Loading...
HomeMy WebLinkAbout20202025 Ver 1_PCN Correction OW Table_202106164a. Site # 4a1. Impact Reason 4b. Impact type 4c. Name of waterbody 4d. Activity type O1 Road Widening P Pond 2 Fill O2 Dam Embankment Replacement T Pond 1 Excavation O3 Dam Riser Structure P Pond 1 Fill O4 Dam Embankment Replacement/Reinforcement P Pond 2 Fill-No Loss O5 Dam Widening P Pond 2 Fill 4g. Total temporary open water Impacts: 0.047 4g. Total permanent open water impacts: 0.327 4g. Total open water impacts: 0.374 4h. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. Permanent impacts include 0.152 ac of no-loss impact and 0.175 ac of open water loss. 4e. Waterbody type 4f. Impact area Pond 0.026 Pond 0.0472 Pond 0.0006 Pond 0.1523 Pond 0.1481 If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then