Loading...
HomeMy WebLinkAboutNCC213695_NOI Application_20210621Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 6/17/2021 5:00:46 PM (NCGO1 NOI Submission) App— by Broussard, Brooklyn C 6/18/2021 8:24:30 AM (Review - Construction NOI 56750) * The task was assigned to Broussard, Brooklyn C by round robin distribution 6/17/2021 5:01 PM The task was assigned to DEMLR NCGO1 NOI Review Team. The due date is: June 21, 2021 5:00 PM 6/17/2021 5:01 PM Submit by Selkane, Aziza 6/21/2021 8:57:24 AM (Payment Verification for NCC2113695) p Athan Parker * Selkane, Azjza assigned the task to Selkane, Azjza 6/21/2021 8:56 AM The task was assigned to DEMLR NCGOII Payment Team. The due date is: July 30, 2021 5:00 PM 6/18/2021 8:25 AM NORTH CAROLINA ErpirironmertW quailly A. Project Information Part A. Project Location and Waterbody Inforn-ation Are you submitting IT No an N01 that was r Yes rejected before? 1 a. Project Name * Archer's Park Subdivision 1b. Specific Lot This field rray be used to list specif c lot nunbers. Numbers 1c. Parcel ID List all R% associated w ith this project. Number(s) (PIN) 272200-64-1289 2. County * Johnston 3. Highway or Street NCHWY231 Address* Street narre only is acceptable if no address nunber assigned yet 4.CityorTownship* O'Neals 5. State * NC 6. Zip Code* 27557 7. Latitude* Enter the latitude in decirral degrees 35.7339 8. Longitude Enter the longitude in clecirral degrees (MJST be negative) -78.2379 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 06/28/2021 Estirrated Construction Project Start Date 10. Date to End 09/30/2021 Fstirnated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial aassif ication for Developrrent 12. Acres to be 52.67 disturbed* (including off -site borrow and waste areas) 13. Total site area 51.51 (acres)* 14. Post- 8.74 construction (Estirrated) impervious area (acres) * NCC Project NCC-JOHNS-2021 -Archer's Park Subdivision Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Pleaseconsult IDWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Moccasin Creek (Bunn Lake) Waterbody* �bn-e of w aterbody into w hich storrrw ater runoff w ill discharge 15b. Waterbody 27-86-2 Index No.* NCWaterbody Index Rinber Sto rmwate r V No discharges will flow F— yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. FbrniUee Inforrration - Legally Fbsponsible Entity and Individual ..................................... ­­ ................................................................ ­­­­­­­ ....................................................................................................... ................... Important: The person Who signs the N01 Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who ovvns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO1 0000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name P and P Land Development, Inc If pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name Athan If Corporation, enter Pbegistered Agent First Wre 3. Last Name* Parker If Corporation, enter F;bgistered Agent Last %rre 3b. Title Vice President 4. Permitee E-mail athan.parker@ampdengineering.com Address* 5. Permittee 919-795-9594 Telephone No.* 6. Permittee Mailing StreetAddress Address* PO Box 4580 Address Line 2 City State / Frovince / Fbgion Emerald Isle NC Flostal / Zip Code Country 28594 United States Check box if the F Yes street address the same as mailing address 7. Permittee Street Street Address Address* 8754 Reed Dr Address Line 2 Suite 14 city State / Frovince / F;bgion Emerald Isle NC Fbstal / Zip Code Country 28594 United States 8. Type of ON nership is only individual if an individual is nan-ed in B. 1. above. Ownership* Non -Government C. Site Contact Information Part C. Roject Ste Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Athan Contact - First Name * 2. Primary Site Parker Contact - Last Name * 3. Title Vice President 4. Site Contact E- athan.parker@ampdengineering.com mail Address* 5. Site Contact 919-795-9594 Telephone No. 6. Organization P and P Land Development, Inc Name 7. Site Contact Street Address Mailing Address PO Box 4580 Address Line 2 city Emerald Isle Fbstal / Zip Code 28594 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. 11. Billing E-mail (For Annual Fee correspondence) athan.parker@ampdengineering.com Default is legally responsible person e-rn3il 12. Billing (For Annual Fee correspondence) Telephone 919-795-9594 Default is legally responsible person telephone State / Frovince / R—egion NC Country United States D. E&SC Plan Part D. aosion & Sediment Control (E&SC) Ran Approval Information ........................................................................................................................................................................................................................................................................................................................................ 1. Date E&SC Plan 05/27/2021 Approved * 2. E&SC Plan Project JC# 21-016-P Number/ID* Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. Local Program* Johnston County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map shoWng the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan 21-016 Archers Park Subdivision ESC Appr 591.67KB Approval letter or 5.27.2l.pdf Grading Permit Mist be RDF f orm3t 6. Site Location Map Must be RDF forn-Bt (linit 20 `VB) Page 1 from 244.07KB 2021.05.2 1.ArchersPa rk. Revised Plan Set. pdf Hease do not upload entire set of E&SC plans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies if necessary. Cover sheet of the plan set has been uploaded as the Site Location Map as site location is on this sheet. 8. NOI Certification 20210617164821549.pdf 54.15KB Form K/Ust be PDF format This is an Express r No Review Project * r Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Any person who knoWngly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knoWngly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty of a Class 2 misdemeanor which may include a fine not to e)ceed ten thousand dollars ($10,000). Under penalty of law, I certify that: I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. PF The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. I will abide by all conditions of the NCGO10000 General Permit and the approved Erosion and Sediment Control Plan. PF If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part 11 (Stormwater Pollution Prevention Plan) of the NCGO1 0000 General Permit. I will nonetheless ensure that all conditions of Part 11 of the permit are met on the project at all times. I hereby request coverage under the NCGO10000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Legally Responsible Person named on this Notice of Intent r Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature 0�e 11911, e4l Type Name* Athan M. Parker Title Vice President Organization Legally Fbsponsible Entity P and P Land Development, Inc Date * 06/17/2021 F. Tracking and COC Info NOI Tracking No. 56750 NC Reference No. NCGOl-2021-3695 Uses 'count nurrber' variable (increrrented by SP) Certificate of NCC213695 Coverage (COC) Uses 'count—nun-ber' variable (incren-ented by SP) No. * Count Number 3695 Sequential nurrber for subrrittal that is incren-ented by Stored Frocedure COC Year 2021 Yearof clatereviewed (used to assign YY digits after "NOMnODCno.) Initial Invoice No. NCC213695-2021 Invoice Due Date 7/18/2021 Initial Fee $ 100.00 Invoice Status OPEN