Loading...
HomeMy WebLinkAbout20160401 Ver 1_Site Inspection_20210618Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20160401 NCDOT - Widen & Improve NC63 from SR 1615 to SR 1004 (U-3301)Buncombe NCDOT - Widen & Improve NC63 from SR 1615 to SR 1004 (U-3301) NC DOT PDEA 6/18/2021 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Road/Highway Widening Region:Asheville Longitude:-82° 40' 53''+35° 39' 04'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on June 18, 2021. I spoke with Paul Hobson (inspector) during the inspection. The following are items that need attention: ~ Station L 28+00 - 35+00 RT/LT - Stabilize spoils along shoulder. Add temporary or permanent grouncover per NPDES requirements. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20160401 6/18/2021 Thorpe, Gregory Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: page:2