Loading...
HomeMy WebLinkAboutSW5210202_Plan (SCM Detail)_202105105.0' 5.0' 5.0' 4.0' SIPHON OUT 6" MIN. WALI THICKNESS (T' 0-RING OUTLET FILL BOTTO RISER CONCRET INVERT ELEVP #5 REBAR @ 12" O.C. WET POND PLAN VIEW NOTES 1. CONCRETE ANTI -FLOTATION BLOCK TO BE PROVIDED WITH MINIMUM TEMPERATURE AND SHRINKAGE STEEL REINFORCEMENT. 2. TRASH RACKS FOR RISER NOT SHOWN FOR CLARITY. 3. TO PREVENT FLOTATION, CAST CONTROL STRUCTURE WITH ANTI -FLOTATION BLOCK WITH #5 REBAR FROM FOOTING. 4. REINFORCED CONCRETE STRENGTH TO BE 3,000 PSI. 5. RISER STRUCTURE TO BE CAST IN PLACE, MONOLITHIC CONCRETE OR PREFAB RISER STRUCTURE THAT ARE MULTIPLE SECTIONS REFER TO RISER JOINT CONNECTION DETAIL. REMOVABLE GATE VALVE WHEEL AND STEM TO EXTEND ABOVE TRASH TRACK, BUT NOT THROUGH ACCESS HATCH 100 YR WSEL = 252.79 TOP OF RISER EL. = 252.50 10 YR WSEL = 252.51 o - - - - - j2YRWSEL =252.32 ------ YR WSEL = 252.15 0 4 CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH o NCDOT STD. 840.66. STEPS SIPHON OUTLET SHALL BE PLACED AT 16" O.C. (SEE DETAIL) WRAP OUTSIDE OF PIPE JOINTS WITH LAYER OF TYPE II GEOTEXTILE 8" DIP FOR DRAIN FILTER, COVER 2 FT BY 3FT OF PIPE CENTERED ON JOINT. 8" X 4" REDUCER FOR o TEMPORARY SKIMMER. REMOVE AT COMPLETION 15" 0 O-RING RCP 8" GATE VALVE FLOW INV. SEE RISER PROFILE 4" PVC FOR TEMPORARY SKIMMER. REMOVE AT 5.0' W X 5.0' L X 1.00' H COMPLETION CONCRETE ANTI -FLOTATION BLOCK 3,000 PSI CONCRETE W/ #5 REBAR @16" O.C. BOTH DIRECTIONS BOTTOM ELEV. = 244.00 5' x 5' (O.D.) PERMANENT REINFORCED CONCRETE OUTLET STRUCTURE DETAILS N.T.S. 260 PROP GROUND 3:1 (TYP) (SEE DAM EMBANKMENT AND SOIL COMPACTION SPECIFICATIONS) 255 1 PIPE I'll 01 24" HDI @ 0.55 250 I .... .... INV IN: 250.00 I FOREBAY 2:1 SLOPE - BELOW SHELF a (� _Iz 6' VEGETATED SHELF 245 I .... ...._-Y TOP SED STORAGE (246.00) BTTM FOREBAY (245.00) 4" DI DRAIN LINE W/ FILTER FABRIC 4" GATE VALVE 240 rn I CD co co N N N N N 0+00 0+50 M N 100 YR WSEL = 252.79 TOP OF BERM (254.00) 10 YR WSEL = 252.51 INCLUDES 5% 2 YR WSEL = 252.32 w SETTLEMENT L n 1 YR WSEL = 252.15 ADJUSTMENT 260 w � O w O J .., .o .., o � ® � Ln N , O 04 �............ ............................... .............. Lq Oz It .. 255 a NIz 1+00 1+50 2+00 2+35.55 RISER STRUCTURE & OUTLET PROFILE VIEW WET DETENTION BASIN CONSTRUCTION SEQUENCE: 1. IF THE WET DETENTION BASIN IS USED AS A SEDIMENT TRAP DURING CONSTRUCTION, ALL SEDIMENT DEPOSITED DURING CONSTRUCTION MUST BE REMOVED, EROSION FEATURES MUST BE REPAIRED, AND THE VEGETATED SHELF MUST BE RESTORED, BEFORE OPERATION AS A STORMWATER SCM BEGINS. 2. DO NOT BEGIN CONSTRUCTION OF WET DETENTION BASIN AREAS UNTIL SITE CONSTRUCTION IS COMPLETE, ALL PARKING SURFACES ARE PAVED, AND THE ENTIRE SITE HAS BEEN ESTABLISHED WITH A GOOD STAND OF GRASS. 3. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN PLACE AND THE SLOPES DRAINING TO THE WET DETENTION BASIN AREA SHALL BE STABILIZED BEFORE CONSTRUCTION OF THE WET DETENTION BASIN BEGINS. 4. INSTALL TEMPORARY SILT FENCE AROUND THE WET DETENTION BASIN AREA AS NEEDED. 5. EXCAVATE WET DETENTION BASIN AREA, PER THE GRADES AND DETAILED ELEVATIONS SHOWN ON THE CONSTRUCTION PLANS. 6. CONTACT ENGINEER SO AN AS -BUILT SURVEY CAN BE PERFORMED OF THE WET DETENTION BASIN. 7. INSTALL ANY REMAINING STORM DRAINAGE PIPES AND INLETS. 8. FINE GRADE THE SIDE SLOPES OF THE WET DETENTION BASIN AREA. DRESS UP VELOCITY DISSIPATER AS NEEDED PER THE PLANS. 9. INSTALL GRASS PER GRASS SPECIFICATIONS. 10. PLANT ALL PROPOSED VEGETATION PER WET DETENTION BASIN PLANTING PLAN. CONTACT THE PROJECT LANDSCAPE ARCHITECT TO COORDINATE AS NEEDED. 11. FINE GRADE, SEED AND STABILIZE ANY REMAINING DISTURBED AREAS AROUND THE OUTSIDE OF THE WET DETENTION BASIN AREA. REMOVE SILT FENCE. 12. UPON COMPLETION OF WORK, CONTACT THE PROJECT ENGINEER AND LANDSCAPE ARCHITECT FOR AN INSPECTION AND TO BEGIN THE AS -BUILT CERTIFICATION PROCESS. AN AS -BUILT SURVEY OF ALL ASPECTS OF THIS FACILITY WILL BE PERFORMED BY THE ENGINEER. CERTIFICATIONS WILL NOT BE ISSUED IF THE SCM DOES NOT MEET OR EXCEED THE REQUIREMENTS CONTAINED IN THE CONSTRUCTION DOCUMENTS. SHOULD REMEDIAL WORK BE REQUIRED, ALL COSTS ASSOCIATED WITH THE REMEDIAL WORK INCLUDING RE -SURVEY AND RE -INSPECTIONS WILL BE BORNE BY THE CONTRACTOR. 4" PVC CAP A PRECAST RISER 8" STRUCTURE WALL 4" ORIFICE AT I 40 PVC PIPE AT INV. 12" ELEV.= 251.00 3 INVERT = 251.00 (PPE) 12" 4" PVC CAP WITH 1.0" 0 DRILLED ORIFICE SIPHON OUTLET DETAIL TOP OF DAM = 254.00' (INCLUDES 5% SETTLEMENT ADJUSTMENT) 30' WIDE EMERGENCY SPILLWAY 3;1 EMERGENCY SPILLWAY ELEV. = 253.00' LINE EMERGENCY SPILLWAY W/ CLASS B RIPRAP AND NON -WOVEN FILTER FABRIC OR 50 MIL HEAVY DUTY SILVER TARP EMERGENCY SPILLWAY TYPICAL SECTION N.T.S. CONSTRUCTION SEQUENCE FOR CONVERTING THE SEDIMENT BASIN INTO A PERMANENT STORMWATER MANAGEMENT BASIN 1. AFTER COMPLETE STABILIZATION OF THE SITE AND APPROVAL FROM THE NCDENR FOR REMOVAL ALL EROSION CONTROL MEASURES, DEWATER THE TEMPORARY SEDIMENT BASIN AND CLEAN OUT ACCUMULATED SEDIMENT. 2. FOLLOW ALL RECOMMENDATIONS OF OWNER'S GEOTECHNICAL ENGINEER FOR ALL BASIN REPAIRS AND MAINTENANCE. 3. REMOVE SKIMMER AND BAFFLES. 5. GRADE BASIN TO FINAL GRADES INDICATED AND SOD SIDE SLOPES. 6. REMOVE PLUGGED RISER AND CUT IN WEIRS & INSTALL PVC QWV DRAW DOWN PIPE. 7. REFER TO LANDSCAPE PLAN FOR SCM PLANTINGS. 4208 Six Forks Road, Suite 1000 Raleigh, NC 27609 p: 919.825.4882 www.sgarc.com Consultants: Civil: Timmons Group 5410 Trinity Road, Suite 102 Raleigh, NC 27607 919.866.4951 MEP: RMF Engineering 8081 Arco Corporate Drive, Suite 300 Raleigh, NC 27617 919.941.9876 Structural Engineer: SCHRADERGROUP 4208 Six Forks Road, Suite 1000 Raleigh, NC 27609 919.825.4882 Communications: Mission Critical Partners 4208 Six Forks Road, Suite 100 Raleigh, NC 27609 888.862.7911 Professional Seal: CAPO SEAL; VO*4 '74 ra + • xwt 0, �w Owner: Franklin County, 113 Market Street Louisburg, NC 27549 NC Ir- LIJ � o U caLO � p CV U Q zL o p C) �Ci)_ z � J LL ISSUED FOR: NO. DESCRIPTION DATE 1 DID SET 02-05-2021 2 100% DESIGN DEVELOPMENT 02-17-2021 3 BUILDING PERMIT SET 04-16-2021 4 ISSUED FOR BIDDING 04-23-2021 DATE: 05/10/2021 SG PROJECT NUMBER: 20-010 Key Plan: Drawing Title: WET POND PLAN, PROFILES, & DETAILS Drawing Number: C402 DAM EMBANKMENT AND SOIL COMPACTION SPECIFICATIONS 1. CONTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DAM EMBANKMENT SHALL BE PLACED IN 6-INCH LOOSE LAYERS (3-INCH LOOSE LAYERS WITHIN 3-FEET OF EITHER SIDE OF THE PRINCIPAL SPILLWAY PIPE TO A DEPTH OF 2-FEET OVER THE PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. 2. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS SHALL BE REMOVED FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS WITH ORGANIC MATTER CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. STONES GREATER THAN 3-INCH (IN ANY DIRECTION) SHALL BE REMOVED FROM THE FILL PRIOR TO COMPACTION. 3. FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIALS. 4. ANY FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING A STORM EVENT SHALL BE PROPERLY SCARIFIED PRIOR TO THE PLACEMENT OF THE NEXT SOIL LIFT. 5. SURFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT CONSTRUCTION AND THE PLACEMENT OF CONTROLLED FILL. 6. FOUNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLE AND/OR UNSUITABLE SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE PERFORMED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. IN NO CASE SHALL THERE BE AN ATTEMPT TO STABILIZE ANY PORTIONS OF THE FOUNDATION SOILS WITH CRUSHED STONE. 7. TREATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING AND ROCK FOUNDATION PREPARATION (I.E., TREATMENT WITH SLUSH GROUTING, DENTAL CONCRETE, ETC.) MAY BE REQUIRED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER. ALL SUCH ACTIVITIES SHALL BE CLOSELY MONITORED AND DOCUMENTED BY THE GEOTECHNICAL ENGINEER. 8. FILL ADJACENT TO THE RISER AND PRINCIPAL SPILLWAY PIPE SHALL BE PLACED SO THAT LIFTS ARE AT THE SAME LEVEL ON BOTH SIDES OF THE STRUCTURES. 9. EARTHWORK COMPACTION WITHIN 3-FEET OF ANY STRUCTURES SHALL BE ACCOMPLISHED BY MEANS OF HAND TAMPERS, MANUALLY DIRECTED POWER TAMPERS OR PLATE COMPACTORS OR MINIATURE SELF-PROPELLED ROLLERS. 10. COMPACTION BY MEANS OF DROP WEIGHTS FROM A CRANE OR HOIST SHALL NOT BE PERMITTED. 11. HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO PASS OVER CAST -IN -PLACE STRUCTURES (INCLUDING THE CRADLE) UNTIL ADEQUATE CURING TIME HAS ELAPSED. 12. TO RE-ESTABLISH VEGETATION AFTER CONSTRUCTION, A 4-INCH LAYER OF TOPSOIL SHALL BE PLACED ON THE DISTURBED EMBANKMENT SURFACE AND THE AREA SEEDED AND MULCHED OR HYDROSEEDED. TESTING, OBSERVATION, AND CERTIFICATION 1. TESTS OF THE DEGREE (%) OF COMPACTION OF THE PLACED FILL IN THE DAM /KEY TRENCH SHALL BE PERFORMED AS A PART OF THE PERMITTEE'S NORMAL QUALITY CONTROL PROGRAM FOR THE CONSTRUCTION OF THE DAM. TESTS SHALL BE CONDUCTED CONCURRENT WITH THE INSTALLATION OF THE COMPACTED FILL AND THE CONTRACTOR SHALL COORDINATE THE CONSTRUCTION OF THE DAM SO THAT THE TESTING CAN BE COMPLETED. SHOULD THE RESULTS OF THE TESTS INDICATE THAT THE SPECIFIED DEGREE OF COMPACTION HAS NOT BEEN OBTAINED; THE PORTIONS OF THE DAM REPRESENTED BY SUCH TESTS SHALL BE REWORKED OR REBUILT. ALL PORTIONS OF THE DAM SHALL ACHIEVE THE SPECIFIED MINIMUM DEGREE OF COMPACTION. 2. CONSTRUCTION OF CLASS A, B AND C DAM EMBANKMENTS SHALL BE DONE UNDER THE OBSERVATION OF A QUALIFIED GEOTECHNICAL ENGINEER, WHO IS REGISTERED AS A PROFESSIONAL ENGINEER IN THE STATE OF NORTH CAROLINA. THE GEOTECHNICAL ENGINEER MUST HAVE EXPERIENCE IN THE DESIGN AND CONSTRUCTION MONITORING OF DAMS OF THE SIZE AND SCOPE COVERED BY THESE STANDARDS AND GUIDELINES. 3. ON CLASS A, B, AND C DAMS (WITH THE EXCEPTION OF DETENTION ONLY CLASS C DAMS THAT COLLECT DRAINAGE FROM AN AREA OF 25-ACRES OR LESS), THE GEOTECHNICAL ENGINEER, AS DEFINED ABOVE, SHALL OBSERVE ALL ASPECTS OF THE CONSTRUCTION OF THE DAM (I.E., PREPARATION OF THE FOUNDATION, INSTALLATION OF THE CUT-OFF TRENCH, INSTALLATION OF THE PRINCIPAL SPILLWAY PIPE, INSTALLATION OF THE INTERNAL DRAINAGE, INSTALLATION OF COMPACTED FILL, ETC.). THE FREQUENCY OF OBSERVATION AND TESTING MUST BE SUFFICIENT FOR THE GEOTECHNICAL ENGINEER (OR THE DESIGN ENGINEER ON CLASS D DAMS AND CLASS C, DETENTION ONLY, DAMS) TO STATE, IN HIS/HER PROFESSIONAL OPINION, THAT THE SPECIFIC ITEMS OBSERVED AND TESTED WERE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS AND SPECIFICATIONS. GENERAL NOTES: 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH NCDEQ AND NCDOT STANDARDS, SPECIFICATIONS AND DETAILS. 2. SEE GRADING PLAN FOR MORE INFORMATION ON ENTIRE SITE GRADING. PLANT SPECIES (SEE TABLE) 2-3" DOUBLE SHREDDED HARD WOOD MULCH LAYER HEIGHT VARIES WITH PLANTS 1" COMPOST LAYER AMENDED SOIL MIX UNDISTURBED EARTH 12" MIN. WET POND VEGETATION DETAIL N.T.S. WET POND VEGETATED SHELF PLANT LIST MINIMUM REQUIRED PLANT DENSITY = 50 PLANTS PER 200 SQUARE FEET OF VEGETATED SHELF (1685 SF / 200 SF) * 50 PLANTS = 421 MINIMUM PLANTS REQUIRED. THE FOLLOWING PLANTS SHALL BE PLANTED ON THE 6-FOOT WIDE VEGETATED SHELF BETWEEN THE ELEVATIONS OF 250.50-251.50: QUANTITY BOTANICAL NAME COMMON NAME SPACING NOTES EUPATORIADELPHUS PLANT IN GROUPS 70 JOE PYE WEED 4' O.C. FISTULOSUS OF 5 GREAT BLUE PLANT IN GROUPS 70 LOBELIA SIPHILITICA 4' O.C. LOBELIA OF 5 CARDINAL PLANT IN GROUPS 70 LOBELIA CARDINALIS 4' O.C. FLOWER OF 5 SPOTTED PLANT IN GROUPS 70 EUPATORIADELPHUS MACULATUS 4' O.C. TRUMPETWEED OF 5 SWAMP PLANT IN 70 ASCLEPIAS INCARNATA 4' O.C. MILKWEED OF GROUPS STARRUSH PLANT IN GROUPS 71 RHYNCHOSPORA COLORATA 4' O.C. PLUMEGRASS OF 5 NURSERY SOURCES: MELLOW MARSH FARM (919) 742-1200 CURE NURSERY (919) 542-6186 6" 1/2"0 GRADE 8 STAINLESS STEEL CONCRETE LAG SCREW 12" x 4" x 1 /2" STAINLESS STEEL STRAP (4 PER RISER JOINT) 3.0" NOTES: 1. CONTRACTOR SHALL INSTALL STRAPS PER DETAIL ON ALL PREFAB RISER STRUCTURES THAT ARE MULTIPLE SECTIONS AND ENSURETHAT THESE JOINTS ARE WATERTIGHT. RISER JOINT CONNECTION DETAIL N.T.S. RCP FES SLOPE 0 % FLOW III III III III III �.:.°'' mml I I III III III °�,� °., , °,, F STAINLESS d BOLT CURTAIN WALL OUTLET PROTECTION NOTES: 1. d = 18" MIN. OR DEPTH OF RIPRAP OUTLET PROTECTION, WHICHEVER IS GREATER. 2. CURTAIN WALL IS TO BE A MIN. 6" IN WIDTH AND CONSTRUCTED OF 3000 PSI REINFORCED CONCRETE. 3. CURTAIN WALL AFFIXED TO BOTTOM OF FLARED END SECTION BY STAINLESS STEEL BOLTS 8" O.C. CONCRETE CURTAIN WALL DETAIL N.T.S. GATE VALVE 7.0' 5.0' 11.3 LF 2"x2"x1/4" ANGLE THE BOLD / DASHED LINETYPE DENOTES THE ACCESS HATCH TO BE PROVIDED BY THE TRASH RACK FABRICATOR PER OUTLET STRUCTURE MATERIAL SPECIFICATIONS AND ALIGNED WITH STEPS 7.0' 1.0' (TYP.) 11.3 LF 2"x2"x1/4" ANGLE CONCRETE ANCHOR BOLT (TYP., SEE N 11.3 LF 2"x2"x1/4" ANGLE 1.0' 1.0' (TYP.) (TYP.) 2' MIN. 2.8' Do ' < 2' !, ! A TOP OF DAM OUTLET PIPE, REFER TO BMP DETAIL SHEETS TOP OF DRAINAGE DIAPHRAGM 2" LAYER OF #8 CHOKING STONE BETWEEN SAND AND GRAVEL (2) 4" SCH 40 PVC PIPE PERFORATED THROUGH WIDTH OF STONE IN DIAPHRAGM #57 STONE ASTM C-33 CONCRETE SAND I- 2' ---1 --d 12" 3xDc 3,000 PSI MIN. CONCRETE CRADLE n NOTE: (NO FLOWABLE A FILL) 1. 4" DRAIN OUTLETS FOR DIAPHRAGM SHALL BE PROTECTED BY AN APPROPRIATE RODENT GUARD: 2" X 2" STAINLESS STEEL MESH SECURED WITH STAINLESS STEEL CLAMP OR APPROVED EQUAL. 2. PIPE SHALL INCLUDE EXPANSION JOINTS SPACED EVERY 8 FEET ON CENTER. 3. JOINTS WRAPPED WITH DOUBLE LAYER OF NON -WOVEN GEOTEXTILE FILTER FABRIC ON OUTSIDE OF PIPE SHALL COVER 2 FEET BY 3 FEET OF PIPE CENTERED ON JOINT. TOP OF DAM J TOP OF DRAINAGE DIAPHRAGM EMERGENCY 2' MIN. `(P SPILLWAY ----- 2'MIN--- - CONCRETE NOTES: ANCHOR BOLT (TYP., 1. ALL REBAR TO BE #4 REBAR. SEE NOTE #4) 2. ALL REBAR AND ANGLES TO BE STAINLESS STEEL. 3. STAINLESS STEEL 2"x2"x1/4" ANGLES SHALL BE WELDED TO THE REBAR TRASH RACK. ONCE WELDED, THE ENTIRE ASSEMBLY SHALL BE PLACED ONTO THE RISER WITH ANGLES SITTING DIRECTLY ON TOP OF RISER. FABRICATED HINGES FOR THE 2'x3' ACCESS 4. CONTRACTOR SHALL ANCHOR THE TRASH RACK TO MANHOLE WALL WITH FOUR HATCH. ACCESS HATCH 4"x1/4" CONCRETE ANCHOR BOLTS THROUGH ANGLES. SHALL BE POSITIONED OVER STEPS. 5. CONTRACTOR SHALL OMIT OR ADJUST REBAR AS NECESSARY TO ALLOW FOR CONCRETE COLLAR. 6. ACCESS HATCH SHALL HAVE AN ACCEPTED DESIGN LIFE OF 75 YEARS. RISER TRASH RACK DETAIL N.T.S. OUTLET PIPE WRAPPED IN DOUBLE LAYER OF NON -WOVEN GEOTEXTILE FILTER FABRIC AT PIPE JOINTS. COVER 2 FT. OF PIPE CENTERED ON JOINT. FLOW - - - of CONCRETE CRADLE 2- SHALL EXTEND THE, ` 2 CION-PERFOFULL LENGTH OF THE ( CONDUIT ()RATED 4" SCH 40 PV(CONNECT TO DOWNSTREAM SECTION A -A DRAINAGE FILTER DIAPHRAGM DETAIL N.T.S. STRUCTURE OR DAYLIGHT ON GRADE) _ 40 PVC THROUGH WIDTH OF STONE IN DIAPHRAGM - CAPPED (TYP.) 4208 Six Forks Road, Suite 1000 Raleigh, NC 27609 p: 919.825.4882 www.sgarc.com Consultants: Civil: Timmons Group 5410 Trinity Road, Suite 102 Raleigh, NC 27607 919.866.4951 MEP: RMF Engineering 8081 Arco Corporate Drive, Suite 300 Raleigh, NC 27617 919.941.9876 Structural Engineer. SCHRADERGROUP 4208 Six Forks Road, Suite 1000 Raleigh, NC 27609 919.825.4882 Communications: Mission Critical Partners 4208 Six Forks Road, Suite 100 Raleigh, NC 27609 888.862.7911 Professional Seal: CAPO SEAL; 0�` 4�'74 a r • Owner: Franklin County, 113 Market Street Louisburg, NC 27549 NC r r W o U caLO � p CV U >N Q z L O p I-, Clio z � J LL ISSUED FOR: NO. DESCRIPTION DATE 1 DD SET 02-05-2021 2 100% DESIGN DEVELOPMENT 02-17-2021 3 BUILDING PERMIT SET 04-16-2021 4 ISSUED FOR BIDDING 04-23-2021 DATE: 05/10/2021 SG PROJECT NUMBER: 20-010 Key Plan: Drawing Title: WET POND NOTES & DETAILS Drawing Number: C403