HomeMy WebLinkAbout20160401 Ver 1_Site Inspection_20210618Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20160401
NCDOT - Widen & Improve NC63 from SR 1615 to
SR 1004 (U-3301)Buncombe
NCDOT - Widen & Improve NC63 from SR 1615 to SR 1004 (U-3301)
NC DOT PDEA
6/18/2021
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Road/Highway Widening
Region:Asheville
Longitude:-82° 40' 53''+35° 39' 04''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on June 18, 2021. I spoke with Paul
Hobson (inspector) during the inspection. The following are items that need attention:
~ Station L 28+00 - 35+00 RT/LT - Stabilize spoils along shoulder. Add temporary or permanent grouncover per
NPDES requirements.
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20160401
6/18/2021
Thorpe, Gregory
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2