Loading...
HomeMy WebLinkAbout20190230 Ver 6_401 Request Attachment_20210617 (3)EST. 78 S.Y. GEOTEXTILE FABRIC EST. 38 TONS CLASS I RIP RAP15" RCP-III 15" RCP-III 24" CSP24" RCP-III15" RCP-III 15" RCP-III EST. 7 S.Y. GEOTEXTILE FABRIC EST. 2 TONS CLASS B RIP RAP SHT.19 -L- STA. 254+50.00WOODS WOODS DB 755 PG 192 KATHERINE ROBINSON, TRUSTEE -L- 25+00 -Y13A- F F F F F F F F F F F F F F F F F F F F F F F F F F F F 2GI 2GI 2GI 2GI2GI 2GI 2GI FS FS FS FS HW STA. 20+45 -Y13A- RT BEGIN SBG STA. 248+45 -L- LT BEGIN SBG STA. 252+00 -L- LT END SBG SEE DETAIL 57 LATERAL 3' BASE DITCH 15" CSP2GI SEE DETAIL 55 CL B RIP RAP TOE PROTECTION SEE DETAIL 45 W/ CL B RIP RAP LATERAL 2' BASE DITCH SEE DETAIL 56 LATERAL 4' BASE DITCH SEE DETAIL 58 LATERAL 2' BASE DITCH -Y13A- RT STA. 26+00 END SBG 15" RCP-III ELB ELBOWS ELB ELB ELBOWS ELB (B U RIE D 1') 84" R CP-I V WETLAND EXCAVATION IN SITE 7 V10 = 3.3 fps Q10 = 9.4 cfs V10 = 1.1 fps Q10 = 11.5 cfs V10 = 1.6 fps Q10 = 19.5 cfs SURFACE WATER TEMPORARY IMPACTS IN NAD 83SCALE 0'50'50' SITE 7 WETLAND DENOTES FILL INFF E E IN WETLAND DENOTES EXCAVATION CLEARING DENOTES MECHANIZED* * * * ** * ** * * S S SURFACE WATER DENOTES IMPACTS IN SHEET 31 OF 53 PERMIT DRAWING HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 19R-2582A 2/8/2019R:\Hydraulics\PERMITS_Environmental\Drawings\31_R-2582A_SITE7.dgnmeme.buscemi8/17/99DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY