HomeMy WebLinkAboutSW6140902_Permit Transfer_20210614ROY,COOPER
Governor
JOHN NICHOLSON
Interim Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
June 14, 2021
Blackbridge Village Owners Association, Inc.
Attn: Thomas Radford Brown, Manager
c/o Southeastern HOA Management
2557 Ravenhill Drive, Suite 1C
Fayetteville, NC 28303'
Subject: Permit Transfer
State Stormwater Management Permit SW6140902
Blackbridge Village Subdivision
Cumberland County
Dear Mr. Brown:
On May 13, 2021, the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources
(DEMLR) received a State Stormwater: Permit Transfer Application Form to transfer ownership of State
Stormwater Management Permit SW6140902, which was originally issued to Caviness Land Development,
Inc. on October 10, 2014 with a Minor Modification to the maximum built -upon area per lot (3,000 square
feet/lot to 4,000 square feet/lot) approved on March 17, 2016 for the subject project. DEMLR staff inspected
the project on June 9, 2021, determined that the documentation is in order, and that the project is compliant
with the terms and conditions of the permit and approved stormwater management plans.
By signing the transfer application form, you have accepted the responsibility for complying with the terms
and conditions outlined in this permit. The Division is hereby notifying you that the subject permit has been
transferred on June 14, 2021 and reminding you that this permit shall be effective until October 9, 2022.
The transferred and re -issued permit is enclosed. Please note that this transferred and re -issued permit
does not impose new or different terms; it merely restates and clarifies some of the previous terms to
provide you with a better understanding of your obligations under the permit.
Please be aware that the project's built -upon area and stormwater controls must be built and maintained
in compliance with the permit documents and the approved plans. Maintenance of the approved system
shall be performed in ` accordance with the signed and approved Operation and Maintenance
Agreement as incorporated into the recorded deed restrictions. Any modifications to this project must
be submitted to DEMLR and approved prior to construction. The issuance of this approval does not
preclude you from complying with all other applicable statutes, rules, regulations, or ordinances, which
may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to
construction.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH).
The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed
with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions
regarding the filing fee (if a filing -fee is required) and/or the details of the filing process at 6714 Mail Service
Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at
www.NCOAH.com. Unless such demands are made, this permit shall be final and binding.
D_EQ
�mrTr; cat+c.uw,
Uej�rtmentat kAVltonmeidol QuelNy '...
North Carolina Departrnent of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1 225 Green Street. Suite 7141 Fayetteville, North Carolina 28301
910.43,3,3300
If you have any questions, please contact Mike Lawyer at (910) 433-3394 or via e-mail at
mike.lawyer@ncdenr.gov.
Sincerely
or Brian Wrenn, Director
Division of Energy, Mineral and Land Resources
ec: Watson G. Caviness, President — Caviness Land Developments, Inc.
PJ Gay — Caviness Land
Scott Brown, PE — 4D Site Solutions, Inc.
cc: FRO — DEMLR, State Stormwater Files
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Blackbridge Village Owners Association, Inc.
for
Blackbridge Village Subdivision
Black Bridge Road near the Town of Hope Mills, NC
Cumberland County
FOR THE
construction, operation and maintenance of one infiltration basin in compliance with the provisions of
Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and
the approved stormwater management plans, specifications and other supporting data as attached
and/or on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division"
or "DEMLR") and considered an enforceable part of this permit.
This permit shall be effective from the date of issuance until October 9, 2022 and shall be subject to the
following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in
the application and other supporting data.
2. The infiltration basin is approved for the management of stormwater runoff as described in the
application documents and as shown on the approved plans.
3. All stormwater collection and treatment systems must be located in either dedicated common
areas or recorded easements. The final plats for the project will be recorded showing all such
required easements, in accordance with the approved plans.
4. The runoff from all built -upon area within the permitted drainage area of this project must be
directed into the permitted stormwater control system.
5. The built -upon areas associated with this project shall be located at least 30 feet landward of all
perennial and intermittent surface waters.
II. SCHEDULE OF COMPLIANCE
1. During construction, erosion shall be kept to a minimum and any eroded areas of the system
will be repaired immediately.
2. The permittee shall at all times provide the operation and maintenance necessary to assure the
permitted infiltration basin functions at optimum efficiency. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled
intervals including, but not limited to:
a. Semi-annual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the filter strip.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and specifications.
f. Debris removal and unclogging of all drainage structures, level spreader, filter media,
planting media, underdrains, catch basins and piping.
g. Access to the cell and outlet structure must be available at all times.
3. Records of maintenance activities must be kept for the infiltration basin and made available upon
request to authorized personnel of the Division of Energy, Mineral and Land Resources. The
records will indicate the date, activity, name of person performing the work and what actions
were taken.
4. The permittee shall submit an annual summary report of the maintenance and inspection
records for the infiltration basin. The report shall summarize the inspection dates, results of the
inspections, and the maintenance work performed at each inspection.
5. The infiltration basin shall be constructed in accordance with the approved plans and
specifications, the conditions of this permit, and with other supporting data.
6. Upon completion of construction, prior to issuance of a Certificate. of Occupancy, and prior to
operation of this permitted facility, a certification must be received from an appropriate designer
for the infiltration basin certifying that the permitted facility has been installed in accordance with
this permit, the approved plans and specifications, and other supporting documentation. Any
deviations from the approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must be restored to design
condition prior to operation as a stormwater treatment device and prior to occupancy of the
facility.
8. The permittee shall submit to the Director and shall have received approval for revised plans,
specifications, and calculations prior to construction, for any modification to the approved plans,
including, but not limited to, those listed below:
a. Any revision to any item shown on the approved plans, including the stormwater
management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project
area is defined as all property owned by the permittee, for which Sedimentation and
Erosion Control Plan approval was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan.
9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for
a minimum of eight years from the date of the completion of construction.
10. The Director may notify the permittee when the permitted site does not meet one or more of the
minimum requirements of the permit. Within the time frame specified in the notice, the permittee
shall submit a written time schedule to the Director for modifying the site to meet minimum
requirements. The permittee shall provide copies of revised plans and certification in writing to
the Director that the changes have been made.
11. All Stormwater Control Measures (SCMs) and associated maintenance accesses on privately
owned land except for those located on single family residential lots shall be located in
permanent recorded easements. The SCMs shall be shown and labeled within the easement.
These easements shall be granted in favor of the party responsible for enforcing the stormwater
program under which the SCMs were approved. SCMs must have access and maintenance
easements to provide the legal authority for inspections, maintenance personnel and equipment.
The entire footprint of the SCM system must be included in the access and maintenance
easement, plus an additional ten or more feet around the SCM to provide enough room to
complete maintenance tasks. The SCM system includes the side slopes, forebay, riser structure,
SCM device, outlet structure, dam embankment and emergency spillway.
III. GENERAL CONDITIONS
This permit is not transferable to any person or entity except after notice, to and approval by the
Director. In the event of a change in ownership, the appropriate form must be completed and
submitted to the Division accompanied by any applicable fee, documentation from both parties
involved and other supporting materials as may be appropriate. The project must be in good
standing with the Division. The approval of this request will be considered on its merits and may
or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such time as the
Division approves a request to transfer the permit. Neither the sale of the project area in whole
or in part, nor the conveyance of common area to a third party, constitutes an approved permit
transfer
3. Any individual or entity found to be in noncompliance with the provisions of this stormwater
management permit or the requirements of the Stormwater rules is subject to enforcement
procedures as set forth in NCGS 143 Article 21.
4. The issuance of this permit does not preclude the Permittee from complying with any and all
statutes, rules, regulations, or ordinances, which may be imposed by other government
agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be
required by this Division, such as the construction, of additional or replacement stormwater
management systems.
6. The permittee grants Division staff permission to enter the property during normal business
hours for the purpose of inspecting all components of the permitted stormwater management
facility.
7. The permit issued shall continue in force and effect until the permittee files a request with the
Division for a permit modification, transfer, renewal, or rescission; however, these actions do not
stay any permit conditions.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must
follow the guidelines established in the North Carolina Erosion and Sediment Control Planning
and Design Manual
9. Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of the permit.
10. The issuance of this permit does not prohibit the Director from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules
and regulations contained in Session Law 2006-246, Title 15A NCAC 2H .1000, and NCGS 143-
215.1 et.al.
11. The permittee shall notify the Division in writing of any name, ownership or mailing address
changes at least 30 days prior to making such changes.
12. The permittee shall submit a permit renewal application with all required forms, documentation,
and processing fee at least 180 days prior to the expiration date of this permit.
Permit transferred and re -issued this the 14th day of June 2021.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
forte' ri4f Wrenn, Directcff
Division of Energy, Mineral and Land Resources
by Authority of the Environmental Management Commission
State Stormwater Management Permit SW6140902