Loading...
HomeMy WebLinkAboutSW5210202_Add Info_20210507ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director Blake Hall, PE 5410 Trinity Road, Suite 102 Raleigh, NC 27607 NORTH CAROLINA Environmental Quality May 7, 2021 Subject: Second Request for Additional Information Stormwater Permit No. SW5210202 Franklin County E911 Franklin County Dear Mr. Hall: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on April 5, 2021. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Prior Comment 8 — "Please dimension the project boundary with bearings and distances (Section VI, 8i). This information should be shown in the main set of plans. Please show the entire extents of the project boundary (You may wish to add this information to plan sheet C4.4). 2. Prior Comment 16a — "Provide pdfs of all revisions... Pdfs must be uploaded using the form at: https:Iledocs.deg. nc.;?ov/Forms/SW Project Submittal" We did not receive the electronic files for this submission. Please ensure that the files from the April 5th submission and the files for the next submission get uploaded. Occasionally, the file upload portal will stall (and not register the upload) if the files are very large. 3. There appears to be a discrepancy between the BUA information shown in the Application/Supplement-EZ Form and as shown in the SIA calculations. In the Application/Supplement-EZ Form, the drainage area to the wet pond is shown as 1.49 acres (64,812 sf) and the amount of BUA in the drainage area is shown as 0.60 acres (25,934 sf). The SIA calculations show the drainage area to the wet pond as 1.48 acres and the amount of BUA in the drainage area as 0.56 acres. Make sure that you are not double counting Existing BUA. 4. The forebay volume appears to be incorrectly calculated in the SIA calculations. The sediment storage area (below elevation 247') should not contribute to the volume of the DNorth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources EQ _ 512 North Salisbury Street 11612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH CAROLINA Department oiEnvironmental aum� 0 ` 919.707.9200 forebay (the stage -storage table shows an incremental volume of 106 cf from elevation 246' to 247' ). 5. The provided stage -storage table for the main pool and forebay do not show the cross - sectional areas or volumes up to the permanent pool (they stop at elevation 250.5'). this was also mentioned in Prior Comment 12. Since the berm separating the forebay from the main pool is below the permanent pool elevation an imaginary vertical line that runs along this berm should be used to divide the main pool from the forebay (See image below). (A) (g) Perm. Pool Elevation INCORRECT Perm. Pool Elevation CORRECT 6. Please correct the following issues with the Supplement-EZ Form: a. Drainage Areas Page: i. Please complete the Entire Site Column. This column is an accounting of all of the BUA for the entire site. The "drainage area" for the entire site would be the project area and the "design storm" and "design volume" are not required for this column. b. Wet Pond Page: i. Lines 2, 26-29, 32, & 35 may need to be changed, depending on earlier comments. ii. Line 34 — The cleanout depth of the forebay is the distance from the permanent pool elevation (251') to the top of the sediment storage elevation for the forebay (247'), expressed in inches. iii. Lines 43 & 44 — The depth of the forebay is the distance from the permanent pool elevation (251') to the excavated bottom of the forebay (246'), expressed in inched. Some forebays are designed to have a sump near the inlet pipe (See Figure 5 of Part C-3 of the Stormwater Design Manual) in these cases, the two different depths would be recorded, but if the bottom of the forebay is at a uniform elevation, then these two Lines would be the same. iv. Line 48 — Per the provided detail on plan sheet C4.2, the pond draws down from below the permanent pool surface elevation. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 6, 2021, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW5210202 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Jim.Farkas@ncdenr.gov or (919) 707-3646. Sincerely, )-6mGW� Jim Farkas Environmental Engineer Stormwater Program cc: Raleigh Regional Office