Loading...
HomeMy WebLinkAbout20211006 Ver 1_US 19 23 Clyde sinkhole_rough plan x-sec_20210616 X-sec facing west NOTE.inflow to box would be temporarily diverted into new sinkho:e bore pipe in flexible pipe that is jammed/sealed into inflow eastbound westbound pipe during filling of box bottom with grout lanes lanes 11111 existing stream pipe Railroadbed o b aut 2OD feet long proposed bore pipe existing junction • proposed rip rap box proposed grout leo channel adjacent 30foot fill MI. existing drop fiow - •m"11111 � Existing stream pipe-30" existing rock culvert existing-40 feet open channel