Loading...
HomeMy WebLinkAboutNC0023124_NOD-2021-PC-0368 Response_20210615Water Quality Lab & Operations, Inc. P.O. Box 1167/ 1522 Tynecastle Highway Banner Elk, NC 28604 Ph. 828-898-6277 Fax 828-898-6255 Daniel Boss Asheville Regional Office 2090 US Hwy 70 Swannanoa, NC 28778 Case No. NOD-2021-PC-0368 Dear Mr. Boss: May 26, 2021 lama 21i JUN - ? 2021 rVater Qualit, Regional Operations Asheville Regional Office Thank you for providing feedback regarding your recent inspection of the GGCC Utility W WTP. In response to the notices of deficiency mentioned in the report, we would like to offer the following information: The bar screen in question is in the process of being fabricated by Avery Welding and Machinery. We will advise when the installation has been completed. The fabrication has been in process and we expect the project to be completed shortly; the materials shortage due to the pandemic and delays of receipt of materials have caused delays in completion. There are no operational tertiary filters at the plant; the list of plant equipment is outdated as the filters have not been in use for several years. If it is acceptable, we would request that we update the equipment description at the plant upon the next permit renewal. The plant has not exceeded limits for BOD or TSS in recent memory; the plant continues to meet limits on both parameters. Iron Mountain Construction has been retained to complete repairs on the concrete in the area of the leak. In addition, possible upgrades and/or replacement options of the plant are being explored via consultations with McGill Associates. Once a finite date for repair and/or replacement are solidified, we will update the DEQ with the intended plan of repair and/or replacement. Thank you for your time and consideration. Please feel free to contact us if we can be of further assistance. Sincerely, Paul Isenhour Laboratory Manager