta 0.00 0.00 0 120 240 380 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) h. .. Hyd No. 1 TR55 Tc Worksheet 3 HydrafIow Hydrographs Extension for AaloCADO Civil 31M 2008 by Astodesk, Inc. v6.052 Hyd. No. 1 Area A Pre Description A B C Totals Sheet Flow = 195.00 400.00 0.00 Manning's n -value = 0.410 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two -year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope ( %) = 8.00 0.00 0.00 Travel Time [mint' = 6.81 + 0.00 + 0.00 - 6.81 Shallow Concentrated Flow Flow length (ft) = 195.00 400.00 0.00 Watercourse slope ( %) = 5.20 9.25 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ftls) = 3.68 4.91 0.00 Travel Time (min) = 0.88 + 1.36 + 0.00 = 2.24 Channel Flow X sectional flow area (sgft) = 8.00 14.00 0.00 Wetted perimeter (ft) = 8.00 14.00 0.00 Channel slope ( %) = 3.50 2.50 0.00 Manning's n- value = 0.240 0.050 0.015 Velocity (ftls) = 1.16 4.71 0.00 Flow length (ft) = 455.0 985.0 0.0 Travel Time (min) = 6.53 + 3.48 + 0.00 10.01 Total Travel Time, Tc ............ __ ............................... ............................... 19.10 min Hydrograph Report H yd refi ow H ydf og rap h s Extension for A utoC A DO Civil 3 Db 2008 by A u tode sk, Inc. v6.052 Hyd. No. 2 Hyd. volume = Area B Pre (On Site) Curve number = Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 11.430 ac Basin Slope = 0.0% Te method = TR55 Total precip. = 2.85 in Storm duration = 24 hrs 0 (cfs) Weill 1.00 Area B Pre (On Site) Hyd. No, 2 -- 1 Year 0.00 . ..... ;.".- .......... -- ---- - F. Tuesday, Nov 20, 2012 Peak discharge = 1.183cfs Time to peak = 727 min Hyd. volume = 8,805 cuft Curve number = 57.4 Hydraulic length = 0 ft Time of conc. (Tc) = 14.50 min Distribution = Type 11 Shape factor = 484 120 240 360 480 600 720 840 960 1080 1200 1320 — Hyd No. 2 Q (Cfs) 2.00 Egli$] 0.00 1440 1560 Time (min) Y .J TR55 Tc Worksheet HydrafIow Hydrographs Extension for Auto CADO Civi13 DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 2 Area 8 Pre (4n Site) Description A B C Totals Sheet Flow Manning's n -value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two -year 24 -hr precip. (in) = 3.60 0.00 0.00 Land slope ( %) = 4.00 0.00 0.00 Travel Time (min) = 8.81 + 0.00 + 0.00 - 8.81 Shallow Concentrated Flow Flow length (ft) = 375.00 0.00 0.00 Watercourse slope ( ° /o} = 9.10 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 4.87 0.00 0.00 Travel Time (min) = 1.28 + 0.00 + 0.00 1.28 Channel Flow X sectional flow area (sgft) = 5.00 0.00 0.00 Wetted perimeter (fit) = 9.00 0.00 0.00 Channel slope ( %) = 3.75 0.00 0.00 Manning's n -value = 0.050 0.015 0.015 Velocity (ftls) = 4.40 0.00 0.00 Flow length (ft) - 1150.0 0.0 0.0 Travel Time (min) = 4.36 + 0.00 + 0.00 -- 4.36 Total Travel Time, Te ............................................... ............................... 14.50 min Hydrograph Report HydrafIow Hydro g rap hs Extension for AutoCADO Civi13 D& 2008 by Auto desk, €nc. v6.052 Hyd. No. 3 Offsite to Wet Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 1,350 ac Basin Slope = 0.0% Tc method = USER Total precip. = 2.85 in Storm duration = 24 hrs Mite to Wet Pond rti Tuesday, Nov 20, 2012 Peak discharge = 2.108 cfs Time to peak = 722 min Hyd. volume = 5,727 tuft Curve number = 80.5 Hydraulic length = Oft Time of cone. (Tc) = 14.50 min Distribution = Type I f Shape factor = 484 Q {cfs} Hyd. NQ. 3 -- 1 Year Q {Gfs) 3,00 3.00 2.00 2.00 Ff 1.00 .00 d M 0.00 .. _.. .., r,..,.. . ,,m,n,., ..,,.,,,..m. ,...... ... 0.40 0 120 240 350 480 640 720 840 960 1080 1200 1320 1440 1564 -- Hyd No. 3 Time (min) Hyd rog raph Report Hyd raflow Hyd rographs Extension for AutoCAD@ 0ivi13M 2008 by Autodesk, Inc. v6.052 Hyd. No. 4 Hyd. volume = Offsite to Wetland 3 Curve number = Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 0.350 ac Basin Slope = 0.0% Tc method = USER Total precip. = 2.85 in Storm duration = 24 hrs Q (cfs) 1.[30 i .uu 0.90 0.90 0.80 0.80 0.70 - 0.70 0.60 0.60 0.50 -- 4.50 0.40; 0.40 0.30 0.30 3 0.20 0.20 0.10 '� 0.10 2 9 S �k f) or) ,.. ,- -- ... � � r..x.�, .,, � .. _ n. nn 0 7 Tuesday, Nov 20, 2012 Peak discharge = 0.872 cfs Time to peak = 718 min Hyd. volume = 1,756 cuff Curve number = 83.2 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 484 ❑ffsite to Wetland 3 Hyd. No. 4 -- 1 Year Q (cfs) 120 240 360 480 600 720 840 960 1080 1200 1320 1444 1560 Time (min) Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D@ 2008 by Autodesk, Inc, v6.052 Hyd. No. 5 Total Adjusted Area 8 Pre Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 2, 3, 4 Tuesday, Nov 20, 2012 Peak discharge = 3,518 cfs Time to peak = 723 min Hyd. volume = 16,288 tuft Contrib. drain. area= 13.130 ac Total Adjusted Area B Pre Q cfs} Hyd. No. 5 -- 1 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 A 1.00 0.00 n >....w,.... �..M.,......_ s.n... , , ,...... ,k.._._. ,,.... ,,........ _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) I.°A- -�M Hyd No. 5 - --- Hyd No. 2 Hyd No. 3 Hyd No. 4 Hydrograph Report Hyd rat low Hydrographs Extension for Auto CAM Civi13 DD 2008 by Autodesk, Inc. v6.052 Hyd. No, 6 Area C Pre Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 1 min 6.130 ac 0.0% TR55 2.85 in 24 hrs Area C Pre Tuesday, Nov 20, 2012 Peak discharge = 1.127 cfs Time to peak = 728 min Hyd. volume = 6,432 tuft Curve number = 60.4 Hydraulic length = 0 ft Time of conc. (Tc) = 18.50 min Distribution = Type 11 Shape factor = 484 Q (cfs) Hyd. No. 6 -- 1 Year Q {cis} 2.00 2.00 1.00 1 00 �1 i 0.00 - _ .�.....wM.......0 r ,,. �.........,......__ .v� _.....,...u. 0,00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1444 1560 Time (min) �... Hyd No. 6 TR55 Tc Worksheet Hydraf low Hydrographs Extension for AutoOAD® 0ivii 3D® 2008 by AUtodesk, Inc. v6.052 Hyd. No. 6 Area C Pre Description A B B Totals Sheet Flow Manning's n -value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two -year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope ( %) = 2.00 0.00 0.00 Travel Time (min) = 11.53 + 0.00 + 0.00 - 11.63 Shallow Concentrated Flow Flow length (ft) = 310.00 70.00 865.00 Watercourse slope ( °Io) = 2.50 2.90 3.80 Surface description = Unpaved Paved Unpaved Average velocity (ftls) = 2.50 3.46 3.15 Travel Time (min) = 1.99 + 0.34 + 4.58 - 6.91 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope ( %) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ftls) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 - 0.00 Total Travel Time, Tc ............................................... ............................... 18.50 min Hydrograph Report HydrafIow Hydrog rap hs Extension for AutoCA DO Civi13 DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 7 Hyd. volume Area D Pre Curve number Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 1.650 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 2.85 in Storm duration = 24 hrs Q (cfs) 0.50 u.av 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 .. 0.15 0.10 0.10 0.05 0.05 0.0a -.. �., � .- �....... »...,,..�..�..�.....k ......,.�.,.� ,�.�..�.... .��.,..r „�....�..«. >..�.v�.,k.i u,m ».. ,..��.,,r.. w...,,....� ,.,.,. . ���,.n�..�.m..� n nn 0 11 Tuesday, Nov 20, 2012 Peak discharge = 0.171 cfs Time to peak = 727 min Hyd. volume = 1,271 cuft Curve number = 57.4 Hydraulic length = 0 ft Time of conc. (Tc) = 13,60 min Distribution = Type f! Shape factor = 484 Area ❑ Pre Hyd. No. 7 -- 1 Year Q (cfs) 120 240 360 480 600 720 840 950 1080 1200 1320 1440 1560 _ Time (miry) Hyd Na. 7 12 TR55 Tc Worksheet MydrafIow Hydrographs Extension for AutoCAD@ CiviI 3D@ 2068 by Auto des K, Inc. v6.052 Hyd. No. 7 Area D Pre Description A B C Totals Sheet Flow Manning's n- value = 0.400 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two -year 24 -hr precip. (in) = 3.60 0.00 0.00 Land slope ( %) = 2.00 0.00 0.00 Travel Time (min) = 11.63 + 0.00 + 0.00 11.63 Shallow Concentrated Flow Flow length (ft) = 330.00 0.00 0.00 Watercourse slope ( %) = 3.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ftls) = 2.79 0.00 0.00 Travel Time (min) = 1.97 + 0.00 + 0.00 - 1.97 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope ( %) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ftls) = 0.00 0.00 0.00 Flow length (ft) - 0.0 0.0 0.0 Travel Time (min) - 0.00 + 0.00 + 0.00 - 0.00 Total Travel Time, Tc ............................................... ............................... 13.60 min Hydrograph Report H yd raf low H yd rogra phs Extension for A u IoC A DO Civil 3 00 2008 by Autod e sk, Inc, v6.052 Hyd. No. 9 Hyd. volume Area A Post Curve number Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 24.670 ac Basin Slope = 0.0% Tc method = USER Total precip. = 2.85 in Storm duration ---------- ------------- ----------------------------- - --- ------- -- - ------------ = 24 hrs --- - ----- - -------------------- - - - ---- . .............. Area A Post 13 Tuesday, Nov 20, 2012 Peak discharge = 18.56 cfs Time to peak = 723 min Hyd. volume = 56,646 cuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 14.90 min Distribution = Type 11 Shape factor = 484 0 (Cfs) Hyd. No. 9 1 Year a (Cfs) 21.00 21.00 18.00 18.00 15-00 15-00 12.00 12M 9.00 - 9.00 6M 6.00 MO - 3.00 (),00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) Hydrograph Report Hyd rafIow Hydrographs Extension for AMCAM Civil 3CK9 2008 by Autodesk, Inc. v6.052 Hyd. No. 10 Hyd. volume Area B Post Curve number Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 20.020 ac Basin Slope = 0.0% Tc method = USER Total precip. = 2.35 in Storm duration = 24 hrs Area B Post Tuesday, Nov 20, 2012 Peak discharge = 31.17 cfs Time to peak = 719 min Hyd. volume = 66,349 tuft Curve number = 76.4 Hydraulic length = 0 ft Time of cone. (Tc) = 7.20 min Distribution = Type 11 Shape factor = 484 Q (cfs) Hyd. No. 10 -- 1 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 l 20.00 20.00 15.00 15.00 10.00 10.00 5,00 5.00 0.00 - .._,..,..,.ti....,,,.... , .....n.. .. ............ w... .,.......,.. w..... 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) ------ Hyd No, 10 Hydrograph Report Hyd rafIow Hyd rographs Extension for AutoCAD9 Civi13 DO 2008 by Aut ode sk, Inc. v6.052 Hyd. No. 12 Hyd. volume Area A to Wetland 2 Curve number Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 14.740 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 2.85 in Storm duration = 24 hrs Area A to Wetland 2 15 Tuesday, Nov 20, 2012 Peak discharge = 21.43 cfs Time to peak = 718 min Hyd. volume = 43,347 cuft Curve number = 73.4 Hydraulic length = 0 ft Time of cone. (Tc) = 5.40 min Distribution = Type 11 Shape factor = 484 Q (cfs) Hyd. No. 12 -- 1 Year Q (cfs) 24.00 24.00 20.00 20,00 16.00 16,00 12.00 12.00 8.00 8.00 4.00 4.00 {5 3 �v o.00 .,. .... w..., . w.a. u.,.,. ...� m .... , v. �..da. 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) lG TR55 TCWorksheet HydrafIow Hydro g rap hs Extension for AutoCADO Civil 3CKO 2008 by Autodesk, Inc. v6.052 Hyd. No. 12 Area A to Wetland 2 Description A B C Totals Sheet Flow Manning`s n -value = 0.050 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope ( %) = 1.00 0.00 0.00 Travel Time (min) = 2.91 + 0.00 + 0.00 2.91 Shallow Concentrated Flow Flow length (ft) = 25.00 20.00 0.00 Watercourse slope ( %) = 1.00 1.00 0.00 Surface description = Paved Unpaved Paved Average velocity (ftls) = 2.03 1.61 0.00 Travel Time (min) = 0.20 + 0.21 + 0.00 - 0.41 Channel Flow X sectional flow area (sgft) = 3.14 0.00 0.00 Wetted perimeter (ft) = 6.28 0.00 0.00 Channel slope ( %) = 2.33 0.00 0.00 Manning's n -value = 0.013 0.015 0.015 Velocity (ftls) = 11.00 0.00 0.00 Flow length (ft) = 2020.0 0.0 0,0 Travel Time (min) 3.06 + 0.00 + 0.00 - 3.06 Total Travel Time, Tc ............................................. __............................ 6.40 min Hydrograph Report H yd rat] ow H ydrogra ph s Extension f or AutoCA D@ Civil 3D@ 2008 by Autod e s k, Inc. v6.0 52 Hyd. No. 13 Area A Bypass Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (Cfs) 5.00 4M MIX 2.00 1.00 1 min 9.930 ac 0.0% TR55 2.85 in 24 hrs Area A Bypass Hyd. No. 13 -- 1 Year 17 Tuesday, Nov 20, 2012 Peak discharge = 4.248 cfs Time to peak = 721 min Hyd. volume = 13,404 tuft Curve number = 63 Hydraulic length = ❑ ft Time of conc. (Tc) = 9.80 min Distribution = Type I I Shape factor = 484 120 240 360 480 600 720 840 Hyd No. 13 0 (Cfs) 5.00 21#111 w 8 iffers, 0.00 960 1080 1200 1320 1440 1560 Time (min) lF-fl TR55 Tc Worksheet Wydraflow Hydrographs Extension for Auto CACOCivil 3DO2008 by Autodesk, Inc. v8.052 Hyd, No. 13 Area A Bypass Description A B C Totals Sheet Flow Manning's n -value = 0.050 0.011 0.011 Flow length (ft) = 50.0 OA 0.0 Two -year 24 -hr precip. (in) = 3.60 0.00 0.00 Land slope ( %) = 1.00 0.00 0.00 Travel Time (min) = 2.91 + 0.00 + 0.00 -- 2.91 Shallow Concentrated Flow Flow length (ft) = 170.00 0.00 0.00 Watercourse slope ( ° / °} = 1.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ftls) = 1.98 0.00 0.00 Travel Time (min) = 1.43 + 0.00 + 0.00 - 1.43 Channel Flow X sectional flow area (sgft) = 3.14 14.00 0.00 Wetted perimeter (ft) = 6.28 14.00 0.00 Channel slope ( %) = 2.70 2.90 0.00 Manning's n -value = 0.013 0.050 0.015 Velocity (ftls) = 11.84 5.07 0.00 Flow length (ft) = 1440.0 1050.0 0.0 Travel Time (min) = 2.03 + 3.45 + 0.00 = 5.48 Total Travel Time, Tc ............................................... ............................... 9.80 min Hydrograph Report HydrafIow Hydrographs Extension for AutoCA€ V Civi13 D& 2006 by Autodesk, Inc. v6.052 Hyd. No. 14 Route Wetland 2 Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 12 .. Area A to Wetland 2 Reservoir name = Wetland 2 Area A Storage Indication method used. I Tuesday, Nov 20, 2012 Peak discharge = 0.509 cfs Time to peak = 1016 min Hyd. volume = 28,057 cuft Max. Elevation = 290.31 ft Max. Storage = 27,789 cuft Route Wetland 2 Q {Cf5} Hyd. No. 14 -- 1 Year Q (Cfs) 24.00 7 24.00 20-00 20.00 16.00 16.00 12.00 12.00 $.00 8.00 4.00 4.00 0.00 -..., .,,,,....... ,.......,._...,... _...... 1� 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) .u.:- Hyd No. 14 Hyd No. 12 :Total storage used = 27,789 cuff Pond Report 20 HydrafIow Hydrographs Extension for AutoCAD& Civil 3D] 2008 by Autodesk, Inc. v6.052 Tuesday, Nov 20, 2012 Pond No- 1 - Wetland 2 Area A Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 289.00 it Stage ! Storage Table Stage (ft) Elevation (ft) Contour area (sgit) Incr. Storage (cult) Total storage (cult) 0.00 289.00 19,670 0 0 1.00 290.00 21,690 20,670 20,670 2,00 291.00 23,780 22,725 43,394 3.00 292.00 25,940 24,850 68,244 4.00 293.00 28,170 27,045 95,289 5.00 294.00 30,470 29,310 124,598 Culvert ! Orifice Structures Weir Structures [A] [131 [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24,00 2.00 0.00 0.00 Crest Len (ft) = 15.33 0.67 16.00 0.00 Span (in) = 24,00 2,00 0.00 0.00 Crest Et. (ft) = 291.80 290.00 292.60 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert EE. (it) = 278.50 289.00 0,00 0.00 Weir Type = Riser Aect Broad - -- Length (ft) 10600 0.50 0.00 0.00 Multi -Stage = Yes Yes No No Slope ( %) m 9.90 0.00 0.00 nla N -Value = .013 .013 .013 nla Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 ........ .... ...... .... ......... ........ ...-- ....- ....._ _ ----------------------------- _ ------------------ - -- - -- - - - Note: CLNerlJOrifice Wtflows are analyxod under infest (ic) and outlel (oc) conlrol. W Sir risois Oai*ed for orifice conditions (io} and submergence Stage Storage ! Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B CIv C PrfRsr Wr A Wr B Wr G Wr O Exfil User Total it cult ft cis Cis cis cis cis cis cfs cis cis cis cis 0.00 0 269.00 0.00 0.00 0.00 0.00 0.00 - -- - -- - -- 0.000 0.10 2,067 289.10 46.62 is 0.01 is - -- --- 0.00 0.00 0.00 - -- 0.015 0.20 4,134 289.20 46.62 is 0.04 is 0.00 0.00 0.00 - -- - -- 0.036 030 6,201 289.30 46.62 is 0.05 is - -- 0.00 0.00 0.00 - -- - -- 0.049 0.40 8,268 289.40 46.62 is 0.06 is 0.00 0.00 0.00 - -- - -- 0.059 0.50 10,335 289.50 46.62 is 0.07 is - -- 0.00 0.00 0.00 - -- - -- 0.068 0.60 12,402 289.60 46.62 is 0.08 is - -- 0.00 0.00 0.00 - -- 0.075 0.70 14,469 289.70 46.62 is 0.08 is - -- 0.00 0.00 0.00 - 0.082 0.80 16,536 289.80 46.62 is 0.09 is - -- 0.00 0.00 0.40 - -- 0.089 0.90 18,603 289.90 46.62 is 0.09 iC 0.00 0,00 0.00 - -- - -- 0.095 1.00 20,670 290.00 46.62 iC 0.10 is - -- - -- 0.00 0.00 0.00 - -- 0.101 1.10 22,942 290.10 46.62 is 0.11 is 0.00 0,07 0.00 - - 0.176 1.20 25,215 290.20 46.62 is 0.11 iC 0.00 0.20 0.00 - 0311 1.30 27,487 29030 46.62 is 0.12 is - -- 0.00 0.37 0.00 - -- 0.482 1.40 29,760 290.40 46.62 is 0.12 is 6.60 0.56 0.00 - 0.585 1.50 32,032 290,50 46.62 is 013 is 0.00 0.79 0.00 - -- 6.914 1.60 34,305 290.60 46.62 is 0.13 is 0.00 1.04 0.00 - 1.166 1.70 36,577 290.70 46.62 is 0.13 is 0.00 1.31 0.00 - 1.440 1.80 38,849 290.80 46.62 is 0.14 is - -- 0.00 1160 0.00 - -- 1.734 1.90 41,122 290.90 46.62 is 0.14 is 0.00 1.91 0.00 - -- 2.047 2.00 43,394 291.00 46,62 is 0.15 is - -- 0.00 2.23 0.00 - -- 2.377 2.10 45,879 291.10 46.62 is 0.15 is --- 0.00 2.57 0.00 - 2.723 2.20 48,364 291.20 46.62 is 0.15 is 0.00 2.93 0.00 - -- 3.086 2.30 50,849 291.30 46.62 is 6.16 is - -- 0.00 3.31 0.00 - -- 3.463 2.40 53,334 291.40 46.62 is 0.16 is - -- --- 0.00 3.70 0.00 - 3.856 2.50 55,819 291.50 46.62 is 0.16 is - 0.00 4.10 0.00 • -- 4.262 2.60 58,304 291.60 46.62 is 0.17 is - -- 0.00 4.52 0.00 4.682 2.70 60,789 291.70 46.62 is 0.17 is - -- 0.00 4.95 0.00 51115 2.80 63,274 291.80 46.62 is 0.17 is --- 0.00 5.39 0.00 5.561 2.90 65,759 291.90 46.62 iC 0.18 is - -- - -- 1.62 5.84 0.00 • -- 7.637 3.00 68,244 292.00 46.62 is 0.18 is - -- 4.57 6.31 0.00 11.66 3.10 70,949 292.10 46.62 is 0.18 is - -- 8.39 6.79 0.00 - -- 15.36 3.20 73,653 292.20 46.62 is 0.19 is - -- 12.92 7.28 0.00 20.38 3.30 76,357 292.30 46.62 is 0.19 is - -- 18.05 7.78 0.00 26.02 3.40 79,662 292.40 46.62 is 0.19 is - -- 23.73 8.30 0.00 - -- 32.21 3.50 81,766 292.50 46.62 is 0.19 iC • -- 29.90 8.82 0.00 38.91 Continues on next page... Wetland 2 Area A Stage 1 Storage I Discharge Table Stage Storage Elevatton Clv A Clv 8 Clv C ft Cuft ft Cfs Cfs cfs 3.60 84,471 292.80 46.62 is 0.20 is - -- 3.70 87,175 292.70 52.07 is 0.12 is - -- 3.80 89,880 292.80 53.78 is 0.09 is - -- 3.90 92,584 292.90 54.35 is 0.07 is - -- 4.00 95,289 293.00 54,79 iC 0.06 is 4.10 98,220 293.10 55.15 is 0.06 is 4.20 101,151 29120 55.47 is 0.05 is 4.30 104,082 293.30 55.76 iC 0.05 is 4.40 107,013 293.40 56,04 is 0.04 is 4.50 109,944 293.50 56.29 is 0.04 is - -- 4.60 112,875 293.60 56.54 is 0.04 is 4.70 115,805 293.70 56.77 is 0.03 is 4.80 118,736 293.80 57.00 is 0.03 is 4.90 121,667 293.90 57.23 is 0.03 iC - -- 5.00 124,598 294.00 57.44 is 0.03 is - -- ,..End PrfRsr Wr A Wr B Wr C cfs Cfs cis Cfs - -• 36.53 9.35 0.00 - -- 43.59 8.36S 132 - -- 46.86s 6.83s 172 - -- 47.90s 6-37s 6.64 - -- 48.68s 6-04s 10.52 - -- 49.32s 5.76s 14.71 49.88s 5,54s 19.33 50.37s 5-34s 24.36 50.81 s 5.188 29.77 - 51.21 s 5.03s 35.52 51,59s 4-90s 41.60 - 51.94s 4.79s 47.99 - -- 52.27s 4.68 s 54.68 52.60s 4,59s 61.67 - -- 52.90s 4.51 s 68.91 21 Wr D Exfil User Total Cfs cfs Cfs Cfs 46,08 - 53.39 . -_ - -- 57.49 - -- 61.18 65.30 69.85 74.80 80.12 - -- 85.80 - 91.80 98.13 - 104.76 111.67 - 118.89 - -- - -- - -- 126.35 Hydrograph Report Hydratlow Hydrographs Extension far AtitoCADO Civil 3D3 2008 by Auto desk, Inc. v6.052 Hyd. No. 15 Total Post Dev To Paint A Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 13, 14 22 Tuesday, Nov 20, 2012 Peak discharge = 4.324 cfs Time to peak = 721 min Hyd. volume = 41,461 tuft Contrib. drain. area= 9.930 ac Total Post Dev To Point A 0 (cfs) Hyd. No. 15 -- 1 Year Q (cfs) 5.00 5.00 4.00- 4.00 3.00 3.00 2.00 2.00 1,00 0.00 - ..,. ,...,_.,..........M ...,.._. ,u.........a,.., 0.00 0 300 500 900 1200 1500 1800 2100 2400 2700 3000 Time (min) - Hyd No. 15 - - - -- Hyd No. 13 - Hyd No. 14 Hydrograph Report HydrafIow Hyd rog rap hs Extension for AetoCAQ® Civil 3DO 2008 by Autodesk, Inc. v6,052 Hyd. No, 17 Hyd. volume Area B to Wet Pond 1 Curve number Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 11.760 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 2,85 in Storm duration = 24 hrs Area B to Wet Pond 1 23 Tuesday, Nov 20, 2012 Peak discharge = 24.43 cfs Time to peak = 718 min Hyd. volume = 49,084 cuft Curve number = 79.6 Hydraulic length = 0 ft Time of cone. (Tc) = 6.30 min Distribution = Type 11 Shape factor = 484 0 (Cfs) Hyd. No. 17 -- 1 Year 0 {cfs} 28.00 28.00 24.00 24.00 20.00 20.00 15.00 16.00 12.40 12.00 8.04 8.00 4.00 4.00 0.00 — , r.. ..M .�.._ ._,.._� ,. H.. ..., .�.sw w -..0 rom. 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time {min} . -..• Hyd No. 17 24 TR55 Tc Worksheet Hydraflow Hydro graphs Extension for AutoCAD@ Qvii 3D@ 2008 by Autodesk, Inc. v6.052 Hyd. No. 17 Area 8 to Wet Pond 1 Description A B C Totals Sheet Flow Manning's n -value = 0.050 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two -year 24 -hr precip. (in) = 3.60 0.00 0.00 Land slope ( %) = 1.00 0.00 0.00 Travel Time (min) = 2.91 + 0.00 + 0.00 - 2.91 Shallow Concentrated Flow Flow length (ft) = 130.00 20.00 0.00 Watercourse slope = 4.60 1.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ftls) = 3.46 2.03 0.00 Travel Time (min) = 0.63 + 0.16 + 0.00 0.79 Channel Flow X sectional flow area (sgft) = 3.14 0.00 0.00 Wetted perimeter (ft) = 6.28 0.00 0.00 Channel slope ( %) = 1.60 0.00 0.00 Manning's n -value = 0.013 0.015 0.015 Velocity (ftls) = 9.11 0.00 0.00 Flow length (ft) = 1430.0 0.0 0.0 Travel Time (min) = 2.62 + 0.00 + 0.00 - 2.62 Total Travel Time, Tc ...... ......................................... ............................... 6.30 min Hydrograph Report H yd raf low Hyd Mgra phs Extension f or Au toCA D& Civil 3 DO 2006 by A u tode sk. Inc. v6,052 Hyd. No. 18 Hyd. volume = Offsite to Wet Pond Curve number = Hydrograph type = SCS Runoff Storm frequency = 1 yrs; Time interval = 1 min Drainage area = 1.350 ac Basin Slope = 0.0% Tc method = USER Total precip. = 2.85 in Storm duration = 24 hrs. - - - - - ----------- . ...... Q (Cfs) 3.00 2.00 1.00 ❑ff'site to Wet Pond Hyd. No. 18 -- 1 Year AT7 Tuesday, Nov 20, 2012 Peak discharge = 2.941 cf s. Time to peak = 718 min Hyd. volume = 5,906 tuft Curve number = 80.5 Hydraulic length = 0 ft Time of conc. (TO = 5.00 min Distribution = Type 11 Shape factor = 484 4 to I I 120 240 360 480 600 720 840 960 111--r— Hyd No. 18 Q (Cfs) 3.00 w0f, 1.00 0.00 1080 1200 1320 1440 1560 Time (min) rl gg J- 4 to I I 120 240 360 480 600 720 840 960 111--r— Hyd No. 18 Q (Cfs) 3.00 w0f, 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hyd rafIow Hyd rographs Extension for Auto CADO Civi13 DO 2006 by Autodesk, Inc. v6.052 Hyd. No. 19 Time to peak = Total to Wet Pond Hyd. volume = Hydrograph type = Combine Storm frequency = 1 yrs. Time interval = 1 min Inflow hyds. = 17, 18 Q (Cfs) 2800 24.00 16.00 12.00 fO 4.00 0.00 0 Total to Wet Pond Hyd. No. 19 -- 1 Year 0 Tuesday, Nov 20, 2012 Peak discharge = 27.37 cfs Time to peak = 718 mire Hyd. volume = 54,990 cuft Contrib, drain. area= 13.110 ac Q (Cfs) 28.00 24.00 X611, Mile, 12.00 M 4.00 . .....w...� ... ,...w........r,.._ �. ,.,.a.. 0.00 124 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 19 - Hyd No. 17 Hyd No. 18 .... ...... Q (Cfs) 28.00 24.00 X611, Mile, 12.00 M 4.00 . .....w...� ... ,...w........r,.._ �. ,.,.a.. 0.00 124 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 19 - Hyd No. 17 Hyd No. 18 Hydrograph Report Hyd rafIow Hydrordraphs Extension for AutoCAD@ Civil 3f@ 2008 by Auto desk, Inc. v6.052 Hyd. No. 20 Route Wet Pond 1 Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 19 - Total to Wet Pond Reservoir name = Wet Pond 1 Area B Storage Indication method used, 27 Tuesday, Nov 20, 2012 Peak discharge = 0.681 cfs Time to peak = 941 min Hyd. volume = 37,659 tuft Max. Elevation = 307.66 ft Max. Storage = 35,234 tuft Route Wet Pond 1 Q {cfs} Hyd. No. 20 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.40 20.00 20.00 16.00 15.00 12.00 12.00 8.00 8.00 4.00 4.04 0.00 1---1 ............. 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 20 . Hyd No. 19 Total storage used - 35,234 cult Pond Report 28 Hydraf €ow Hydrographs Extension for AutoCAD® Civil 3D@ 2008 by Autodesk, Inc. v6.052 Tuesday, Nov 20, 2012 Pond No. Z - Wet Pond 1 Area B Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 306.00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 306.00 17,500 0 0 0.50 306.50 20,630 9,521 9,521 1,00 307.00 21,600 10,556 20,076 2.00 308.00 24,650 23,106 43,182 3.00 309.00 27,090 25,858 69,040 4.00 310,00 28,870 27,972 97,013 5.00 311.00 30,700 29,777 126,790 6.00 312.00 32,830 31,756 158,546 Culvert ! Orifice Structures Weir Structures [A] [g] [C] [PrfRsr] [A] [g] [C] [D] Rise (in) = 24.00 2.25 Inactive 0.00 Crest Len (ft) = 15.50 0.50 12.00 0.00 Span (in) = 24,00 2.25 8.00 0.00 Crest El. (ft) = 310.00 30720 311.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 2.60 333 Invert El. (ft) = 300.50 306.00 307.20 0.00 Weir Type = Riser Rect Broad Length (ft) = 82.00 0.50 0.50 0.00 Multi-Stage = Yes Yes No No Slope ( %) m 1.58 0.00 0.00 nla N -Value = .013 .013 .013 nia Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Contour) Mufti -Stage nla Yes Yes No TW Elev. (ft) = 0.00 - - -- - --- ....._.V........ -. _ _ -- ......... ___ Note: Culveworifice oulflows are analyzed under Intel (icj and outlet .... ..._._-...m. ----------- - (oc) control. Weir risers - - - °- ....._.. ..__..._....� _.._ - - -- checked for orifice conditions (ic) and submergence (s). Stage I Storage ! Discharge Table Stage Storage Elevation CIv A Civ B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cis 0,00 0 306.00 0.00 0.00 0.00 0.00 0.00 0.00 - -- 0.000 0.05 952 306.05 32.08 lc 0.00 is 0.00 - 0.00 o.00 0.00 - -- 0.005 0.10 1,904 306.10 32.08 is 0.02 is 0.00 - -- 0.00 0.00 0.00 - -- - -- 0.016 0.15 2,856 306.15 32.08 is 0.03 is 0.00 - -- 0.00 0.40 0.00 - -- - -- 0.031 0.20 3,808 306.20 32.08 is 0.04 is 0.00 0.00 0.00 0,00 - -- __ 0.p43 0.25 4,760 306.25 32.08 is 0.05 is OAO - -- 0.00 0.00 0.00 -__ 0.053 0.30 5,712 306.30 32.08 is 0.06 is 0.00 0.00 0.00 0.00 - 0.060 0.35 6,665 306.35 32.08 is 0.07 is 0.00 0.00 0.00 0.40 0.067 0,40 7,617 306.40 32.08 is 0.07 is 0.00 0.00 0100 0.00 - -- 0.074 0.45 8,569 306.45 32.08 is 0.08 is 0.00 - -- 0.00 0.00 0.00 0.079 0.50 9,521 306,50 32.08 is 0.08 is 0.00 0.00 0.00 0.00 - -- 0.085 0.55 10,576 306.55 32.08 is 0.09 is 0.00 0.00 0.00 0.00 - -- 0.090 0.60 11,632 306.60 32.081c 0.09 is 0.00 0.00 0.00 0.00 ••. -•- 0.095 0,65 12,687 306.65 32.08 is 0.10 is 0.00 - -- 0.00 0.00 0.00 0.099 0.70 13,743 306.70 32.08 is 0.10 is 0.00 --- 0.00 0.00 0.00 --- 0.104 0.75 14,799 306.75 32.08 is 0.11 is 0.00 - -- 0.00 0.00 0.00 - -- 0.108 0.80 15,854 306.80 32.08 is 0.11 is 0.00 - -- 0.00 0.00 0.00 0.112 0.85 16,910 306,85 32.08 is 0.12 is 0.00 - -- 0.00 0.00 0.00 0.116 0.90 17,965 306.90 32.08 is 0.12 is 0.00 - -- o.0o 0.00 0.00 - -- - -- - -- 01119 0.95 19,021 306.95 32.08 is 0.12 is 0.00 0.00 0.00 0.00 - -- 0.123 1.00 20,076 307.00 32.08 is 0.13 is 0.00 0.00 0.00 0.00 - -- - -- - -- 0.127 1.10 22,367 307.10 32.08 is 0.13 is 0.00 0.00 0.00 0.00 ___ _._ 0.133 1.20 24,698 307.20 32.08 1s 0.14 is 0.00 0.00 0.00 0.00 - - 0.140 1.30 27,008 307.30 32.08 is 0.15 is 0.00 - -- 0.00 0.05 0.00 - -- - -- 0.199 1.40 29,319 307.40 32.08 is 0.15 is 0.00 0.00 0.15 0.00 - -- - -- - 0.301 1.50 31,629 307.50 32.08 Ic 0.16 is 0.00 0.00 0.27 0.00 - -- 0.431 1.60 33,940 307.60 32.08 is 0.16 is 0.00 0.00 0.42 0.00 - -- 0.584 1.70 360250 307.70 32.08 is 0,17 is 0.00 0.00 0.59 0.00 - -- 0.757 1,80 38,561 307.80 32.08 is 0.17 is 0.00 - -- 0.00 0.77 0.00 - 0.947 1.94 40,872 307.90 32.08 is 0.18 is 0.00 0,00 0.98 0.00 - 1.154 2.00 43,182 308.00 32.08 is 0.18 is 0.00 -•- 0.00 1.19 0.00 - - 1.375 2.10 45,768 308.10 32.08 is 0.19 is 0.04 0.00 1.42 0.00 • -- 1.610 2.20 48,354 308.20 32.08 is 0.19 is 0.00 0.00 1.67 0.00 -•- 1.858 2.30 50,940 308.30 32.08 is 0.20 is 0.00 0.00 1.92 0.00 - -- - -- - -- 2.118 Continues on next page... Wet Pond 9 Area B Stage 1 Storage ! Discharge Table Stage Storage Elevation Clv A CIv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft Cuft ft Cfs cfs Cfs Cfs cfs Cfs cfs cfs Cfs Cfs cfs 2.40 53,525 308,40 32.08 is 0.20 is 0.40 - -- 0,00 2.19 0.00 2.391 2.50 56,111 308.50 32.08 is 0.21 is 0.00 -•- 0.00 2.47 0.00 - 2.674 2.60 58,697 308.60 32.08 is 0.21 1s 0.00 -•- 0.00 2.76 0.00 - 2.969 2.70 61,283 308.70 32.08 iC 0.21 is 0.00 0.00 3.06 0.00 - -- 3.273 2.80 63,869 308.80 32.08 is 0.22 is 0.00 - 0.00 3.37 0.00 - -- 3.588 2.90 66,454 308.90 32.08 is 0.22 is 0.00 0.00 3.69 0.00 - -- - -- 3.913 3.00 69,040 309.00 32.08 is 0.23 is 0,00 - -- 0.00 4.02 0.00 - - 4.247 3.10 71,837 309.10 32.08 is 0.23 iC 0.00 - -- 0.00 4.36 0.00 - -- - -- 4.591 3.20 74,635 309.20 32.08 is 0.23 is 0.00 -•• 0.00 411 0.00 - -- 4.944 3.30 77,432 309.30 32.08 is 0.24 is 0.00 0.00 5.07 0.00 - -- 5.305 3.40 80,229 30940 32.08 is 0.24 iC 0.00 0.00 5.43 0.00 --- 5.675 3.50 83,026 309.50 32.08 is 0.25 is 0.00 0.00 5.81 0.00 - -- 6.053 3.60 85,824 309.60 32.08 is 0.25 is 0.00 0.00 6.19 0.00 - -- 6.439 3.70 88,621 309.70 32.08 is 0.25 is 0.00 0.00 6.58 0.00 - -- - 6.834 3,80 91,418 309.80 32.08 iC 0.26 is 0.00 0.00 6.98 0.00 - -- - -- 7.236 3.90 94,215 309.90 32.08 is 0.26 is 0.00 - -- 0,00 7.39 0.00 - - -- 7.647 4.00 97,013 310.00 32.08 is 0,26 IC 0.00 -•- 0.00 7.80 0.00 - -- - -- 8.064 4.10 99,990 310.10 32.08 is 0.27 is 0.00 - -- 1.63 8.22 0.00 - -- - -- 10.12 4.20 102,968 310.20 32.08 is 0.27 is 0.00 --- 4.62 8.65 0.00 - - -- 13.54 4.30 105,945 310.34 32.08 is 0,27 is 0.00 - -- 8.48 9.09 0.00 - °° 17.84 4.40 108,924 310.40 32.08 is 0.28 is 0.00 - -- 13.06 9.53 0.00 22.86 4.50 111,901 310.50 32.08 is 0.28 is 0.00 - -- 18.25 9.98 0.00 28.51 4.60 114,879 310.60 34.69 is 0.26 iC 0.00 - -- 23.99 10.44 0.00 - 34.69 4.70 117,857 310.70 40.21 is 0.19 is 0.00 30.23 9-79s 0.00 - -- - -- 40.21 4.80 120,834 310.80 44.16 is 0.12 is 0.00 36,85s 7-20s 0.00 - -- - -- 44.16 4.90 123,812 310.90 45.10 is 0.09 is 0.00 38.65s 6.36s 0.00 - -- 45.10 5.00 126,790 311.60 45.69 is 0A8 is 0.00 39.74s 5.86s 0.00 - -- 45.68 5.10 129,966 311.10 46.15 is 0.07 is 0.00 40,59s 5.48s 0.99 - -- - -- 47.13 5.20 133,141 311.20 46.54 is 0.06 is 0.00 41,30s 5,17s 2.79 - 4933 5.30 136,317 311.30 46.89 is 0.06 is 0.00 - -- 41.9# s 4,92s 5.13 - -- - -- 52.01 5.40 139,492 311.40 47.21 is 0.05 Ic 0.00 - -- 42.46 s 4.70s 7.89 - 55.90 5.50 142,668 311.50 47.52 is 0.05 is 0.00 --- 42.95 s 4.51 s 11.03 - -- - -- - -- 58.54 5.60 145,843 311.60 47.80 is 0.04 iC 0.00 - -- 43.41 s 434 s 14.50 62.29 5.70 149,019 311.70 48.08 is 0.04 is 0.00 - -- 43.83s 4,20s 18.27 - -- --- 66.35 5.80 152,195 311.80 48,35 is 0.04 is 0.00 - -- 44.23s 4.07s 22.32 - -- 70.67 5.90 155,370 311.90 48.61 Ic 0.04 is 0.00 - -- 44.59 s 3.96s 26.64 - -- 75.23 6.00 158,546 312.06 48.86 is 0.03 is 0.00 - -- 44.96s 3.86s 31.20 - 80.05 MWIR Hydrograph Report Hydraflow Hydrographs Extension for Auto CADO Civi13 DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 21 Area to Wetland 3 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (cfs) 10.00 MM 4.00 2.00 0.00 0 120 240 — ---, Hyd No. 21 1 min 3.870 ac 0.0% USER 2.85 in 24 h rs Area to Wetland 3 Hyd. No. 21 -- 1 Year 360 480 600 720 840 Tuesday, Nov 20, 2012 Peak discharge = 9.686 cfs Time to peak = 718 min Hyd. volume = 19,509 cuft Curve number = 83.3 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 484 Q (cfs) 10.00 I 11, Iwo] ■ 11 2.00 1 I _._,.. , "'""` �.N...�,,.......J... 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report HydrafIow Hydrog rap hs Extension for AutoCAO® Civil 300 2008 by Autodesk, Inc. v6.052 Hyd. No. 22 Offsite to Wetland 3 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (cfs) 1,00 0.90 0,80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 1 min 0.350 ac 0.0% USER 2.85 in 24 hrs 31 Tuesday, Nov 20, 2012 Peak discharge = 0.872 cfs Time to peak = 718 min Hyd. volume = 1,755 cuft Curve number = 83.2 Hydraulic length = 0 ft Time of Conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Offsite to Wetland 3 Hyd. No, 22 -- 1 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 120 240 364 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No, 22 Time (min) Hydrograph Report Hydraf[ow Hyd rographs Extension for AutoCACO QviI " 2008 by Auto desk, Inc. v6.052 Hyd. No. 23 Total to Wetland 3 Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 21, 22 Total to Wetland 3 32 Tuesday, Nov 20, 2012 Peak discharge = 10.56 cfs Time to peak = 718 miry Hyd. volume = 21,265 cuft Contrib. drain. area= 4.220 ac Q (cfs) Hyd. No, 23 -- 1 Year Q {cfs} 12.00 12.00 10.00 10.00 8.00 $.00 6.00 6.00 4.00 , 4.00 MO 2,00 0.00 _...,.....�t.... ,� ..w .. k. ,...�. µ , ._,.�,� .,..k,.w,.. - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) --v Hyd No. 23 Hyd No. 21 --- Hyd No. 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 300 2008 by Autodesk, Inc. v6.052 Hyd. No, 24 Hyd. volume Route Wetland 3 Max. Elevation Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 23 - Total to Wetland 3 Reservoir name = Wetland 3 Area 8 Storage Indication method used. 33 Tuesday, Nov 20, 2012 Peak discharge = 0.353 cfs Time to peak = 838 min Hyd. volume = 13,817 tuft Max. Elevation = 290.12 ft Max. Storage = 13,262 tuft Route Wetland 3 0 (cis) Hyd. No. 24 -- 1 Year 0 (cis) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2,00 0, 00 _.....,.,... �...M.,.... _ 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (miry) Y- Hyd No. 24 - Hyd No, 23 ;' Total storage used = 13,262 cuft Pond Report 34 Hydraflow Hydrographs Extension for Auto CADp Civil 3D@ 2008 by Autodesk, Inc. v6,052 Tuesday, Nov 20, 2012 Pond No. 7 - Wetland 3 Area 8 Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 289.00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Iner. Storage (tuft) Total storage (tuft) 0.00 289.00 10,760 0 0 1.00 290.00 12,480 11,608 11,648 2.00 291.00 14,290 13,373 24,982 3.00 292.40 16,170 15,219 40,200 4.00 292,00 18,104 17,124 57,325 Culvert 1 Orifice Structures Weir Structures 1A] 1131 [C] [PrfRsr] [A] [g] [C] [D] Rise (in) = 18.00 1.50 0.00 0.00 Crest Len (ft) = 10.00 2.00 12,00 0.00 Span (in) = 18.00 1.50 0.00 0.00 Crest El. (ft) = 291.00 290.00 291.80 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 2.60 3.33 Invert El. (ft) = 273.00 289.00 0.00 0.00 Weir Type = Riser Rect Broad Length (ft) = 112.00 0.50 0.00 0.00 Multi -Stage = Yes Yes No No Slope ( %) = 9.82 0.00 0.04 nla N -Value = .013 .013 .013 nla Orifice Coeff. = 0,60 0.60 0.60 0.60 Exfil.(inthr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) W 0.00 - - -- ................. .............. Note: Gulvert/O+Ifico outflows aro analyzed undor inter (ic) and outlet (oc) control. W eir risers chocked for oriko condil ion s V0 and submergence (s). Stage 1 Storage 1 Discharge Table Stage Storage Elevation Clv A CIv B CIv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total It tuft It cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 289.00 0.00 0.00 0.00 0.00 0.00 - -- - -- 0.000 0.10 1,161 289.10 33.22 is 0.01 is - -- 0.00 0.00 0.00 - -- - -- 0.011 020 2,322 289.20 33.22 is 0.02 is - -- 0.00 0.00 0.00 - -- - -- 0.022 0.30 3,482 289.30 33.22 is 0,03 is - -- 0.00 0.00 0.00 - -- - -- 0.029 0.40 4,643 289.40 33.22 is 0.03 is - -- -•- 0.00 0.40 0.00 - - 0.034 0.50 5,804 289.50 33.22 Ic 0.04 is - -- - -- 0.00 0.00 0.00 - -- - 0.039 0.60 6,965 289.64 33.22 is 0.04 iC - 0.00 0.00 0.00 - -- - -- 0.043 010 8,126 289.70 33,22 Ic 0.05 is 0.00 0.00 0,00 - -- - -- 0.047 0.80 9,287 289.84 33.22 Ic 0.05 Ic - -- 0.00 0.00 0.00 - -- - -- 0.051 0.90 10,447 289.90 33.22 is 0.05 is - -- - -- 0.00 0.00 0.00 - -- - -- 0.054 1.00 11,608 290,00 33.22 is 0.06 is - -- 0.00 0.00 0.00 - -- - -- 0.057 1.10 12,946 290.14 33.22 is 0.06 is - -- 0.00 0.21 0.00 - -- - -- 0.271 1.20 14,283 290.20 33.22 is 0.06 Ic - -- 0.00 0.60 0.00 --- - -- 0.659 1.30 15,620 290.30 33.22 is 0.07 is - -- 0.00 1.09 0.00 - -- - -- 1.160 1,40 16,958 290.40 33.22 is 0.07 is - -- - -- 0.00 1,68 0.00 1.753 1.50 18,295 290.50 33.22 is 0.07 is - -- - -- 0.00 2.35 0.00 - -- 2.425 1,60 19,632 290.60 33.22 is 0.07 Ic - - -- 0.04 3.10 0.00 - -- - -- 3.169 1.70 20,970 290,70 33.22 is 0.48 is - -- 0.00 3.90 0.00 - -- - -- - -- 3.97E 1.80 22,307 290.80 33.22 is 0.08 is - -- 0.00 4.77 0.00 - -- - -- 4.843 1.90 23,644 290.94 33.22 is 0,08 is - -- 0.00 5.69 0.00 - -- 5,767 2.00 24,982 291.00 33.22 is 0.08 is - 0.40 6.66 0.00 - -- - -- 6.742 2,10 26,504 291.10 33.22 is 0.08 is - -• 1.05 7.68 0.00 - -- - -- 8.821 2.20 28,025 291.20 33.22 is 0.09 is - -- 2.98 815 0.00 - -- - - 11.82 2.30 29,547 291.30 33.22 is 0.09 is - -- 5.47 9.87 0.40 - -- - -- 15.43 2.40 31,069 291.44 33.22 is 0.09 is - -- 8.42 11,03 0.00 - -- 19.55 2.50 32,591 291.50 3122 is 0.09 is - -- 11.77 12.24 0.00 - -- - 24.10 2.60 34,113 291.60 33.22 is 0.49 is - -- 15.48 13.48 4.40 - -- - 29.05 2.70 35,635 291.70 34.33 is 0.08 is - -- 19.50 14.75s 0.00 - -- - 34.33 2.80 37,157 291.84 35.48 is 0.05 is - -- 23,15s 12.28s 0.00 - 35.48 2.90 38,679 291,90 3518 is 0.04 is - -- 24.22s 11.52s 0.99 - -- - 36.77 3.00 40,200 292.00 36.00 is 4.03 is - -- 24.94s 11.02s 2.79 - -- - -- 3819 3.10 41,913 292.10 36.17 is 0.03 is 25.51 s 10,63s 5.13 - -- - 41.30 3.20 43,625 292.20 36.33 is 0.03 is - 25,99S 10.31 s 7.89 - -- 44.22 3.30 45,338 292.30 36.47 is 0.02 is - -- 26,40S 10.04s 11.03 - -- - -- - 47.49 3.40 47,050 292A0 36.60 is 0.02 is - -- 26-77s 9.81 s 14.50 - -- - -- 5110 3.54 48,763 292.50 36.72 is 0.02 io - -- 27-09s 9.61 s 18.27 - -- - -- 54.99 3.64 50,475 292.60 36.84 is 0.02 is 27.38s 9.43s 22.33 - -- 59.16 Continues on next page... Wetland 3 Area B Stage / Storage I Discharge Table Stage Storage Elevation Clv A ft tuft ft cfs 3.70 52,187 292.70 36.95 is 3.80 53,900 292.80 37.06 is 3.90 55,612 292.90 37.16 is 4.00 57,325 292.00 0.00 ...End Clv B cfs 0.02 is 0.02 is 0.02 is 0.00 Clu C Cfs PrfAsr Wr A Wr B Wr C cfs cfs cfs cfs 27.65s 9.28s 26.64 27.89s 9.14s 31,20 28.11 s 9.02s 36.00 0.00 0.00 2.79 35 Wr D Exfil User Total cfs cfs cfs cfs - -- - -- --- 63.58 - -- - -- - -- 68.25 - 73.15 - -- - -- 2.791 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADQ Civil 3DO 2008 by Autodesk, Inc. v5.052 Hyd. No. 25 Area B Bypass Hydrograph type = SCS Runoff Storm frequency = 1 yrs. Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q {Gfs) 2.00 1.00 1 min 4.390 ac 0.0% TR55 2.85 in 24 hrs. Area B Bypass Hyd. No. 25 -- 1 Year 36 Tuesday, Nov 20, 2012 Peak discharge = 1.542 of Time to peak = 720 min Hyd. volume = 5,095 tuft Curve number = 61.6 Hydraulic length = 0 ft Time of conc. (To) = 7.20 min Distribution = Type 11 Shape factor = 484 I I 66' 120 240 360 480 600 720 840 960 --- Hyd No. 25 Q (cfs) 2.00 ii+I41 0.00 1080 1200 1320 1440 1550 Time 4min) 37 TR55 Tc Worksheet HydrafIow Hydrographs Extension for Auto CADO Civil 3DD 2008 by Auto desk, Inc. v6.052 Hyd. No. 25 Area B Bypass Description A B C Totals Sheet Flow = 9.00 0.00 0.00 Manning's n -value = 0.400 0.011 0.011 Flow length (ft) .- 50.0 0.0 0.0 Two -year 24 -hr precip. (in) = 3.60 0.00 0.00 Land slope ( %) = 12.00 0.00 0.00 Travel Time (min) = 5.68 + 0.00 + 0.00 5.68 Shallow Concentrated Flow Flow length (ft) = 170.00 0.00 0.00 Watercourse slope ( ° /Q} = 19.40 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ftls) = 7.11 0.00 0.00 Travel Time (min) = 0.40 + 0.00 + 0.00 - 0.40 Cd,TiiiTa Is. Gl X sectional flow area (sgft) = 6.00 0.00 0.00 Wetted perimeter (ft) = 9.00 0.00 0.00 Channel slope ( %) = 1.90 0.00 0.00 Manning`s n -value = 0.015 0.015 0.015 Velocity (ftls) = 10.43 0.00 0.00 Flow length (ft) = 690.0 0.0 0.0 Travel Time (min) = 1.10 + 0.00 + 0.00 1.10 Total Travel Time, Tc ............................................... ............................... 7.20 min Hydrvgraph Report Hydra #low Hyd rographs Extension for AutoCADO Civil 3D@ 2008 by Autodesk, Inc. v6.052 Hyd. No. 26 Total Post ❑ev to Point B Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 1 min Inflow hyds. = 20, 24, 25 Q (cfs) 2.00 1.00 o.00 0 300 11.1 --l- Hyd No. 26 RR Tuesday, Nov 20, 2012 Peak discharge = 1 .812 cfs Time to peak = 721 min Hyd. volume = 56,571 tuft Contrib. drain. area= 4.390 ac Total Post ©ev to Point B Hyd. No. 26 -- 1 Year 600 900 1200 Hyd No. 20 1500 1800 2100 2400 2700 Hyd No. 24 - Hyd No. 25 Q (cfs) 2.00 HU0101 0.00 3000 Time (rain) 01 Hydrograph Report HydrafIow Hydrographs Extension for AutoCAt7® Civi13 00 2008 by Autodesk, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 28 Area C Post Hydrograph type = SCS Runoff Peak discharge = 0.707 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 2,439 tuft Drainage area = 2.030 ac Curve number = 61.7 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of cone. (Tc) = 8.80 min Total precip. = 2.85 in Distribution = Type 11 Storm duration = 24 hrs. Shape factor = 484 Q (cfs) Area C Post Hyd. No. 28 -- 1 Year Q (cfs) 1.00 i .uu 0.90 0.90 0.80 0.80 0.70 0,70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 's 0.10 0.10 0 00 -... w . m.,.. ew.,. N...... n, ...,......,......H..w...w,....„ ..s.., b.... .. a .W, a n nn 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Time (miry) Hyd No. 28 MI, TR55 Tc Worksheet HydrafIow Hydrographs Extension for AutoCADO Civi13 DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 28 Area C Post Description A B C Totals Sheet Flow = 6.28 0.00 0.00 Manning's n -value = 0.240 0.011 0.011 Flow length (ft) = 50.0 0.0 OA Two -year 24 -hr precip. (in) = 3.60 0.00 0.00 Land slope ( %) = 3.00 0.00 0.00 Travel Time (min) = 6.57 + 0.00 + 0.00 - 6.57 Shallow Concentrated Flow ............................... 8.80 min Flow length (ft) = 400.00 0.00 0.00 Watercourse slope ( °I °) = 4.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ftls) = 3.23 0.00 0.00 Travel Time (min) = 2.07 + 0.00 + 0.00 2.07 Channel Flow X sectional flow area (sgft) = 3.14 0.00 0.00 Wetted perimeter (ft) = 6.28 0.00 0.00 Channel slope ( %) = 5.30 0.00 0.00 Manning's n -value = 0.013 0.015 0.015 Velocity (ftls) = 16.58 0.00 0.00 Flow length (ft) = 170.0 0.0 0.0 Travel Time (min) = 0.17 + 0.00 + 0.00 - 0.17 Total Travel Time, Tc . .............................................. ............................... 8.80 min Hydrograph Report Hydrafiow Hydrog rap hs Extension for AutoGAD(D Civi13 DO 2008 by Autodesk, Inc, v6.052 Hyd. No. 30 Hyd. volume = Area D Past Curve number = Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 0.140 ac Basin Slope = 0.0% Tc method = USER Total precip. = 2.85 in Storm duration = 24 hrs Area D Post 41 Tuesday, Nov 20, 2012 Peak discharge = 0.054 cfs Time to peak = 720 min Hyd. volume = 162 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 mire Distribution = Type 11 Shape factor = 484 Q {cfs} Hyd. No. 30 -- 1 Year 0 (Cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 OM 0.03 0.02 - 0.02 0.01 0.01 f 0.00 �. _ .. x .,... 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd Na. 30 Time (min) r--- Hydrograph Summary ReKydlow Hyd rographs Extension for AutoCAD@ Civil 3D® 2008 by Autodesk, Inc. v6.052 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Time to interval peak (min) (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used {cult} Hydrograph description 1 SCS Runoff 14.72 1 727 60,257 - - - - -- - - - -•- - -- Area A Pre 2 SCS Runoff 3.858 1 725 16,923 - - - - -- - - - - -- - - - - -- Area B Pre (On Site) 3 SCS Runoff 2.955 1 722 7,960 - - - - -- - - - -•- - - - - -- Offsite to Wet Pond 4 SCS Runoff 1.177 1 718 2,389 - - - - -- - - - - -- - - - - -- Offsite to Wetland 3 5 Combine 7.195 1 723 27,272 2, 3, 4 - - - - -- - - - - -- Total Adjusted Area B Pre 6 SCS Runoff 2.758 1 727 11,477 - - - - -- - - - - -- - - - - -- Area C Pre 7 SCS Runoff 0.557 1 725 2,443 - - - - -- - - - - -- - - - - -- Area D Pre 9 SCS Runoff 30.44 1 723 86,978 - - - - -- - - - - -- - - - - -- Area A Past 10 SCS Runoff 45.24 1 719 95,472 --• - -- - - - - -- - - - - -- Area B Post 12 SCS Runoff 31.76 1 718 64,171 - - - - -- - - - - -- - - - - -- Area A to Wetland 2 13 SCS Runoff 8.630 1 720 22,729 - - - - -- - - - - -- - - - - -- Area A Bypass 14 Reservoir 1.242 1 837 48,521 12 290.63 34,929 Route Wetland 2 15 Combine 8.731 1 721 71,250 13,14 -• -••• - - - - -- Total Post Dev To Point A 17 SCS Runoff 34.17 1 718 68,716 - - - - -- - - - - -- - - - - -- Area B to Wet Pond 1 18 SCS Runoff 4.076 1 718 8,208 - - -• -- - - - --- ---- -- Offsite to Wet Pond 19 Combine 38.25 1 718 76,925 17,18 - - - - -- - - - - -- Total to Wet Pond 20 Reservoir 1.476 1 824 59,066 19 308.04 44,291 Route Wet Pond 1 21 SCS Runoff 13.07 1 718 26,527 - - - - -- - - - - -- - - - - -- Area to Wetland 3 22 SCS Runoff 1.177 1 718 2,389 - - - - -- - - - - -- - - - - -- Offsite to Wetland 3 23 Combine 14.25 1 718 28,916 21,22 - - - - -- -• - - -- Total to Wetland 3 24 Reservoir 1.081 1 753 21,400 23 290.28 15,449 Route Wetland 3 25 SCS Runoff 3.543 1 719 8,869 - - - - -- - - - - -- - - - - -- Area B Bypass 26 Combine 3.948 3 721 89,336 20, 24, 25 - - - - -- - - - - -- Total Post Dev to Point 6 28 SCS Runoff 1.547 1 721 4,237 - - - - -- - - - - -- - - - - -- Area C Post 30 SCS Runoff 0.120 1 719 286 - - - - -- - - - - -- - - - - -- Area D Post 09- 116- pre - post- rev. gpw Return Period: 2 Year Tuesday, Nov 20, 2012 Hydrograph Report Hyd raflow Hydrog rap hs Extension for AutoCAO® Civil 3D@ 2008 by Autodesk, Inc. vs. 052 Hyd. No. 1 Hyd. volume Area A Pre Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 27.650 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.44 in Storm duration = 24 hrs Area A Pre 43 Tuesday, Nov 20, 2012 Peak discharge = 14.72 cfs Time to peak = 727 min Hyd. volume = 60,257 tuft Curve number = 62.3 Hydraulic length = 0 ft Time of conc. (Tc) = 19.10 min Distribution = Type ll Shape factor = 484 Q {cfs} Hyd, No. 1 -- 2 Year Q (Cfs) 1 5.00 15.40 12.00 12,00 9.00 9.00 6.00 ,t 6.030 3.00 3.00 0.00 _....,..,..� ...N.� ...,.w�.. ,�......w. �,...� ....r� ._,.w..w,.. _.. rR. ti. 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (rein) -- Hyd No. 1 Hydrograph Report Hyd raflow Hydrog rap hs Extension for AutoGAO® Civil 30@ 2008 by Autodesk, Inc. u6.052 Hyd. No. 2 Area B Pre (On Site) Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval Drainage area Basin Slope To method Total precip. Storm duration 1 min 1 1.430 ac 0.0% TR55 3.44 in 24 h rs 11 El! Tuesday, Nov 20, 2012 Peak discharge = 3.858 cfs Time to peak = 725 min Hyd. volume = 16,923 cuft Curve number = 57.4 Hydraulic length = ❑ ft Time of conc. (To) = 14.50 min Distribution = Type 11 Shape factor = 484 Area B Pre {On Site} Q {cfs} Hyd. No. 2 -- 2 Year Q (cfs} 4.00 4.00 3.00 3.00 2.00 2.00 3 b 1.00 1.00 3 L 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (rain) - - Hyd No. 2 Hydrograph Report HydrafEow Hydrographs Extension for Auto CADO Civi13 00 2008 by Autodesk, Inc. v6.052 Hyd. No. 3 Hyd. volume = offsite to Wet Pond Curve number = Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 1.350 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.44 in Storm duration = 24 h rs Offsite to Wet Pond 45 Tuesday, Nov 20, 2012 Peak discharge = 2.955 cfs Time to peak = 722 min Hyd. volume = 7,960 tuft Curve number = 80.5 Hydraulic length = 0 ft Time of cant. (Tc) = 14.50 min Distribution = Type II Shape factor = 484 Q (cis) Hyd. No. 3 -- 2 Year Q {c #s} 3,00 3.00 2.00 2.00 1.00 1.00 0.00 -.. ,..,....... �.. u......., .,�.,_...,..,Y., y,..,.. 0,00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd Na. 3 Time (min) .-,.. •._. Hydrograph Deport Hyd raflow Hydrographs Extension for AutoCAD& Civil 3D9 2008 by Autodesk, Inc. v6.052 Hyd. No. 4 Hyd. volume Offsite to Wetland 3 Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.350 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.44 in Storm duration = 24 hrs 0 (Cfs) 2.00 19010 � �f w, Offsite to Wetiand 3 Hyd. No. 4 -- 2 Year Hi Tuesday, Nov 20, 2012 Peak discharge = 1.177 cfs Time to peak = 718 min Hyd. volume = 2,389 cuft Curve number = 83.2 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 484 120 240 360 480 600 720 840 960 Hyd No. 4 Q (cfs) 2.00 1.00 0.00 1080 1 200 1320 1440 Time (min) Hydrograph Report Hyd rafIow Hydrog rap hs Extension for AutoCAD® Civil 3CKD 2008 by Autodesk, Inc. v6,052 Hyd. No. 5 Total Adjusted Area B Pre Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 2, 3, 4 47 Tuesday, Nov 20, 2012 Peak discharge = 7.195 cfs Time to peak = 723 min Hyd. volume = 27,272 tuft Contrib. drain. area= 13.130 ac Total Adjusted Area B Pre Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) --l— Hyd No. 5 . Hyd No. 2 . Hyd No. 3 Hyd No. 4 Hydrograph Report Hydraf low Hyd rog rap hs Extension for Auto CADO Civi13 DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 6 Hyd. volume Area C Pre Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 6.130 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.44 in Storm duration = 24 hrs Q (Cfs) 3.00 will] 1.00 Area C Pre Hyd. No. 6 -- 2 Year Tuesday, Nov 20, 2012 Peak discharge = 2.758 cfs Time to peak = 727 min Hyd. volume = 11,477 Cuft Curve number = 60.4 Hydraulic length = 0 ft Time of cone. (Tc) = 18.50 min Distribution = Type 11 Shape factor = 484 M � ti t} 120 240 360 480 600 720 840 960 Hyd No. 6 Q (Cfs) 3.00 OR 1.00 0.00 1080 1200 1320 1440 1560 Time jmin) r El Hydrograph Report Hydraflow Hydrog rap hs Extension for Auto CADO Civi13 D& 2008 by Autodesk, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 7 Area ❑ Pre Hydrograph type = SCS Runoff Peak discharge = 0.557 cfs Storm frequency = 2 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 2,443 tuft Drainage area = 1.650 ac Curve number = 57.4 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of cone. (Tc) = 13.60 min Total precip. = 3.44 in Distribution = Type it Storm duration = 24 hrs Shape factor = 484 Area D Pre Q (of$) Hyd. No. 7 -- 2 Year Q {cfs} 1.00 1.00 0.90 0.90 0.80 - 0.80 0,70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 = 0.20 4.10 _ . 0.10 0.00 ,.,..,,rtw ., w., p, ,., M .., . ..r .._.,. ..n.�,,: �.., .....,., 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) w °� Hyd No. 7 Hydrograph Report HydrafIow Hyd rographs Extension for AutoCAD@ Civil 2008 by Autodesk, Inc. v6.052 Hyd. No. 9 Hyd. volume Area A Post Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 24.670 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.44 in Storm duration = 24 h rs Area A Post 50 Tuesday, Nov 20, 2012 Peak discharge = 30.44 cfs Time to peak = 723 min Hyd. volume = 86,978 tuft Curve number = 70 Hydraulic length = 0 ft Time of conc. (Tc) = 14.90 min Distribution = Type fl Shape factor = 484 0 (Cfs) Hyd. No. 9 -- 2 Year Q (Cfs) 35,00 35.00 30.00 34.00 25.00 25M 3 20.00 20.00 15.00 '3 15.00 di I d 10.00 10.00 a 5.00 5.00 0.00 - �..�,�.M,.M�., ...., �.., �. H, �.. wu..,.,, �... m.. M... ...,w�.�.�._�.._,..._....H���,� �.0 .�,_�...� �,.w...,. �.�Y..,.. ...�....w. .xw__..,� o.ao 0 120 240 360 480 600 720 844 960 1080 1200 1320 1440 1550 Time (min) N Hyd No. 9 Hydrograph Report Hyd rat low Hydrog rap hs Extension for AutoCADO Civil 3M 2008 by Autodesk, Inc. v6.052 Hyd. No. 10 Hyd, volume Area B Post Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 20.020 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.44 in Storm duration = 24 hrs Q (cfs) 50.00 011014] 10414181 i[ OE Area B Post Hyd. No. 10 -- 2 Year 51 Tuesday, Nov 20, 2012 Peak discharge = 45.24 cfs Time to peak = 719 min Hyd, volume = 95,472 cuft Curve number = 76.4 Hydraulic length = 0 ft Time of cone. (TO = 7.20 min Distribution = Type 11 Shape factor = 484 Q (cfs) 50.00 40.00 "1 41411 908111 10.00 0.00 MO 0 120 240 360 480 640 720 840 960 1080 1200 1320 1440 1560 Hyd No, 10 Time (min) -- �v Q (cfs) 50.00 40.00 "1 41411 908111 10.00 0.00 MO 0 120 240 360 480 640 720 840 960 1080 1200 1320 1440 1560 Hyd No, 10 Time (min) -- Hydrograph Report HydrafIow Hyd rographs Extension for Auto OAM Civi13 M 2008 by Autodesk, Inc. v6.052 Hyd. No. 12 Hyd. volume Area A to Wetland 2 Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 14.740 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.44 in Storm duration = 24 hrs Area A to Wetland 2 `.MW Tuesday, Nov 20, 2012 Peak discharge = 31.76 cfs Time to peak = 718 min Hyd. volume = 64,171 cuft Curve number = 73.4 Hydraulic length = ❑ ft Time of cone. (Tc) = 6.40 min Distribution = Type 11 Shape factor = 484 Q (cfs) Q (of$) Hyd. No. 12 -- 2 Year 35.00 35M 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 N� ,.....n .,,,,..... _. ,ri...w_.........,.M.` �., .,... 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - -.., Hyd No. 12 Time {rein} Hydrograph Report HydrafIow Hyd rographs Extension for AutoCAO® CiviI 3D@ 2008 by Autodesk, Inc. v6.052 Hyd. No. 13 Hyd. volume Area A Bypass Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 9.930 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.44 in Storm duration = 24 hrs Area A Bypass Tuesday, Nov 20, 2012 Peak discharge = 8.330 cfs Time to peak = 720 min Hyd. volume = 22,729 cuft Curve number = 33 Hydraulic length = 0 ft Time of conc. (Tc) = 9.80 min Distribution = Type II Shape factor = 484 Q {Cfsy Q (cfs) Hyd. No. 13 -- 2 Year 10.00 1 0.00 8.00 8.04 6M 6.00 4.00 4.00 2.00 2.00 �h h 0.00 - .................... �.... ..... �. ,.�.... „W ..n..m............. �.., 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 13 lime (min) .�...,�-�.. 6 -E,1 Hydrograph Report Hydraflow Hyd rographs Extension for AutoCA©O Civil 3 D 2008 by Aut ode sk, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 14 Route Wetland 2 Hydrograph type = Reservoir Peak discharge = 1.242 cfs Storm frequency = 2 yrs Time to peak = 837 min Time interval = 1 min Hyd. volume = 48,521 cuft Inflow hyd. No. = 12 - Area A to Wetland 2 Max. Elevation = 293.63 ft Reservoir name = Wetland 2 Area A Max. Storage = 34,929 tuft Storage Indication method used Q (cfs) 35.30 30.00 25M 23.00 15.00 10.30 5M 0 00 Route Wetland 2 Hyd. No. 14 -- 2 Year 3 Q {cfs} 35.00 30.00 25.00 20.00 15.00 10.40 5.00 a Oo 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time {rain} Hyd No. 14 - Hyd No. 12 Total storage used = 34,929 ouft Hydrograph Report ........... . . ...... Hydraf I ow H ydro g ra Phs Extension f or AutoCADO Civil 3DQD 2008 by Autodes k, Inc. v6-052 Hyd. No. 15 Total Post Dev To Point A Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 13, 14 — -- -------- ---- - — - - - - ---------------------------------- Q (Cfs) 10-00 Rvee, To, 2.00 0.00 - 0 300 Hyd No. 15 Aei Tuesday, Nov 20, 2012 Peak discharge = 8,731 cfs Time to peak = 721 min Hyd. volume = 71,250 cuft Contrib. drain. area= 9.930 ac Total Post Dev To Point A Hyd. No. 15 -- 2 Year 600 900 1200 1500 1800 2100 2400 2700 — Hyd No. 13 — Hyd No. 14 0 (Cfs) 1 MO ADD, I. I r-1101 4.00 14 Me, 0.00 3000 Time (min) Hydrograph Report HydrafIow Hydrographs Extension for AutoCAD@ C 3DD 2008 by Autodesk, Inc, v6.052 Hyd. No. 17 Hyd. volume Area B to Wet Pond 1 Curve number = Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 11.760 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.44 in Storm duration = 24 hrs Area B to Wet Pond 1 56 Tuesday, Nov 20, 2012 Peak discharge = 34.17 cfs Time to peak = 718 min Hyd. volume = 68,716 tuft Curve number = 79.6 Hydraulic length = 0 ft Time of conc. (Tc) = 6.30 min Distribution = Type 11 Shape factor = 484 Q (cfs) Hyd. No. 17 -- 2 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 1 S 1 10.00 10.00 5.00 x 5.00 0.00 -.,...11.11,......... —..,,, >. .� , Y. ._. .n. q w.. „. �,. ..�. 0.00 0 120 240 360 480 640 720 840 960 1480 1200 1320 1440 1560 —•..•- Hyd Na. 17 Time (min) Hydregraph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3170 2008 by Autodesk, Inc. v6.052 Hyd. No. 18 Hyd. volume Offsite to Wet Pond Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 1 .350 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.44 in Storm duration = 24 hrs Offsite to Wet Pond 57 Tuesday, Nov 20, 2012 Peak discharge = 4.076 cfs Time to peak = 718 min Hyd. volume = 8,208 cuft Curve number = 80.5 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Q (cfs) Hyd. No. 18 -- 2 Year Q (cfs) 5.00 5M 4.00 4M 3.00 3.00 2.00' 2.00 1 1 1.00 1.00 MO- F,.. ,.,_ .............,� . � „ ., v_.,,. Wu.. _..... M....pN ... ,.,... �r . M� .w 0.0( 0 120 240 360 480 500 720 840 960 1080 1200 1320 1440 1560 ,I.—I Hyd No. 18 Time (min) Hydrograph Report H yd raf I ow H yd rogra phs Extension for A utoC AD@ Civil 3 DO 200 8 by A utodes k, Inc. v6 . 052 Hyd. No. 19 Time to peak = Total to Wet Pond Hyd. volume = Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. -.1-1- - -- ------ ------------------ - = 17, 18 . ............ --- - --------------- ------ Total to Wet Pond 58 Tuesday, Nov 20, 2012 Peak discharge = 38.25 cfs Time to peak = 718 min Hyd. volume = 76,925 cuft Contrib. drain. area= 13.110 ac Q (Cfs) Hyd. No. 19 2 Year 0 (ofs) 40.00 40.00 30.00 MOO 20.00 20.00 10.00 10-00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 19 - Hyd No. 17 - Hyd No. 18 Hydrograph Report HydrafIow Hydrographs Extension for AutoCADO Civil 300 2008 by Autodesk, Inc. v6.052 Hyd. No. 20 Route Wet Pond 1 Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 19 - Total to Wet Pond Reservoir name = Wet Pond 1 Area B Storage Indication method used a (Cfs) 40.00 30.00 20.00 W10111 Route Wet Pond 1 Hyd. No. 20 -- 2 Year Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage 59 Tuesday, Nov 20, 2012 = 1 .476 cfs = 824 min = 59,066 tuft = 308.04 ft = 44,291 tuft 0.00 - f...... ,...w.. _...a�.........,.._.... 0 300 - ...... — Hyd No. 20 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 19 Total storage used = 44,291 cuff Q (Cfs) 40.00 30.00 20.00 10.00 1 0.00 3000 Time (min) Hydrograph Report HydrafIow Hydrographs Extension for AutoCADO Civil 3€ & 2008 by Auto desk, Inc. v6.052 Hyd. No. 21 Hyd. volume Area to Wetland 3 Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 3.870 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.44 in Storm duration = 24 hrs 0 (Cfs) 14M 12.00 10.00 4.00 2.00 MI, � M Area to Wetland 3 Hyd. No. 21 -- 2 Year l�l#1 Tuesday, Nov 20, 2012 Peak discharge = 13.07 cfs Time to peak = 718 min Hyd. volume = 26,527 tuft Curve number = 83.3 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type ll Shape factor = 484 Q (Cfs) 14.00 12.00 10.00 wo IM 901 09 EGI F I E, .....1.,.�..._ E .................�...,.I..�, w,.,..- .....,�..........ti.. ..y.� I 1 3 r ..... ,.r. .:f..: ,..7 O.Qo 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (rain) Hyd No. 21 Hydrograph Report Hydraflow Hydrographs Extension for AuIoCADO Civil 3D@ 2008 by Autodesk, Inc. v6.052 Hyd. No. 22 Hyd. volume Offsite to Wetland 3 Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.350 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.44 in Storm duration = 24 hrs Q (cfs) 2.40 1.00 I li I affslte to Wetland 3 Hyd. No. 22 -- 2 Year 61 Tuesday, Nov 20, 2012 Peak discharge = 1.177 cfs Time to peak = 718 min Hyd. volume = 2,389 tuft Curve number = 83.2 Hydraulic length = 0 €t Time of cone. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 484 120 240 360 480 640 720 840 960 1080 1200 1320 Hyd No. 22 0 (cfs) 2.00 MIIC 0.00 1440 Time (min) x P £fir i' �i �I {gq! 4 t b 120 240 360 480 640 720 840 960 1080 1200 1320 Hyd No. 22 0 (cfs) 2.00 MIIC 0.00 1440 Time (min) Hydrograph Report Hydfat low Hyd ro g rap h s Extension far Au t oCA DO Civil KO) 2008 by Au tode sk, Inc. v6.052 Hyd. No. 23 Total to Wetland 3 Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = . ......... ......................... . ... ... 21, 22 - - -------- Total to Wetland 3 IN 1; Tuesday, Nov 20, 2012 Peak discharge = 14.25 cfs Time to peak = 718 min Hyd. volume = 28,916 cuft Contrib. drain. area= 4.220 ac Q (Cfs) Hyd. No. 23 2 Year 0 (Cfs) 15.00 - 15-00 12.00 - 12.00 9.00 9.00 6.00 6.00 3.00 3-oo O.oO 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 23 — Hyd No. 21 — Hyd No. 22 Hydrograph Report 63 Hyd rat low Hydrographs Extension for AutoCAD® Civil 3M 2008 by Autodesk, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 24 Route Wetland 3 Hydrograph type = Reservoir Peak discharge = 1,981 cfs Storm frequency = 2 yrs Time to peak = 753 min Time interval = 1 min Hyd. volume = 21,400 tuft Inflow hyd. No. = 23 - Total to Wetland 3 Max. Elevation = 290.28 ft Reservoir name = Wetland 3 Area B Max. Storage = 15,409 tuft Storage Indication method used Q (cfs) 15.00 12.00 Yailil ailil eaiI1l Route Wetland 3 Hyd. No. 24 -- 2 Year 0.00 - .._,.w .,..,.._., .._s., W.." ri :�. _ U-� 0 300 600 w Hyd No. 24 900 1200 1500 1800 2100 2400 2700 Hyd No. 23 Total storage used T 15,409 tuft Q (cfs) 15.00 &milf • es, ff-OXITI, 3.00 0.00 3000 Time (min) Hydrograph Report Hyd ra{iow Hyd rographs Extension for Auto CACKD Civic 3DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 25 Hyd. volume Area B Bypass Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 4.390 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.44 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 2.00 X1111 ri aF t Area B Bypass Hyd, No. 25 -- 2 Year M-1 Tuesday, Nov 20, 2012 Peak discharge = 3.543 efs Time to peak = 719 min Hyd. volume = 8,869 cuft Curve number = 61.6 Hydraulic length = 0 ft Time of conc. (Tc) = 7.20 min Distribution = Type 11 Shape factor = 484 120 240 360 480 600 720 840 Hyd No. 25 Q (Cfs) 4.00 welt WiL 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) b 120 240 360 480 600 720 840 Hyd No. 25 Q (Cfs) 4.00 welt WiL 1.00 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Deport Hydrallow Hydrographs Extension for AutoCAD® Civil 31DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 26 Total Post Dev to Point B Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 20, 24, 25 DR Tuesday, Nov 20, 2012 Peak discharge = 3.948 cfs Time to peak = 721 min Hyd. volume = 89,336 cuft Contrib. drain. area= 4.390 ac Total Post Dev to Point B Q (ofs) Hyd. No. 26 -- 2 Year Q (cfs) 4.00 4.00 3.00 0.00 2.00 2 00 1.00 � ' y 1.00 z 0.00 �,,,.......r,Yw .......,w.__...__.H,.,. 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time {miry p „ Hyd No. 26 Hyd No. 20 - Hyd No. 24 - Hyd No. 25 Hydrograph Report Hyd rafIow Hydrog rap hs Extension for AutocADO Civi13 DO 2008 by Aufodesk, Ino. v6.052 Hyd. No. 28 Hyd. volume Area C Post Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 2. 030 ac Basin Slope = 0.0% To method = TR55 Total precip. = 3.44 in Storm duration = 24 hrs. Q (Cfs) 2.00 O Area C Post Hyd. No. 28 -- 2 Year .: Tuesday, Nov 20, 2012 Peak discharge = 1,547 cfs Time to peak = 721 min Hyd. volume = 4,237 cuft Curve number = 81.7 Hydraulic length = ❑ ft Time of cone. (To) = 8.80 min Distribution = Type I Shape factor = 484 w 0 is 120 240 360 480 600 720 840 960 Hyd No. 28 Q (Cfs) 2.00 1.00 _.,.... 0.00 1080 1200 1320 1440 1560 Time (min) i+ r w 0 is 120 240 360 480 600 720 840 960 Hyd No. 28 Q (Cfs) 2.00 1.00 _.,.... 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAQ® Civil "2048 by Autodesk, Inc. v6.052 Hyd. No, 30 Hyd. volume Area D Post Curve number Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.140 ac Basin Slope = 0.0% Tc method = USER Total precip. = 3.44 in Storm duration = 24 hrs Area D Post �1 Tuesday, Nov 20, 2012 Peak discharge = 0.120 cfs Time to peak = 719 min Hyd. volume = 280 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 484 Q (cfs) Hyd. No. 30 -- 2 Year Q (cfs) 0.50 0.45 _ 0.50 0.40 0.45 0.35 0.40 0.30 0.35 0.25 0.30 0.20 0.25 0.20 0.15 0.10 0.15 0.05 0.10 0.05 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 --- Hyd No. 30 Time (min) IMM Hydrograph Summary RepydKtw Hydrographs Extension for AutoCADO Civil 3DO 2008 by Autodesk, Inc. v6.052 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 43.43 1 726 145,855 - - - - -- -- -- -- -• -- -- Area A Pre 2 SCS Runoff 1537 1 723 46,664 - -- - -- - - - - -- Area B Pre (On Site) 3 SCS Runoff 5.325 1 722 14,359 - - - --- ------ - - - --- Offsite to Wet Pond 4 SCS Runoff 2.011 1 717 4,172 - - - - -- - - - -- - -- --- Offsite to Wetland 3 5 Combine 21.61 1 722 65,195 2, 3, 4 - - - - -- - - - - -- Total Adjusted Area 6 Pre 6 SCS Runoff 8.987 1 725 29,088 - - - - -- -•---- - -• --- Area C Pre 7 SCS Runoff 2.219 1 723 6,736 ------ - - - - -- - - - - -- Area D Pre 9 SCS Runoff 66.81 1 722 181,693 - - - - -- ---- -- Area A Post 10 SCS Runoff 85.70 1 718 181,538 - - - - -- -- -• -- -- -• -- Area 6 Post 12 SCS Runoff 63.23 1 718 127,238 - - - - -- -• - - -- - - - - -- Area A to Wetland 2 13 SCS Runoff 23.36 1 720 54,160 - - - - -- - - - - -- ------ Area A Bypass 14 Reservoir 5.312 1 751 111,114 12 291.74 61,887 Route Wetland 2 15 Combine 26.29 1 720 165,274 13,14 - - - - -- --- --- Total Post Dev To Point A 17 SCS Runoff 61.31 1 718 125,357 -•- --- - -- --- ------ Area B to Wet Pond 1 18 SCS Runoff 7.216 1 718 14,808 - - - - -- - - - - -- - - - - -- 0ffsite to Wet Pond 19 Combine 68.53 1 718 140,165 17,18 - - - - -- • - - - -- Total to Wet Pond 20 Reservoir 4.987 1 754 121,571 19 309.21 74,967 Route Wet Pond 1 21 SCS Runoff 22.30 1 717 46,269 - - - - -- - - - - -- - - - - -- Area to Wetland 3 22 SCS Runoff 2.011 1 717 4,172 - - - - -- - - - - -- - - - - -- Offsite to Wetland 3 23 Combine 24.31 1 717 50,441 21,22 - - - - -- ------ Total to Wetland 3 24 Reservoir 6.128 1 725 42,803 23 290.94 24,139 Route Wetland 3 25 SCS Runoff 10.08 1 719 21,821 -- - - -- ------ - - - - -- Area B Bypass 26 Combine 17.54 1 721 186,195 20, 24, 25 - -- --- - -• --- Total Post Dev to Point B 26 SCS Runoff 4.445 1 720 10,400 - - - -•- - -- - -- - -- - -- Area C Post 30 SCS Runoff 0.346 1 718 714 - - - - -- - - - - -- - - - --- Area D Post 09 -116- pre - past- rev.gpw Return Period: 10 Year Tuesday, Nov 20, 2012 Hydrograph Report Hyd raf I ow H ydrog rap h s Extension f or Auto CACIO Civil 31* 2008 by Autodes k, Inc. v8.052 Hyd. No. 1 Area A Pre Hydrograph type = SCS Runoff Storm frequency = 10yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration a (Cfs) 50-00 MM 20.00 10.00 1 min 27.650 ac 0.0% TR55 4.99 in 24 hrs Area A Pre Hyd. No. 1 -- 10 Year LI-Ell Tuesday, Nov 20, 2012 Peak discharge = 43.43 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 726 min 145,855 cuft 62.3 0 ft 19.10 min Type 11 484 Q (Ofs) 50.00 40.00 OIX011 KIKIIII MIXIIIII 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 70 Hydrograph Report Hydrat low Hyd rographs Extension for AutoCA IM Civil 3dCR) 2006 by Au lodes k, Eno. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 2 Area 6 Pre (On Site) Hydrograph type = SCS Runoff Peak discharge = 15.37 cfs Storm frequency = 10 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 46,664 cuft Drainage area = 11.430 ac Curve number = 57.4 Basin Slope = 0,0% Hydraulic length = 0 ft Tc method = TR55 Time of cone. (Tc) = 14.50 min Total precip. = 4.09 in Distribution = Type Il Storm duration = 24 hrs Shape factor = 484 Q (cfs) 18.00 15.00 12.00 11 ■ 11 3.00 1 11 Area B Pre (On Site) Hyd. No. 2 -- 10 Year Q (cfs) 18.00 I&IIiI1] 12.00 01181 6.00 3.00 0.00 124 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 i i ,3 i � a Q (cfs) 18.00 I&IIiI1] 12.00 01181 6.00 3.00 0.00 124 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 2 Hydrograph Report HydrafIow Hyd rographs Extension for AutoCADO Civi13 DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 3 Hyd. volume = Offsite to Wet Pond Curve number Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 1.354 ac Basin Slope = 0.0% Tc method = USER Total precip. = 4.99 in Storm duration = 24 hrs Q {cfs} 6.00 5.00 EK0101 001 r i 1.00 0 of t Off site to Wet Pond Hyd. No. 3 -- 10 Year 71 Tuesday, Nov 20, 2012 Peak discharge = 5.325 cfs Time to peak = 722 min Hyd. volume = 14,359 cuft Curve number = 80.5 Hydraulic length = 0 ft Time of conc. (Tc) = 14.50 min Distribution = Type 11 Shape factor = 484 Q (cfs) 6.00 61 4.00 Mrs, 1 WiIi afff w...r..w.._ ., _..........., .... _........ w.,..N_..,_.,. 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Z3 S5 9 Z 7L ) i J '�... Q (cfs) 6.00 61 4.00 Mrs, 1 WiIi afff w...r..w.._ ., _..........., .... _........ w.,..N_..,_.,. 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hydrograph Report Hydraf low Hyd rog rap h s Extension for AutoGA DO C ivi I 3DO 2008 by Autod e sk. Inc. v6,052 Hyd. No. 4 Hyd. volume = Offsite to Wetland 3 Curve number Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = I min Drainage area = ❑.35❑ ac Basin Slope = 0.0% Tc method = USER Total precip. = 4.99 in Storm duration = . . ... ............... 24 hrs .......................... a (Cfs) 3.00 0601 1.00 offsite to Wetland 3 Hyd. No. 4 -- 10 Year 72 Tuesday, Nov 20, 2012 Peak discharge = 2.❑11 cfs Time to peak = 717 min Hyd. volume = 4,172 cuft Curve number = 83.2 Hydraulic length = ❑ ft Time of conc. (Tc) = 5.❑❑ min Distribution = Type 11 Shape factor — - - --- ---------------------------- = 484 - 0.00 -1 0 120 240 360 480 600 720 840 960 Hyd No. 4 0 (Cfs) 3.00 wort, Will] 0.00 1080 1200 1320 Time (min) Hydrograph Report Hydra #low Hyd rographs Extension for AutoCADO Civil 3D@ 2008 by Autodesk, Inc. v6.052 Hyd. No. 5 Total Adjusted Area 6 Pre Hydrograph type = Combine Storm frequency = 1 p yrs Time interval = 1 min Inflow hyds. = 2, 3, 4 73 Tuesday, Nov 20, 2012 Peak discharge = 21.51 cfs Time to peak = 722 min Hyd. volume = 65,195 tuft Contrib. drain. area= 13.136 ac Total Adjusted Area B Pre a (cfs) Hyd. No. 5 -- 10 Year Q (Cfs) 24.00 24.00 20,00 20.40 s t s 16.00 16.00 12.00 12.00 8.00 8.00 .I s� 4.00 4.00 0.00 ............. ... .... 0.00 0 120 240 360 480 600 720 840 950 1080 1200 1320 1444 1560 Time (min) Hyd No. 5 Hyd No. 2 - Hyd No. 3 Hyd No. 4 Hydrograph Report H yd raf I ow H yd rog rap h s Extension to r Auto C A DO Civil 3 DR) 2008 by Autod e S k, Inc. v6.052 Hyd. No. 6 Hyd. volume Area C Pre Curve number Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 6.130 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.99 in Storm duration = 24 hrs Area C Pre 74 Tuesday, Nov 20, 2012 Peak discharge = 8.987 cf s Time to peak = 725 min Hyd. volume = 29,088 tuft Curve number = 60.4 Hydraulic length = 0 ft Time of conc. (Tc) = 18-50 min Distribution = Type II Shape factor = 484 Q (Cfs) Hyd. No. 6 -- 10 Year 0 (Cfs) 10.00 10-00 8.00 . .. .......... ... - - 8.00 6.00 InL 6.00 4.00 .............. ..... 4.00 2.00 2.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hyd rog raph Report Hyd rafIow Hydrographs Extension for AutoCADO Civil 3i@ 2008 by Autodesk, Inc. v6,052 Hyd. No. 7 Area D Pre Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (cfs) 3.00 2.00 196111 1 min 1.650 ac 0.0% TR55 4.99 in 24 hrs Area D Pre Hyd. No. 7 -- 10 Year 75 Tuesday, Nov 20, 2012 Peak discharge = 2.219 cfs Time to peak = 723 min Hyd. volume = 6,736 cuft Curve number = 57.4 Hydraulic length = ❑ ft Time of conc. (Tc) = 13.60 min Distribution = Type II Shape factor = 484 �J 120 240 360 480 600 720 840 960 — Hyd No. 7 Q (cfs) 3.00 4 Me 1.00 0.00 1080 1200 1320 1440 1560 Time (min) 3 3 �J 120 240 360 480 600 720 840 960 — Hyd No. 7 Q (cfs) 3.00 4 Me 1.00 0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrog rep hs Extension for AMOADO Civii 3D@ 2008 by Autodesk, Inc. v8.052 Hyd. No. 9 Hyd. volume Area A Post Curve number Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval .= 1 min Drainage area = 24.670 ac Basin Slope = 0.0% Tc method = USER Total precip. = 4.99 in Storm duration = 24 hrs Q (cfs) 70.00 F e M Q-101 1016111 Area A Post Hyd. No. 9 -- 10 Year 76 Tuesday, Nov 20, 2012 Peak discharge = 66.81 cfs Time to peak = 722 min Hyd. volume = 181,693 tuft Curve number = 70 Hydraulic length = ❑ ft Time of conc. (Tc) = 14.90 min Distribution = Type 11 Shape factor = 484 all, Q (cfs) 70.00 ;:Ii181 50.00 4 O II II Ce IMIC 10.00 N., ,. ......,.r.,,,.N.. _ 0,00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No, 9 f 4 5 3� z. a F � 7 {3x Y 3 � ; 3 all, Q (cfs) 70.00 ;:Ii181 50.00 4 O II II Ce IMIC 10.00 N., ,. ......,.r.,,,.N.. _ 0,00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No, 9 Hydrograph Report Hyd rat low Hydrog rep hs Extension for Auto CADO CiviI 3DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 10 Area B Post Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 1 min 20.020 ac 0.0% USER 4.99 in 24 hrs rri Tuesday, Nov 20, 2012 Peak discharge = 85.70 cfs Time to peak = 718 min Hyd. volume = 181,538 tuft Curve number = 76.4 Hydraulic length = 0 ft Time of cone. (Tc) = 7.20 min Distribution = Type 11 Shape factor = 484 Area B Post Q (cfs) Q (cfs) Hyd. No. 10 -- 10 Year 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.40 10.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. � o Time (min) ,a...,.M,..� i .... .......... .... �t fi �� y''W�� s%; .. a•Hynr.. ..w...ry,• � . ..... ................r ie.r.,......�........, ....... ....................r.....r..., ........... ! »•n.•�.. ,. .. . Z- :r»..w- ....�.�... 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.40 10.00 0 00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. � o Time (min) ,a...,.M,..� Hydrograph Report . . .. . .. .... ...................... . Hydraf low H yd rogra phs Extension to r AutoCA D Oa Civil 3 D@) 2008 by Autod es k, I ric. v6.052 Hyd. No. 12 Area A to Wetland 2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 14.740 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.99 in Storm duration = .............. 24 hrs ------------ Area A to Wetland 2 W*1 Tuesday, Nov 20, 2012 Peak discharge = 63.23 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 718 min 127,238 tuft 73.4 ❑ ft 6.40 min Type 11 484 0 jCfs) Hyd. No. 12 10 Year Q (Cfs) 70.00 70.00 60.00 60.00 50.00 50-00 40.00 M 40.00 a. 3 30.00 0.00 20.00 20.00 10.00 10,00 0.00 0,00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 ,-- Hyd No. 12 Time (min) — Hydrograph Report Hydraflow Hyd rographs Extension for AutoCAQO Civil 3D@ 2008 by Autodesk, inc. v6.052 Hyd. No. 13 Hyd. volume Area A Bypass Curve number Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 9,930 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.99 in Storm duration = 24 hrs 0 (cfs) 24,00 M191181 IM11f] M 4M Area A Bypass Hyd. No. 13 -- 10 Year 79 Tuesday, Nov 20, 2012 Peak discharge = 23.36 efs Time to peak = 720 min Hyd. volume = 54,160 tuft Curve number = 63 Hydraulic length = 0 ft Time of cork. (Tc) = 9.80 min Distribution = Type 11 Shape factor = 484 0 (cfs) 24M 20.00 i M0rli 12.00 M 4.00 0.00 ur ... „ 0.00 0 120 240 360 480 600 720 840 960 1084 1200 1320 1440 1550 --- Hyd No. 13 Time (min) x, 1 0 (cfs) 24M 20.00 i M0rli 12.00 M 4.00 0.00 ur ... „ 0.00 0 120 240 360 480 600 720 840 960 1084 1200 1320 1440 1550 --- Hyd No. 13 Time (min) Hydrograph Report Io] Hydraf low Hydrographs Extension for AutoCAD(D Civil 300 2008 by Autodesk, Inc. vG.052 Tuesday, Nov 20, 2012 Hyd. No. 14 Route Wetland 2 Hydrograph type = Reservoir Peak discharge = 5.312 cf s Storm frequency = 10 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 111,114 tuft Inflow hyd, No. = 12 - Area A to Wetland 2 Max. Elevation = 291,74 ft Reservoir name = Wetland 2 Area A Max. Storage = 61,887 tuft Storage Indication method used Route Wetland 2 Q (Cfs) Hyd. No. 14 -- 10 Year Q (Cfs) 70.00 70.00 MOO 60-00 50.00 50.00 40.00 40.00 30,00 30-00 20-00 20.00 10.00 10.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time {mire} Hyd No. 14 - Hyd No. 12 Total storage used = 61,887 tuft Hydrograph Report Hyd rafIow Hyd rog rap hs Extension for AutoCAD@ Civil 3DO 2008 by Autodesk, Inc. v6.052 Hyd. No, 15 Total Post Dev To Point A Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 13, 14 Q (ofs) 28.00 N M 20.00 16.00 12.00 1:11+I7 :10#1 81 Tuesday, Nov 20, 2012 Peak discharge = 26.29 cfs Time to peak = 720 min Hyd. volume = 165,274 tuft Contrite. drain, area= 9.930 ac Total Post Dev To Point A Hyd. No. 15 -- 10 Year 180 360 Hyd No. 15 Q (Cfs) 28.00 MKiIWI MI ti t: f[• t C 12.00 AM • m ._... _...... w 0.00 540 720 900 1080 1260 1440 1620 1800 --- Hyd No. 13 - Hyd No. 14 Time (mite) i . ... ...... 1 'z a� z 180 360 Hyd No. 15 Q (Cfs) 28.00 MKiIWI MI ti t: f[• t C 12.00 AM • m ._... _...... w 0.00 540 720 900 1080 1260 1440 1620 1800 --- Hyd No. 13 - Hyd No. 14 Time (mite) Hydrograph Report Hydraf low Hydrographs Extension for AutoCADO Civi13 DO 2008 by Auto desk, Inc. v6.052 Hyd. No. 17 Area B to Wet Pond 1 Hydrograph type = SCS Runoff Storm frequency = 1 ❑ yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (cfs) 70.00 50.00 40.00 MOO q1 11 IIIXIIl7 MI,M 1 min 11.76❑ ac 0.0% TR55 4.99 in 24 hrs. 120 240 360 Hyd No. 17 i:1 Area B to Wet Pond 1 Hyd. No. 17 -- 10 Year RM Tuesday, Nov 20, 2012 Peak discharge = 61.31 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 718 min 125,357 tuft 79.6 ❑ ft 6.30 min Type 11 484 Q (Cfs) 70.00 ■11! M118141#1 a 1 !I#' 30.00 20.00 10.00 -. _....—......:..:�.�:.......�- ,,..,— - 600 720 840 960 1000 1200 1320 1440 Time (min) Hydrograph Report Hydraf [ow H yd rog rap h s Extension for Auto CADO Civil 3DO 2008 by A utodes k, Inc. v6.062 Hyd. No, 18 Offsite to Wet Pond Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 1 min 1.350 ac 0.0% USER 4.99 in 24 hrs Offsite to Wet Pond 83 Tuesday, Nov 20, 2012 Peak discharge = 7.216 cfs Time to peak = 718 min Hyd. volume = 14,808 tuft Curve number = 80.5 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type [I Shape factor = 484 Q (Cfs) Hyd. No. 18 -- 10 Year Q (Cfs) 8.00- 8.00 6.00 6.00 4 4,00 .00 2.00--- 2.00 0.0() 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 18 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3DO 2008 by Autodesk, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 19 Total to Wet Pond Hydrograph type = Combine Peak discharge = 68.53 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 140,165 cuft Inflow hyds. = 17, 18 Contrib. drain. area= 13.110 ac Total to Wet Pond a (Cfs) a (Cfs) Hyd. Na. 19 -- 10 Year 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 t 20.00 20.00 10.00 10.00 0.00 m 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) W° Hyd No. 19 Hyd No. 17 Hyd No. 18 Hydrograph Report i Hyd ratlow Hyd rog rap hs Extension for AutoCA00) Civi13 M 2008 by Autodesk, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 20 Route Wet Pond 1 Hydrograph type = Reservoir Peak discharge = 4.987 cfs Storm frequency = 10 yrs Time to peak = 754 min Time interval = 1 min Hyd. volume = 121,571 tuft Inflow hyd. No. = 19 - Total to Wet Pond Max. Elevation = 30921 ft Reservoir name = Wet Pond 1 Area B Max. Storage = 74,967 cuft Storage Indication method used. Route Wet Pond 1 Q (cfs) Hyd. No. 20 -- 10 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2440 2700 3000 Time (min) —•° -- Hyd No. 20 Hyd No. 19 Total storage used = 74,967 tuft Hydrograph Report Hyd rafIow Hydrog rap hs Extension for AutoCAD© Civi13 DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 21 Hyd. volume Area to Wetland 3 Curve number Hydrograph type = SCS Runoff Storm frequency = 18 yrs Time interval = 1 min Drainage area = 3.878 ac Basin Slope = 0.0% Tc method = USER Total precip. = 4.99 in Storm duration = 24 hrs Q (Cfs) 24.00 f Area to Wetland 3 Hyd. No. 21 -- 10 Year 20.00 16.00 12.00 TillI. 4.00 Bill 120 240 Hyd No. 21 360 480 600 Tuesday, Nov 20, 2012 Peak discharge = 22.30 cfs Time to peak = 717 min Hyd. volume = 46,269 tuft Curve number = 83.3 Hydraulic length = 0 ft Time of conc. (Tc) = 5,00 min Distribution = Type 11 Shape factor = 484 Q (Cfs) 24.00 IKiXiZ6] 1 6.00 NIM0I #1 OR 4.00 0.00 720 840 960 1080 1200 1320 Time (rain) Hy+drograph R Report T Tuesday, Nov 20, 2012 hs extension for AutoC ADO Civil 3D® 2005 by Auto desk, Ono. v6.052 r h Hyd. No. 22 of #site to Wetland 3 3 p peak discharge 2 2.011 cfs Hydrograph type = = 5CS Runoff = Time to peak = = 717 min Storm frequency = = W yrs H Hyd. volume ^ ^ 83.2 Time interval = = 1 Hydraulic length = = 0 It Drainage area = = 0.0 °o T Time of conc. tTc3 5 5.00 min Tc method = =USER D Distribution � � 484 Total precip. _ Q (Of S) 3.00 2.0( 1.1 {,.uw 0 120 240 snu ,.. offsite to Wetland 3 , R - ),) __ i n Year C) (cfs) a nr) ..row Hyd No. 22 11 11 0.00 :0 -ime (rr Hydrograph Report Hydratlow Hydrographs Extension for AutoCADO Civil 3D& 2008 by Autodesk, Inc. v6.052 Hyd. No. 23 Total to Wetland 3 Hydrograph type = Combine Storm frequency = 10 Yrs Time interval = 1 min Inflow hyds. .^ _N 21' H22___._.._ _._..___._______.�___.________. Q (cis) 28.00 24.00 016 4 16.40 12.01 8.f 4.1 O.vv 240 36U y.av 0 120 Hyd No. 23 Hyd No. 21 Hyd No. 22 Total to Wetland 3 W,A No, 23 -- 1 o Year Tuesday, Nov 20, 2012 Peak discharge w 24.31 cfs Time to peak = 717 min Hyd. volume = 50,441 tuft Contrib. drain. area= 4220 ac Q (cfs) no fld ME OR MEN 12.00 MOM FIKI 0.00 0 l lrlie (111, Hydrograph Report Tuesday, Nov 24, 2012 dra ra hs extension far AutoCA� Civil 3bC�3 2046 by Autodesk, Mc, v6•452 Hydraflow HY 9 Hyd. No. 24 6.128 cfs Route Wetland 3 Peak discharge Time to peak = = 725 min Hydrograph type = Reservoir '10 yrs Hyd. volume y 42,803 cuft 293.94 ft Storm frequency Time interval _ 1 min 23 _ Total to Wetland 3 Max. Elevation Max. Storage = = 24,139 tuft Inflow hyd. No. = = Wetland 3 Area Reservoir name Storage indication method used. Q (c #s) 2$.00 24.00 20.00 16.01 12.( E:3 L Route Wetland 3 -1 i n Vnar 0 (cis) no M u.Lry ISO Skit) •,� •• 0ota1 storage used = 24,139 cu ft Hyd No. 24 Hyd No. 23 J 56141 ffllt= 2.00 4,00 f Hydrograph Report Hydraf low H yd rogra phs E xto nsi on for A u toC A DO Civil 3 DO 2008 by Auto desk, Inc. v6.052 Hyd. No. 25 Hyd. volume = Area B Bypass Curve number = Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 4.390 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.99 in Storm duration .......... = 24 hrs ---------- Area B Bypass PEI - Tuesday, Nov 20, 2012 Peak discharge = 10.08 cfs Time to peak = 719 min Hyd. volume = 21,821 tuft Curve number = 61,6 Hydraulic length = 0 ft Time of conc. (Tc) = 7.20 min Distribution = Type I I Shape factor = 484 Q (Cfs) Hyd. No. 25 10 Year 0 (Cfs) 12.00 12.00 10-00 10.00 8.00 8.00 6-00- 6.00 4.00 4M 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 —1.111— Hyd No. 25 Time (min) 1 Hydrograph Report Hydraflow Hyd rog rap hs Extension for AutoCADOO Civil 3tY7.R 2008 by Autodesk, Inc, v6.052 Hyd. No, 26 Total Post Dev to Point B Hydrograph type = Combine Storm frequency = 1 Q yrs Time interval = 1 min Inflow hyds. = 20, 24, 25 a Tuesday, Nov 20, 2012 Peak discharge = 17.54 cfs Time to peak = 721 min Hyd. volume = 186,195 cuff Contrib. drain, area= 4.390 ac Total Post Dev to Point B Q (cfs) Hyd. No. 26 -- 10 Year Q (cfs) 18.00 18.40 15.00 1 5.00 12.00 12M 9.00 9.00 9 S 6.00 a 6.00 4 3.00 3.00 �v 0.00 - ,...r........_ .... .....r.,,,,.,,..,,.� 0.00 0 240 480 724 960 1200 1440 1684 1920 2160 2400 2640 Time (rain) m rc Hyd No. 26 Hyd No. 20 . Hyd No. 24 Hyd No. 25 Hydrograph Report Hydraflow Hyd rograph9 Extension far Auto0ADD Civi13 DO 2008 by Autodesk, ino. ve.052 Hyd. No. 28 Hyd. volume Area C Post Curve number Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 2.030 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 4.99 in Storm duration = 24 hrs Q {cfs} 5.00 WX 3.00 Will] 1.00 0.00 0 Area C Post Hyd. No. 28 -- 10 Year Tuesday, Nov 20, 2012 Peak discharge = 4.445 cfs Time to peak = 720 min Hyd. volume = 10,400 cuft Curve number = 61.7 Hydraulic length = 0 ft Time of cone. (Tc) = 8.80 min Distribution = Type II Shape factor = 484 Q {cfs} 5.00 4.00 001 tr 1.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 28 Time (min) Hydrograph Report H yd raf I ow H yd rog rap hs Extension f o r AutoCACIO Civic 3 DR) 2008 by Autod es k, t ric. vG .052 Hyd. No. 30 Hyd. volume = Area D Post Curve number = Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.140 ac Basin Slope = 0.0% Tc method = USER Total precip. = 4.99 in Storm duration -.1 ...... . ............... = 24 hrs Area D Post M Tuesday, Nov 20, 2012 Peak discharge = 0.346 cf s Time to peak = 718 min Hyd. volume = 714 cuff Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type 11 Shape factor - -------- ----------- ------------ = 484 Q (cf S) Hyd. No. 30 10 Year a (Ofs) 0.50 - 0.50 0.45 0.45 0.40 - 0.40 0.35 - ..... . 0.35 0.30 0.30 0.25 0.25 0.20 - - 0.20 11�1 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - 0,00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 30 �I! Hydrograph Summary RePPy ow Hydrographs Extension for Auto CAMCivi1 3DO2008 by Autodesk, Inc. v6.052 Hyd. No. Hydrograph type (origin) Peak flow (efs) Time interval (min) Time to peak (min) Hyd. volume {cult} Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 SCS Runoff 99.19 1 725 314,141 - - - -_ - - - - -- Area A Pre 2 SCS Runoff 39.51 1 723 108,867 - - - - -- - - - - -- - - - - -- Area B Pre (On Site) 3 SCS Runoff 9.149 1 722 25,098 - -• -• -- Offsite to Wet Pond 4 SCS Runoff 3.335 1 717 7,113 - - - - -- - - - - -- - -- - -- Offsite to Wetland 3 5 Combine 50.53 1 722 141,078 2, 3, 4 - - - - -- - - - - -- Total Adjusted Area B Pre 6 SCS Runoff 21.38 1 724 64,497 - - - - -- - - .... - ----- Area C Pre 7 SCS Runoff 5.703 1 723 15,716 - - - - -- - - - - -- -- -- -- Area 0 Pre 9 SCS Runoff 131.68 1 722 354,029 - - - - -- - - - - -- ---- -- Area A Post 10 SCS Runoff 153.29 1 718 330,177 - - - - -- - - - - -- - - - - -- Area B Post 12 SCS Runoff 116.40 1 718 238,723 -- - --- - -- --- - - -- -- Area A to Wetland 2 13 SCS Runoff 51.03 1 720 115,468 - - - - -- - - - - -- --- - -- Area A Bypass 14 Reservoir 62.19 1 723 222,237 12 292.93 93,244 Route Wetland 2 15 Combine 109.59 1 721 337,705 13,14 - - - - -- - - - - -- Total Post Dev To Point A 17 SCS Runoff 10546 1 717 220,979 - - - - -- - - - - -- - - - -- Area 8 to Wet Pond 1 18 SCS Runoff 1230 1 717 25,883 - - - - -- -• - - -- - - - - -- Offsite to Wet Pond 19 Combine 117.76 1 717 246,861 17,18 - -•••- - -- --- Total to Wet Pond 20 Reservoir 40.94 1 724 227,697 19 31032 118,403 Route Wet Pond 1 21 SCS Runoff 36.94 1 717 78,819 - - - - -- -- -- -- - - - - -- Area to Wetland 3 22 SCS Runoff 3,335 1 717 7,113 - -• -• -- ----•- Off site to Wetland 3 23 Combine 40.27 1 717 65,932 21, 22 - - - - -- - - - - -- Total to Wetland 3 24 Reservoir 27.12 1 721 78,213 23 291,57 33,520 Route Wetland 3 25 SCS Runoff 22.52 1 719 47,492 - - -- -- - - - --- -- - - -- Area B Bypass 26 Combine 82.15 1 722 353,402 20, 24, 25 - - - - -- - - - - -- Total Post Dev to Point B 28 SCS Runoff 9.982 1 720 22,601 - - - - -- - - - - -- - - - - -- Area C Post 30 SCS Runoff 0.781 1 718 1,569 - - - - -- - - - - -- - ---- Area D Post 09- 116- pre - past- rev.gpw Return Period: 100 Year Tuesday, Nov 20, 2012 Hydrograph Report H yd raf I ow Hyd rogra ph 9 Extension for A uloCADO C M 13 49 2008 by A uto de sk, I nc. v6.052 Hyd. No. 1 Area A Pre Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (Cfs) 100.00 :1 1 C .1 ii 40.00 20.00 0.00 0 120 240 1-1,11,-" Hyd No. 1 I min 27.650 ac 0.0% TR55 7.40 in 24 hrs Area A Pre Hyd. No, 1 -- 100 Year �'1- Tuesday, Nov 20, 2012 Peak discharge = 99.19 cf s Time to peak Hyd. volume Curve number Hydraulic length Time of cone, (Tc) Distribution Shape factor 725 min 314,141 craft 62.3 0 ft 19.10 min Type 11 484 Q (Cfs) 100.00 it 11 r, D6141114j, HIMIJ 000141 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report H yd raf low Hyd rog rap h s Extension for AutoCA DO Civil 3 DQD 2008 by A u todesk, Inc. v6.052 Hyd. No. 2 Area B Pre (On Site) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 11.430 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 7.40 in Storm duration = 24 hrs Q (Cfs) 40.00 20.00 10.00 Area B Pre (On Site) Hyd. No. 2 -- 100 Year M. Tuesday, Nov 20, 2012 Peak discharge = 39.51 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 723 min 108,867 cuft 57.4 0 ft 14.50 min Type 11 484 Mo — 0 120 240 360 480 600 720 840 Hyd No. 2 Q (Cfs) 40.00 30.00 20.00 Wiff 0.00 960 1080 1200 1320 1440 1560 Time (min) . . ......... Mo — 0 120 240 360 480 600 720 840 Hyd No. 2 Q (Cfs) 40.00 30.00 20.00 Wiff 0.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutaCAD& Civil 3130 2008 by Autodesk, Inc. v6.052 Hyd. No. 3 Hyd. volume = offsite to Wet Pond Curve number = Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 1.350 ac Basin Slope = 0.0% Tc method = USER Total precip. = 7.40 in Storm duration = 24 hrs Q (cfs) 10.00 F-111001 N. f: 4.00- 2.00 - Offsite to Wet Pond Hyd. No. 3 -- 100 Year Tuesday, Nov 20, 2012 Peak discharge = 9.149 cfs Time to peak = 722 min Hyd. volume = 25,098 cuft Curve number = 80.5 Hydraulic length = 0 ft Time of cone. (Tc) = 14.50 min Distribution = Type 11 Shape factor = 484 Q {cfs} - 10.00 'W:31#I11 - 6.40 - 4.00 - 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 �..,w, Hyd No. 3 Time (min) .f 3 5 x ? 3; s �1 Q {cfs} - 10.00 'W:31#I11 - 6.40 - 4.00 - 2.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 �..,w, Hyd No. 3 Time (min) Hydrograph Report Hyd rafIow Hydrog rap hs Extension for AutoCADO Civil 3DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 4 Offsite to Wetland 3 Hydrograph type = SCS Runoff Storm frequency = 100 yrs. Time interval = 1 min Drainage area = 0.350 ac Basin Slope = 0.0% Tc method = USER Total precip. = 7.40 in Storm duration = 24 hrs Q (cfs) 4.00 3.00 W1111s 1.00 - Qffsite to Wetland 3 Hyd. No. 4 -- 100 Year Tuesday, Nov 20, 2012 Peak discharge = 3.335 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of cone. (Tc) Distribution Shape factor 717 min 7,113 cuft 83.2 0 ft 5.00 min Type 11 484 0.00 --... n........,.,,... �...,,....._.........,,.,...... 0 120 244 u.,......,.., Hyd No. 4 360 480 600 720 840 960 Q (Cfs) - 4.00 WRIC =iI ;] - 1.00 0.00 1080 1200 1320 Time (min) i 0.00 --... n........,.,,... �...,,....._.........,,.,...... 0 120 244 u.,......,.., Hyd No. 4 360 480 600 720 840 960 Q (Cfs) - 4.00 WRIC =iI ;] - 1.00 0.00 1080 1200 1320 Time (min) MO Hydrograph Report H Yd raf I ow Hydrog rap h $ Extension f or AutoCA DO Q vi 13 DO 2008 by Autod es k, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 5 Total Adjusted Area B Pre Hydrograph type = Combine Peak discharge = 50.53 cfs Storm frequency = 100yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 141,078 cuft Inflow hyds. = 2, 3, 4 --------------- - ---------------- --- — - -------------- - . ....... -.1-1--l-1-1-11— ----------------- Contrib. drain. area= 13.130 ac Total Adjusted Area B Pre 0 (Cfs) Hyd. No. 5 100 Year Q (Cfs) 60.00 MOO 50-00 50.00 40.00 40.00 30-00 30.00 20.00 20.00 10-00 5 10.00 0.00 O.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 - Hyd No. 2 - Hyd No. 3 - Hyd No. 4 Time (min) Q (cfs) 24,00 KIIIIII IM- 4n Oi ., O E Area C Pre Hyd. No. 6 -- 100 Year Q (cfs) 24.00 Kil +Ii] WMIM IM1101 +F t O 0.00 -- s„ w.....,_,n.,, .! ........ .............! ..,..u. _. ,..,:,.L.........,...,. . .. ........ ... .t... I I I I I i r M....., 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) goo Hydrograph Report HydrafIow Hydrographs Extension for AutoCAD® Civil 3D© 2008 by Autodesk, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd, No. S Area C Pre Hydrograph type = SCS Runoff Peak discharge = 21.38 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 64,497 cuft Drainage area = 6.130 ac Curve number = 66.4 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 18.50 min Total precip. = 7.40 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 24,00 KIIIIII IM- 4n Oi ., O E Area C Pre Hyd. No. 6 -- 100 Year Q (cfs) 24.00 Kil +Ii] WMIM IM1101 +F t O 0.00 -- s„ w.....,_,n.,, .! ........ .............! ..,..u. _. ,..,:,.L.........,...,. . .. ........ ... .t... I I I I I i r M....., 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report Hyd raf low H yd rog raph s Extension for A u t oCA DO Civil 3D® 2008 by Auto desk, I n C. v6.052 Hyd. No. 7 Area D Pre Hydrograph type = SCS Runoff Storm frequency = 100 yrs. Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 1 min 1.650 ac 0.0% TR55 7.40 in 24 hrs Area D Pre 101 Tuesday, Nov 20, 2012 Peak discharge = 5.703 cfs Time to peak = 723 min Hyd. volume = 15,716 tuft Curve number = 57.4 Hydraulic length = 0 ft Time of conc. (Tc) = 13.60 min Distribution = Type 11 Shape factor = 484 Q (Cfs) Hyd. No. 7 100 Year Q (Cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 ---L -------- L 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 ---:-- Hyd No. 7 Time (min) Hydrograph Report Hydraf low Hydrographs Extension for Au too ADO Civi13 DO 2008 by Auto desk, Inc. v6.052 Hyd. No. 9 Area A Post Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 24.670 ac Basin Slope = 0.0% To method = USER Total precip. = 7.40 in Storm duration = 24 hrs Q (cfs) 140.00 120.00 100M :1 it F-101011 KIIIIil 9ililll Area A Post Hyd. No. 9 -- 100 Year ,s 3� 5 3 R 102 Tuesday, Nov 20, 2012 Peak discharge = 131.68 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (To) Distribution Shape factor 722 min 354,029 tuft 70 0 ft 14.90 min Type 11 484 Q (cfs) 140.40 MKIIIII] 140.00 :1 11 Wil]flll] 40.00 20.00 fIT1T1 t � � D 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Y� Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydroyraphs Extension for AutoCADO Civil 3DO 2008 by Autodesk, Inc. v6.052 Hyd. No. 10 Area B Post Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 20.020 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 7.40 in Storm duration = 24 hrs Q (cfs) 1 60.00 140.00 Mixel iI110181 1.018181 60.00 40.00 �1 1 ti Area B Post Hyd. No. 10 -- 100 Year 103 Tuesday, Nov 20, 2012 Peak discharge = 153.29 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of cone. (Tc) Distribution Shape factor 718 min 330,177 tuft 75.4 0 ft 7.20 min Type 11 484 Q (cfs) 160M 140.00 M1111] f ti tip :� of 60.00 40.00 20.00 0.00 w N.......,., n.,.. 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 r.,,.. Hyd No. 10 Time (min) a i 3 ) G k Y Q (cfs) 160M 140.00 M1111] f ti tip :� of 60.00 40.00 20.00 0.00 w N.......,., n.,.. 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 r.,,.. Hyd No. 10 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2008 by Autodesk, Inc, v6.052 Hyd. No, 12 Hyd. volume Area A to Wetland 2 Curve number Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 14.740 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 7.40 in Storm duration = 24 hrs Q (ef S) 120.00 110114111 r*6 - 14111 11 11*00111 5 Area A to Wetland 2 Hyd. No. 12 -- 100 Year 104 Tuesday, Nov 20, 2012 Peak discharge = 116.40 cfs Time to peak = 718 min Hyd. volume = 238,723 tuft Curve number = 73.4 Hydraulic length = 0 ft Time of conc. (TO = 6.40 min Distribution = Type 11 Shape factor --------------- = 484 0.00 -1-1-111 . . .... 0 120 240 360 -- Hyd No. 12 MX Q (Cfs) 120.00 100.00 041-3 M#$ 0.00 600 720 840 960 1080 1200 1320 1440 Time (min) Hydrograph Report Hydra f low Hyd ro g rap h s Ex le i i s io ii for AutuCADO Civil 3 DD 2008 by Aulude s k' 1110, v6.052 Hyd. No. 13 Area A Bypass Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (Cfs) WOO 50.00 KIIIIII 30.00 20.00 10.00 1 min 9.930 ac 0.0% TR55 7.40 in 24 hrs Area A Bypass Hyd. No. 13 -- 100 Year 105 Tuesday, Nov 20, 2012 Peak discharge = 51.03 cfs Time to peak = 720 min Hyd. volume = 115,468 cuft Curve number = 63 Hydraulic length = 0 ft Time of conc. (Tc) = 9.80 min Distribution = Type 11 Shape factor = 484 i0i Q (Cfs) MOO "0 Of, HIMIT41 e 0=4 60 KIXIIII i - 0,00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd Na. 13 Time (min) . . ..... .......... - J---- A-- i0i Q (Cfs) MOO "0 Of, HIMIT41 e 0=4 60 KIXIIII i - 0,00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd Na. 13 Time (min) Hydrograph Report 106 HydrafIow Hydro graphs Extension for AutuCADO Civil 3D@ 2008 by Autodesk, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 14 Route Wetland 2 Hydrograph type = Reservoir Peak discharge = 62.19 cfs Storm frequency = 190 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 222,237 cuft Inflow hyd. No. = 12 - Area A to Wetland 2 Max. Elevation = 292.93 ft Reservoir name = Wetland 2 Area A Max. Storage = 93,244 cuft Storage Indication method used Q (cfs) 120.00 100.00 t ri ri 40.00 Q X ! li Route Wetland 2 Hyd. No. 14 -- 100 Year 180 360 540 720 900 1080 1260 1440 Hyd No. 14 Hyd No. 12 Total storage used T 93,244 tuft Q (cfs) 120.00 i1@110111 ;: - ti O, 40.00 20.00 0.00 1620 Time (min) r G Ep S 180 360 540 720 900 1080 1260 1440 Hyd No. 14 Hyd No. 12 Total storage used T 93,244 tuft Q (cfs) 120.00 i1@110111 ;: - ti O, 40.00 20.00 0.00 1620 Time (min) Hydrograph Report Hydrailow Hydrograph9 Extension for AutoGADCP) Civil 3D® 2000 by Autodesk, Inc. v6.052 Hyd. No. 15 Time to peak = Total Post Dev To Point A Hydrograph type = Combine Storm frequency = 100 yrs Time interval = t min Inflow hyds. = 13, 14 Q (cfs) 120A0 =14 n .i# !f 60.00 H010161 aiI +L WIN Tuesday, Nov 20, 2012 Peak discharge = 109.59 cfs Time to peak = 721 min Hyd. volume = 337,705 tuft Contrib. drain. area= 9.930 ac Total Post Dev To Point A Hyd. No. 15 -- 100 Year Q {cfs} 1 20.00 100.00 2f If n. f l 40.00 WKiI41 o .w ,�._,..._....:.,,.....�..,...�� . _ _ 0.00 0 120 240 360 480 600 720 844 960 1080 1200 1320 1440 1560 m Hyd No. 15 — Hyd No. 13 Hyd No. 14 Time (min) Hydrograph Report Hydrat low H yd rog rap h s Extension for AutoCADS G tvi 13 DO 2008 by A uto des k, Inc. v6.052 Hyd. No. 17 Area B to Wet Pond I Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = I min Drainage area = 11.760 ac Basin Slope = 0.0% To method = TR55 Total precip. = 7,40 in Storm duration = 24 hrs - - - -------------- Q (efs) 120.00 IMIXIM ;:f 0 4 IT-416161 9#10101 0.00 0 120 240 -111-1-1-1 Hyd No. 17 Area B to Wet Pond 1 Hyd. No. 17 -- 100 Year W'. Tuesday, Nov 20, 2032 Peak discharge = 105-46 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (To) Distribution Shape factor 717 min 220,979 tuft 79.6 0 ft 6.30 min Type 11 484 0 (Cfs) 120M 100.00 �*-IVXIIII 40.00 0.00 720 840 960 1080 1200 1320 Time (min) ii ......... .... . 0 (Cfs) 120M 100.00 �*-IVXIIII 40.00 0.00 720 840 960 1080 1200 1320 Time (min) Hydrograph Report Hydra #low Hydrographs Extension for AutoCADO Civil 3000 2008 by Autodesk, tnc. v6.052 Hyd. No. 18 Hyd. volume Offsite to Wet Pond Curve number Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 1.350 ac Basin Slope = 0.0% To method = USER Total precip. = 7.40 in Storm duration = 24 hrs 4 (Gfs) 1 4.00 12.00 10.00 ;i 1 1 L r C NOR MOM M ❑ffsite to Wet Pond Hyd. No. 18 -- 100 Year i [;k] Tuesday, Nov 20, 2012 Peak discharge = 12.30 cfs Time to peak = 717 min Hyd. volume = 25,883 cuft Curve number = 80.5 Hydraulic length = ❑ ft Time of cone. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 484 Q {cfs} 14.00 12.00 1 0.00 1 1 1 tl 1 .�,n Will] 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (ruin) _._ Hyd No. 18 x i z tt` is �3 Q {cfs} 14.00 12.00 1 0.00 1 1 1 tl 1 .�,n Will] 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (ruin) _._ Hyd No. 18 Hydrograph Report Hyd rat low Hyd rog ra p h 6 Extension f o r AutoCA DQD Civic 3DO 2008 by Autodes k, Inc. v6.0 52 Hyd. No. 19 Time to peak = Total to Wet Pond Hyd. volume = Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 1 min Inflow hyds. = --------------- 17, 18 ............. Total to Wet Pond M11 Tuesday, Nov 20, 2012 Peak discharge = 117.76 cfs Time to peak = 717 min Hyd. volume = 246,861 tuft Contrib. drain, area= 13.110 ac - ----- ------- --- ------------------ --------- Q (Cfs) Hyd. No. 19 100 Year Q (Cfs) 120.00 120.00 100.00 E 100.00 80.00 80,00 60.00 60-00 40.00 40.00 20,00 20.00 0,00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) '111-- Hyd No. 19 -- Hyd No. 17 - Hyd No. 18 Hydrograph Report Hyd rat low Hyd rographs Extenslon for AutoCADO Civil 300 2008 by Autodesk, Inc. v6.052 Hyd. No. 20 Hyd. volume Route Wet Pond 1 Max. Elevation Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 19 - Total to Wet Pond Reservoir name = Wet Pond 1 Area B Storage Indication method used Q (Cfs) 120.00 100.00 :r t� 20.00 1 r Route Wet Pond 1 Hyd. No. 20 -- 100 Year ill Tuesday, Nov 20, 2032 Peak discharge = 40.94 cfs Time to peak = 724 min Hyd. volume = 227,097 tuft Max. Elevation = 310.72 ft Max. Storage = 118,403 tuft 180 360 540 720 900 1080 1260 1440 1620 Hyd No. 20 - Hyd No. 19 Total storage used = 118,403 tuft Q (Cfs) 120.00 iIEIffiiI; :1 091 C .O OH; ROX0i] KOO] 4.00 1800 Time (min) ...�,n..,.,......J. ..._......... i 07s...... 180 360 540 720 900 1080 1260 1440 1620 Hyd No. 20 - Hyd No. 19 Total storage used = 118,403 tuft Q (Cfs) 120.00 iIEIffiiI; :1 091 C .O OH; ROX0i] KOO] 4.00 1800 Time (min) Hydrograph Report Hydraflow Hydrog rap h s Extension f or A utoGA DCR) Civil 3CO 2008 by Au tode sk, Inc. v6.052 Hyd. No. 21 Area to Wetland 3 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 0 (Cfs) 40.00 30M 20.00 iftleff 0.00 0 120 240 -11-1-1-1 Hyd No. 21 1 min 3.870 ac 0.0% USER 7.40 in 24 hrs Area to Wetland 3 Hyd. No. 21 -- 100 Year 112 Tuesday, Nov 20, 2012 Peak discharge = 36.94 cfs Time to peak = 717 min Hyd. volume = 78,819 tuft Curve number = 83.3 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type 11 Shape factor . ........... = 484 360 480 600 720 840 960 1080 1200 Q (Cfs) 40.00 M We WO i 0.00 1320 Time (min) Hydrograph Report Hydrafiow Hydrographs Extension for AutoCAD* Civil 3W) 2008 by Autodesk, Inc. v6.052 Hyd. No. 22 Hyd. volume = 4ffsite to Wetland 3 Curve number = Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 0.350 ac Basin Slope = 0.0% Tc method = USER Total precip. = 7.40 in Storm duration = 24 hrs Q (cfs) 4.00 01181 OM 1.00 ❑ffsite to Wetland 3 Hyd. No. 22 -- 100 Year 113 Tuesday, Nov 20, 2012 Peak discharge = 3.335 cfs Time to peak = 717 min Hyd. volume = 7,113 tuft Curve number = 83.2 Hydraulic length = 0 ft Time of cone. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 484 0.00 0 120 240 N %...... Hyd No. 22 360 480 600 720 840 960 a {cfs} 4.00 MOP f f' 1.00 0.00 1080 1200 1320 Time (min) g 3�5 r� f a k a s 0.00 0 120 240 N %...... Hyd No. 22 360 480 600 720 840 960 a {cfs} 4.00 MOP f f' 1.00 0.00 1080 1200 1320 Time (min) Hydrograph Report Hyd raf I ow H yd rog rap hs Extension f o r Auto CA DO Civil 3DO 2006 by A utode s k, Inc. v6-052 Hyd. No. 23 Total to Wetland 3 Hydrograph type = Combine Storm frequency = 100yrs Time interval = 1 min Inflow hyds. = - ---- ------ 21, 22 Total to Wetland 3 114 Tuesday, Nov 20, 2012 Peak discharge = 40.27 of s Time to peak = 717 min Hyd. volume = 85,932 tuft Contrib. drain. area= 4.220 ac ---- — - -------------- Q (Cfs) Hyd. No. 23 100 Year Q (Cfs) 50.00 50.00 40.00 40.00 30.00 MOO 20.00 20.00 10.00 . .................. I MO 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 23 — Hyd No. 21 — Hyd No. 22 Hydrograph Report Hydraflow Hydrographs Extension for Auto CAD@ Civil 3D(& 2008 by Autodesk, Inc. v6.052 Hyd. No. 24 Route Wetland 3 Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time t0 peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 23 - Total to Wetland 3 Max. Elevation Reservoir name = Wetland 3 Area B Max. Storage Storage Indication method used, Route Wetland 3 115 Tuesday, Nov 20, 2012 = 27.12 cfs = 721 min = 78,213 tuft 291.57 ft 33,520 tuft d (cfs) Hyd. No. 24 -- 100 Year 0 (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 14.00 0.00 _,.,.._7 .. n . ..... .... .... .n ,. = y -.. _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (rein) Hyd No. 24 Hyd No. 23 Total storage used = 33,520 tuft ii iii Hydrograph Report H yd rati ow H yd ro g rap hs Extension f o r Auto CAND Civil 3DO 2008 by Autod es k, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 25 Area B Bypass Hydrograph type = SCS Runoff Peak discharge = 22.52 cfs Storm frequency = 100 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 47,492 tuft Drainage area = 4.390 ac Curve number = 61.6 Basin Slope = 0.0% Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 7.20 min Total precip. = 7.40 in Distribution = Type 11 Storm duration - - ------- ----- - --- ------------ = 24 hrs -- -------------------------------- Shape factor - - -------------- - - = 484 0 (Cfs) 24.00 20M IiII961f, 12.00 M-60 SKII Area B Bypass Hyd. No. 25 -- 100 Year Q (Cfs) 24.00 20.00 16.00 12.00 M. M11 S il 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) '- .. . .... Hyd No. 25 Hydrograph Report H yd rat low Hyd rog rap h s Extension for Auto CA D®R Civil 3 DD 2008 by Auto d es k, Inc. v6.062 Hyd. No. 26 Total Post Dev to Point B Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 1 min Inflow hyds. = 20, 24, 25 Q (Cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20-00 10.00 () nn iM Tuesday, Nov 20, 2012 Peak discharge = 82.15 cfs Time to peak = 722 min Hyd. volume = 353,402 tuft Contrib. drain. area= 4.390 ac Total Post Dev to Point B Hyd. No. 26 -- 100 Year (Cfs) 0 180 Hyd No. 26 360 540 720 Hyd No. 20 UI V -VV 80-00 70.00 60.00 50.00 40.00 30-00 20.00 10.00 0.00 900 1080 1260 1440 1620 Time — Hyd No. 24 — Hyd No. 25 me (min) Ii 11.1' Hydrograph Report Hydraflow Hydrographs Extension for AutoCACO Civil 3 D 2008 by Autodesk, Inc. v6.052 Tuesday, Nov 20, 2012 Hyd. No. 28 Area C Post Hydrograph type = SCS Runoff Peak discharge = 9.982 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 9 min Hyd. volume = 22,601 tuft Drainage area = 2.030 ac Curve number = 61.7 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.80 min Total precip. = 7.40 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Q (cfs) 10.00 M . ti O SW O, to C).00 0 120 240 Hyd No. 28 Area C Post Hyd. No. 28 -- 100 Year 360 480 600 720 840 Q (cfs) 10.00 N. is Milo] GK6I11 W041 w. „., . 0.04 960 1080 1200 1320 1440 1560 Time (min) �x � �Aq 360 480 600 720 840 Q (cfs) 10.00 N. is Milo] GK6I11 W041 w. „., . 0.04 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hyd raf low Hydrog rap hs Extension f o r AutoCADIJI? Civil 3 DCO 2 00 B by Au tode sk, Inc. v6-052 Hyd. No. 3❑ Hyd. volume = Area D Post Curve number = Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 0.140 ac Basin Slope = 0.0% Tc method = USER Total precip. = 7.40 in Storm duration .... ... . ..................... = 24 hrs I.- . ............ - — -------------------- - . ..... .................. Area D Post 119 Tuesday, Nov 20, 2012 Peak discharge = 0.781 ofs Time to peak = 718 min Hyd. volume = 1,569 cuft Curve number = 61 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 484 Q (Cfs) Hyd. No. 30 100 Year Q (Cfs) 1.00 - 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 - 0.20 0.10 - 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No, 30 Time (min) STORMWATER QUALITY NinToGEN CALCULArlolvs PROJECT NAME North Wake County ES & Community Center LOCATION Raleigh, NO I - City of Raicigh Property Phase: Post-Dev WHO Tre3' 'anent Type of Land Cover Undisturbed open space Managed open space Impervious surfaces TOTAL Base N Loading Rate DATE /f 8128112 PROJECT NO s 09 -116 Ii. Ear KAL Area aC) TN export coeff (lb/ac/ r TN export ibl r 0.00 0.60 0.00 20.35 7.56 1.20 21,20 24.42 160.27 27.97 184.69 6.62 lbslaclyr Phase: Runoff to Det. n-T. on a+�el:kimd-s Type of Land Cover Undisturbed open space Managed open space Impervious surfaces TOTAL Area ac TN export coeff Iblacl r TN export fbl r 0.00 O.EO 0.00 7.11 5.49 1.20 21.20 8.53 107.91 12.20 116.44 TN to BMP = 116.A4 Ibslyr N Removal Efficiency of BMP = 40% TN Removed by 8MP = 46.58 Iblyr Phase: �- ui-toff to 90''IJ f SS et € Ctti ratio i Pond Type of Land Cover Undisturbed open space Managed open space Impervious surfaces TOTAL TN to 8MP = N Removal Efficiency of BMP = TN Removed by 8MP = Adjusted TN Export Adjusted Base N Loading Rate Target N Loading Rate = N to be Offset by Payment N to be Offset by Payment = Payment Maintenance Length: Total N to be offset= Area ac 0.00 TN export eoeff Iblacl r 0.60 TN export Ibl r 0.00 1.72 1.20 2.06 2.36 21.20 50.03 4.06 52.10 52,10 lbslyr 25% 13.02 lblyr 125.09 lblyr 4.48 lbslaclyr 3.60 lbslaclyr 0.88 lbslaclyr 24,62 Ibslyr 30 yrs 738.48 fbs x $20.29 $14,983.76 <: oA7tr 2 12 81 81 1' PROJECT NAME'' (A T RDJEC NO r North Wake County ES & Community Center Cam us 09.116 LOCATION BY Ralei[1h, INC KAL �.......... Lot 2 .- YYCPSS Phase: osi -Dew w/0 T 'r oaliT9ent Type of Land Cover Undisturbed open space Managed open space Impervious surfaces TOTAL Base N Loading Rate W Area ac TN export coeff lblacl r TN export 1b1 r 0.00 0.60 0,00 7,06 1.20 8.47 5.45 21,20 115.54 12.51 124.01 9.91 Ibslaclyr Phase: F#.IT;Of f tO WetlarKIS Type of Land Cover Undisturbed open space Managed open space Impervious surfaces TOTAL TN to BMP = N Removal Efficiency of 8MP TN Removed by 8MP = Area ac TN export coeff Iblacl r TN export lbl r 0.00 0.60 0.00 0.77 1.20 0.92 1.88 21,20 39.86 2.85 40.78 40.78 Ibslyr 40% 16.31 €b /yr Phase. Hiu), mfi to 9- `,1.•01 ,5S M)t Fond Type of Land Cover Undisturbed open space Managed open space Impervious surfaces TOTAL TN to BMP = N Removal Efficiency of BMP m TN Removed by BMP = Adjusted TN Export = Adjusted Base N Loading Rate Target N Loading Rate = N to be Offset by Payment N to be Offset by Payment= Payment Maintenance Length Total N to be offset= Area ac TN export coeff Eblacl r TN export lbl r 0.00 0.60 0.00 4.12 1.20 4,94 3.56 21.20 75.47 7,68 80.42 80.42 Ibslyr 25% 20.10 Iblyr 87.60 Iblyr 7.00 Ibslaclyr 3.60 Ibslaclyr 3.40 Ibslaclyr 42.56 Ibslyr 30 yrs 1,276.84 Ibs x $24.29 $25,906.27 DATE :T i[ 8128112 r 1 '•Ji 1 PROJECT NAME • PROJECT "+ i North Wake County E5 & Community Center Campus 09.116 +l LOCATION By Raleiah, NC KAL - ----------- . Area 4 - City of Raleigh Leas Phase: POSt -DC?V W/0 ii�i$i33t'!i Type of Land Cover Undisturbed open space Managed open space impervious surfaces TOTAL Base N Loading Rate Area ac TN export coeff lblacl r TN export lb/ r 0.00 0.64 0.00 6.16 1.20 7.39 0.28 21.20 5.94 6.44 1 3.33 2.07 lbslaclyr Phase: Ri?if oif to iii'. on %Jon Wodand Type of Land Cover Undisturbed open space Managed open space Impervious surfaces TO'T'AL Area ac TN export coeff (lb/ac/ r TN export lb/ r 0A0 0.60 0.00 3.48 1.20 4.18 0.28 21.20 5.94 3.76 10.11 TN to BMP = 10.11 Ibslyr N Removal Efficiency of BMP = 40% TN Removed by BMP = 4.04 lblyr (THIS IS IS ,FOIR IN'r-OR,NIATIC. N ONLY, THIS AIR-EA Adjusted TN Export = Adjusted Base N Loading Rate Target N Loading Rate = N to be Offset by Payment = N to be Offset by Payment= Payment Maintenance Length Total N to be offset= 9.28 Iblyr 1.44 Ibslaclyr 3.60 Ibslaclyr -2.16 Ibslaclyr -13.90 Ibslyr 30 yrs 0.00 Ibs x $20.29 $0.00 BMP MAINTENANCE PLAN WET DETENTION POND 1 ABBOTTS CREEK COMMUNITY CENTER & ELEMENTARY SCHOOL RALEIGH, NORTH CAROLINA MARCH, 2013 Prepared by: CLH DESIGN, PA CARY, NC General BMP Maintenance Guidelines Regularly inspect and maintain Wet Detention Ponds as described herein Preserving the structural integrity of the dam of a pond BMP (Best Management Practice) is important in protecting downstream life and property. There are at least four aspects of the dam that require specific attention: 1. Assessment of hazard potential due to changes in downstream development; 2. Seepage; 3. Dam material problems; 4. Vegetation growth on the dam embankments. Assessment of Hazard Potential As new development occurs downstream of the BMP, the chance of significant property damage or danger to human life may increase if catastrophic failure of the dam occurs. Although the dam may be initially exempt from regulation by the State, the owner is responsible for reporting to the City and Dam Safety Office downstream development that may affect the hazard classification of the dam. Seepage The downstream side of the dam should be inspected regularly for evidence of significant seepage. Seepage can emerge anywhere below the normal pool elevation, including the downstream slope of earth dams, areas beyond the toe of the dam, and around the spillway or pond outlet conduit. Indications of significant seepage include areas where the soil is saturated or where there is a flowing "spring" or leak. If "sinkholes" in the dam embankment are noticed, or if constant flowing water is noticed on the downstream side of the dam, then seepage has become excessive and professional engineering advice should be sought immediately to avert a major structural problem or a catastrophic failure of the dam. Dam Material Problems For earth dams, pronounced cracks on the embankment surface indicate the first stages of potential dam failure. Transverse cracks (running perpendicular to the embankment face) generally indicating differential settlement of the dam, can provide pathways for excessive seepage. Longitudinal cracks (running parallel to the embankment face) may be due to inadequate compaction of the dam during construction or shrinkage of the clay (desiccation) in the top of the embankment during prolonged dry conditions. These cracks may eventually lead to slope failure such as sliding or sloughing. For reinforced concrete dams, the concrete should be checked for pronounced cracking, leakage from the joints, and displacement (noticeable leaning or bulging). Also, excessive seepage, leakage, or springs just downstream of the concrete dam could be indicative of potential seepage - related "piping" problems under the dam. If such problems or other structural problems are observed, professional engineering advice should be sought. Vegetative Growth Trees and other woody vegetation are not permitted on the top slopes or dam embankments. Large root systems from woody vegetation can weaken the dam structure and provide seepage pathways. Thick vegetative cover can also provide a haven for burrowing animals such as the groundhog. These animals can create a network of burrows in the dam embankments that can significantly weaken the dam, by creating seepage paths, which may eventually lead to dam failure. Mowing of the dam embankments should occur, at a minimum, once every 6 months to prevent woody vegetation growth and cover for burrowing animals. Trash and vegetative floatables (grass clippings, leaves, limbs, etc.) should be cleaned from the pond surface and surroundings periodically to promote a healthy, aesthetically pleasing environment, and to prevent blockage of the pond outlets. Studies have shown that people are less likely to litter ponds that are aesthetically pleasing and support wildlife. Wet Detention Ponds Buffer Vegetation Strong rooted grasses that have a high tolerance for erosion should be planted on embankments around the pond. Good grass cover should be maintained around the pond perimeter to prevent excessive sediment from entering the pond. The following should be used as guidelines for maintaining buffer vegetation. To sustain the structural integrity of the dam, no trees or woody vegetation should be allowed on the dam embankments or top of dam. These areas should be mowed on a quarterly basis. To preserve the hydraulic capacity of the pond system and to prevent runoff from backing up, inlet and outlet areas should be kept clear of heavy vegetation. To provide easy access to the pond, the maintenance access around the pond should be free of trees and mowed on a periodic basis. Trees and brush, if desired, are acceptable on pond embankments other than the dam. Erosion Problems Unsuitable fill material, inadequate compaction, and /or poor stabilization of earth structures can result in accelerated erosion where high runoff velocities exist. High velocities usually occur on steep pond embankments, at pond inlet and outlet discharge areas, and where the water is constricted to channel flow The entire pond area should be inspected quarterly for signs of erosion, paying special attention to the following areas. Embankments If pond embankments are not kept well vegetated with grasses, rill erosion (small channels formed in the embankment due to poor grass cover) may occur. Rill erosion can be repaired by filling the small channels with suitable soil, compacting, and seeding. If may be necessary to install temporary erosion control (such as hay bales) along heavily eroded areas to allow the repaired areas to stabilize. It is especially important to inspect for and immediately repair any erosion on the dam embankments. Pipe Inlet and Outlet areas Where erosion causes the undercutting of the downstream end of pipe, the undercut should be stabilized immediately to prevent the end pipe section from "breaking" off. Eroded areas should be filled with good compatible soil and covered with geotextile and riprap. Open Channel Flow Eroded areas should be seeded /sodded and protected with temporary velocity dissipation (such as excelsior matting, straw bales, etc.) If erosion continues, a more robust lining should be used. Blockaize of Outlets Wet extended detention ponds are designed for the water to exit the pond through the low flow onfice(s), the principal spillway, and the emergency spillway. It is important to check all three outlets for blockage that would impair the pond" water quality and hydraulic functionality. Low Flow Orifice(s) Unless an inverted orifice is used, some type of trash guard is to be maintained over the low flow onfice(s) to prevent clogging. When the orifice becomes clogged the water level rises to the principal spillway elevation and the benefits associated with temporary storage and its gradual release are lost. To preserve "extended detention ": the low flow orifice should be inspected for blockage monthly and after large storms. Principal and Emergency Spillway Principal and emergency spillways are designed to safely convey larger than one -inch storms that produce runoff, which exceed the water quality volume of the BMP. IF these spillways are blocked so they do not operate at full capacity, the risk of dam overtopping or other uncontrolled releases may result. To ensure the hydraulic capacity of the spillways, the spillways should be inspected for blockage monthly and after large storms. If a riser/barrel is used for the principal spillway, a trash rack is to be maintained on the riser. Vegetative growth in the riser should be removed promptly so that the design capacity of the spillway is maintained. Also, the outlet area where the barrel projects from the fill should be clear of tree limbs, sediment accumulation, etc. Sediment Accumulation To preserve the BMP's pollutant removal capability, sediment must be removed in areas where the capacity of the design sediment storage volume has been exceeded. The forbay helps to improve the removal efficiency of the pond system by trapping the majority of coarser suspended solids behind the baffle. When sediment deposition in the forebay exceeds the designed sediment storage capacity for the forebay, the forebay must be dredged. An indication of when the forebay sediment capacity is exceeded is when sediment bars are visible near the inlet discharge or when the sediment level at the inlet to the pond is less than one foot below the normal pool surface (the elevation of the pool is at the bottom of the low flow orifice). Typically, forebays will need to be dredged every 5 to 10 years. Depth measurements relative to the normal surface elevation (bottom of water quality orifice) should be taken at several locations around the pond. The sediment is to be removed when the measured depth is less than the design permanent pool depth. If a forebay is sued at the inlet area of the pond and is regularly dredged, the frequency of dredging the entire pond could be greatly reduced. MAINTENANCE OF WET DETENTION PONDS After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi - annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. BASIN DIAGRAM Permanent Pool Elevation Sediment Removal El4 75% Sediment Removal Elevation Bottom Elevation 1 25% 25% f Bottom Elevation / FOREBAY MAINPOND Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. Date of Inspection: Inspected By: Pond No.: Description Method Frequency Time of year ✓ EMBANKMENT Mow lawn grass on embankment. Mower Monthly as needed All year Inspect and repair erosion. Re -seed Lawn Grass Seeding Mixture. Visual Monthly All year Check pond embankment for bare earth and eroded areas. Re -seed Lawn Grass Visual Quarterly All year Check the downstream toe of the embankment for "springs" or wet spots Visual Quarterly All year Check embankment and crest for pronounced cracking or slope failures Visual Quarterly All year Check for pipe undercut at inlet and outlet discharge areas Visual Quarterly All year Check for erosion downstream of pipe outlet Visual Quarterly All year Check for new development downstream of dam that may be effected by failure Visual Yearly All year INTERIOR STR UCTUREIOPERA TION Check sediment accumulation in forebay area Visual Yearly All year Check sediment accumulation in main and area Visual Yearly All year Check for blockage of low flow orifices, principal and emergency spillways Visual Monthly All year Open and close pond drain to ensure proper operation Visual Yearly All year Remove accumulation of trash Visual Monthly All year PLANTS Remove and replace all dead and diseased vegetation considered beyond treatment See planting specifications Twice a year As directed by landscaper Treat all diseased trees and shrubs Mechanical or by hand N/A Varies, dependent on insect/disease infestation Water plant material at the end of each day for fourteen consecutive days and after planting is completed By hand Daily Immediately after completion of project Replace of support stakes By hand Once a year Only remove stakes in the spring Replace any deficient stakes or wires By hand As needed As needed INSPECTION NOTES BMP Location Plan I Wet Detention Pond Detail 1 ............ . . ....... . k. ............................................. R �?q fa, ii Wet Detention Pond Detail 1 . . ....... . ............................................. Wet Detention Pond Detail 1 . . ....... . Wet Detention Pond Detail 1 a I Wet Detention Pond Detail 2 yk it ........................................... 1 M' VA 40 IV e, 444 . ...... . . .......... :1 tot pf!, g 4 90 ill AA ............. I Wet Detention Pond Detail 2 yk it ........................................... I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Abbotts Creek Community Center & Elementary School BMP drainage area number: Wet Detention Pond 'I' Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, SEAL My commission expires BMP MAINTENANCE PLAN DETENTION WETLAND 2 ABBOTTS CREEK COMMUNITY CENTER & ELEMENTARY SCHOOL RALEIGH, NORTH CAROLINA MARCH, 2013 Prepared by: CLH DESIGN, PA CARY, NC General BMP Maintenance Guidelines Regularly inspect and maintain constructed Detention Wetland as described herein Preserving the structural integrity of the dam of a wetland BMP is important in protecting downstream life and property. There are at least four aspects of the dam that require specific attention: 1. Assessment of hazard potential due to changes in downstream development; 2. Seepage; 3. Dam material problems; 4. Vegetation growth on the dam embankments. Assessment of Hazard Potential As new development occurs downstream of the BMP, the chance of significant property damage or danger to human life may increase if catastrophic failure of the dam occurs. Although the dam may be initially exempt from regulation by the State, the owner is responsible for reporting to the County and Dam Safety Office downstream development that may affect the hazard classification of the dam. Seepage The downstream side of the dam should be inspected regularly for evidence of significant seepage. Seepage can emerge anywhere below the normal pool elevation, including the downstream slope of earth dams, areas beyond the toe of the dam, and around the spillway or wetland outlet conduit. Indications of significant seepage include areas where the soil is saturated or where there is a flowing "spring" or leak. If "sinkholes" in the dam embankment are noticed, or if constant flowing water is noticed on the downstream side of the dam, then seepage has become excessive and professional engineering advice should be sought immediately to avert a major structural problem or a catastrophic failure of the dam. Dam Material Problems For earth dams, pronounced cracks on the embankment surface indicate the first stages of potential dam failure. Transverse cracks (running perpendicular to the embankment face) generally indicating differential settlement of the dam, can provide pathways for excessive seepage. Longitudinal cracks (running parallel to the embankment face) may be due to inadequate compaction of the dam during construction or shrinkage of the clay (desiccation) in the top of the embankment during prolonged dry conditions. These cracks may eventually lead to slope failure such as sliding or sloughing. For reinforced concrete dams, the concrete should be checked for pronounced cracking, leakage from the joints, and displacement (noticeable leaning or bulging). Also, excessive seepage, leakage, or springs just downstream of the concrete dam could be indicative of potential seepage - related "piping" problems under the dam. If such problems or other structural problems are observed, professional engineering advice should be sought. Vegetative Growth Trees and other woody vegetation are not permitted on the top slopes or dam embankments. Large root systems from woody vegetation can weaken the dam structure and provide seepage pathways. Thick vegetative cover can also provide a haven for burrowing animals such as the groundhog. These animals can create a network of burrows in the dam embankments that can significantly weaken the dam, by creating seepage paths, which may eventually lead to dam failure. Mowing of the dam embankments should occur, at a minimum, once every 6 months to prevent woody vegetation growth and cover for burrowing animals. Trash and vegetative floatables (grass clippings, leaves, limbs, etc.) should be cleaned from the wetland surface and surroundings periodically to promote a healthy, aesthetically pleasing environment, and to prevent blockage of the wetland outlets. Studies have shown that people are less likely to litter wetlands that are aesthetically pleasing and support wildlife. 2 Detention Wetlands Buffer Vegetation Strong rooted grasses that have a high tolerance for erosion should be planted on embankments around the wetland. Good grass cover should be maintained around the wetland perimeter to prevent excessive sediment from entering the wetland. The following should be used as guidelines for maintaining buffer vegetation. To sustain the structural integrity of the dam, no trees or woody vegetation should be allowed on the dam embankments or top of dam. These areas should be mowed on a quarterly basis. To preserve the hydraulic capacity of the wetland system and to prevent runoff from backing up, inlet and outlet areas should be kept clear of heavy vegetation. To provide easy access to the wetland, the maintenance access around the wetland should be free of trees and mowed on a periodic basis. Trees and brush, if desired, are acceptable on wetland embankments other than the dam. Erosion Problems Unsuitable fill material, inadequate compaction, and /or poor stabilization of earth structures can result in accelerated erosion where high runoff velocities exist. High velocities usually occur on steep wetland embankments, at wetland inlet and outlet discharge areas, and where the water is constricted to channel flow. The entire wetland area should be inspected quarterly for signs of erosion, paying special attention to the following areas. Embankments If wetland embankments are not kept well vegetated with grasses, rill erosion (small channels formed in the embankment due to poor grass cover) may occur. Rill erosion can be repaired by filling the small channels with suitable soil, compacting, and seeding. If may be necessary to install temporary erosion control (such as hay bales) along heavily eroded areas to allow the repaired areas to stabilize. It is especially important to inspect for and immediately repair any erosion on the dam embankments. Pipe Inlet and Outlet areas Where erosion causes the undercutting of the downstream end of pipe, the undercut should be stabilized immediately to prevent the end pipe section from "breaking" off. Eroded areas should be filled with good compatible soil and covered with geotextile and riprap. Open Channel Flow Eroded areas should be seeded /sodded and protected with temporary velocity dissipation (such as excelsior matting, straw bales, etc.) If erosion continues, a more robust lining should be used. Blockaize of Outlets Detention wetlands are designed for the water to exit the wetland through the low flow orifice(s), the principal spillway, and the emergency spillway. It is important to check all three outlets for blockage that would impair the wetland" water quality and hydraulic functionality. Low Flow Orifice(s) Unless an inverted orifice is used, some type of trash guard is to be maintained over the low flow onfice(s) to prevent clogging. When the orifice becomes clogged the water level rises to the principal spillway elevation and the benefits associated with temporary storage and its gradual release are lost. To preserve "extended detention ": the low flow orifice should be inspected for blockage monthly and after large storms. Principal and Emergency Spillway Principal and emergency spillways are designed to safely convey larger than one -inch storms that produce runoff, which exceed the water quality volume of the BMP. IF these spillways are blocked so they do not operate at full capacity, the risk of dam overtopping or other uncontrolled releases may result. To ensure the hydraulic capacity of the spillways, the spillways should be inspected for blockage monthly and after large storms. If a riser/barrel is used for the principal spillway, a trash rack is to be maintained on the riser. Vegetative growth in the riser should be removed promptly so that the design capacity of the spillway is maintained. Also, the outlet area where the barrel projects from the fill should be clear of tree limbs, sediment accumulation, etc. Sediment Accumulation To preserve the BMP's pollutant removal capability, sediment must be removed in areas where the capacity of the design sediment storage volume has been exceeded. The forebay and deep pool helps to improve the removal efficiency of the wetland system by trapping the majority of coarser suspended solids behind the baffle. When sediment deposition in the forebay and deep pool exceeds the designed sediment storage capacity, the forebay and deep pool must be dredged. An indication of when the forebay and deep pool sediment capacity is exceeded is when sediment bars are visible near the inlet discharge or when the sediment level at the inlet to the wetland is less than one foot below the normal pool surface (the elevation of the pool is at the bottom of the low flow orifice). Typically, forebays and deep pools will need to be dredged every 5 to 10 years. Depth measurements relative to the normal surface elevation (bottom of water quality orifice) should be taken at several locations around the wetland. The sediment is to be removed when the measured depth is less than the design permanent pool depth. If a forebay is sued at the inlet area of the wetland and is regularly dredged, the frequency of dredging the entire wetland could be greatly reduced. 11 Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the stormwater wetland is established, the wetland plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet detention basin. - Once a year, a dam safety expert will inspect the embankment. After the wet detention pond is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is present. Remove the trash /debris. The perimeter of the Areas of bare soil and /or Regrade the soil if necessary to wetland erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 5 BMP element: Potential problem: How I will remediate the problem: The forebay Sediment has accumulated in Search for the source of the the forebay to a depth that sediment and remedy the problem if inhibits the forebay from possible. Remove the sediment and functioning well. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. The deep pool, shallow Algal growth covers over Consult a professional to remove water and shallow land 50% of the deep pool and and control the algal growth. areas shallow water areas. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray) - the deep pool and shallow consult a professional. water areas. Shallow land remains flooded Unclog the outlet device more than 5 days after a immediately. storm event. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Best professional practices Prune according to best professional show that pruning is needed practices. to maintain optimal plant health. Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible. Remove the sediment and of the deep pools. dispose of it in a location where it will not cause impacts to streams or the BMP. BMP element: Potential problem: How I will remediate the problem: The embankment A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. The micropool Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Plants are growing in the Remove the plants, preferably by micropool. hand. If a pesticide is used, wipe it on the plants rather than spraying. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local authority. damage have occurred at the outlet. BMP Location Plan Detention Wetland 2 — Detail 1 Py 'z w ¢ 3�' Sk I F`Ki! } :5 1 Mfr 5$,'- ........... .. i ar r i R r n-7 ' £ 4 1 CF 4 9¢ I� 3 d 2 at i 22, k'k n Y f UUxx it fe., _ �k w it x gi ....: ........ E F S� 1` it Detention Wetland 2 — Detail 1 I 10 ................ ......................... Ship', 'W I p v too 1 15 A it 7--J A 211 AS it J.) 2 --1 4 J-T 10 ................ ......................... Ship', 'W I p v too 1 15 A it A 211 AS it 2 --1 4 J-T A SS ii wig tp! I out v 01 Why to jlkl 11"11: 11'sm mIr Detention Wetland 2 — Detail 2 I I 11 77 m4 r". I, kY Pit it. ...... "We R Nkr!p H- ed I 11 Detention Wetland 2 — Detail 3 77 Detention Wetland 2 — Detail 3 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Abbotts Creek Community Center & Elementary School BMP drainage area number: Detention Wetland `2' Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, SEAL My commission expires 12 BMP MAINTENANCE PLAN DETENTION WETLAND 3 ABBOTTS CREEK COMMUNITY CENTER & ELEMENTARY SCHOOL RALEIGH, NORTH CAROLINA MARCH, 2013 Prepared by: CLH DESIGN, PA CARY, NC General BMP Maintenance Guidelines Regularly inspect and maintain constructed Detention Wetland as described herein Preserving the structural integrity of the dam of a wetland BMP is important in protecting downstream life and property. There are at least four aspects of the dam that require specific attention: 1. Assessment of hazard potential due to changes in downstream development; 2. Seepage; 3. Dam material problems; 4. Vegetation growth on the dam embankments. Assessment of Hazard Potential As new development occurs downstream of the BMP, the chance of significant property damage or danger to human life may increase if catastrophic failure of the dam occurs. Although the dam may be initially exempt from regulation by the State, the owner is responsible for reporting to the County and Dam Safety Office downstream development that may affect the hazard classification of the dam. Seepage The downstream side of the dam should be inspected regularly for evidence of significant seepage. Seepage can emerge anywhere below the normal pool elevation, including the downstream slope of earth dams, areas beyond the toe of the dam, and around the spillway or wetland outlet conduit. Indications of significant seepage include areas where the soil is saturated or where there is a flowing "spring" or leak. If "sinkholes" in the dam embankment are noticed, or if constant flowing water is noticed on the downstream side of the dam, then seepage has become excessive and professional engineering advice should be sought immediately to avert a major structural problem or a catastrophic failure of the dam. Dam Material Problems For earth dams, pronounced cracks on the embankment surface indicate the first stages of potential dam failure. Transverse cracks (running perpendicular to the embankment face) generally indicating differential settlement of the dam, can provide pathways for excessive seepage. Longitudinal cracks (running parallel to the embankment face) may be due to inadequate compaction of the dam during construction or shrinkage of the clay (desiccation) in the top of the embankment during prolonged dry conditions. These cracks may eventually lead to slope failure such as sliding or sloughing. For reinforced concrete dams, the concrete should be checked for pronounced cracking, leakage from the joints, and displacement (noticeable leaning or bulging). Also, excessive seepage, leakage, or springs just downstream of the concrete dam could be indicative of potential seepage - related "piping" problems under the dam. If such problems or other structural problems are observed, professional engineering advice should be sought. Vegetative Growth Trees and other woody vegetation are not permitted on the top slopes or dam embankments. Large root systems from woody vegetation can weaken the dam structure and provide seepage pathways. Thick vegetative cover can also provide a haven for burrowing animals such as the groundhog. These animals can create a network of burrows in the dam embankments that can significantly weaken the dam, by creating seepage paths, which may eventually lead to dam failure. Mowing of the dam embankments should occur, at a minimum, once every 6 months to prevent woody vegetation growth and cover for burrowing animals. Trash and vegetative floatables (grass clippings, leaves, limbs, etc.) should be cleaned from the wetland surface and surroundings periodically to promote a healthy, aesthetically pleasing environment, and to prevent blockage of the wetland outlets. Studies have shown that people are less likely to litter wetlands that are aesthetically pleasing and support wildlife. 2 Detention Wetlands Buffer Vegetation Strong rooted grasses that have a high tolerance for erosion should be planted on embankments around the wetland. Good grass cover should be maintained around the wetland perimeter to prevent excessive sediment from entering the wetland. The following should be used as guidelines for maintaining buffer vegetation. To sustain the structural integrity of the dam, no trees or woody vegetation should be allowed on the dam embankments or top of dam. These areas should be mowed on a quarterly basis. To preserve the hydraulic capacity of the wetland system and to prevent runoff from backing up, inlet and outlet areas should be kept clear of heavy vegetation. To provide easy access to the wetland, the maintenance access around the wetland should be free of trees and mowed on a periodic basis. Trees and brush, if desired, are acceptable on wetland embankments other than the dam. Erosion Problems Unsuitable fill material, inadequate compaction, and /or poor stabilization of earth structures can result in accelerated erosion where high runoff velocities exist. High velocities usually occur on steep wetland embankments, at wetland inlet and outlet discharge areas, and where the water is constricted to channel flow. The entire wetland area should be inspected quarterly for signs of erosion, paying special attention to the following areas. Embankments If wetland embankments are not kept well vegetated with grasses, rill erosion (small channels formed in the embankment due to poor grass cover) may occur. Rill erosion can be repaired by filling the small channels with suitable soil, compacting, and seeding. If may be necessary to install temporary erosion control (such as hay bales) along heavily eroded areas to allow the repaired areas to stabilize. It is especially important to inspect for and immediately repair any erosion on the dam embankments. Pipe Inlet and Outlet areas Where erosion causes the undercutting of the downstream end of pipe, the undercut should be stabilized immediately to prevent the end pipe section from "breaking" off. Eroded areas should be filled with good compatible soil and covered with geotextile and riprap. Open Channel Flow Eroded areas should be seeded /sodded and protected with temporary velocity dissipation (such as excelsior matting, straw bales, etc.) If erosion continues, a more robust lining should be used. Blockaize of Outlets Detention wetlands are designed for the water to exit the wetland through the low flow orifice(s), the principal spillway, and the emergency spillway. It is important to check all three outlets for blockage that would impair the wetland" water quality and hydraulic functionality. Low Flow Orifice(s) Unless an inverted orifice is used, some type of trash guard is to be maintained over the low flow onfice(s) to prevent clogging. When the orifice becomes clogged the water level rises to the principal spillway elevation and the benefits associated with temporary storage and its gradual release are lost. To preserve "extended detention ": the low flow orifice should be inspected for blockage monthly and after large storms. Principal and Emergency Spillway Principal and emergency spillways are designed to safely convey larger than one -inch storms that produce runoff, which exceed the water quality volume of the BMP. IF these spillways are blocked so they do not operate at full capacity, the risk of dam overtopping or other uncontrolled releases may result. To ensure the hydraulic capacity of the spillways, the spillways should be inspected for blockage monthly and after large storms. If a riser/barrel is used for the principal spillway, a trash rack is to be maintained on the riser. Vegetative growth in the riser should be removed promptly so that the design capacity of the spillway is maintained. Also, the outlet area where the barrel projects from the fill should be clear of tree limbs, sediment accumulation, etc. Sediment Accumulation To preserve the BMP's pollutant removal capability, sediment must be removed in areas where the capacity of the design sediment storage volume has been exceeded. The forebay and deep pool helps to improve the removal efficiency of the wetland system by trapping the majority of coarser suspended solids behind the baffle. When sediment deposition in the forebay and deep pool exceeds the designed sediment storage capacity, the forebay and deep pool must be dredged. An indication of when the forebay and deep pool sediment capacity is exceeded is when sediment bars are visible near the inlet discharge or when the sediment level at the inlet to the wetland is less than one foot below the normal pool surface (the elevation of the pool is at the bottom of the low flow orifice). Typically, forebays and deep pools will need to be dredged every 5 to 10 years. Depth measurements relative to the normal surface elevation (bottom of water quality orifice) should be taken at several locations around the wetland. The sediment is to be removed when the measured depth is less than the design permanent pool depth. If a forebay is sued at the inlet area of the wetland and is regularly dredged, the frequency of dredging the entire wetland could be greatly reduced. 11 Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the stormwater wetland is established, the wetland plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet detention basin. - Once a year, a dam safety expert will inspect the embankment. After the wet detention pond is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is present. Remove the trash /debris. The perimeter of the Areas of bare soil and /or Regrade the soil if necessary to wetland erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 5 BMP element: Potential problem: How I will remediate the problem: The forebay Sediment has accumulated in Search for the source of the the forebay to a depth that sediment and remedy the problem if inhibits the forebay from possible. Remove the sediment and functioning well. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. The deep pool, shallow Algal growth covers over Consult a professional to remove water and shallow land 50% of the deep pool and and control the algal growth. areas shallow water areas. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray) - the deep pool and shallow consult a professional. water areas. Shallow land remains flooded Unclog the outlet device more than 5 days after a immediately. storm event. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one -time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Best professional practices Prune according to best professional show that pruning is needed practices. to maintain optimal plant health. Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible. Remove the sediment and of the deep pools. dispose of it in a location where it will not cause impacts to streams or the BMP. BMP element: Potential problem: How I will remediate the problem: The embankment A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. The micropool Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Plants are growing in the Remove the plants, preferably by micropool. hand. If a pesticide is used, wipe it on the plants rather than spraying. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local authority. damage have occurred at the outlet. BMP Location Plan I I 0 N I I ........... ZIA i� . .. .. ......... % 4 yy ft ?, Detention Wetland 3 — Detail I ........................................... Detention Wetland 3 — Detail I 10 ar fill q W: L.j F, Ff I 'A I Detention Wetland 3 — Detail 2 I I I Detention Wetland 3 — Detail 3 11 t i -4- -4- ff , N 'M Y It - ------ Y 777F :-rF ry N61, . Eli I P .H Ti� i C�% iF NN F "k 51 it - - - -------- kI J Detention Wetland 3 — Detail 3 11 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Abbotts Creek Community Center & Elementary School BMP drainage area number: Detention Wetland `3' Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, SEAL My commission expires 12 9 lklk� 0010 Pa 0 Z a I I i ``l All" " I ` v � 1' 111(1"' ,_--`/ / xL It 1 f It ovl lit it V, Xx x; x\ x� /Xy X X, w CA /A I'd ffl ;Xx ilto cb� I) It \N 1 t , -1t 1 x w/d, 40' NOM t, 11 1 7%/// It No' \1 w ��d-— �d�ifi ',%j �/M' R/ 9 xw —; //z MR, V W/M/W Jill Vbf 1 I I � z o � \ ``�. � � \ � \ � \ ti`.. `�—.�� mil, t �.�1� l.� � � _ �[ /A�_s `t''�~ -`-- f Is rri -b- 0 0 CZ om m -Io 0 Z O 40 40 40 CA cn cn In r 2 r 0 n n 40 n n 0 n n n n n 0 PO n PO 0 PO 0 PO PO 0 0 0 0 '4. CD C> t-A CD CD bN 6 CD CD 60 CD CD CD 0 PO PO (D PO PO PO PO 0 PO PO PO PO PO (D (D (D (D (D (D (D w (D r4i r4i pay y pay pay 00 r"ki (D C C 6 --j i-i W ;-.j ID /rj' O z lklk� 0010 Pa 0 Z a I I i ``l All" " I ` v � 1' 111(1"' ,_--`/ / xL It 1 f It ovl lit it V, Xx x; x\ x� /Xy X X, w CA /A I'd ffl ;Xx ilto cb� I) It \N 1 t , -1t 1 x w/d, 40' NOM t, 11 1 7%/// It No' \1 w ��d-— �d�ifi ',%j �/M' R/ 9 xw —; //z MR, V W/M/W Jill Vbf 1 I I � z o � \ ``�. � � \ � \ � \ ti`.. `�—.�� mil, t �.�1� l.� � � _ �[ /A�_s `t''�~ -`-- f Is rri -b- 0 0 CZ om m -Io 0 Z O r O � �z u � O y ►b e+ 8 N O n °o W C� 1 1 / DiDE w i A 4 70 m �o a z a a D Z 0 m -oz-1 � ''"� �� ' W K L CD nm� Cil Qo � ti C � '+� -...- i 1 ' (1 ' ' � ti ' l l rt '\ t �� � `,e ` - � '\ �- =-.._. ` ,�� -._._ �� t j �� � _'".r�✓ ✓.�}�1,� 1 °�.: ' ���� �-- -:.- �_� -.., \. \ \� \` � a 1 \ \ NNZ D o \ v ! 1 \ t \ O 1 !l t y m D DO �v D cmil rn*1 C) -0 Cn 0 F- O zo Cz� D < oz� D D C VI N Oz O D C C/) � C z�m z�m z�m z�m = z� moo moo moo moo cDn � D �z O D �� v D � OV No1 �� - ,NI>,v DMZ is C011 CA CN N W V v D m n O� V D O O O fa O O Oto V0�O 1 Cn n _`O _'CN RCN ,cvo.CN„� Z Do1D co C�i1 4 p W CVn u, I 00 p OD ��_ DZ� 0010 to NO NO �(0� n O V --V �V1N ON ON 144 W 20 y� �*1 C.d 90 OD v y n 00 O� CN �O porn C�jO OO v _ CJI V .p V (o fV O L4 V n N0) N SA 6) oNioOiL�+ n0 ,4 N C Cn c 0 O NO co co L4 CN r �O * m m mz z m m r �i m v � y ° -0 0 0 70 m �o a z a a D Z 0 m -oz-1 � ''"� �� ' W K L CD nm� Cil Qo � ti C � '+� -...- i 1 ' (1 ' ' � ti ' l l rt '\ t �� � `,e ` - � '\ �- =-.._. ` ,�� -._._ �� t j �� � _'".r�✓ ✓.�}�1,� 1 °�.: ' ���� �-- -:.- �_� -.., \. \ \� \` � a 1 \ \ NNZ D o \ v ! 1 \ t \ O 1 !l t y m D DO �v D cmil rn*1 U) m m CA N 00 w N z n O z U) C) O z U) co N) C) -0 Cn 0 F- O zo Cz� D < oz� D C VI N Oz O D C C/) � C O z� � D �z O D �� rq zz rq U) m m CA N 00 w N z n O z U) C) O z U) co N) �nz FT1 O a �N =r zo Cz� < �� ICC D C VI N ;:u C ;;u � C O z� -0 FTI D z w CD D r t�..w�wGo �rn �czm C) O Z r D z OZ Z r- \ \a 1 t l \1�f,�> J li 11} i ii11 z a �N =r y a S o N� VI \ \a 1 t l \1�f,�> J li 11} i ii11