Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCS000304_Renewal Application_20210621
i KL EINFEL OER Bright People. Right Solutions. June 16, 2021 Kleinfelder File No. CLT21 L126930 Ms. Suzanne McCoy DEMLR — Stormwater Program Individual Permit Renewal 1612 Mail Service Center Raleigh, NC 27699-1612 REC i V ED JUN 212021 DENR-LAND QUA' ITY STQRMWATER PERMITTING SUBJECT: Individual NPDES Stormwater Permit Renewal Gerdau Long Steel North America - Charlotte Steel Mill Charlotte, North Carolina Kleinfelder Project: 20220184.001A Dear Ms. McCoy On behalf of Gerdau Ameristeel US, Inc. (Gerdau), Kleinfelder is submitting the enclosed National Pollutant Discharge Elimination System (NPDES) Individual Stormwater Permit Renewal application. The Gerdau facility currently operates under NPDES Permit No. NCS000304, issued by the North Carolina Department of Environmental Quality (NCDEQ), Division of Water Quality. The current permit will expire on October 31, 2021. The NPDES permit renewal application package includes the following • NCDEQ Application Forms. o Renewal Application Form. o Stormwater Pollution Prevention Plan Development and Implementation Certification form. o Supplemental Information form. • Current site map from the Stormwater Pollution Prevention Plan (One Plan). • A summary of analytical monitoring results during the term of the existing permit. • A summary of visual monitoring results during the term of the existing permit. • A summary of Best Management Practices utilized at the facility. • A description of significant changes in industrial activities at the facility. 20220184.001A I CLT21 L126930 Page 1 of 2 June 16, 2021 © 2021 Kleinfelder www.kleinfelder.com KLEINFELDER 9009 Perimeter Woods Drive, Suite E, Charlotte, NC 28216 p 1704.598.1049 If you have any questions, please contact Mr. Mitch Fralick of Gerdau at Mitchell. Fralick(cDgerdau.com or the undersigned. Sincerely, KLEINFELDER, INC. Thomas Sipe, PE Project Professional tsipe(c)-kleinfelder.com Christine K. Brenk, CHMM Senior Principal Professional cbrenk(a.kleinfelder.com TS/CKB:asp Attachments: A — NCDEQ Forms B — Site Map C — Analytical Results Summary D — Visual Monitoring Results Summary E — Summary of Best Management Practices F — Description of Industrial Changes 20220184.001A I CLT21 L126930 Page 2 of 2 June 16, 2021 © 2021 Kleinfelder www.kleinfelder.com ATTACHMENT A NCDEQ FORMS 20220184.001A I CLT21L126930 June 16, 2021 © 2021 Kleinfelder www.kleinfelder.com Permit Coverage K"r'o. Renewal Application Form — ES National Pollutant Discharge Elimination System NP INC Permit Number Environmental Stormwater Individual Permit NS 000aoa Quality Please provide your permit number in box in the upper right hand corner, complete the information In the space provided below and return the completed renewal form along with the required supplemental information to the address Indicated, Owner Information * Address to which permit correspondence will be mailed Owner/Organization Name: Gerdau Amedsleal Corporation Owner Contact: Mr. Rodrigo Can — Mailing Address: PO Bax481980 Charlotte, NC 26269 Phone Number: Fax Number: E-mail address: Facility Information Facility Name: GaNau Amodstael US, inn.-Ch.fths Mill Facility Physical Address: 6601 Lakeview Rd Charlotte, NC 28269 Facility Contact: Mr. Mitchell Frallck Mailing Address: PO Box481980 Charlotte, NO 28269 Phone Number: 704-55IM361 x3035 Fax Number: E-mail address: mitchell.frallckggerdau.com Permit Information Permit Contact: Mr. Mitchell Frallck Mailing Address: PO Box 481980 Chadotte, NC 28269 Phone Number: 704-596-0361 x3035 Fax Number: E-mail address: milchelLfralick®gardau.com Discharge Information Receiving Stream: Long Creek Stream Class: C Basin: Catawba River Basin Sub -Basin: 03-06.34 Number of Outfalis: 4 Facility/Activity Changes Please describe below any changes to your facility or activities since issuance of your permit. Attached a separate sheet if necessary. Notapplicable. There have been no changes that significantly impact the quantity, or pollulsnl concentration levels otstormwater discharges. CERTIFICATION I certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief such information is true, co fete and accurate, Signature Date �/ ��,I a 1 Mitchell Frallck Environmental, Health, and Safety Manager Print or type name of person signing above Title DEMLR - Stormwater Program Please return this completed application form Dept, of Environmental Quality and requested supplemental information to: 1612 Mail Service Center Raleigh, North Carolina 27699-1612 North Carolina Division of Energy, Mineral, and Land Resources — Stormwater Program Facility Name: Permit Number: Location Address: Gerdau Amerlateel US, Inc - Charlotte MIA NCS000304 6601 Lakevlew Rd Chadolle, NC 28269 County: Mecklenburg "I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were developed and implemented under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate and complete." And "I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been fully implemented at this facility location in accordance with the terms and conditions of the stormwater discharge permit." And "I am aware that there are significant penalties for falsifying information, including the possibility of fines and imprisonment for knowing violations," Signature Nfthell FWI.k Print or type name of person signing above Date WzmZ 1 Environmental, Health, and Safety Manager Title SPPP Certification 10/13 SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL NPDES STORMWATER PERMIT Two copies of each of the following shall accompany this submittal in order for the application to be considered complete: (Do not submit the site Stormwater Pollution Prevention Plan) Initials M 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of industrial activities (including storage of materials, disposal areas, process areas and loading and unloading areas), drainage structures, drainage areas for each outfall, building locations and impervious surfaces should be clearly noted. 2. A summary of Analytical Monitoring results during the term of the existing permit (if your permit required analytical sampling). Do not submit individual lab reports. The summary can consist of a table including such items as outfall number, parameters sampled, lab results, date sampled, and storm event data. 3. A summary of the Visual Monitoring results. Do not submit individual monitoring reports. The summary can consist of a table including such items as outfall number, r parameters surveyed, observations, and date monitoring conducted. M r 4. A summary of the Best Management Practices utilized at the permitted facility. Summary should consist of a short narrative description of each BMP's in place at the facility. If the implementation of any BMP's is planned, please include M ( information on these BMP's. 1 t" 5. A short narrative describing any significant changes in industrial activities at the permitted facility. Significant changes could include the addition or deletion of work processes, changes in material handling practices, changes in material storage practices, and/or changes in the raw materials used by the facility. Hrr t� 6. Certification of the development and implementation of a Stormwater Pollution Prevention Plan for the permitted facility (Sign and return attached form). If the final year analytical monitoring of the existing permit term has not been completed prior to filing the renewal submittal, then the last years monitoring results should be submitted within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal waiting on lab results) ATTACHMENT B SITE MAP 20220184.001A I CLT21L126930 June 16, 2021 © 2021 Kleinfelder www.kleinfelder.com U � O R. N 11� � w e z M W Go LD LLJ Go w Y W ¢ H Q Y a � �1]mYt. �ra• C�i $v' �I 9 �qw�N�tOe�irJawE6Qiac] n W�a:oaEEEaE€MI@€� Q n2 ly QQ H Ig -lz iz ZOE ZImIC I I >WI a:5— (fix'09) 5" g77IASI-r---�I 0 11'4 zo Z WONmo.b • 3 tt R rW�n 3 O p�v fHA E � qis ,� ATTACI IMENT C ANALYTICAL RESULTS SUMMARY 20220184.001A I CLT21L126930 June 16, 2021 © 2021 Kleinfelder www.kleinfelder.com Gerdau Long Steel North America NPDES Stormwater Permit Renewal Analytical Monitoring Summary Date mg/L 6/7/2019 10/16/2019 4/20/2020 12/14/2021 5/3/2021 Wet Chemistry mg/L mg/L mg/L mg/L mg/L mg/L Total Suspended Solids 100 26 8.5 43.2 50.4 203 BOD Total 30 3.5 12.5 2.5 16.8 6.3 COD Total 120 53.1 <25 25.2 <25 <25 Oil and Grease Oil and Grease 15 <5 <5.0 <5.0 <5.0 <5.0 Metals Aluminum 0.75 0.289 0.165 0.56 0.967 0.416 Boron Cadmium 0.003 <.001 <.001 <.001 <.001 <.001 Chromium 1 <.005 <.005 <.005 0.0103 0.009 Copper 0.01 0.0072 <.005 <.005 <.005 <.005 Lead 0.075 0.0058 <.005 <.005 <.005 0.0068 Nickel 0.26 <.005 <.005 <.005 <.005 <.005 Zinc 0.126 0.0397 <.01 0.0187 0.0353 0.0394 Ph 1 6-9 1 6.4 1 7.7 1 7.2 7.1 1 7.4 * Samples collected at Outfall 4. ATTACHMENT D VISUAL MONITORING RESULTS SUMMARY 20220184.001A I CLT21L126930 June 16, 2021 © 2021 Kleinfelder www.kleinfelder.com C N 4 N N N A w v lu = Z m — m 3 Bw y o-0a oa-o 0 0v c oa m Em O O 0 E O Oc c Oc X U U0 o d uo n u u O o> -o 0 o o0 ENo o�Nv 3 r o a E Z a E o L 4 o a E o o v 3 a E O E E o v E E o v E o �, E o E v o� ov- o c c ow- m o�� E co 0> °c v m a m °c m E 3 � o o 0 0 a W Q U/ U C O O O C O C O C ryO p LL c O C o C o C O C - 0 co � 0 o 0 o o o o o m - v E h p N N t+1 m LL o 0 v N E o h v 0 N u U u p V 0 N C C N C C OJ C C N c C N c C c c C 3 c C a 0 3 0 3 o 0 a 3 o o U m n E C C 0 W a C N ti M O tp O O1 d o l0 C O @ r° a 0 0 o o 0 � 0 o 0 0 0 0 O N N a � ATTACHMENT E SUMMARY OF BEST MANAGEMENT PRACTICES 20220184.001A I CLT21L126930 June 16, 2021 © 2021 Kleinfelder www.kleinfelder.com Gerdau Long Steel North America NPDES Stormwater Permit Renewal Best Management Practices (BMPs) BMP Frequency Location Description Scrap yard Perform inspections of areas looking for materials on the ground or other surface exposed to stormwater. Spot check contents of Inspections Monthly Alloy Storage dumpsters looking for free liquids and oily materials. Expeditiously contain and cleanup spills of substances posing a substantial risk of Carbon and Lime Storage Silos pollution to stormwater runoff. Remove liquids and oily materials Waste Dumpsters from dumpsters promptly. Inspections are documented. Perform daily sweeping of high traffic paved areas Perform weekly sweeping of all paved areas Sweeping/ Daily and Weekly All paved surfaces Perform weekly washing of high traffic areas Washing Activities are documented in logs. Perform daily cleaning of baghouse dust loading building. This part of Cleaning Daily Baghouse dust loading area the standard daily routine for this area and is not specifically documented. Drummed Upon receipt of Water treatment chemicals Perform inspections of containers upon arrival at facility. Promptly Material Storage materials move materials to appropriate storage areas where shelter and berms Other liquids received in drums and totes are provided. Documentation not required. Refractory Maintain materials within bermed areas to minimize impact to stormwater. Maintain minimum of 10 foot setback from edge of bank Mill scale Bulk Material Daily of ditches and where possible maintain vegetative cover in buffer Storage zone. Inspect areas to ensure materials are stored as described and berms and setback areas are maintained. This part of the standard Slag daily routine for this area and is not specifically documented. Equipment Daily Locomotives Perform inspections and maintenance. This is part of the standard Fork Maintenance trucks daily routine for this area and is not specifically documented. Other mobile equipment Use inserts to help filter Al runoff from turnings pile. Inspect insert Scrap Yard Storm Drain in Scrap Yard Southwest of quarterly and replace as needed. This is in response to high Al Water Drain Quarterly Turning Pile on Concrete Pad concentrations seen in Oct 2018 west outfall sample. Investigation showed almost 3x benchmark value in water in the storm drain by the turnings pile. This PM is done by Central Maintenance. Description of Significant Industrial Changes During the term of the existing stormwater permit, the Gerdau Long Steel North America facility has not implemented significant changes in industrial activities that affect stormwater discharges. Within the next three years, Gerdau is considering a project for constructing a concrete truck staging area over a portion of a closed/capped landfill located at the site. Since the existing landfill is capped with impervious material, this proposed project is not expected to create a significant quantity of additional stormwater run-off. As part of the engineering review and design of the project, an analysis of stormwater volumes and containment requirements will be conducted.