Loading...
HomeMy WebLinkAboutNC0035708_Pretreatment Compliance Inspection_20090112o \A"/9 CO 7 Beverly Eaves Perdue, Governor Dee Freeman, Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality January 12, 2009 Janna Scherer Pretreatment Coordinator/Lab Supervisor 1094 Addor Road Aberdeen, NC 28315 SUBJECT: Pretreatment Compliance Inspection Moore County Water Pollution Control Plant NPDES Permit No. NC0037508 Moore County Dear Ms. Scherer: Enclosed you will find a copy of the Pretreatment Compliance Inspection Report for the December 17, 2008 inspection of the pretreatment records and files. The report indicates that Moore County Water Pollution Control Plant meets the pretreatment requirements as outlined in 15A NCAC 2H .0900. We appreciate your co-operation and your continued efforts with the pretreatment program. My complements to you on an excellent job of up-to-date record keeping and organization of the Pretreatment files. If you have any questions concerning this report, please do not hesitate to contact me at (910) 433-3312. Dale Lopez Environmental Speciaa Enclosure: Pretreatment Compliance Inspection Report EPA Water Compliance Inspection Report Theinial Metal Treating, Inc. enforcement infouiiation, (six pages) 2009 TTO Certification Check Sheet cc: Dana Folley, PERCS -Pretreatment Unit FRO files One NorthCarotina Naturally North Carolina Division of Water Quality 225 Green Street, Suite 714 Fayetteville, NC 28301-5043 Phone (910) 433-3300 Customer Service Fax (910) 486-0707 1-877-623-6748 Internet: www.ncwaterqualitv.org An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT FAYETTEVILLE REGIONAL OFFICE BACKGROUND INFORMATION 1. Control Authority (POTW) Name: Moore County Water Pollution Control Plant 2. Control Authority Representative: Janna Scherer 3. Title(s): Laboratory Supervisor/Pretreatment Coordinator 4. Last Inspection Date: 01/10/2008 Inspection Type (Circle One): PCI Audit 5. Has Program Completed All Requirements from the Previous Inspection or Program Info Sheet(s)? Yesl 6. Is POTW under an Order That Includes Pretreatment Conditions? Nol Order Type And Number: Are Milestone. Dates Being Met? Yes / No PCS CODING Trans.Code Program NPDES Number MM/DD/YY �I J NI CIO 10 13.17 15 10 18 12 /17 /09 (DTIA) Inspec.Type Inspector IPI JSIIII (TYPI) (INSP) Fac.Type (FACC) 7. Current Number of Significant Industrial Users (SIUs)? 4 SIUS 8. Current Number of Categorical Industrial Users (CIUs)? 4 CIUS 9. Number of SIUs Not Inspected by POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled by POTW in the Last Calendar Year? 0 11. Enter the Higher Number of 9 or 10. 0 NOIN 12. Number of SIUS With No IUP or With an Expired IUP? 0 NOCIv 13. Number of SlUs In SNC for Either Reporting or Limits Violations During Either of the Last 2 Semi -Annual Periods (Total Number of SIUs in SNC). 0 PSNC 14. Number of SIUs in SNC for Reporting During Either of the Last 2 Semi -Annual Periods. 0 MSNC 15. Number of SIUs in SNC for. Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 SNPS 16. Number of SIUs in SNC for Both Reporting and Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the parameters and how are these problems being addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production? If Yes, How Are These Problems Being Addressed? No 19. Which Industries have been in SNC during either of the Last 2 Semi -Annual Periods? Have any Industries in SNC (During Either of the Last 2 Semi -Annual Periods) not been Published for Public Notice? (May refer to PAR if Excessive SIUs in SNC) 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed copy of the Order been sent to the Division? 21. Are any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? SNC for Limits: 0 SNC for Reporting: 0 Not Published: 0 0 PRETREATMENT PROGRAM ELEMENTS REVIEW - Please review POTW files and complete the following: Program Element Date of Last Approval Date Next Due, If Applicable 11/04/05 11/01/10 Headwork Analysis (HWA) Industrial Waste Survey (IWS) 11/05/08 09/01/13 Sewer Use Ordinance (SUO) 10/16/07 Enforcement Response Plan (ERP) 11/19/08 Long Term Monitoring Plan (LTMP) 07/13/04 22. Is the LTMP Monitoring Being Conducted at Appropriate Locations and Frequencies? 23. Should any Pollutants of Concern be Eliminated From or Added to the LTMP? 24. Are Correct Detection Levels being used for all LTMP Monitoring? 25. Is the LTMP Data Maintained in a Table or Equivalent? Yes Is the Table Adequate? [Yes Noj Yes [Yes INDUSTRIAL USER PERMIT (UP) FILE REVIEW 26. User Name Thermal Metals Erico 27. IUP Number A008 II A005 28. Does File Contain Current Permit? Yes Issued 07/01/08 Yes • Issued 07/01/08 29. Permit Expiration Date? 06/30/10 06/30/13 30. Categorical Standard Applied (I.E. 40 CFR 413, Etc.) or N/A 433 433 31. Does the File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? Yes 12/28/07 Yes 12/20/07 32. Does the File Contain an Inspection Completed Within Last Calendar Year? Yes 12/03/08 Yes 11/25/08 ~ 33. a. Does File Contain A Slug Control Plan? b. If No, is One Needed? (See Inspection Fonn from POTW) Yes Yes 34. For 40 CFR 413 And 433 TTO Certifiers, Does The File Contain A Toxic Organic Management Plan (TOMP)? Yes Yes 35. ' a. Does the File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a. Yes, 07/03/08 b. Yes a. Yes, 07/03/08 b. Yes 36. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP? yes Yes 37. Does File Contain POTW Sampling Chain -Of -Custody's? Yes Yes 38. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required By IUP?• Yes Yes 39. Does Sampling Indicate Flow or Production? Yes Yes, (Continuous Discharge) SIU sends POTW a monthly sheet with the daily flows 40. During the Most Recent Semi -Annual Period, Did the POTW Identify All Non -Compliance from Both POTW and SIU Sampling? Yes, Violations in Feb & Mar 2008 N/A No Non -Compliance 41. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations b. Did Industry Resample Within 30 Days? a. Yes b. Yes N/A N/A 42. Was the SIU Promptly Notified of any Violations (Per ERP)? Yes N/A 43. During the Most Recent Semi -Annual Period, Was the SIU in SNC? No N/A 44. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTWs ERP? Yes (see attached copies) N/A 45. Do the Files Contain Penalty Assessment Notices? N/A N/A 46. Does the File Contain Proof of Penalty Collection? 47. a. Does the File Contain any Current Enforcement orders? b. Is SIU in Compliance with Order? 48. Did the POTW Representative Have Difficulty in Obtaining any of this Requested Information for You? N/A N/A N/A N/A No No FILE REVIEW COMMENTS 1. Erico was the only CIU/SIU that owns a 24-hour composite sampler. They were also the only one that had 24-hour discharge. The flow was measured with an ISCO 3010 Ultrasonic Flow Meter. 2. Thermal Metals performed batch discharge. Samples were dipped out of the discharge of the flocculation tank. 3. Meridian used an 8.5 gallon per discharge with an automatic transfer pump with counter. 4. An oversight by the PT Coordinator delayed the sending a Non -Compliance to Thermal Metals for not reporting the TTO Certification letter for the first half of 2008. Please see the attached Notice of Non - Compliance that was sent to, Thermal Metals, the TTO Certification letter sent by Thermal Metals, and a TTO check sheet for the PT Coordinator to monitor the TTO Certification letters from the four CIUs (433). 5. An attachment to this PCI includes the Notice of Violations that were sent to Thermal Metals for the February and March 2008 IUP limit exceedances. The Response Letter from the Thermal Metals, for the February 2008 NOV, is also included. PCI Comments: 1. The POTW records and files were organized and well maintained. NOD: NOV: QNCR: NO NO NO POTW Rating: Satisfactory ✓ Marginal nsatisfactory PCI COMPLETED BY: Dale Lopez, Envi a} pecfii t Date: 01/12/2009 Name and Signature of Reviewer Agency/Office/Telephone Date Belinda S. Henson n " v NCDENR/Fayetteville/(910) 433-3300 `401 INO INDUSTRY INSPECTION PERFORMED DURING THIS PCI INDUSTRY INSPECTION CODING: Trans.Code Main Program Permit Number MM/DD/YY Inspec.Type Inspector Fac.Type J NI CIO 10 13171510181 1.Industry Inspected: 2.Industry Address: 3.Type of Industry/Product: 4.Industry Contact: 00 /00 / 00 J I I I .S I (DTIA) (TYPI) (INSP) (FACC) Phone: Fax: 5.Does the POTW use The Division Model Inspection Form or Equivalent? Yes / No 6.Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview B Plant Tour C. Pretreatment Tour D. Sampling Review E. Exit Interview Industrial Inspection Comments: United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section.A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection 1 I NI "2 151 31 N00037508 111 121 08/12/17 1 17 Type Inspector Fac Type 181 p1 191 s1 201 1 I I I I 1 1 1 1 1 1 I "I I I 1166 Remarks 211 I I 1 I I I I 1 I I 1 I 1 1 1 I I I I 1 1.1 1 1 1 1 I I► I Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 671 2.0 1 69 7° 1 41 71 11 721 NI 731 1 1 74 751 I I I I I 1 J 80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Moore County WPCF 1060 Addor Rd Aberdeen NC 28315 Entry Time/Date 10:00 AM 08/12/17 Permit Effective Date 05/07/01 Exit Time/Date 02:00 PM 08/12/17 Permit Expiration Date 09/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Jeffery W Corder/ORC/910-281-3146/ Other Facility Data , Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Marcus A Jones,PO Box 1927 Carthage NC 28327/Public Works Director// No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) 131 Pretreatment Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspectors) ) Agency/Office/Phone and Fax Numbers Date ! Dale Lope FRO WQ//910-433-3300 Ext.712/ /y Signature of Ma agement Q A Re iewer Agency/office/Phone and Fax Numbers Date , 1404idc-YD 1/'2/U9 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page # 1 NPDES NC0037508 111 121 yr/mo/day 08/12/17 Inspection Type 17 18IPI (cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (1) Erico was the only CIU/SIU that owns a 24-hour composite sampler. They were also the only one that had continuous 24-hour discharge. The flow was measured with an ISCO 3010 Ultrasonic Flow Meter. (2) Thermal Metals performed batch discharge. Samples were dipped outofthe discharge of the flocculation tank. (3) Meridian used an 8.5 gallon per discharge with an automatic transfer pump with counter. (4) An oversight by the PT Coordinator delayed the sending of a Non -Compliance to Thermal Metals for not reporting the TTO Certification letter for the first half of 2008. Please see the attached .Notice of Non -Compliance that was sent to Thermal Metals, the TTO Certification letter sent by Thermal Metals, and the TTO check sheet for the PT Coordinator to monitor the TTO Certification letters for the four ClUs (433). (5) An attachment to this PCI includes the.NOVs that were sent to Thermal Metals for the February and March 2008 IUP limit exceedances. The Response Letter from Thermal Metals, for the February 2008 NOV, is also included. Page # 2 Department of Public Works, Wastewater Treatment Plant 1094 Addor Road Aberdeen, NC 28315 Woiplay March 24, 2008 Jerry Ritter Thermal Metal Treating, Inc 9546 Hwy 21 I E • PO Box 367 Aberdeen, NC 28315 Subject: NOTICE OF VIOLATION Permit No. A008 Dear Mr. Ritter: .Telephone: (930) 281 •-3 11(5 Facsimile: (9.10) 28 1 -20 1 7 LY A review of Thermal Metal Treating's monitoring data for February 2008 showed the following violation(s): Parameter Date Limit Value Reported Value From Industry Reported Value From POTW Limit Type Copper 2/14/08. 2.07 mg/1 2.98 mg/1 Monthly Average Exceeded Nickel 2/14/08 3.98 mg/1 . 41.2 mg/1 Daily Maximum Exceeded Nickel 2/14/08 2.00 mg/1 41.2 mg/1 Monthly Average Exceeded Zinc 2/1.4/08 2.61 mg/1 8.43 mg/1 Daily Maximum Exceeded Zinc 2/14/08 1.48 mg/1 8.43 mg/1 Monthly Average Exceeded Remedial actions should be taken to correct these problems. The Moore County Water Pollution Control Plant may pursue enforcement action for this and any additional violations in accordance with the Enforcement Response Plan. Per Section 8.1 of the Moore County Sewer Use Ordinance, Thermal Metal Treating shall respond in writing within thirty (30) days as to the cause of these violations and what corrective actions will be taken to prevent future reporting violations. A9443 TFIERMiAL METAL TREATING, INC. Your gateway to innovative metal processing technology ISO 9002 April 21, 2008 Janna Scherer Moore County Waste Water Treatment Plant 1094 Addor Road Aberdeen, NC 28315 Subject: Notice of violation reply Permit No. A008 Dear Janna Sherer, 9546 HWY 211 EAST - ABERDEEN, NC 28315 PO BOX 367 - ABERDEEN, NC 28315 P: 910 — 944 -3636 F: 910 — 944 -3280 www.thermalmetal.com APR 2 d 2008 AJJ BY: Thermal Metal Treating was sited for exceeding its daily and monthly maximum discharge limits for Nickel and Zinc and the daily limit for copper during its last reporting cycle. Regarding the violation of its waste water permit the following is the response for corrective action: o Identified the waste stream within the facility that contributed to the violation • Set up an independent reservoir to segregate this waste stream • Batch -treat and test for metals separately from the other waste streams. o Improved our in house metal test procedures to evaluate lower mg/liter quantities. Attached please find the last independent laboratory metal test result of the TMT treated waste stream. Best regards, Jry Ritter resident Meritech, Inc. Environmental Laboratory Laboratory Certification No. 165 Contact: David Wilson Client: 'ii'hermal Metal Trea ting, Inc. PO Box 367 Aberdeen, NC 2831.5 iMeritech Work Order it 03270842 Sample: Pipe 01 Grab Report Date: Date Sample Rcvd: Parameters Result Analysis Date Reporting Limit Method Cadmium, total < 0.002 mg/L . 4 (_hro.mium, total /3/08 0.002 mg/L . EPA 200.7 0.025 mg/L 4/3/08 0.005 mg/L EPA Copper, total 0.144 ill L g/ EI-A 200.7 Lead, toted g/ 4/3/08 0.002 mg/L E.I'A 200.7 < 0.010 uig/L 4/3/08 Nickel, total 0.423 mg/L0.010 mg/L EPA 200.7 Silver, total 4/3/08 0.010 mg/L EPA 200.7 4/3/08 < 0.005 mg/L 4/3/08 0.005 mn L Zinc, total 0.370 .m.g/L g/ EPA 200.7Cyanide, total 0.01.0 mg/L EPA 200.7 <0.005 m L pH 9.8 mgS.U/ 3 27/ 08 0.005 mg/L EPA 335.4 / 1.0 - 14.0 S.U. SM 4500 I -I B 4/4/08 3/27/08 3/27/08 .1 hereby certify that.I have reviewed and approve these data. aborator.V Representative 642 Tanuo Road, Reidsville, North Carolina 27320 t el. (336)342-4748 fax.(336)342-1522 Department of Public Works Wastewater Treatment Plant 1094 Addor Road Aberdeen, NC 28315 April 28, 2008 Jerry Ritter Thermal Metal Treating, Inc 9546 Hwy 211 E PO Box 367 Aberdeen, NC 28315 Subject: NOTICE OF VIOLATION Permit No. A008 Dear Mr. Ritter: Telephone: (910) 281-31 ,16 Facsimile: (910) 281-2047 A review of Themal Metal Treating's monitoring data for March 2008 showed the following violation(s): Parameter Date Copper Copper Zinc Zinc 3/13/08 Limit Value 3.38 mg/1 Reported Value From Industry 5.14 mg/1 Reported Value From POTW March 2.07 mg/1 2.64 mg/1 3/13/08 2.61 mg/1 3.71 mg/1 Limit Type Daily Maximum Exceeded Monthly Average Exceeded March 1.48 mg/1 2.04 mg/1 Daily Maximum Exceeded Monthly Average Exceeded Remedial actions should be taken to correct these problems. The Moore County Water Pollution Control Plant may pursue enforcement action for this and any additional violations in accordance with the Enforcement Response Plan. Additional samples were collected by Thermal Metal Treating and sent out for testing. Results showed that the problems had been corrected but monthly averages were not within the permitted limits. No response is needed at this time. Please be aware of your permit limits. If you have any questions, please contact me at 910-281-3146. rrrl tL YI L. Li _I Department; of Public Works Wastewater Treatment Plant 1.094 Addor Road Aberdeen, NC 28315 •As � ageOtty December 29, 2008 Jerry Ritter Thermal Metal Treating, Inc. 9546 NC 211 E PO Box 367 Aberdeen, .NC 28315 Subject: NOTICE OF NON-COIVIPLIANCE Permit No. A008 Telepb.one: (91.0) 281-31.46 Facsimilef (910) 281-2047 Dear Mr. Ritter: A. review of the Thermal Metal Treating files for 2008 showed the following violation(s): Parameter Date Limit Value Reported Limit Type Reporting Jamiary i — June 30 Value From Industry No TTO Certification Reporting Vidlations- Incomplete Report Remedial actions should be taken to correct these problems. The Moore County Water Pollution Control Plant may pursue enforcement action for this and any additional violations in accordance with the Enforcement Response Plan. The violation was discussed during the annual inspection and a report was received on December I8, 2008. Please note Part I1_l, 7 (Total Toxic Organics Certification) in your permit regarding due dates and requirements for TTO certification. If you have any questions, please contact me at 910-281-31.46. Sincerely, C 1dcuytiyia 2 Janna Scherer, County of Moore, Lab Supervisor/Pretreatment Coordinator Cc: Mr. James D. Frye, County of Moore, Superintendent Mr. Dennis Brobst, County of Moore, Public Works Director A9443 THER E'; L METAL TREATING, INC. Your gateway to innovative metal processing technology ISO 9002 TO: Moore County Water Pollution Control Plant 1094 Addor Road Aberdeen, NC 28315 9546 HWY 211 EAST - ABERDEEN, NC 28315 PO 90X 367 , ABERDEEN, NC 28315 P: 910 - 944 -3636 F: 910 - 444 -3280 www.thermalmeta I.com MgMEVErm DEC 1 `.b 2008 B Y: a� TTh:Jenny Scherer Januarylst — June 30th 2008 Pretreatment & FOG Coordinator REF: TTO (Total Toxic Organic) Thermal Metal Treating believes and substantiated by the small levels detected by the lab analysis that these toxic organics will remain at the low levels listed in the Total Toxic Organic (TTO) test panel. . Thermal Metal also certifies that: "Based on my inquiry of the person or persons directly responsible for managing compliance with the permit limitation (or pretreatment standard) for total toxic organic (TTO), we certify that, to the best of our knowledge and belief, no dumping of concentrated toxic organics into the wastewaters has occurred at our facility. We further certify that Thermal Metal Treating is implementing the Toxic Organic Management Plan submitted to the Moore County POTW_" If any questions please feel free to contact Thermal Metal at 910-944-3636. Sincerely, Jerry Ritter President 2009 TTO Certification Check Sheet Jan 1 — June 30 July I — December 31 Industry Date Received Date Received Erico Pinnacle Thermal Metal Meridian Kiosks