Loading...
HomeMy WebLinkAboutNCC213605_ESC Approval Submitted_20210617Planning & Development Department Nathan Pennington Planning Director LETTER OF APPROVAL May 24, 2021 Airo Way, LLC Mr. Vladimir Grebenyuk 2348 Smokey Park Highway Candler, NC 28715 RE: Project Name: Mission Campus -Phase 1 Acres Approved: 12.76 AC Project 9: ERO2021-00043 County: BUNCOMBE City: CANDLER Address: 99999 PROPST ROAD River Basin: FRENCH BROAD Stream Classification: C Date Received by: 4-30-2021 Plan Type: INSTITUTIONAL Dear Sir/Madam, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. This approval shall become null and void if you have not made progress on the site within six months after the date of approval. A one-time six month extension can be granted for good cause shown upon receiving a written request from you before the expiration of the approved plan. This letter of approval is being issued prior to the issuance of the stormwater permit due to concurrent reviews, but any land disturbing activity associated with this project shall not begin prior to issuance off all required permits including the stormwater permit and the land disturbing permit. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas(a�ncdenr.gov or Paul Clark at Paul. clark(cr�,ncdenr. og_v. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. The Land Disturbing Permit must be posted at the job site. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, W. Jason Guess Erosion Control Officer Enclosures: NPDES NCGO1 Fact Sheet Cc: ACE Engineering, PA