HomeMy WebLinkAbout20202025 Ver 1_PCN Correction OW Table_202106164a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type
O1 Road Widening P Pond 2 Fill
O2 Dam Embankment
Replacement T Pond 1 Excavation
O3 Dam Riser Structure P Pond 1 Fill
O4 Dam Embankment
Replacement/Reinforcement P Pond 2 Fill-No Loss
O5 Dam Widening P Pond 2 Fill
4g. Total temporary open water Impacts:
0.047
4g. Total permanent open water impacts:
0.327
4g. Total open water impacts:
0.374
4h. Comments:
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then
individually list all open water impacts below.
Permanent impacts include 0.152 ac of no-loss impact and 0.175 ac of open water loss.
4e. Waterbody type 4f. Impact area
Pond 0.026
Pond 0.0472
Pond 0.0006
Pond 0.1523
Pond 0.1481
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then