Loading...
HomeMy WebLinkAbout20210038 Ver 1_More Info Received_20210601Strickland, Bev From: Megan Bollero <megan@cws-inc.net> Sent: Tuesday, June 1, 2021 4:55 PM To: Johnson, Alan Subject: [External] DWR# 21-0038 McMullen Creek Quail Hollow Sanitary Sewer Replacement Attachments: 2019-0062_McMullenCreekQuailHollow_Memo_6.1.21.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Alan. I have attached a memo for your records regarding the McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement (DWR# 21-0038). Let me know if you have any questions. Thanks, Megan Bollero, WPIT Project Scientist Carolina Wetland Services Inc. 550 E Westinghouse Boulevard Charlotte, NC 28273 Cell:(757)-576-6433 www.cws.net 1 CAROLINA WETLAND SERVICES, INC. 550 E. Westinghouse Blvd. Charlotte, NC 28273 704-527-1177(office) 704-527-1133 (fax) To: Mr. Alan Johnson Date: June 1, 2021 NCDWR, 401 & Buffer Permitting Unit 512 N. Salisbury., 9th Floor Raleigh, NC 27607 Subject: McMullen Creek Tributary at Quail Hollow Sanitary Sewer Project (SAW-2021-00109, DWR# 21-0038) Charlotte, North Carolina CWS Project No. 2019-0062 Dear Mr. Johnson, The McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement site is an approximately 4,700-foot long, 50-foot wide sewer corridor. The corridor is located just south of Baltusrol Lane and extends to the west-southwest to Smithfield Church Road, with a section that extends north adjacent to Sun Mist Lane and ends at Winged Bourne Road. A small portion of the project extends along Gleneagles Road from just west of Seminole Court to just east of Ballantyne Court in Charlotte, North Carolina (Figures 1 and 2, Attachment A). Charlotte has contracted Carolina Wetland Services, Inc. (CWS) to provide Section 404/401 permitting services for this project. Nationwide Permit Nos. 12 and 13 were issued by the USACE on March 1, 2021, and a 401 Water Quality Certification was issued by NCDEQ on March 9, 2021 (Attachments B and C). As noted in the original impact figures, the client intended to have a temporary stream crossing across Perennial Stream E in the form of a bridgemat (S2; Sheet 4; Attachment D). Upon construction it was determined that a temporary culvert crossing would be required instead of the bridgemat. All work will take place in the footprint of the previously permitted impacts, and no additional impacts will occur (Attachment E). This memo has been prepared for records only. ATTACHMENTS INCLUDED: DESCRIPTION Attachment A - Figures 1-8C Attachment B - Nationwide Permit No. 29 SAW-2021-00109 Attachment C - NCDEQ Water Quality Certification DWR # 21-0038 Attachment D - Original Impact Drawings Attachment E - Temporary Culvert Details Please do not hesitate to contact Megan Bollero at 757-576-6433 or megan@cws-inc.net should you have any questions or comments regarding this request. Sincerely, �I L. Megan Shelton, Project Scientist ►N= Aliisa Harjuniemi, PWS Senior Project Manager McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement June 1, 2021 Attachments CWS Project No. 2019-0062 Attachment A: Figures 1-8C tuc Tennessee Georgia 1% Virginia Park Hgh �y deln v � 5r a c North -Carolina a � Pnuth Park q+� South Carolina Malt Fhrlipo Fairriow Rd Place ArtowoodRd Cp ra riirn_ �Qb n, P y^'►�� or+ � o � o Se a � p yo Shason Rd VV Cr'04Bt4v Rd ¢ ti c OuaII Baltusrol Road Ii .I, .. Winged Bourne Road rr•:,Ilrr.., / P-f, rIli, n VSmithfield Church Road a i Z. e ai1d �1� Q park �, Par k _1 J gL11r uK, s R .8kLLa r1 Prnevrlle-Matthews Rd Carmel Country Club u CedartiNeoJ Country Arbarer: Club a r ara fi Place 3ulail �� Carohn Puce •m TP: ji { 0 � PW r r Glen n '+ A � rC •-t�Rf Golf C lub at Legend Ba Ila ntyne Project Limits (15 ac.) 5,000 2,500 0 5,000 Feet REFERENCE: BACKGROUND VICINITY MAP PROVIDED BY ESRI, 2020. Balkantyne / L 11 Country SCALE: 1 inch = 5,000 feet DATE: 1/14/2021 Vicinity Map FIGURE NO. CWS PROJECT NO: DRAWN BY: 2019-0062 ALH McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement COORDINATES: CHECKED BY: A' CAR ❑ L I 1 �1 A Mecklenburg County 35.109905,-80.84107 AVH WETLAND SERVICES Charlotte, North Carolina G:\Shared drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road\JDWrcGIS\Figurel_Vicinity.mxd '• S dR �,I �Huntmgtavne A- F.rms 1 - ylll3nnn Elem Sch St+'ro ` __._ / ,•' 1 c y A _ _.� .+� _ - ~ Sri •r pH�l��i Sdt - - 2 TA fR5ALl �A - . \.. v:� pa�E P NS I l Do pn . 0¢ 1 .; II � r � �.r9j,l�� � ` •t ���c O Rp5E1"jAA� ,� N'j .y@�• 5NA R��' G`fNFACi(£S - ~ - _� __ Tk ICi �•IGSOjT vl�� Iqp C t 11 1 � xPo H allvv 1 0 4 Qto-xi!?ta!!aw countm Club Lake 2 ao fv�fnq�Q ; P -I I �s srrnhheld 5 M—kieNX09 HS RCkFs4i,�,` O r TRDM pR L rr JT 'N x j 5 • L S:S IJRsr FACE Y Y FQ a u R ....' .• r49 AS.y[krnN `9�. ` r f i N •. �`� �G Dq Nfo".V,. 1 QU'Q ` i � Z ' vs h'EAlJpyi,9i� IL I ''~�1 i f ry Gp •. Y 5E� �L IrL]rAl: Arxl� � ' p x � c v Legend _ fl trrrff,� f / ChxErttr Project Limits (15 ac.) /// �ahoGc sls �+ ]y _ 2,000 1,000 0 2,000 Feet 0 REFERENCE: USGS 7.5 MINUTE TOPOGRAPHIC QUADRANGLE(S): WEDDINGTON, INC SCALE: 1 inch = 2,000 feet DATE: 1/14/2021 USGS Topographic Map FIGURE NO. CWS PROJECT NO: DRAWN BY: 2019-0062 ALH McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement2 COORDINATES: CHECKED BY: CAR ❑ L I N A Mecklenburg County 35.109905,-80.84107 AVH WETLAND SERVICES Charlotte, North Carolina G:\Shared drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road\JD\ArcGIS\Figure2_Topo.mxd GAShared drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road\JD\ArcGIS\Figure3_AerialMap.mxd St L WuD `r' Q X- N Pt WkB N U IrB PGa��ras\ eB o Bar Harbor Ln a = � t Gene WkB aglesRd M m w WkE o Wk S, to e� e� WE �d9/�, IrB s IuB 10 s sQ, WkD 0 Smithfield Church Rd Wk �y. WkE k so Ir �O kE )r L � WkD \�a�o�s�� WkD d 0 L CeB2 R� WkD I ItIAEel WkE / p WuD O` Windmil V,t, WkB PI m Fo DJ ki>)o WkD or Or WkE U WkD m D v o WkD QU WkB o � WkB w'n dbyood,C/- WkD kB Tapper ty ale o er`a ` Cr WkD E wfn dw Legend Soil Unit Name and Description Hydric Coverage(% ) MeB Mecklenburg fine sandy loam, 2 to 8 percent slopes No 1.8 MO Monacan loam, 0 to 2 percent slopes, frequently flooded Yes 52.9 WkB Wilkes loam, 4 to 8 percent slopes No 1.9 WkD Wilkes loam, 8 to 15 percent slopes No 27.1 WkE Wilkes loam, 15 to 25 percent slopes I No 16.3 Total Covers e: 100 oodCr Ir Project Limits (15 ac.) L Roads v WkE coo WkB �Ca� CD gshe 1,000 500 0 1,000 Feet REFERENCE: USDA-N RCS WEB SOIL SURVEY OF MECKLENBURG COUNTY, INC, DATED 2020 rton Dr oreSt Dr Me aC WkD k SCALE: 1 inch = 1,000 feet 1/14/2021 Y DATE: USDA-NRCS Web Soil Survey FIGURE NO. CWSPROJECT NO: DRAWN BY: of Mecklenburg County 2019-0062 ALH h' McMullen Creek Tributary at COORDINATES: CHECKED BY: CAR ❑ L I 1 �1 A Quail Hollow Sanitary Sewer Replacement Mecklenburg County WETLAND SERVICES 35.109905,-80.84107 AVH Charlotte, North Carolina 4-1 Shared drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road\JDVvcGIS\Figure4_Current.mxd S CUB CUB Mks 'L Cu6. 1. MS �� kC a CtiD EnG MS Cue IuB Cup bra M[; V,1.6 0 40 E[i❑ WUD �MrJ 'P aF Me8 '- CUB CuB COD2- MkB Ce67 k fi 1 r Ce62 �t M1fkB Nk3 „p CeD2 CBf}2 M�3 WAI? iNeg � t•'�� (:�H Ce02 t gyp- M O MO hik6 wkE a CeB2 ,ptuP M1.t3 Mr-u MeB `J a P ,�4�� a� M '' • � y I s WkE ae m WkD Me6 WkU �5 Mk6 PaE La Wu0 fuB Wk I F ^Ce62 n En8 WkE O� � wu0 m Mee 72 PdE aF. Vu6 z\ G WkD WkE �f ep WkB I�B Mks WkD Gleneagles Road Ce62 � f wkp w� CuB MeB IrB Wkp MPD t� ;r � yak h.KD k9 Mrs 1re Wkc wkL N/kE Quail Hollow Road MkB MkB WkB WIRE O 8 Wka Wk6 w W V,C) WkB wkp IuB Ly '�5 �a g� � �E Wk0 Wk Wkb WkD T U I r$ k6 W kE-t I W ko wkjb MeB k6 =--_ wkB Wkb 0 Irs Iu6 K k tQ wWrr IrB Wk WkB WkD MO Wub �f I` Smithfield Church Road WkL' ,,; ire NO Vf1 �$� lure. U8 1uB Wks Wk6 _ � WkE Wkb -W uD WkD WkD t Carmel Acres Drive Wkc IrB O h.� Ir6 __:_ /t• f l McB !rB O WkD MO wits 1 Wkr) fLiF�. 1re:-= = WkD VrA 1rA WkD Q � r/� i�7leFSIrB f3 Lyk �� WW Ir 16D � Wk6 irR u' �eq 7 - Wkb IWkD Wks J` kYk$\ wat¢T Ire W k D TJ frA yak IrB ` _iu ��6 ,ry Irf1 .Wkt7 WkD kt5� IrB WkE WkB G i r$ �-_V$1'$ WkB WkU wk6 ea �.� WkE WkD Wks WkB WkD WkE Wkb W Wk WkD Ike Meth WkB Wkb MO wkO WkE �e Legend 1�1 r8 Wka = Project Limits (15 ac.) 21000 1,000 0 2,000 Feet REFERENCE: USDA-NRCS PUBLISHED SOIL SURVEY OF MECKLENBURG COUNTY, NC, SHEETS 7 AND 12, DATED 1980. SCALE: 1 inch = 2,000 feet DATE. 1/14/2021 USDA-NRCS Published Soil Survey FIGURE NO. CWS PROJECT NO: DRAWN BY: of Mecklenburg County 2019-0062 ALH McMullen Creek Tributary at COORDINATES: CHECKED BY: CAR ❑ L I Iwl A Quail Hollow Sanitary Sewer Replacement Mecklenburg County WETLAND SERVICES 35.109905,-80.84107 AVH Charlotte, North Carolina 5 Soil Unit Name and Description Hydric MeB Mecklenburg fine sandy loam, 2 to 8 percent slopes No MO Monacan loam, 0 to 2 percent slopes, frequently flooded Yes WkB Wilkes loam, 4 to 8 percent slopes No WkD Wilkes loam, 8 to 15 percent slopes No WkE Wilkes loam, 15 to 25 percent slopes No 3:\Shared drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road\JDVvcGIS\Figure5_Historic.mxd Ridge fF d GreenOasi/ a�o� �h�sf/esf Rshar°n Magnolia Bridge R o Ora Oe co ° o e C as\o m �s�lo- co cc �m) oov a o °Coebr rFtd s co �o Q� Poau\� o Bar Harbor Ln `° Q� \rdtetteeRd G/enea9eS Shillington Pl d h� C7 C�. Seminole Ct r LU O W cU `w N 0 /� o m N a Sell N O 9/e s a - - o - 3 - a m c o N �o m� Gre mN 9 1 t o� PWindmill o O o G�c� /ach—� ° Fo c a\rdStCo�O\ �' cdo k Arbor Pointe Dr 'hOorOr C�oc pe/< Qo� o �z Quail SO Q- ,' sto HuntLn Le end as et g \off/ �\e \aG�\N Fzd Project Limits (15 ac.) t �ydonHattCr Qua\\v\e Roads Spr�n9� Ga�o aO d~~0 T I'1'%nd National Wetland Inventory p r a lh o Cre ty ® Freshwater Emergent Wetland L Gt04 �eo�oP o\c y° � �Vlndwo-Freshwater Forested/Shrub Wetland StoodCr a � Freshwater Pond Fa9�Q8 > - Riverine WILDLREFERIFE SERVII EONAL WETLAND INVENTORY DATA FOR NORTH CAROLINA, ACCESSED 2019 ED BY UNITED STATES FISH AND ° Asher�on Or 1,000 500 0 1,000 Feet BACKGROUND LAYER(S) PROVIDED BY MECKLENBURG COUNTY GIs DEPARTMENT, DATED 2020. Dr SCALE: DATE: FIGURE NO. 1 inch = 1,000 feet 1/14/2021 National Wetland Inventory CWS PROJECT NO: DRAWN BY: 2019-0062 MLB McMullen Creek Tributary at COORDINATES: CHECKED BY: CAR ❑ L I N A Quail Hollow Sanitary Sewer Replacement 35.109905,-80.84107 AVH WETLAND SERVICES Mecklenburg County 6 Charlotte North Carolina G:\Shared drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road\JD\ArcGIS\Figure6_NWl.mxd GAShared drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road\JD\ArcGIS\Figure7_FEMA.mxd REFERENCE: BACKGROUND GIS LAYER(S) PROVIDED BY MECKLENBURG COUNTY GIS DEPARTMENT, DATED 2020. NOTE: JURISDICTIONAL WATERS OF THE U.S. WERE DELINEATED (FLAGGED IN THE FIELD), CLASSIFIED, AND SURVEYED USING A SUB -FOOT CAPABLE GPS UNIT BY CWS, INC., ON OCTOBER 28 AND DECEMBER 28, 2020. JURISDICTIONAL FEATURES HAVE NOT BEEN VERIFIED BY THE USACE. Legend Project Limits (15 ac.) - - - Intermittent Stream - Perennial Stream ® Emergent Wetland ® Forested Wetland Pond - Roads 2019-0062 CWS PROJECT NO: Boundaries Overview of Jurisdictiona CHECKED B O LC) ECY) oLf) U CO QN Z� Do LLQ QJ F 1..1 FIGURE NO. 8� ng Team Drive\2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road\JD\ArcGIS\Figure8_JD G:\Shared drives\Co C", QN 1 SCP1:. Perennial Stream A • 29If s7o Wetland AA ♦ 0.06 acre 00 r- 610 -11 CA REFERENCE: BACKGROUND GIs LAYER(S) PROVIDED BY MECKLENBURG COUNTY GIs DEPARTMENT, DATED 2020. NOTE: JURISDICTIONAL WATERS OF THE U.S. WERE DELINEATED (FLAGGED IN THE FIELD), CLASSIFIED, AND MAPPED USING A SUB -FOOT CAPABLE GPS UNIT BY CWS, INC., ON OCTOBER 28AND DECEMBER 28, 2020. JURISDICTIONAL FEATURES HAVE NOT BEEN VERIFIED BY THE USACE. Legend ♦ Project Limits (15 ac.) • Matchline ♦ Perennial Stream ® Forested Wetland ♦ Pond • Roads ODP Data Point ♦ ♦ SCP Stream Classification Point Indicates Flow ♦► Photo Location and Direction 400 200 0 400 Feet ♦. 1 I Perennial Stream B 81 If SCP2 0 u� Pond A 0.08 acre 1 inch = 50 feet SCALE: DATE: FIGURE NO. 1 inch = 400 feet 1/14/2021 Jurisdictional Boundaries CWS PROJECT NO: DRAWN BY: 2019-0062 ALH McMullen Creek Tributary at COORDINATES: CHECKED BY: CAR ❑ L 1 NA Quail Hollow Sanitary Sewer Replacement 8A WETLAND SERVICES Mecklenburg County 35.109905,-80.84107 AVH Charlotte, North Carolina G:\Shared drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road\JD\ArcGIS\Figure8A_JD.mxd M , hes Figure 8C Perennial Stream E 74 if Wetland BB 0.03 acre Old Chapel Ln Perennial Stream D 1,168 if 1 inch = 50 feet REFERENCE: BACKGROUND GIS LAYER(S) PROVIDED BY MECKLENBURG COUNTY GIS DEPARTMENT, DATED 2020. NOTE: JURISDICTIONAL WATERS OF THE U.S. WERE DELINEATED (FLAGGED IN THE FIELD), CLASSIFIED, AND SURVEYED USING A SUB -FOOT CAPABLE GPS UNIT BY CWS, INC., ON OCTOBER 28 AND DECEMBER 28, 2020. JURISDICTIONAL FEATURES HAVE NOT BEEN VERIFIED BY THE USACE. \ i1 Intermittent Stream C 40 if %5sP6 1 inch = 25 feet ,.,r'stro Legend Project Limits (15 ac.) Matchline Intermittent Stream Perennial Stream Emergent Wetland Forested Wetland Roads Data Point scP Stream Classification Point Indicates Flow 0+ Photo Location and Direction 200 100 0 200 Feet 0 0 W U O O O 0 6) z 15 0 N O Boundaries Jurisdictiona FIGURE NO. 8B g Team Drive \2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road UD\ArcGIS\Figure8B_JD.mxd G:\Shared drives\ �1a a) m m w Perennial Stream D (cont) 9� a� S,O ° Legend Project Limits (15 ac.) — Perennial Stream Matchline REFERENCE: BACKGROUND GIs LAYER(S) PROVIDED BY MECKLENBURG Roads COUNTY GIs DEPARTMENT, DATED 2020. NOTE: JURISDICTIONAL WATERS OF THE U.S. WERE DELINEATED (FLAGGED < Indicates Flow IN THE FIELD), CLASSIFIED, AND MAPPED USING A SUB -FOOT CAPABLE GPS UNIT BY CWS, INC., ON OCTOBER 28AND DECEMBER 28, 2020. JURISDICTIONAL b FEATURES HAVE NOT BEEN VERIFIED BY THE USACE. atCil F16 Ce HB 300 150 0 300 Feet SCALE: 1 inch = 300 feet 1/5/2021 Jurisdictional Boundaries FIGURE NO. CWS PROJECT NO: DRAWN BY 2019-0062 ALH McMullen Creek Tributary at 8 C Quail Hollow Sanitary Sewer Replacement COORDINATES: CHECKED BY: h' CAR ❑ L I 1 �1 A Mecklenburg County 35.109905,-80.84107 AVH WETLAND SERVICES Charlotte, North Carolina G:\Shared drives\Consulting Team Drive\2019\2019 Consulting Projects\2019-0062 McMullen Creek Tributary Sewer thru Quail Hollow Country Club to Gleneagles Road\JDWrcGIS\Figure8C_JD.mxd McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement June 1, 2021 Attachments CWS Project No. 2019-0062 Attachment B: Nationwide Permit Nos. 12 and 13 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2021-00109 County: Mecklenburg U.S.G.S. Quad: NC-Weddington GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Charlotte Water Irene Okioga Address: 5100 Brookshire Bouleavard Charlotte, NC 28216 Telephone Number: 704-336-1063 E-mail: irene.okiogaAcharlottenc.gov Size (acres) 15 Nearest Town Charlotte Nearest Waterway McMullen Creek River Basin Santee USGS HUC 03050103 Coordinates Latitude: 35.109905 Longitude:-80.84107 Location description: The review area consists of an approximately 4,700 foot -long, 50 foot -wide sewer corridor which is located lust south of Baltursol Lane and extends to the west-southwest to Smithfield Church Road with a section that extends north adiacent to Sun Mist Lane and ends at Winged Bourne Road. In addition, a small portion of the review area extends along Gleneagles Road from iust west of Seminole Court to east of Ballantyne Court. Reference review area description shown in Pre -Construction Notification entitled "Figure 8, Overview of Jurisdictional Boundaries" 01/14/24 Description of projects area and activity: This verification authorizes the permanent and temporary stream, wetland, and open water impacts as described in Table 1 below. All temporary stream and open water impacts will be restored to pre-existing conditions after the completion of construction. Nationwide Permit No. Resource Impacted Duration of Impact Amount of Impact Reason for Impact 12 Wetland AA Permanent 0.030 acre Conversion of forested wetland to herbaceous wetland 13 Stream D Permanent 1,008 linear feet Bank stabilization 12 Stream D Permanent 10 linear feet Riprap stabilization Stream D Temporary 40 linear feet Construction access Stream D Permanent 128 linear feet Bank stabilization Stream E Permanent 150 linear feet Bank stabilization Stream E Permanent 10 linear feet Riprap stabilization Stream E Temporary 30 linear feet Construction access Stream C Permanent 28 linear feet Culvert installation Stream C Permanent 12 linear feet Dissipator pad Stream B Temporary 60 linear feet Construction access Pond A Temporary 0.06 acres Dewatering TOTAL PERMANENT WETLAND IMPACTS 0.030 acres TOTAL PERMANENT STREAM IMPACTS 1,346 linear feet TOTAL TEMPORARY STREAM IMPACTS 130 linear feet NOTE: Criteria (b) of Nationwide Permit 13 (i.e., 500 linear feet of bank stabilization activities) is waived for this project. Stabilization activities are to extend more than 500 feet along the stream banks but shall not extend beyond 1,136 linear feet as authorized above. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 12. Utility Line Activities and NWP 13. Bank Stabilization Activities SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 2/18/2021, and the enclosed plans Construction Drawings, Sheets 1-22 dated January 2021. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Bryan Roden -Reynolds at 704-510-1440or bryan.roden-reynolds(a,usace.army.mil. Bryan Roden -Reynolds Corps Regulatory Official: c 2021.03.01 13:20:38-05'00' Date: 3/1/2021 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.anny.mil/cm_apex/f?p=13 6:4:0 Copy furnished: Agent: Carolina Wetland Services, Inc. Megan Bollero Address: 550 E. Westinghouse Boulevard Charlotte, NC 28273 Telephone Number: 757-576-6433 E-mail: megan(a,cws-inc.net SAW-2021-00109 SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Action ID Number: SAW-2021-00109 County: Mecklenburg Permittee: Charlotte Water, Irene Okioga Project Name: McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement Date Verification Issued: 3/1/2021 Project Manager: Bryan Roden -Reynolds Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Bryan Roden -Reynolds Charlotte Regulatory Office U.S Army Corps of Engineers 8430 University Executive Park Drive, Suite 615 Charlotte, North Carolina 28262 or bryan.roden-rynolds@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date SAW-2021-00109 MEMORANDUM FOR RECORD SUBJECT: Department of the Army Memorandum Documenting General Permit Verification 1.0 Introduction and overview: Information about the proposal subject to one or more of the Corps regulatory authorities is provided in Section 1, detailed evaluation of the activity is found in Sections 2 through 4 and findings are documented in Section 5 of this memorandum. Further, summary information about the activity including administrative history of actions taken during project evaluation is attached (ORM2 summary). 1.1 Applicant name: Charlotte Water, Irene Okioga 1.2 Activity location: Latitude: 35.109905 Longitude:-80.84107 Location description: The review area consists of an approximately 4,700 foot -long, 50 foot -wide sewer corridor which is located just south of Baltursol Lane and extends to the west-southwest to Smithfield Church Road with a section that extends north adjacent to Sun Mist Lane and ends at Winged Bourne Road. In addition, a small portion of the review area extends along Gleneagles Road from just west of Seminole Court to east of Ballantyne Court. Reference review area description shown in Pre -Construction Notification entitled "Figure 8, Overview of Jurisdictional Boundaries" Nationwide Permit No. Resource Impacted Duration of Impact Amount of Impact Reason for Impact 12 Wetland AA Permanent 0.030 acre Conversion of forested wetland to herbaceous wetland 13 Stream D Permanent 1,008 linear feet Bank stabilization 12 Stream D Permanent 10 linear feet Riprap stabilization Stream D Temporary 40 linear feet Construction access Stream D Permanent 128 linear feet Bank stabilization Stream E Permanent 150 linear feet Bank stabilization Stream E Permanent 10 linear feet Riprap stabilization Stream E Temporary 30 linear feet Construction access Stream C Permanent 28 linear feet Culvert installation Stream C Permanent 12 linear feet Dissipator pad Stream B Temporary 60 linear feet Construction access Pond A Temporary 0.06 acres Dewatering TOTAL PERMANENT WETLAND IMPACTS 0.030 acres TOTAL PERMANENT STREAM IMPACTS 1,346 linear feet TOTAL TEMPORARY STREAM IMPACTS 130 linear feet 1.3 Description of activity requiring verification:This verification would authorize the permanent and temporary stream, wetland, and open water impacts as described in Table 1 below. All temporary stream and open water impacts will be restored to pre-existing conditions after the completion of construction. 1.4 Is this an After -the -Fact verification? No. 1.5 Date PCN determined complete for processing 2/22/2021 1.6 Jurisdiction Determination completed? A Preliminary JD was completed on 1/2512020. SAW-2021-00109 1.7 Permit authority: Section 404 of the Clean Water Act (33 USC 1344) 1.8 Applicable Permit: NWP 12. Utility Line Activities and NWP 13. Bank Stabilization Activities 1.9 Activity requires written waiver of NWP limits? No. 1.10 Activity requires a waiver from the requirements of a regional condition(s)? No. 2.0 Evaluation of the Pre -Construction Notification 2.1 Direct and indirect effects caused by the GP activity: The direct effects of the proposed activity in waters would include the loss of jurisdictional waters (as specified in Section 1.3) and their associated aquatic resource functions. The proposed activity also has the potential to result in indirect effects to waters including excess sedimentation in downstream waters, disruption and/or killing of aquatic life in the direct vicinity of the project area, increase of downstream flows, and blocking/restricting aquatic life passage transiting in and through the project area. These indirect effects are expected to be minimal due to design criteria and Best Management Practices (BMPs) required by Nationwide Permit General and Regional Conditions. Additionally, indirect effects would be further reduced through the implementation of BMPs required by state, local, and Federal ordinances and regulations. 2.2 Site specific factors: The review area consists of undeveloped forest, open grassy areas, and a sewer line right-of-way. The surrounding land use consists of undeveloped forest areas, single-family residential developments and a golf course. 2.3 Coordination 2.3.1 Was the PCN coordinated with other agencies? No. Agency coordination with the USFWS is required for the Northern Long Eared Bat. However, the Corps is not required to wait for a response from the USFWS Asheville Office in accordance with local procedures. 2.3.2 Was the PCN coordinated with other Corps offices? No. 2.4 Mitigation 2.4.1 Provide brief description of how the activity has been designed on -site to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site:The applicant provided a detailed statement describing their efforts to avoid and minimized impacts to waters of the United States on the project site in the preconstruction notification. Based on this information, the Corps believes the applicant has avoid and minimized impacts to waters of the United State to the maximum extent practicable. 2.4.2 Is compensatory mitigation required for unavoidable impacts to jurisdictional aquatic resources to reduce the individual and cumulative adverse environmental effects to a minimal level? Yes. SAW-2021-00109 Provide rationale: Compensatory mitigation is required to ensure minimal adverse environmental effects. The project area is located within the Lower Catawba watershed (HUC 03050103) which is highly urban. This area has a long history of intensive land uses which has resulted in long term degradation to aquatic resources. The watershed has rapidly converted to developed area and impervious surfaces since the 1970's due to the rapid expansion of the Charlotte metropolitan area. The National Land Cover Dataset estimated that 7.697% of the watershed (HUC 03050103) consisted of impervious surfaces in 2011. This is expected to be 8.5-9% today based on the pace of development in this watershed since 2011. Scientific literature cited by the USEPA Office of Water Recovery in their 09/01/2011 dated Recovery Potential Metrics Summary Form for watershed percent impervious cover suggests that these levels of impervious surfaces cause substantial physical, chemical, and biological harm to the aquatic environment. Additionally, there are currently no private mitigation banks or in -lieu fee sites with credits available to offset losses of aquatic function from private development in this watershed. Given the quality of the waters to be impacted, the scarcity of similar resources in this watershed, and the largely urban nature of the watershed, the waters within the project area provide important aquatic resource functions to downstream waters that are difficult to replace. The loss of these functions in this setting and in the proposed quantities necessitates compensatory mitigation to ensure that cumulative impacts to onsite and downstream aquatic resources are individually and cumulatively minimal. 2.4.3 Type and location of compensatory mitigation Is the impact in the service area of an approved mitigation bank? Yes. if yes, does the mitigation bank have appropriate number and resource type of credits available? Yes. Is the impact in the service area of an approved in -lieu fee program? Yes. If yes, does the in -lieu fee program have the appropriate number and resource type of credits available? Yes. Selected compensatory mitigation type/location(s): See Table 2 Table 2: Mitigation Type and Location Mitigation bank credits X In -lieu fee program credits Perm ittee-responsible mitigation under a watershed approach Perm ittee-responsible mitigation, on -site and in -kind Perm ittee-responsible mitigation, off -site and/or out of kind Does the selected compensatory mitigation option deviate from the order of the options presented in §332.3(b)(2)-(6)? N/A. If yes, provide the rationale for the deviation, including the likelihood for ecological success and sustainability, location of the compensation site relative to the impact site and their significance within the watershed, and/or the costs of the compensatory mitigation project (see 33 CFR §332.3(a)(1)): SAW-2021-00109 2.4.4 Amount of compensatory mitigation: 80 linear feet of stream credits. and 0.03 acres of wetland credits Rationale for required compensatory mitigation amount: This amount of compensatory mitigation is required because the mitigation site is located in a different watershed/8 digit HUC than the impacted aquatic resources. Stream C will be permanently impacted for 40lienar feet. The PCN lacked site specific information such as North Carolina Wetland Assessment Methodology and North Carolina Stream Assessment Methodology to determine the current quality of the impacted stream (i.e., Stream C). Without understanding of the current quality of the impacted stream, the Corps assumes this stream as high quality and determined the compensatory mitigation ratio accordingly (i.e., 2:1). In addition, the project proposed to convert 0.03 acres of a forested wetland to a herbaceous wetland. While this impact to permanent but not considered a loss of jurisdictional waters, compensatory mitigation (at a reduced ratio) is still considered for wetland conversion impacts. Therefore, the conversion of 0.03 acre of wetlands will be mitigated for at a 1:1 ratio. Click here to enter text. 3.0 Compliance with Other Laws, Policies and Requirements 3.1 Section 7(a)(2) of the Endangered Species Act (ESA) 3.1.1 ESA action area: The action area includes the waters of the United States that will be directly affected by the proposed work or structures and uplands directly affected as a result of authorizing the work or structures. 3.1.2 Has another federal agency taken steps to document compliance with Section 7 of the ESA and completed consultation(s) as required? No. 3.1.3 Known species/critical habitat present? No. The Corps has determined that it has fulfilled its responsibilities under Section 7(a)(2) of the ESA. IPAC Species in Mecklenburg County: NAME: Northern Long-eared Bat (Myotis septentrionalis) STATUS: Threatened NAME: Carolina Heelsplitter (Lasmigona decorata) STATUS: Endangered NAME: Rusty -patched bumble bee (Bombus affinis) STATUS: Endangered NAME: Michaux's sumac (Rhus michauxii) STATUS: Endangered NAME: Schweinitz's sunflower (Helianthus schweinitzii) STATUS: Endangered NAME: Smooth coneflower (Echinacea laevigata) STATUS: Endangered Effect determination(s), including no effect, for all known species/habitat, and basis for determination (s): Based on the latest version of the Natural Heritage Program's NHEO data, there are listed species located within or in the vicinity of the action area and this activity is one that may affect those listed species. The Corps has determined the proposed activity will not directly or indirectly affect any species subject to the ESA. . 3.1.4 Consultation with either the National Marine Fisheries Service and/or the U.S. Fish and Wildlife Service was initiated and completed as required, for any determinations other than "no effect" (see the attached "Summary" sheet for begin date, end date and closure method of the consultation). The USACE reviewed this project in accordance with (IAW) the NLEB Standard Local Operating Procedures for Endangered Species (SLOPES) between the USACE, SAW-2021-00109 Wilmington District, and the Asheville and Raleigh U.S. Fish and Wildlife Service (Service) Offices, and determined that the action area for this project is located outside of the highlighted areas/red 12-digit HUCs and activities in the action area do not require prohibited incidental take; as such, this project meets the criteria for the 4(d) rule and any associated take is exempted/excepted. IAW the NLEB SLOPES, the USACE sent a Situation 1 email to the Service on February 22, 2021, informing them about this project. Service Concurrence: as established in the NLEB SLOPES, this project does not require prohibited intentional take of the NLEB and it meets the criteria for the 4(d) rule; therefore any associated take is exempt and it is not necessary for the USACE to wait 30 days for the Service to object or concur. Based on a review of the information above, the Corps has determined that it has fulfilled its responsibilities under Section 7(a)(2) of the ESA. 3.2 Magnuson -Stevens Fishery Conservation and Management Act, Essential Fish Habital (EFH) The NWPs/RGPs were coordinated with the NMFS during the permit renewal process. NMFS coordination/EFH consultation is required if the activity affects SAV. This activity does not affect SAV. Therefore, NMFS coordination/EFH consultation has been completed. 3.2.1 Has another federal agency taken steps to comply with EFH provisions of Magnuson -Stevens Act? No. Click here to enter text. 3.2.2 Did the proposed project require review under the Magnuson -Stevens Act? No. 3.3 Section 106 of the National Historic Preservation Act (Section 106) 3.3.1 Section 106 permit area:The permit area includes those areas comprising waters of the United States that will be directly affected by the proposed work or structures, as well as activities outside of waters of the U.S. because all three tests identified in 33 CFR 325, Appendix C(g)(1) have been met. Final description of the permit area: All three test have been met and portions of the larger project undertaken outside of waters of the U.S. are in the permit area. Activities undertaken outside WOUS are included in the permit area because those activities are directly associated and integrally related with the authorized work and those activities would not occur but for the authorization of the work within the WOUS. 3.3.2 Has another federal agency taken steps to comply with Section 106 of the National Historic Preservation Act and completed consultation(s) as required? No. 3.3.3 Known cultural resource sites present and/or survey or other additional information needed? No. Based on the NCDCR "HPOWEB" service and aerial photographs, there are no known historic properties located in the permit area or in close proximity to the permit area. Effect determination and basis for that determination: The Corps has determined the proposed activity has no potential to cause effects to properties listed or eligible for listing in the National Register of Historic Places, because the project is located in areas SAW-2021-00109 that have been extensively modified. This activity is so limited in nature and scope that there is little likelihood of impinging upon a historic property even if such properties were present within the affected area(s). 3.3.4 Consultation was initiated and completed as required with the appropriate agencies, tribes and/or other parties for any determinations other than "no potential to cause effects" (see the attached "Summary" sheet for consultation type, begin date, end date and closure method of the consultation). The Corps has determined that it has fulfilled its responsibilities under Section 106 of the NHPA. 3.4 Tribal Trust Responsibilities 3.4.1 Was government -to -government consultation conducted with Federally -recognized Tribe(s)? No. There are no known tribal interests in the project area. Provide a description of any consultation(s) conducted including results and how concerns about significant effects to protected tribal resources, tribal rights and/or Indian lands were addressed. The Corps has determined that it has fulfilled its tribal trust responsibilities. 3.4.2 Other Tribal including any discussion of Tribal Treaty rights? Select Yes or No. 3.5 Section 401 of the Clean Water Act — Water Quality Certification (WQC) 3.5.1 Is a Section 401 WQC required, and if so, has the certification been issued or waived? A general WQC has been issued for this permit. 3.6 Coastal Zone Management Act (CZMA) 3.6.1 Is a CZMA consistency concurrence required, and if so, has the concurrence been issued, waived or presumed? N/A, a CZMA consistency concurrence is not required. 3.7 Wild and Scenic Rivers Act 3.7.1 Is the projectlocated in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the system? No. According to http://www.rivers.gov, the proposed project area is not within a designated or study river. 3.8 Effects on Corps Civil Works Projects (33 USC 408) 3.8.1 Does the applicant also require permission under Section 14 of the Rivers and Harbors Act (33 USC 408) because the activity, in whole or in part, would alter, occupy, or use a Corps Civil Works project? No, there are no Corps Civil Works project(s) in or near the vicinity of the proposal. 4.0 Special Conditions 4.1 Are special conditions required to ensure minimal effects, protect the public interest and/or ensure compliance of the activity with any of the laws above? Yes. 4.2 Required special condition(s) SAW-2021-00109 Special condition: a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. Rationale:See Section 2.4.2. 5.0 Determination 5.1 Waiver request conclusion, if required or select N/A: The Corps has determined the proposed activity will result in no more than minimal adverse effects, based on a case specific review in Section 2.0. Therefore, a waiver of the specified limits of this NWP will be granted. 5.2 The activity, with the required mitigation, will result in no more than minimal individual and cumulative adverse effects on the aquatic environment and will not be contrary to the public interest, provided the permittee complies with the special conditions identified above. 5.3 This activity, as described, complies with all terms and conditions of the permits identified in Section 1.5. PREPARED BY: Bryan Roden -Reynolds 2021.03.01 13:19:20-05'00' Date: 3/1 /2021 Bryan Roden -Reynolds Compensatory Mitigation Responsibility Transfer Form Permittee: Charlotte Water, Irene Okioga Action ID: SAW-2021-00109 Project Name: McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement County: Mecklenburg Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03050103, Catawba River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 40 0.03 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03050103, Catawba River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 80 0.03 Mitigation Site Debited: City of Charlotte Umbrella Stream and Wetland Mitigation Bank (Coliseum Creek [80 linear feetl and Muddy Creek [0.03 acre]) (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from City of Charlotte Umbrella Stream and Wetland Mitigation Bank (Coliseum Creek and Muddy Creek), confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 2/16/2021 was included with the preconstruction notification. This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to:1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC 27587 (email: todd.tugwell@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: Bryan Roden -Reynolds USACE Field Office: Charlotte Regulatory Office US Army Corps of Engineers 8430 University Executive Park Drive, Suite 615 Charlotte, North Carolina 28262 Email: bryan.roden-reynolds@usace.army.mil Bryan Roden -Reynolds 2021.03.01 13:17:50-05'00' USACE Project Manager Signature 3/1/2021 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement June 1, 2021 Attachments CWS Project No. 2019-0062 Attachment C: NCDEQ Water Quality Certification (DWR# 21-0038) ROY COOPER Governor MICHA£L S. REGAN Secretary S. DANI£L SMITH Director NORTH CAROLINA Environmental Quality March 9, 2021 DWR# 21-0038 Approval #2 Mecklenburg County Ms. Irene Okioga Charlotte Water 5100 Brookshire Blvd. Charlotte, NC 28216 Delivered via email to Irene.Okiogo@charlottenc.gov Subject: APPROVAL of 401 Water Quality Certification with Additional Conditions McMullen Creek Tributary at Quail Hollow Sanitary Sewer Project Dear Ms. Okioga: You have our approval for the impacts listed below for the purpose described in your application January 5, 2021, submitted to the Division of Water Resources (Division) February 18, 2021, and payment received on February 22, 2021. The Division has determined that the proposed project and impact will comply with water quality requirements covered by the attached Water Quality General Certification Number 4133, 4134 and the conditions listed below, provided that you adhere to the certification located at https://deg.nc.gov/about/divisions/water-resources/water-quality-permitting/401-buffer-permitting- branch/general and the conditions listed below. This certification is associated with the use of General Permit Number 12 and 13 once they are issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval replaces the previous approval that was issued on March 3, 2021. The following proposed impacts are hereby approved. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b)] Type of Impact Amount Approved Temporary Impact Amount Approved Permanent Impact Stream Restoration Culvert/Rip rap 130 linear ft. 1,286 linear ft. 60 linear ft. Wetland 1 0 acres 0.03 acres Open Waters 1 0.08 acres 0 acres This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this Certification and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] EQ North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 26115 Nf IHTH (:4:?�"1!.INA '� ity /`� 704,663.1699 If you are unable to comply with any of the conditions of the attached Water Quality General Certification or with the additional conditions itemized below, you must notify the Mooresville Regional Office within 24 hours Additional conditions: Diversion Ditches and other storm water conveyances as related to the sediment and erosion control measures shall be matted and/or stabilized to reduce sediment loss and turbidity. This includes interior/exterior slopes of sediment basins. [15A NCAC 02H .0506 (b)(3) and (c)(3)] 2. Stormwater discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream banks. [15A NCAC 02B .0203] Justification: In order to protect against impairment of water quality standards and best usage of receiving and downstream waters, water quality based management practices must be employed to protect against direct or indirect discharge of waste or other sources of water pollution. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 One (1) copy of the petition must also be served on DEQ as follows: Mr. Bill Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review by the Division under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699. Sincerely, DocuSigned by: A-r.. 4tW H P44•ft for F161FB69A2D84A3... W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office, DEQ Attachments cc: Army Corps of Engineers, Charlotte, email Megan Bollero, Carolina Wetland Services, Inc., mega n(u)_cws-inc.net DWR 401 & Buffer Permitting Branch file MRO, Land Quality CERTIFICATE OF COMPLETION NCDWR Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Wetland & Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement June 1, 2021 Attachments CWS Project No. 2019-0062 Attachment D: Original Impact Drawings APPLICATION FOR NON -DISCHARGE PERMIT GRAVITY SEWER MAIN EXTENSION CHARLOTTE WATER PROJECT NAME PROPOSED 8", 12" AND 16" SANITARY SEWER TO SERVE CREEK BASIN MCMULLEN CREEK TRIBUTARY AT QUAIL HOLLOW CLTWater PROJECT NO.: PROJECT TYPE: ❑NEW CONSTRUCTION ®RELOCATION ❑MODIFICATION OF PERMIT NO. OTHER VOLUME OF WASTEWATER GENERATED BY THIS PROJECT: _ ON 190 GAL/DAY/SINGLE FAMILY HOUSEHOLD X * GALLONS PER DAY BASED HOUSEHOLDS OR 135 GAL/DAY/MULTI-FAMILY UNIT X * UNITS OR IS BASED ON : WASTEWATER TREATMENT PLANT RECEIVING WASTEWATER: ❑ McALPINE CR. (NC0024970) ❑ IRWIN CR. (NC0024945) ❑ MCDOWELL CR. (NC0036277) ❑ SUGAR CR. (NC0024937) ❑ MALLARD CR. (NC0030210) ❑ ROCKY CR. (NC0036269) NATURE OF WASTEWATER 100 % DOMESTIC % INDUSTRIAL %COMMERCIAL -%OTHER ORIGIN OF WASTEWATER ❑ SUBDIVISION ❑ SCHOOL ❑ APARTMENTS/CONDO'S ❑ COMMERCIAL ❑ INDUSTRIAL ❑ OTHER LIST ANY PARAMETER AND ITS CONCENTRATION THAT WILL BE GREATER THAN NORMAL DOMESTIC LEVELS: NONE IF WASTEWATER IS NON -DOMESTIC, DESCRIBE LEVEL OF PRETREATMENT: N/A IF A PRETREATMENT PERMIT IS REQUIRED, HAS ONE BEEN ISSUED? YES ❑ NO HAS ENGINEER DETERMINED THAT DOWNSTREAM SEWERS ARE CAPABLE TO HANDLE THIS FLOW? ® YES ❑ NO PERMIT NO. FOR SEWERS IMMEDIATELY DOWNSTREAM PIPE DIAMETER OF SEWERS IMMEDIATELY DOWNSTREAM 33 INCH HAS ENGINEER DETERMINED THAT NC DEM AND CLTWater MINIMUM DESIGN STANDARDS ARE MET BY THIS PROJECT? ® YES ❑ NO COMPLETE NAME AND ADDRESS OF ENGINEERING DESIGN FIRM: CHARLOTTE WATER 5100 BROOKSHIRE BOULEVARD CHARLOTTE, NORTH CAROLINA 28216 TELEPHONE 704 399 2221 PROFESSIONAL ENGINEER'S CERTIFICATION: I, JASONDORN , ATTEST THAT THIS APPLICATION FOR MCMULLEN CREEKTRIBUTARY AT QUAIL HOLLOW HAS BEEN REVIEWED BY ME AND IS ACCURATE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. I FURTHER ATTEST THAT TO THE BEST OF MY KNOWLEDGE THE PROPOSED DESIGN HAS BEEN PREPARED IN ACCORDANCE WITH THE APPLICABLE REGULATIONS. ALTHOUGH CERTAIN PORTIONS OF THIS SUBMITTAL PACKAGE MAY HAVE BEEN DEVELOPED BY OTHER PROFESSIONALS, INCLUSION OF THESE MATERIALS UNDER MY SIGNATURE AND SEAL SIGNIFIES THAT I HAVE REVIEWED THIS MATERIAL AND HAVE JUDGED IT TO BE CONSISTENT WITH THE PROPOSED DESIGN. NORTH CAROLINA PROFESSIONAL ENGINEER'S SEAL, SIGNATURE, AND DATE: CLTWater PERMIT NO. PLANT FLOW ALLOCATION RECORDED BY: PERMIT APPROVED BY: ISSUED KERI B. CANTRELL, PhD, P.E., CHIEF ENGINEER DESIGN COMPANY: Gavel & Dorn Engineering, PLLC PLANS PREPARED BY: JASON DORN, P.E ADDRESS: 6730 FREEDOM DRIVE, CHARLOTTE, NC 28214 PHONE: (704) 919-1900 DATE DESIGN COMPLETED: - SURVEY COMPANY: LANDTEC SURVEYED BY: ED GODSEY, PLS ADDRESS: 11657 ROZZELLES FERRY RD PHONE: 704-595-7530 DATE SURVEY COMPLETED: - DEVELOPER: N/A ADDRESS: - PHONE: - CONTRACTOR: - ATLANTIC COAST CONTRACTORS, INC INDEX OF SHEETS SHEET NO. 1 COVER SHEET CHARLOTTE PRELIMINARY PLANS SHEET NO.2 NOTES (1) — SHEET NO. 3 NOTES (2) NOT FOR CONSTRUCTION SHEET N0.4 EROSION CONTROL (1) SHEET NO. 5 EROSION CONTROL (2) SHEET NO. 6 EROSION CONTROL (3) kAJ IrEFZ SHEET NO. 7 EROSION CONTROL (4) SHEET NO. 8 PLAN &PROFILE - STA 0+00 - 10+00 SHEET NO. 9 PLAN &PROFILE - STA 10+00 - 20+00 SHEET NO. 10 PLAN &PROFILE - STA 20+00 - 30+00 SHEET NO. 11 PLAN &PROFILE - STA 30+00 - 40+00 SHEET NO. 12 PLAN &PROFILE - STA 40+00 -END & LATERAL REROUTE SHEET NO. 13 PLAN &PROFILE - GLENEAGLES - STA CHARLOTTE, NORTH CARO]LINA 0+00-END SHEET NO. 14 MCMULLEN CREEK RELAY - STA 0+00 -END SHEET NO. 15 PIPELINE REHABILITATION PLAN (1) RIBUTAR TY �SHEET NO. 16 PIPELINE REHABILITATION PLAN (2) Mu""'�MULLEN Uf�REEK SHEET NO. 17 PIPELINE REHABILITATION PLAN (3) SHEET NO. 18 PIPELINE REHABILITATION PLAN (4) SHEET NO. 19 DETAILS (1) SHEET NO. QUAIL HOLLOW 'RE P L U"� DETAILS (2) EMENT SEWER SHEET NO. 2�1 DETAILS (3) SHEET NO. 22 DETAILS (4) JANUARY 2021 VICINITY MAP NOT TO SCALE NCDEQ PERM/T NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE LIMITS OF DISTURBED AREA IS EXTENTS OF EDGE OF PAVEMENT TO TEMPORARY CONSTRUCTION EASEMENT AND/OR RIGHT-OF-WAY UNLESS OTHERWISE NOTED TOTAL DISTURBED AREA = 11.6 ACRES CHARLOTTE WATER CONTACT: TESHA OKIOGA PHONE: 704-336-1063 CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. APPROVAL SEAL N.C.P.E. SUMMARY OF SEWER MAINS & MANHOLES SIZE I LENGTH II SIZE I LENGTH 8" 226 LF 12" 1,356 LF 16" 2,959 LF TOTAL NO. OF MANHOLES: 14 TOTAL NO. LOTS SERVED: PROJECT NAME: MCMULLEN CREEK TRIBUTARY AT QUAIL HOLLOW - REPLACEMENT SEWER INSPECTOR: - INSIDE CHARLOTTE: (V�YES ( ) NO: TOPO NO: - JOB NO: 2019000745 FILE NO: DATE OF ACTIVATION: No. Dote By Revision I DATE AS BUILT: BY: A CITY OF CHARLOTTE DEPARTMENT GENERAL NOTES 1. THESE GENERAL NOTES ARE INTENDED TO DIRECT THE CONTRACTOR TO CERTAIN KEY ASPECTS OF THIS PROJECT. DETAILED INFORMATION CONCERNING THE SCOPE OF WORK, CONSTRUCTION SEQUENCE, TECHNICAL SPECIFICATIONS, AND OTHER MATTERS ARE CONTAINED IN THE PROJECT MANUAL. 2. CONSTRUCTION DRAWINGS DEPICT A COMBINATION OF GROUND SURVEY INFORMATION, & AVAILABLE GIS INFORMATION. GROUND SURVEY HAS BEEN COMPLETED WHERE IT WAS DEEMED TO BE NECESSARY FOR DESIGN OF THE PROJECT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCY BETWEEN THE GROUND SURVEY, SUBSURFACE CONDITIONS, AND ACTUAL FIELD CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL SUBSURFACE UTILITIES. CHANGES OR DEVIATIONS FROM THE CONFIGURATION, CONNECTIVITY, DIMENSIONS, DEPTHS, AND OTHER INFORMATION PERTINENT TO THE SANITARY SEWERS IN THE PROJECT AREA WILL BE REPORTED TO THE ENGINEER, AND RECORDED BY THE CONTRACTOR IN THE RECORD DRAWINGS THAT ARE REQUIRED AS PART OF THIS CONTRACT. 3. THE MOST RECENT EDITION OF THE THE CITY OF CHARLOTTE TECHNICAL SPECIFICATIONS AND DETAIL DRAWINGS FOR WATER LINE AND SANITARY SEWER LINE CONSTRUCTION WILL GOVERN ALL WATER AND SANITARY SEWER CONSTRUCTION. LEGEND BUILDING CURB & GUTTER EDGE OF ROADWAY EXISTING FIRE HYDRANT EXISTING IRON PIN EXISTING WATER VALVE EXISTING WATER MAIN EXISTING q SANITARY SEWER EXIST. SAN. SEWER MANHOLE STRUCTURE EXISTING GAS MAIN EXISTING GAS SERVICE FENCE GAS STRUCTURE UNIDENTIFIED POST UNIDENTIFIED STRUCTURE GUARD RAIL MARSH, POND, WETLAND OR LAKE OVERHEAD ELECTRIC PIERS POWER POLE/GUY WIRE PROPERTY LINE RIP - RAP ROAD/STREET R/W SEDIMENT FENCE (SILT FENCE) STD. 6.62 SEDIMENT FENCE OUTLET SIDEWALK STREET SIGN (LABEL TYPE) STORM DRAIN/CATCH BASIN, YARD AND DROP INLET - TOWER LINE TREE & BUSH UNDERGROUND CABLE UNDERGROUND ELECTRIC UNDERGROUND TELEPHONE RAILROAD WATER METER WATER VALVE TREE LINE BRUSH LINE SUBSURFACE INVESTIGATION PERMANENT UTILITY EASEMENT TEMPORARY CONSTRUCTION EASEMENT SEWER EASEMENT GAS EASEMENT 30' STREAM BUFFER INLET PROTECTION GAS CROSSING TEMPORARY STREAM CROSSING CONCRETE DRIVEWAY (PROFILE) ASPHALT DRIVEWAY (PROFILE) PROPERTY LINE FEMA FLOODWAY LINE 100-YR COMMUNITY FLOODWAY LINE FEMA FLOODPLAIN LINE 100-YR COMMUNITY FLOODPLAIN LINE IRRIGATION SPRINKLER 0 w- SS G Gs OE ri EITHER / OR R/w SFO SW OE O uc -UT UT UT ■ 14 0 PE TCE SSE E �TI NC DEQ EROSION CONTROL NOTES/CONSTRUCTION SEQUENCE 1. THE PROJECT SHALL COMPLY WITH EROSION AND SEDIMENT CONTROL PERMIT ISSUED BY NC DEQ FOR PROJECT. 2. CONTRACTOR SHALL PREVENT EROSION OF SOIL AND SEDIMENTATION ON THE SITE AND ON ADJACENT PROPERTY RESULTING FROM HIS CONSTRUCTION ACTIVITIES. EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON SHEETS 4 THROUGH 7 SHALL BE INSTALLED PRIOR TO THE COMMENCEMENT OF ANY LAND DISTURBING ACTIVITIES. THE CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES UNTIL THE COMPLETION OF CONSTRUCTION AND APPROVAL BY THE ENGINEER TO REMOVE. 3. CONTRACTOR SHALL TAKE ALL REASONABLE MEASURES TO PREVENT TRACKING MUD/SOIL ON ACTIVE ROADWAYS. ANY MUD/SOIL TRACKED ON ROADWAYS SHALL BE CLEANED DAILY. 4. EROSION CONTROL MEASURES WILL BE INSPECTED DAILY BY THE CONTRACTOR. EROSION CONTROL MEASURES IN NEED OF REPAIR WILL BE REPAIRED BY THE CONTRACTOR PRIOR TO CONTINUING WITH THE PROJECT WORK. 5. IF EROSION CONTROL MEASURES, IN ADDITION TO THOSE SPECIFIED AND REQUIRED ON THE DRAWINGS, ARE REQUIRED BY THE ENGINEER DUE TO THE ACTION OR PROCESSES OF THE CONTRACTOR, ALL COST SHALL BE AT THE CONTRACTOR'S EXPENSE AND AT NO ADDITIONAL COST TO THE OWNER. 6. FOR ON SITE TEMPORARY STOCKPILE OF SOIL MATERIAL THE CONTRACTOR MUST INSTALL SILT FENCE CONTAINMENT AREA IN ACCORDANCE WITH DETAIL 1-A. 7. SEE SHEET 3 FOR NPDES NCGO1, GROUND STABILIZATION REQUIREMENTS. SEEDING SHALL BE IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS OR AS DIRECTED BY PLANS. 8. A PERMANENT VEGETATIVE COVER SUFFICIENT TO RESTRAIN ACCELERATED EROSION SHALL BE ESTABLISHED ON ALL DISTURBED AREAS. TEMPORARY VEGETATIVE COVER SHALL BE ESTABLISHED DURING ALL TIMES OF THE YEAR NOT SUITABLE FOR THE ESTABLISHMENT OF PERMANENT VEGETATIVE COVER. ANY TEMPORARY SEEDING THAT THE INSPECTOR DETERMINES AS FAILING WILL BE RE -SEEDED UPON NOTIFICATION OF THE CONTRACTOR. 9. AT THE COMPLETION OF THE WORK OR AT SUCH TIME AS THE ENGINEER, OWNER, AND STATE REGULATORY AGENCY DETERMINE THAT ADEQUATE PERMANENT EROSION CONTROL MEASURES HAVE BEEN ESTABLISHED, THE CONTRACTOR SHALL REMOVE THE EROSION CONTROL MEASURES AND DISPOSE THEM OFF SITE. 10.CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT TEMPORARY CONSTRUCTION ENTRANCE IS SUFFICIENTLY STABLE AT ALL TIMES DURING CONSTRUCTION TO PREVENT RUTTING AND TRACKING OF MUD BEYOND THE PROJECT LIMITS. IF THE CONTRACTOR DOES NOTE MUD OUTSIDE OF THE PROJECT LIMITS, THEY SHALL IMMEDIATELY CLEAN UP THE SITE AND MAKE NECESSARY IMPROVEMENTS. IF THE CONTRACTOR NOTES EXCESSIVE RUTTING OF THE CONSTRUCTION ENTRANCE OR WET, LOW SPOTS, ETC. THEY SHALL CONTACT THE OWNER OR ENGINEER FOR DIRECTION. AT THE DIRECTION OF THE OWNER, ENGINEER (OR NCDEQ INSPECTOR), THE CONTRACTOR SHALL STABILIZE CONSTRUCTION ENTRANCE AS PER DETAIL 1-F. 11.NO TEMPORARY PIPED STREAM CROSSINGS OF MCMULLEN CREEK OR TRIBUTARY CREEKS WILL BE ALLOWED EXCEPT FOR THE TEMPORARY CROSSINGS NOTED ON THE PLAN AT STATIONS 10+98 AND 29+21. ALL OTHER PROJECT AREAS WILL BE ACCESSED VIA ACCESS ROADS AND EASEMENTS AS NOTED ON THE PLANS. 12.NO WORK SHALL TAKE PLACE IN MCMULLEN CREEK TRIBUTARY EXCEPT FOR THOSE AREAS WHERE A STREAM BYPASS SET UP IS NOTED ON THE PLANS. ALL WORK WITHIN THE CREEKS SHALL BE IN THE DRY. OUTER LIMITS OF TEMPORARY CONSTRUCTION EASEMENT AND/OR PERMANENT SEWER EASEMENT ARE EQUAL TO THE LIMITS OF DISTURBED AREA ON ALL SHEETS DISTURBED AREA = 11.6 AC STANDARD DETAILS THE FOLLOWING STANDARDS AND THE LATEST REVISION THERETO ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE ARE CONSIDERED A PART OF THESE PLANS. CDOT STANDARDS SHALL BE USED. CDOT STANDARDS: PIEDMONT NATURAL GAS EASEMENT NOTES 1. CONSTRUCTION ACCESS WILL BE ALLOWED IN THE PIEDMONT NATURAL GAS RIGHT-OF-WAY AS PER THE ENCROACHMENT AGREEMENT. 2. THE GAS MAIN SHALL BE PROTECTED BY INSTALLING ORANGE SAFETY FENCING 5' FROM THE GAS MAIN ALONG AREAS WHERE CONSTRUCTION TRAFFIC WILL BE RUNNING PARALLEL TO THE MAIN. VEHICULAR CROSSINGS OVER THE GAS MAIN SHALL BE MADE ONLY AT LOCATIONS DESIGNATED ON THE PLANS. VEHICULAR CROSSINGS SHALL BE CONSTRUCTED PER CONSTRUCTION DETAIL 1-D. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALTERNATE VEHICULAR GAS CROSSING LOCATIONS WITH PIEDMONT NATURAL GAS, AS NEEDED. 4. USE OF THE PIEDMONT NATURAL GAS EASEMENT FOR STORAGE OR STAGING AREA IS NOT PERMITTED UNLESS APPROVED BY PIEDMONT NATURAL GAS FIELD INSPECTOR. STORAGE SHALL BE LIMITED TO NO MORE THAN TWO WEEKS AT ANY LOCATION. CONTRACTOR TO ENSURE THAT ACCESS TO THE FULL LENGTH OF THE GAS EASEMENT IS AVAILABLE AT ALL TIMES TO PIEDMONT NATURAL GAS TO ADDRESS MAINTENANCE OR EMERGENCY ISSUES. 5. THE USE OF EXPLOSIVES WILL NOT BE PERMITTED WITHIN PIEDMONT NATURAL GAS RIGHT-OF-WAY AS PER THE APPROVED ENCROACHMENT AGREEMENT. 6. THE CONTRACTOR SHALL BE LIABLE FOR ANY DAMAGE TO PIEDMONT NATURAL GAS FACILITIES RESULTING FROM CONSTRUCTION. 7. THE CONTRACTOR SHALL CROSS THE PIEDMONT NATURAL GAS LINE ONLY WHERE NOTED ON THE PLANS. 8. ALL VEHICULAR CROSSINGS SHALL BE CONSTRUCTED WITH STEEL PLATES, TIMBER MATS, OR EQUIVALENT AS PER DETAIL 1-D. 9. ANY DEVIATION FROM THE PLANS SHALL BE COORDINATED WITH PIEDMONT NATURAL GAS AND IS THE RESPONSIBILITY OF THE CONTRACTOR. FLOODPLAIN NOTES 1. THE CONTRACTOR IS INFORMED THAT THIS PROJECT IS IN A FLOODPLAIN. 2. ALL EXCESS MATERIALS RESULTING FROM THE CONSTRUCTION (DIRT, ROCK ETC.) OF THE PROJECT SHALL BE HAULED OFF -SITE AND DISPOSED OF IN AN APPROVED MANNER AT THE CONTRACTOR'S EXPENSE. THERE SHALL BE NO EXCESS MATERIAL SPREAD AND LEFT IN RIGHT-OF-WAY. POST -CONSTRUCTION AND PRE -CONSTRUCTION GRADES SHALL MATCH. 3. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE DONE TO THE CONTRACTOR'S WORK BY HEAVY RAINS OR FLOODS AND SHALL TAKE ALL REASONABLE PRECAUTIONS TO PROVIDE AGAINST DAMAGES BY BUILDING SUCH TEMPORARY DIKES, CHANNELS, OR SHORING TO CARRY OFF STORM WATER AS THE NATURE OF THE WORK MAY REQUIRE. 4. THE CONTRACTOR WILL BE RESPONSIBLE FOR TAKING ALL PRECAUTIONS NECESSARY TO PROTECT THE PROPOSED SEWER FROM FLOOD, FLOATATION, AND DEBRIS, INCLUDING, BUT NOT LIMITED TO, INSTALLATION OF WATERTIGHT PLUGS AND TEMPORARY SEALING OF MANHOLES. OPEN ENDS OF PIPES SHALL BE PLUGGED (WATERTIGHT) AT NIGHT. 5. THE CONTRACTOR SHALL PREPARE A BYPASS PUMPING PLAN THAT INCLUDES A CONTINGENCY PLAN FOR LARGE RAIN EVENTS THAT MAY FLOOD THE WORK AREA. CONTINGENCY PLAN MAY INCLUDE ELEVATING OF PUMPS, SECURING OF ALL BYPASS LINES, SEALING MANHOLES FROM INFILTRATION, AND/OR TEMPORARY REESTABLISHMENT OF EXISTING GRAVITY SEWER SYSTEM VIA INSTALLATION OF TEMPORARY PIPING. SUBSURFACE INVESTIGATION Bore Depth (ft) Comments PWR Auger Refusal Water Termination Station # B-1 8 10 1+00 Auger Probe B-2 9 10 1+66 B-3 - 10 4+32 B-4 0 0 7+28 Could Not Drill Past Surface Rock B-5 9 10 11+31 B-6 10 12+92 B-7 10 14+39 B-8 10 15+85 B-8A 10-15 15 16+00 Auger Probe B-9 8 8 20+87 B-10 6 5 6 25+92 B-11 12 28+57 Soft Digs Sample ID Utility Type Station Station Offset Coordinates Depth to Utility Easting Northing TH-1 Sewer 13+14 - 1447900.42 500473.98 5 TH-1A Gas 13+14 - 1447900.42 500473.98 6.62 TH-2 Gas 5+66 15 NE NA NA 3.83 TH-3 Sewer 0+36 - NA NA 3.14 TH-3A Gas 0+36 - NA NA 5.73 TH-4 Gas 36+73 - NA NA 2.89 TH-5 Water 36+38 5 E NA NA 4.82 TH-6 Electric 36+24 6 E NA NA 1.83 APPROVALS (SEALS) PRELIMINARY PLANS NOT FOR CONSTRUCTION NCDEQ PERMIT NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. • itto) Know what's below. Call before you dig. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. DIAGRAM NO. TITLE: 12 WORK AREA IN T WITH 3 LIANES) U LANE CHARLOTTE CHARLOTTE WATER N.C.P.E. WJ)T E R CHARLOTTE, NORTH CAROLING CHARLOTTE LAND DEVELOPMENT STANDARDS: STD. DTL NO. 40.02 TITLE: TREE PROTECTION DETAIL GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 Scales PLAN - PROFILE Hor. - Vert. - MCMULLEN CREEK TRIBUTARY AT QUAIL HOLLOW REPLACEMENT SEWER NOTES I AKinTC(` CDT! SRK I SMM Revision I Surveyed By I Designed By I Drawn By I Project-Engr I Approved By Date Sheet Of 2 22 A CITY OF CHARLOTTE DEPARTMENT NC DEQ - NCGO1 GROUND STABILIZATION & MATERIAL HANDLING REAL ESTATE SPECIAL PROVISIONS PRELIMINARY PLANS NOT FOR CONSTRUCTION GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HOW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HOW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or . Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erasion control products with or reinforcement matting without temporarygrass seed ■ Hydroseeding • Appropriately applied straw or other mulch ■ Shrubs or other permanent plantings covered ■ Plastic sheeting with mulch ■ Uniform and evenly distributed ground cover 9ufflcientto restrain erosion • Structural methods such as concrete, asphalt or rew in Ing wa lls ■ Rolled erosion control p roducts with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offs[te. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. aNSITE C011,1CRETE �rASHOUT STRUCTURE NITM LINER r�r�.�_ �r �r+U � Y ,rr rape is�4 41 ;"" rrraT*. e4l A .+uilr`°d.q sa44•i Ill Lrt ids. pw�rru�gsaa,14■i.ne_ he.Ict4llr ��•ruA grig* K ,r a. PT sTRucTugr CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NC DEQ - NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection rxords must indudw business hours (1) Rain gauge Daily Daily rdinfdll arfmunts, maintained in If no daily rain gauge observations are made during weekend or good wwklrig hollday periods, and no indlvidual day rainfall informatlon is order available, record the cumulative rain measurement for those un attended days (and this will determine if a site inspeeliun is ne:eded). Days on which no, rainfall occurred shall be recorded as -:ero." The permittee may use another rain-manitvring device approved by the DwIsion (2) F&sc At least onto per t Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspect lon, and within 24 3. Name of the penun pe fof nnng lhr irap-tiers, hours of a rain 4. Indical ion of whel her the niteasures were apera Iins event a 1-0inch In properly. 24 hours S. Description of maintename needs for the measure, 6. De•sVi in Ion. evidence. and date of corrective act urns take,i (3) Starmwater At least once per 1. Ide ntificatlon of the dlscha rga outfa Its ire petted, discharge 7cale ndar days 2. Dal e a rxi tim a of t he inspen ion, outfal is (51>05) and within 24 3. Name of the person performing the inspection, hours of a rain 4, f:viccr ce of Ind lcators of starmwater pollut Ion such as oll event > LD inch in sheen, floating or suspended solids or discoloration, 24 hours S. Indication ofvisible sedlrnent leaving the site, 6. DP criP lion evidence and date of correct ive act ions taken. (4) Pcritn rater of At least ont.e per If visible sedhne prat tun Is Found outside site lim Its, then a retard site 7 cakrndar days of the following shall be made: and within 24 1 Actions taken to; Iran up or stahiliie the sedlmem that has IeR hours of ra In the site ll m Its. event s 1.0 inch in 2. Description, evidence, and date of correct iw actions taken, and 24 hours 3. An min la nation as to the actions taken to control future re eases. Is)Strna ens nr At least once per If the strea in or wet la rid has incrrmed visili lei Nadi enema l inn rrra wetlands vusile 7wlerdar days stream has, visib le Increased lur hidity fmnr the cum tr uclieu or offsiie and within 24 activity, then a rew rd of the Following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accesslblel event P 1.0 inch In 2. Records of the required reports to the appropriate Division 24 hours Regional 6ffiw per Fart III, Sed on C, item 2lia} of this permit. 16) Ground After each phase 1. The phase of grading (Install atlon of perimeter E&SC slabdieatiun of grading inures, clad ring and gru bbierrg, installation of steam measure., drainage radlil ies, wmp let ion of all land -disturbing activity, construction of redereiop ment, perma near ground cover), 2. Dueu mernalion that the req ulfed ground slabilitalitm m-surm have hewn providied within the required ti meframe or an assurance that they wiF! be pmvided as soon as possible, NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a} Itach L&SC measure has hecn installed Initial and date each MSC measure on aeopy and does not significantly deviate from the of the approved L&SC plan or complete, date larat ions, di mensio ns and relative elevations and sign an inspection report that lists each shown on the approved L&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required span the Initial installation of the E&SC measures or if the L&SC measures are modified after initial Installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection rep art to indicate completion of the construction phase. (c) Ground cover is located and Installed Initial and date a copy of the approved E&SC In accordance with the approved L&SC plan or complete, date and sign an Inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a cop yaf the approved E&SC to E&SC measures. plan or complete, date and sign an Inspection report to indicate the completian of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down g for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Re portin 7imeframes After Discovery) and Other Requirements; Ia) Visible sediment ■ Within 24 hours, an oral or electron icnot ification. deposition in a ■ Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. pivision staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named onthe NC 303M list as Impaired for sedirnerit related causes, the permittee may be required to perform additional man itoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliant•: with the federal orstate im aired -waters conditions. [bl ail spills and Wthin24hours, an oral or electronic n at ificatia n. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spi11 or release. substances per Item 1(b)-[ej above Jr) anticipated ■ Rreporrat himst ten days before the date of the bypass, if possP&fe. bypasses [40 CFR the report shall include an evaluation of the anticlpated quality and 122-41(m)(3)] effect of the bypass. _ (dj Unanticipated Within 24 hours, an oral or electronic notification. bypasses [40 CFR 1Arothin 7rvlendw days, a report that indodes an evaluation of the 122.41(m)(3)] quality and effect of the hypass. le) Noncompliance Within24 hours, an oral or electronic notification. with the conditions • within i th n 7 calendar d s a re rt that wntalns a desul ton of the oY . Po P of th i s pe rrnit that noncompliance, and Its causes; the pentad of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time nonco mp I is nce is expected to environmenti40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(II(711 prevent reoccurrence of the noncompliance- 140 CFR 122-41(l)(6)- Division staff may waive the requirement for a written report on a case by cast basis. PLEASE REFER TO THE PROJECT MANUAL FOR COMPLETE PARCEL SPECIAL PROVISIONS. BELOW IS A SUMMARY OF KEY ITEMS BY PARCEL. 1. 27 2. 28 3. 29 4. 30 5. 31 6. 32 7. 33 8. 34 9. 44 10. 45 11. 46 12. 47 13. 48 14. 49 15. 50 16. 51 17. 52 18. 53 19. 54 20. 55 21. 56 22. 57 23. 58 24. 59 25. 60 26. 61 27. 62 28. 63 TBD APPROVALS (SEALS) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE ce CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE N0. P-0601 0111111=1111110 NCDEQ PERMIT NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. • 5 tj Know what's below. Call before you dig. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. CHARLOTTE CHARLOTTE WATER W6TER CHARLOTTE NORTH CAROLINA V I vv v. v Scales PLAN - PROFILE Hor. Vert. - As Built I ANIITFr' File No. MCMULLEN CREEK TRIBUTARY AT QUAIL HOLLOW - REPLACEMENT SEWER NOTES Date SRK SRK JLD Revision I Surveyed By I Designed By I DraWn By I Project-Engr I Approved By Sheet Of 3 22 Date A CITY OF CHARLOTTE DEPARTMENT Al /: ,Ill \� EXIST. 30' vv SANITARY SEWER �� EASEMENT (TYP.) , EXIST. 33" SANITARY - / SEWER PIPE TO REMAIN i IN PLACE (TYP.) CW JOB #542-23 = '� CW FILE #MM-2 / MH 4140 I / R I // 49.8 N N 5 .8 1 A 53 .3 I / OI�T .2 /C (SFi� FST� CONSTRUCTION /�FF� X$� ACCESS VIA BALTUSROL LN. Property Owner Information Parcel No PID Owner Last Owner First Propery Address Deed Ref OF MECKLENBURG HEYDON 61 20922380 NA 26428-124 HALL HOMEOWNERS ASSOC ASSOCATION HEYDON HALL 63 20922381 NA 24046-84 HOMEOWNERS / �� .---- - PROTECT EXIST. GAS- _ \ \ I ( MAIN WITH ORANGE565 / \ l ,� FENCING PER DETAILI-D \3635 SMFFH-FI LD 6kIUl2 RD - - / -PROP. TEMPORARY CONSTRUCTION r� I I� II / / J� i�/� � - E, GN - / i EASEMENT ALONG GAS EASEMENT I I / /�% /%i% C�41�/IDEE LAND COMPANY, DORO��I 14ARRIS,- // PATRICIA M HARRIS, &GARY Wl-IARRIS ��- � �DEEDRfF�24988581 ` i--5-75-- / \\\ - - - TA�CRARCECNZ9�22A- - _ - - - - _ \ \ \ \ \ \ \ \ \ \ \ \ 1 \ 1 EXIST. PROPERTY LINE (TYP.) 555 flI 5/v6iv � �-3���20�`- � Iw59.58 COMMUNITY 100YEAR rs1DE bRO FLOODPLAIN (TYP.) V. IN 5�` OUT 5 FEMA 100-YEAR' l j �' / FLOODPLAIN (TYP.) j / l/ \ I V PROP. 35' TEMPOF \ 1 / CONSTRUC' / l \ 1 PROP. STREAMBANK RESTORATION /i /� i \ / PER TABLE (THIS SHEET) 44 EASEMENT �- PROP. STREAMBANK RESTORATION' PER TABLE (THIS SHEET) PERFORM TEMPORARY STREAM BYPASS PER DETAIL 2 E� F-KUIVI IUF UF• bANK 75LF EACH SIDE ±582 SF RIP RAP STABILIZATION ±291 SF MAT & PLANTINGS /3 3\ 3635 SMITH ELD CHURCH RD C�` �MpEE LAND COANY,_DOROTHY HARRIS� TRICIA M HARRIS, & GARY W HARRIS �, v / DEED REF: 24988-581 --- TAX PARCEL NO: 20922201 _. .._.. .... .. _. ..._.. .. _ / \ LMI LRML 11 tr./ (APPROX.) REMOVE & REPLACE " TO MATCH EXIST. (TYP.) \ cMUctENCRfFKTR�B. EXIST. IRRIGATION SPRINKLER /Annnw \ nrnnf-%Xir o nrni Af-r PROP. 20' TEMPORARY CONSTRUCTION EASEMENT (TYP.) QUAIL HOLLOW GOLF COURSE 3 AREA VICINITY MAP N TS PRELIMINARY PLANS NOT FOR CONSTRUCTION 930 tot) Know what's below. Call before you dig. EROSION CONTROL NOTES: 1. PROJECT IS LOCATED IN THE CATAWBA RIVER BASIN 2. ALL DISTURBED AREAS TO BE SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION OF CONSTRUCTION. 3. EVERY 150 LF AND WHERE LOW SPOTS EXIST IN TOPOGRAPHY THAT CONCENTRATE FLOW ALONG SILT FENCE, INSTALL SILT FENCE OUTLET PER DETAIL 1-B. 4. THE LIMITS OF DISTURBANCE SHALL BE DEFINED AS THE PERMANENT EASEMENT AND TEMPORARY EASEMENT AS SHOWN ON THE PLANS UNLESS OTHERWISE NOTED. 5. ALL WORK WITHIN CREEKS SHALL BE COMPLETED IN THE DRY. UTILIZE COFFER DAM AND PUMP AROUND PER DETAILS 2-E & 2-D Streambank Restoration Start End Restoration Length LF Restoration Method Detail San. Sewer Station Offset San. Sewer Station Offset 1+74.96 27.44 2+05.48 20.22 34 Bo u I d e r Toe 2-C 2+05.48 20.22 3+44.21 17.49 144 Streambank Stabilization* Sheet 21 3+44.21 17.49 4+49.62 18.41 103 Wood Toe 2-B 4+49.62 18.41 4+84.22 19.45 37 Streambank Stabilization* Sheet 21 4+84.22 19.45 5+50.28 15.62 67 Bo u I d e r Toe 2-C 5+50.28 15.62 6+27.80 18.25 81 Boulder Toe w/ Class B Stone 2-C 6+27.80 18.25 7+02.42 17.01 77 Streambank Stabilization* Sheet 21 7+02.42 17.01 8+15.23 27.86 119 Wood Toe 2-B 8+15.23 27.86 10+03.81 20.40 206 Streambank Stabilization* Sheet 21 10+03.81 20.40 10+70.25 22.93 70 Wood Toe 2-B 10+84.45 30.26 11+39.02 30.01 70 Streambank Stabilization* Sheet 21 * Streambank stabilization to include grading the streambank at a 2:1 slope, placement of matting, live staking, and seeding persheet 21. Riprap shall not be included as part of the streambank restoration indicated in this table. 1 GRAPHIC SCALES 1 inch = 40 ft. CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 M dd 1g xpp TCF TOP OF BANK (TYP.) A(J����' �pF OUTLET PER �,.� EXIST. 15' SANITARY �'ss DETAIL 1-B (TYP.) SEWER EASEMENT (TYP.) \.. �� A- 0 \ ss w v —00 tv \ \ \ > 3d PROP. 20' TEMPORARY \\� / ©I —2 p CONSTRUCTION / °00°-_ O 3d EASEMENT (TYP.) � - \ SF EXIST. IRRIGATION PIPE P SF O (APPROX.) REMOVE & REPLACE F 0 O 3d \ TO MATCH EXIST. (TYP.) EXIST. IRRIGATION SPRINKLER 570 - 13 00 3d T - - w\ (APPROX.) REMOVE &REPLACE- - _ _\ TO MATCH EXIST. (TYP.)-580 3d 3 _ \ CONTRACTOR TO INSTALL DOUBLE ROWS OF SILT FENCE ALONG OUTER z4 00\ LIMITS OF EASEMENT LOCATED ON O w &\ PID #20956101 ((( pF \ 585 -- `- -� EXIST. IRRIGATION -575-- - SAND TRAP PF VALVE (APPROX.) (TYP.) � � �`� 2� _ — , NEW PIPE TO BE SA INTDVIA TALAO PEN CUINSTALLATION �NDTRAP \ _ /3 2\ — ,w�� Q LENEAGLES QUAIL HOLLOW COUNTRY CLU DEED REF: 02437- ,71 — TAX PARCEL NO. 2 56] M _ -------- PROP. TEMPORARY CONSTRUCTION ENTRANCE PER DETAIL 1-F 540 i y / �85 T7TTTT�T / � J ��7�7 EXIST. 12" HIGH PRESSURE GAS _74- MAIN (APPROX. LOCATION) (TYP.) Z4.; l l�C) GAS CROSSING hh PER DETAIL 1 D — o 58e- \3219 SEVEN EAGLES — — - ERIC D ALPERT &-DONN-A-- K ALPERT — — DEED REF: 04999-861 - - TAX PARCEL NO:20938208 c � �Eac� 0 QUAIL HOLLOW GOLF COURSE ROJECT AREA �y � pM uN pFt 2 v �VJV� VICINITY MAP N TS V Know what's below. Call before you dig. GRAPHIC SCALE 0 20 40 1 inch = 40 ft. EROSION CONTROL NOTES: 1. PROJECT IS LOCATED IN THE CATAWBA RIVER BASIN 2. ALL DISTURBED AREAS TO BE SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION OF CONSTRUCTION. 3. EVERY 150 LF AND WHERE LOW SPOTS EXIST IN TOPOGRAPHY THAT CONCENTRATE FLOW ALONG SILT FENCE, INSTALL SILT FENCE OUTLET PER DETAIL 1-B. 4. THE LIMITS OF DISTURBANCE SHALL BE DEFINED AS THE PERMANENT EASEMENT AND TEMPORARY EASEMENT AS SHOWN ON THE PLANS ACCESS VIA SEVEN EAGLES �' ���L�v 3101 SEVEN EAGLES UNLESS OTHERWISE NOTED. (SEE INSET A THIS SHEET) �� \ TRUST JF HENDRICK III 5. ALL WORK WITHIN CREEKS SHALL BE 0 �/ I IRREVOCABLE & ROBERT C RICE COMPLETED IN THE DRY. UTILIZE oo I // /�// DEED REF: 23133-036 COFFER DAM AND PUMP AROUND SS ©� g / II �I TAX PARCEL NO: 20938204 PER DETAILS 2-E & 2-D 01 11: 119 SEVEN EAGLES PA 7RI SWISHER & LAURA E S HER \ DEED REF: 11539-055 / I /� I (i / \ \ �4 = � , I(I I - \ \ E TAX PARCEL NO: 20938206 17 PRELIMINARY PLANS I / I � � \, t NOT FOR CONSTRUCTION ©© CONSTRUCTION SHALL BE IN ACCORDANCE WITH EXIST. 35' GAS \ \ EX. PIPE TO BE / / j/ / j / // I I I I -- :: f ° ©° /// CHARLOTTE WATER STANDARD SPECIFICATIONS. � � � \ � � REPLACED VIA PIPE � / / / � � � \ P EASEMENT (TYP.) � � ?�3 �• � I � � `�' o � / /// / BURSTING (NO OPEN VA //� ��� %%_ �/ A \ V ©o© � //// NCDEQ PERMIT NO: / cur) x v v _ / I NCDOT ENCROACHMENT N0: C `� I + EXIST. PROPERTY — -- - - O i �i °"� J l / v 119 SEVEN EAGLES / I MUNICIPALITY: CHARLOTTE LINE (TYP.) 52 !/ice A PAT -RI SWISHER & LAURA E S HER DEED REF: 11539 055 ,�'� �� I I DISTURBED AREA: 11.6 AC. ° 3119 SEVEN EAGLES -€` - 5 N!'S0 0937 � PATRICK L SWISHER & L-AURA' g5 TAX PARCEL NO: 20938206 SWISHER — 1446 2Q DEED REF: 11539-055 53 G PROP. TEMPORARY -580 TAX PARCEL NO: 20938206 — _ _ INSET A 1 / EXIST. FENCE _ �, CONSTRUCTION ENTRANCE SCALE: 1"=40' ` — PER DETAIL 1-F (TYP.) y MH- 601/I (TYP.) _ 3201 VEN EAGLES RIM 9.4�4 / I MH-24o01� N: 50223.520 r N: 502301.555 I / / $ \ --- ) B PERRY &SALLY MORGAN PERRY V. N o 2 1�579.87 E: 1446761: 51 --E: 144674 362 DEED REF: 19896-565 � INV OU� 5 0 0, INV. LN 572.0 3J1 58U — / 54 8443 WINGED BOURNE _ / — / INV. OUT-571.8 EAGLES -TAX PARCEL NO: 20938207 Y1 / t+ J — / - St= ��. MH-240 28 — — i � ° - / �, \ yF� 3D1 i X N: 502270.7 5 �J R III I/T HENDRICK & ROBERT RICE PWA IFALPE�T— — — — 3Jl 301 3J + 3 lE- 1446764.23��, C, !M. �N 151783.3 DEED REF: 16508-286 99-861 w � �e EXIST. 4" SEWER � 3D1 I I SSE D INV. OUT7 S 1 20938208 LATERAL (TYP.) 3_ - / 3d 3d d 3d - TAX PARCEL NO: 20938203 ���— — �� I 1 _ -- -- A l 34S SSE S + �� _ _ _ —�� I PROTECT EXIST. GAS �'' X + v \ - 3s MAIN WITH ORANGE / 3SS PE PE 3SS $ �� ijEXIST.4" FENCING PER DETAIL 1-D � �� �5� E 1* PE ,�/i \ 596 I L s� ji �c / # T E __TGE TcE "` _ - - _— _=—=_ SERVICE (TYP.) / 1 - C -- SS ' �� - --�TCE — EASEMENT EXTENDS 7L 0 RIM 579. 9 / i ��• �_ - _ _ v _ !/ o %..i - — — —..- EX. PIPE TO BE - SSE32 PE — — — inn S6 .� — TO WINGED BOURNE. _ _ — —_— — — — _ —_= — -- - — _ -®�'�;—�...Tv�H-2�c}e2 3, REPLACED VIA PIPE WI 57 BOURN - F _ NO CONSTRUCTION SSE �c - - 7 — — _ — _ ` — — -- _%� r - = — < �� _ 5 cE �\ oo IN O OPEN K STOPHER ROLL < ACCESS 11V 72.9 I\ �BURS ( REF:28878 3 ..'==—�— — — PROP. SILT FENCE OUTLET — — �� T No! 20 8202 �, S,•..,%--- --- — —-- � CUT) ---- --_ -- — �� J� 0 PER DETAIL 1-B TYP. \� Ss , � IN �.,, F PROP. TEMPORARY CONSTRUCTION ENTRANCE } PROP. SILT FENCE PER . C� PERDETAILI-F z 3 k DETAIL 1-A (TYP.) PROP. 15' TEMPORARY EXIST - , M _ M I m pact 568.1 c, T 567.9 gyration _ — 3D1 3: SS S rn C — 3 3 m z —SSE S E SSE 30 co m rrn n ° S O D PE F S WO E 0 0 — --- - ------ V—'— E ), EX. PIPE TO BE REPLACED VIA PIPE BURSTING (NO OPEN CUT) TEMP. STREAM CROSSING PER DETAIL 1-C 66 LF STREAMBANK RESTORATION PER pE SHEET 21 TO BE PERFORMED M ±1387 SF RIP RAP STABILIZATION ±382 MAT & PLANTINGS (USE cE I ORNAMENTAL RIVER STONE AT THIS LOCATION) - NEW PIPE TO BE INSTALLED VIA OPEN CUT INSTALLATION PROP.20'TEMPORARY 'M CONSTRUCTION EASEMENT (TYP.) �M ' APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 CONSTRUCTION EASEMENT (TYP.) ' �, _ _ % © s5 Op P� �, j/�/ FOOTBRIDGE (TYP.) �� �.� r v i 1 F� o© 000 ©© r ��I - - o ®o _ Jj RMN2� / PROP. 20 PERMANENT t �`� 2 P �� - / �.�; EASEMENT (TYP.) _ o� f y� - �N1 s& A9 --�� /�%�/� v 8 EAGLE GLEN 424 EAGLE GLEN \� �� ass �j �NI ' i �A CHARLOTTE W `ram, — =�..: ! , ; �/ G) EXIST. 15 SANITARY f �\ p 4p ! N�. ss CHARLOTTE WATER O y %� _ f JAMES FR RICK WEBB SIMPSON & DAVIS & LISA E D W�T E R SEWER EASMENT(TYP.) ={ EXIST.8"SANITARY DEED REF:23533-970 ������ ISMS CHARLOTTE, NORTH CAROLING G✓� i _ / REPLACED VIA PIPE /� — m THE WHI EPH 8N9T TRUST U/T/A/ I I\\ \\ 1 s $ SEWER PIPE TO REMAIN TAX PARCEL NO: 20938216 ti 4 ram. O / TAX 0: 20938224 IN PLACE (TYP.) BURSTING (NO OPEN I I / � 1. —� 20 TOP OF BANK — y / `�> > MCMULLEN CREEK TRIBUTARY i CUT) BUFFER (TYP.) �N o _ — — , — , / �� // C ' ,- - � Job No. File No. —� �— /, � —_� / � \ �\✓�1��I �� _ � �� Scales QUAIL x --� `r \ \ - / / III �� \\ 1„ - 40' °� ° Q r� - `� _ v II��II� II I _ _ _ NSF PLAN REPLACEMENT SEWER -- ��' IIIII\II I / \ � " PROFILE 1" = 40' Property Owner Information -- \ — — — _ � � � -- -- ' � � � � .\� � \ I 111��1111 III � � �\��\� ,. Hor. ,/ � �8�� � , 1 Ill� nA_ \ vent. ,,, — 4, EROSION CONTROL & Parcel No owner Last Owner First Propery Address Deed Ref PID \ — — ` \ \ CONSTRUCTION ENTRANCES 53 SEVEN EAGLES HOMES ASSOCIATION C/O THE HARRIS LAND CO NA 25991-859 20938298 As Built Dote Sheet Of 54 THE HARRIS LAND COMPANY NA 06144-067 20938205 LANDTEC SRK SRK JLD 5 22 55 SEVEN EAGLES HOMES ASSOCIATION NA 25991-859 20938299 No. Dote By Revision Surveyed By Designed By Drown By Project-Engr Approved By Date / CONTRACTOR TO INSTALL DOUBLE - -_ - \ \ \ \ ,X,�,\\ \ \ \ — _ — — — -- _ — — / / / / / / // / / / / / / / / / / EXIST. FLOODPLAIN ROWS OF SILT FENCE ALONG OUTER \ — — _ — — — 70 G EAGLES RD _ — — _ _ — — �� /i , % / , / / � COMML LIMITS OF EASEMENT LOCATED ON _ -- -- — � \N EXIST. 35' GAS EASEMENT (TYP.) MCMULLEN CREEK CENTERLINE PER GIS (TYP.) E �.. E � E � E 3 E — E E E E LF — EXIST. IRRIGATION PIPE (APPROX.) (TYP.) EXIST. IRRIGATION SPRINKLER (APPROX.) (TYP.) . -- i — i I I I G — EXIST. CONTOURS PER GIS (TYP.) / M M \ \ \ CMULLEN CREEK / TRIBUTARY CENTERLINE Perennial Stream B a S10: 60 1f Temporary Impact FEMA � � G TEMPORARY STREAM FLOODPLAIN (TYP.) M CONTRACTOR TO INSTALL DOUBLE — Bridgemat Crossing \� ROWS OF SILT FENCE ALONG OUTER CROSSING PER DETAIL 1-C LIMITS OF EASEMENT LOCATED ON l - Detail 1-C COMMUNITY FLOODPLAIN G \ �\ \ PID #20956101 �' / / M� (FUTURE) (TYP.) TAX PARCEL NO. 20921127 PROP. 20' TEMPORARY — — — �/; / — Dl / PROP. 50' PERMANENT I w Ln N EXIST. IRRIGATION PIPE (APPROX.) (TYP.) EXIST. IRRIGATION SPRINKLER / — (APPROX.) (TYP.) I.VIVIIVIl11Vl I I ENCROACHMENT AREA (TYP.) E E E REMOVE EX. TREE (TYP.) 3°, Jl E D n C/1 = SSE mrn r 19 00 SSE v Ln SSE SSE SSE 24 cn m _ — — / .' \ a 'NA�t4" °R SSE SSE SSE 23+00 m (An a / �d �o j 3SS SSE 22 00 rn . \ ( 34 —� D �� 3s SF-0 zoo RM S 6a5 21 00 SFO SF s -- — A S / L o w--_ --------___-- -- n I �56 y / SSA E�� �Z:A ,/ // __—_ - �—// PROP. SILT FENCE TO BE � r" /J /� ------ ----- _—_ — �, ° — �a• / __-- — --- LOCATE AT MCMULLEN / --- ---- ------------ — s�., - �.� — __ __ PROP. SILT FENCE- 5 - — — PER DETAIL 1-A __ CREEK TRIBUTARY TOP OF ti 54 46.2 _ _ — _ / \ BANK (TYP.) m - m EXIST. PROPERTY LINE (TYP.) -- / / PROP. SILT FENCE OUTLET \ 7 PER DETAIL 1-13 (TYP.) / �——Ike-- — Un w v MCMULLEN CREEK \ ----� --- m -- CENTERLINE PER ------ — EXIST.35'GAS--------- REMOVE EX. - _ _ / — — — — GIS (TYP.) — EASEMENT (TYP.) _ y ' TREE (TYP.) j _ — — — ��� �---- \ E E E E y O / /'� �'�'�E _E Es'^ m E E k. \ 3 3 3 FEMA FLOODWAY (TYP.) COMMUNITY / ENCROACHMENT AREA (TYP.) G CONSTRUCTION ` 71 i s 301 EASEMENT (TYP.) W N \ 32 EASEMENT (TYP.) — — -- - �d i „1 \ li 3700 GLENEAGLES RD — 01 i+4" °A" e E1y` N�� 53.65 526 EXIST. 30' SEWER NA�N� QUAIL HOLLOW RiM 541 a — — A�N��� COUNTRY CLUB — - EASEMENT (TYP.) m DEED REF: 02437 571 �7L „ouY E MAPLE ! E`� TAX PARCEL NO: 20956 , d 17 0p S 16• �A�Nul" �Z• *A�NoT3d Ln E Y 3d v) SSE 3d L 3d 3d 3d i 7y �2• As" " 16 As+ 18+ 3d 3d _ 3d (0)E�►A 0 SS 3d 3d 3d 3d �� / " ASH Ll QUAIL HOLLOW GOLF COURSE 3 VICINITY MAP N TS • V Know what's below. Call before you dig. GRAPHIC SCALE 0 20 40 1 inch = 40 ft. EROSION CONTROL NOTES: 1. PROJECT IS LOCATED IN THE CATAWBA RIVER BASIN 2. ALL DISTURBED AREAS TO BE SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION OF CONSTRUCTION. 3. EVERY 150 LF AND WHERE LOW SPOTS EXIST IN TOPOGRAPHY THAT CONCENTRATE FLOW ALONG SILT FENCE, INSTALL SILT FENCE OUTLET PER DETAIL 1-B. 4. THE LIMITS OF DISTURBANCE SHALL BE DEFINED AS THE PERMANENT EASEMENT AND TEMPORARY EASEMENT AS SHOWN ON THE PLANS UNLESS OTHERWISE NOTED. 5. ALL WORK WITHIN CREEKS SHALL BE COMPLETED IN THE DRY. UTILIZE COFFER DAM AND PUMP AROUND PER DETAILS 2-E & 2-D. GENERAL NOTES: 1. CONTRACTOR TO INSTALL 12' DRIVE PER DTL 1-E ALONG EASEMENT FROM STATION 0+00 TO 36+50. PRELIMINARY PLANS - NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 EXIST. 100-YEAR FLOODPLAIN (TYP.) COMMUNITY 100-YEAR FLOODPLAIN (TYP.) EXIST. CONTOURS - PER GIS (TYP.) EXIST. PROPERTY LINE (TYP.) \ \ PROP. 50' PERMANENT \ EASEMENT (TYP.) 3d _. SS SS `I�LTU S RO L THOMAS E SKAI S — DEED REF: 16841-28 X PARCEL N0. 20921 0 /_� - - - ----- --- -f%- 24 3 SHARON RD` \� Gt�NEAGLES HOMES ASSOC DEED REF: 04267-276 TAX PARCEL NO. 20921151 A EXIST. 30' DEED REF: 16764-52 1 V A \ vV A v \ — — — — — — — — / / / / 9 COMMUNITY 100-YR SANITARY SEWER TAX PARCEL NO.2092112 \ \ \ \ \ \ - -- _-- — / / 7700 BALTUSROL LN + \ V — — — — — -5G5- / / FLOODWAY (TYP.) — s� �LRIM 3d \ \ EASEMENT (TYP.) \ \ \ \ -- - _ — -- — — — — — — / / / KEVIN J ROCHE / q \SS n/ / \ \ \ \ \ \ — — — — — / / // DEED REF: 09161-556 J i �Q 7AX PARCEL NO. 20921129Qj SE3d Ln SS3d3d(� WO: � 25 00 SSE 3d \\�����/3di 1-1 ��\ \ \ ---� �� i // / 36 \\ �� / Q 3SS SSE 3d \ \ \ \ \ - -- -- — / — — � 3d SS SFO 26 00 \ SSE \ 3d 3d \ \ \1 \ \ — -- -- ' 3 3 SSE / d F / \ �� — — — \ \ d 3d — — 3d 3� 3d / 3d SSE 27 \ \,r_ / SSE - ' 33+00 SF ' 3SS \ SS �S — — - # / --- --/ ' SSE / E SS \ \ 28�00 SSE SSE -- -- _ _ SSf SSE SSE SSE / 32 0 0 / — ��0— — — -- - - - - 9 00 3-55 � 31 00 SF 3 S / - --- - SF ------- -- PROP. SILT FENCE PER -- - — — — — — — — — — —�� — — _- - - - — \ \ SS 3 3S ' �� '-- — -- DETAIL I-A(TYP.)Ln -- ------ -- ---- PROP. SILT FENCE r '-sa ----_-------' /. � -- —— — — OUTLET PER��- w a __--- FEMA FLOODWAY (TYP.) — DETAIL 1-B (TYP.) - — - -- -- - -- , , --- N m_-------------------------------- _ ----- - - ------ - - ---- rsp�' 600E4THST11THFLOOR --- --- \��� — ------------ ------ — --- ----------- —� — , — -- --- ___------- ---- ----- COUNTYMECKLENBURG \\\ \�� \�\� — ------ - --------- _----------------- DEED REF:08345-383 TAX PARCEL NO. 20930126 PROP. CONSTRUCTION ENTRANCE PER DETAIL 1-FLp EXIST. 15' - SANITARY SEWER EASEMENT (TYP.) PROP.20' PERMANENT EASEMENT (TYP.) 30 _ — — — \ \ \ \ / / / / / J / , PROP. 30' TEMPORARY \ 7630 BALTUSRO LN — — — \ \ / / i S CONSTRUCTION EASEMENT (TYP.) MAX LAMBETHDA IEL EXIST. UNDERGROUND TELECOM (APPROX.) (TYP.) � � S EXIST. 20' SANITARY - SEWER EASEMENT (TYP.) PROP. 10' PERMANENT EASEMENT (TYP.) 46 3904 SEMINOLE CT WILLIAM 0 L HUTCHINSO DEED REF: 33342-826 TAX PARCEL NO. 20921147 A 3900 SEMINOLE CT GREGORY A CURRIE & JENNIFER M CURRIE DEED REF: 33016-421 TAX PARCEL NO. 20921148 AS S J' PROPERTY LINE (TYP.) J� ±1046 SF FORESTED WETLANDS WITHIN TEMP. CONSTRUCTION EASEMENT. CONTRACTOR NOT TO \ J� RESTORE DISTURBED WETLAND AREA J� "-3810 GLENEAGLES RD QUAIL HOLLOW #3 1N@tl' REMOVE EX. J TREE (TYP.) PROP. TEMPORARY CONSTRUCTION EASEMENT (TYP.) A / SEWER PIPE (TYF 3901 SEMINOLE CT EXIST. STORM DAVID L FRANCIS & tic DRAINAGE BETTY L FRANCIS cS EASM ENT (TYP.) DEED REF: 06622-524 coo TAX PARCEL NO. 20921149 GLENEAGLES ROAD SANITARY SEWER RELOCATION Oor y�E Cr fit 'WATER VAULT RIM 589.28 �INV OUT 584.0 18" RCP WATER BLOW -OFF CONC. CONTAINMENT STRUCTURE PROP. TEMPORARY ACCESS ENTRANCE (SEE SHEET 13) EXIST. FIBER OPTIC CABLE (TYP.) J" INV 579.0 - EXIST. GAS MAIN (TYP.) SOIL STOCKPILE AREA (TYP.) yo ROJECT AREA � OE QUAIL HOLLOW GOLF COURSE 3 PROJECT AREA �y�v 2� oM uN pR Jv v/v VICINITY MAP N TS tt-1 wD Know what's below. Call before you dig. GRAPHIC SCALE 0 20 40 1 inch = 40 ft. EROSION CONTROL NOTES: 1. ALL DISTURBED AREAS TO BE SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION OF CONSTRUCTION. 2. EVERY 150 LF AND WHERE LOW SPOTS EXIST IN TOPOGRAPHY THAT CONCENTRATE FLOW ALONG SILT FENCE, INSTALL SILT FENCE OUTLET PER DETAIL 1-B. 3. THE LIMITS OF DISTURBANCE SHALL BE DEFINED AS THE PERMANENT EASEMENT AND TEMPORARY EASEMENT AS SHOWN ON THE PLANS UNLESS OTHERWISE NOTED. 4. ALL WORK WITHIN CREEKS SHALL BE COMPLETED IN THE DRY. UTILIZE COFFER DAM AND PUMP AROUND PER DETAILS 2-E & 2-D GENERAL NOTES: 1. CONTRACTOR TO INSTALL 12' DRIVE PER DETAIL 1-E ALONG EASEMENT FROM STATION 0+00 TO 36+50. PRELIMINARY PLANS - NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: CDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 570 570 O = N o0 K• V • 5 0 II +�' I`� II •� 560 W� ILf I, 0C 550 VENT ELE =5 4.00 PN EAS ---PROP MENLil C-- ELE ATI 8 N ( PVC—' P.) I I PROP. SE ER IPE 16" C-905 PVC PROP. 16" C-905 PVC PROP. 16 „ C-905 PVC L O T-54 . 0— 1 TH-1 FL U = 4 .50 116 540 EXI HIG'111 PR SSU E G S LI E 5 O OUTSIDE DROP FLl=3 3 0' FLl=4 2 6 FL O T 5 8. 0— 3 15,30 1 1 1 1 1 1 15 0 1 +00 2+00 3+00 Ill �l ©q EMERGENT WETLAND 34 HEYDON HALL CR— I HEYDON HALL HOMEOWNE� EXIST. COMMUNITY /i� v� v � I � � ASSOCIATION OF MECKLENBUR INC 100-YEAR EXIST. 33 SANITARY / / AA \\�\ DEED REF: 27714-14 FLOODPLAIN TYP.) 4 HMEXb'i�W SEWER PIPE TO REMAIN / \ \\\\\ D I PERENNIAL TAX PARCEL NO:20922379 ( J DQ�I IA T L'� I - \ _ HEYDON HALL CR. - - v v� vvvv STREAM \V� + \ DE�E REf 7�\ © A I I I v — (CDOT) IN PLACE (TYP.) / / \\ \ \\ / CW JOB #542-23 �C L �092��0 I I / © / EXIST 100 YEAR \ I 5+00 6+00 7+00 e 9+00 10+00 Property Owner Information Parcel No PID Owner Last Owner First Propery Address Deed Ref OF MECKLENBURG HEYDON 61 20922380 NA 26428-124 HALL HOMEOWNERS ASSOC ASSOCATION HEYDON HALL 63 20922381 NA 24046-84 HOMEOWNERS /' CW FILE #MM-2 \ \\\� ' `_\\ — — \ I I \ \ \ \ \ I I ( 51 / / / / C 0 \� — a© 000 0 — / vvv� \� FLOODPLAIN (TYP.) / I A \ \ VA _ A I / I vv� EXIST. 30' SANITARY SEWER ;vvv EXIST. 20' TOP OF- - EASEMENT (TYP.) BANK BUFFER (TYP.) ��__ _ �I\ I 0 \ TH-3 \ ) \ Soft Digs Sample ID Utility Type Station Station Offset (ft.) Coordinates Depth to Utility (ft.) Easting lNorthing TH-2 Gas 5+66 15 NE NA NA 3.83 TH-3 -- -- I - -- I - NA NA 3.14 TH-3A Gas 1 0+36 1 - NA NA 5.73 STA 0+36 \ ��E: 280C�� 354,— E / (499451.664, 1448628.063 \�. EXIST. 15 1 \ \ \T� k�R�EL O,202,2307 _ J SANITARY SEWER \ \ \ \ \ \ \� w �I)�llll/ s �sF l STA. +6�5 96 EASEMENT (TYP.) 'j REPLACE CONE WITH FLAT / PROP, MH 1 I I \ \ \ V A \ >v� v / ; PROP. 40' TEMPORARY— N / � EXIST. TOP OF / � I \ \\\ \ o \.\� ��\ / -- TOP SECTION/WATER-TIGHT CONSTRUCTION ) — 52, 0� I \ \ \ i �` CONSTRUCTION ,i_ ; FRAMEA ND COVER, AND �' I'�'— I BANK (TYP.) — — \ \ \ \ \ \// 0//�•— ss9 (I\ EASEMENT (TYP.) g SENT. \ SSI- vv� \ \\ — �� t / 0 WNEAS`A SCr ��— — 61\ /��/C VA F \�'� \ \ �55vv A _ _= II A / \;�' M KL NBLlRG [Ld " ICHAEL� 8i �HELLE A� �4�1V1/ � I��R� ARIO,-C -D E f271�SS D'EEDR.205& � - cJ 41c410 A "L�NOl 2 . — -/TAX PAf C VNO E / \ z �\ _ �� \ EXIST. PROPERTY ��ji \� s \ _ _ _ \\\ FFkr I,� \ \ / — — \-9436-_HEYDON HALL-Ck� —�� ✓� L / _�_ */ // \� E i \ \\�Rie LINE (TYP.) \ / \ JOSEPH MILLER &ZTS7�M KELLEY — _ �N \ —-fON�A� IVC LdFU�Lrt�I�= 11/lll I / J A E SS DEED REF: 29086 37 U�LG —_— i / v A �� TAX PARCEL NO: 2092 378 _ // o A 9 A�_, V \ / v v v� / DE 852-428lit-_ \ 4 \\��\ \ _ _ ��STA. 4+31. 2 _ 3Dl — — = _ — I 3 i :/��i- // , — _�a�_ \��.•. 555. 1SV EXIST. 35 GAS EASEMENT (TYP.) \ _ _ — — — _ �" — SSE J SSE +00 — — — — \� 9S 4 34 SSE SSE \ — --- 7 _ �\ ��- ' /— _—ass-4 — \�\ / / \ \\ Quail No low Alignment: S A O+Od 3 / ) _ — _ — — _ -`y _ _ — — _ _ ; —� - \�\\ EXIST. FL , \ \\� \ 9 l / — --569 \ \ Exist. McMullen Creek Trunk: STA. 0+00 O O O w L/) W w = Z J LU LU _ W (- / EXIST. MH-241402 _\; — _ //�� �_-- ________ _-_____ ---\�� \\� \ \ �I /� \✓—\ Q oTEE --565- EXIST. �� ga --- - - — --- _ �' /// i --- — _ -2E — J COMMUNITY\_\ \ __—____—_ N FLOODWAY(TYP.) ---_ —�\ -SA \\+2�8� \�---__—_�--TH-2 ___ --- _ ---- l —� (_ //--___ \ ROP_ MH #3 \ 491448381.779) RIM 556.68\\\ 991 4,\ — — — — --_--(/ 2 151 PROP. TEMPORARY CONSTRUCTION \3Cz35 SVTfL& kUR RD_ EASEMENT ALONG GAS EASEMENT C-A1L/IDE6LANf7COMPANY, DORO��I 1ARRiS,— _ , / — — — — — \ I EXIST. 12 HIGH PRESSURE GAS PA "I-HARRIS, -& _QAI Y WL-IARAI� — — � — — — — — _ \//I �R / � I f J/l/ LINE (APPROX. LOCATION(TYP.)EED-Rf 24988-581 — __— 57 __-- _ v — i�— I ��, r,,ii, ��� v �. may. •� v� F ti Off` G G�N�O�fS L 0 C QUAIL HOLLOW y GOLF COURSE o" y� hJ 4� ROJECT AREA yO - ON` �2 Jv ;� VICINITY MAP N TS hays below. II before you dig. SCALES VERTICAL 0 2 4 1 inch = 40 ft. 1 inch = 4 ft. PRELIMINARY PLANS - NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: CDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 1 1 +00 12+00 13+00 14+00 15+00 16+00 17+00 11111=11MG ( — \ — _ / / // ////70 PROP. 20SEWER A - / �� �� //� /� � — CiED NE- \ �� / �/ // / /, AN R LA CINDY LAT% / / E - \ EASEMENT (TYP.) �� �ED_REF: 32 7 \ \ \ \ \ V A 1 \ \ v v v v '� M�+-2415os - -- -- E — - — ' �� EXIST. 8 SANITARY �TAx P in o �0937� s IM 56�,32- — — \ (D- — EXIST. 15' SEWER j ��� SEWER PIPE TO REMAIN o _ 3 �I 557.2 (W) 1 9+00 20--00 Soft Digs SamplelD Utility Type Station Station Offset (ft.) Coordinates Depth to Utility (ft.) Easting Northing TH-1 Sewer 13+14 - 1447900.42 500473.98 5 TH-1A Gas 13+14 - 1447900.42 500473.98 6.62 —EASEMENT (TYP.) �� IN PLACE (TYP.) INV. LI— — vv _-9-1Y4 QED Bfl ��.. OUT 55 1 o E PIS-3�20b3---IT) ) �E-N HA GYP /� w — RIM 5 9.58\ — — — H� / ��j.. • J D 1 /�. �� _ v I \ I v. IN 567.1 Svc — — — 097 88 //i/� / — 9200 WINGED O / (INSIDE 6ROP RICARDO L & BRENDA L ELIAS _ ) _ v l \ — — IN / / : / i �— \ SS \ DEED REF: 26800-620\ INJf: -OUT 555.5 �/�TAX PARCEL N0: 2093710 \ A / s \ V A GAS UE EXIST. 35' PERENNIAL STREAM _ EASEMENT (TYP.) // _ SF \ �i �' / / �AVA V �. S S V A MH-2415/1 \/ I �—� l �. © �i / �•k �� / � \ �S S RIM 56�.2 / o/ y / fSSF INV. IN 5 .1 / � �// / \ I I I � --� "� / // / � � � / / /��/ / .��� � \ \\ \ ass S )Nv. o r 57. S _ ss �— / — �/ i ) \ ' EXIST. IRRIGATION \ SE EXIST. PROPERTY /// / \ �� ` l / _ / �� s� / S i I 1 S 1 S / I I \ 9100 WINGED SOUR / / / LINE (TYP.) j / r — \ \— — —�_, _ / // / i / S / I \ DAVID VORONIN & B�NAV-VQR — / / / 99� WATER PIPE (TYP.)— v I \ — / // ;v ss ss ss — — — / — 3S5 DEED-RE�3Fs3�17�6�— — -� � -'� - , / / / I 56k).00 / / / � � � � �S S ,T�EtNe-�69�05— PROP. 35' TEMPORARY , ///�; / V. rN 554.9 (W) EXIST. IRRIGATION \ / \ ,— // N .AIN 55 �� �S/ ' . A�.... CONSTRUCTION \ \ \ -- �_ — // OUT 554. S \ SPRINKLER TYP. — PROP. 40' TEMPORARY \�\ \ — �\ \\ \ _ — �/� _ EASEMENT (TYP.) �� / 1 // \ (TYP.) EXIST. 4" SEWER( CONSTRUCTION I \ \ \ _ _ = ���%� �� \ i /,,r — / / j EXIST. 15' SANITARY \ LATERAL(TYP.) EASEMENT TYP. \ \ ` — — — — �\ - y` = i ��ii � \ \ —i �% � / `n S / / / SEWER EASEMENT TYP. E —� SS ass/ /i vO 1 \ \\ — ��/ /. �� \ i� // / S� I l l l l l PROP. 30' PERMANENT — �� E \ I / I \\ EXIST. TOP OF BANK (TYP.) — ! / _ / —/S ( ( I — �— — — — N�REEK \ \ �e // �� �ii I 1 \ I EASEMENT TYP. \� \ TRJe• i cR .:. — , / 3 \ (TYP.) \� $AN� TRAP \ 20'TOPOFBANK :'—EN`�� /�✓ / = d \\ \\\\ s . / 95 HEYDO HALL C I p \ \ \ \ \\ o �... I + 1 BUFFER (TYP.) /� //i/ / / — 1 Np . \ — p I O ( r RIN FINANCE PARTMENTJLL 41.1 �r`�90 „ \ \ _ 0 DEED : 34023 109 0 / / — (SAND I AP // — �S A. 11 31.1 ss PE �� V A V / �� / RARY — fY PROP 20 TEMPO � o CEL NO• 9 2304 � i .. � i �� �� \ / �� ROP. MH #4 ' — _ // f ( `� / sus' / l CONSTRUCTION I \� �j /i ��/ — %/� . 3! 558.1 _� — �l / / / / 1 I 3� I / O - EASEMENT (TYP.) — — �� EXIST. YARD / . S - � E / � / / DRAIN INLET r- /( ASS } ��� ?'Cl-/ qE/lll// \ \ �d `�� rCE — \ (D VA / SSE E SS 3 / \ T �� �// // l/ \ 1 00 3d \ 3d v r� — / 1 N20 1 1 / G� —�� m / l l l -- - \ rCE l (llr� 5 / �� _ _ _ — — / l / 1?� — 3 - - ✓ s / STA. f4+3873 _ _ ' _ _ l /T / / / i \ L- - \ - --- -- — - rcE — / / / / — — _ 00 N10.36' � 3d rCE CROP. MH 6 � / iA. 1' +8 .49 _ _ � � \ \ \ � `�` # �j rc v v v 0i � s�� _ / PROP. MH #7 "/ — / / / / / /E -rc_ _ _ �� \ _ ?E W M An — o MH-241484 RIM = 56 .01 / R/M = 56$.88 �� // %/� / / / \ \E� — — \ _ _ — PE PE 502.p,�!• O 19+00 - _ 3— . — / — _ -T — - 561.87 / / / /� ( \ E - X�` �.�+ - / INV. 55 8 TH-1 /(D / / / / / / _ — �v _ — N S ,1�5— —� \�� / T STA13+14 / /�'X� / / / ( / l I — rE—_—_ - PE PZ u 2 (1447900.42 500473.98) / / PROP. 20 TEMPORARY ' -�` LL K1H-2414 3 / / / / \ o — — PE Lu S s: PERENNIAL � \\\\\\\RIM / / CONSTRUCTION / — — \ — —r�€ _ — PE — z — \ /— / A\ / NV. IN 5535 / / EASEMENT (TYP.) / v \ �/ , \ \ \ • — _ — I W v STREAM / / \\\ 1 INV. IN 553. _ STA. 12+92.22 / U Ln �'o / / 1II�yvV — ROP. MH #5 / I I / // �� // i / v�--� v ,— �� �2 --- ---- k I / / ' / / l ) 37 GLES RD— — _ Q / �O J l /r I — '�� \ I / PROP. TEMPORARY ---- RIM = 561.55 I I (l // / a / / / //� / / / / �� \ �� / / I / / a4 ; — IL HULL M — — , -9 - �—. + / CONSTRUCTION / / / / / \ / I i i-- \� _ COU — -- ---__ — \—__'— / 1 r I EASEMENT TO MATCH / — _PARCELNO- GASNO-GASEASEMENT (TYP.) AA / —\ V �, \ I I I /� / EXIST. FENCE (TYP.) GOLF _ — I I \ / / / / \ , — — — — _ —_ —_— _ _ PROTECT EX. TREES EXIST. UNDERGROUND / -- — — — EXIST. 12" HIGH PRESSURE — — — — / I I / / / / ELECTRIC (APPROX.) (TYP.) GAS LINE (APPROX. �� I l l l l /i �V — ���/ / /� /— 0�--- ' LOCATION) (TYP. — — _ 0 L — W —\ 3635 SMITH JELD CHURCH RD I I\\t ✓ �����' — / / \ _ / _ — — CAMDEE LAND COMPANY DOROTHY HARRI�S, �����\//� `/� \\ O /7 PATRICIA M HARRIS,'& GARY W HARRIS / DEED REF: 24988-5gl/ ��1 \� �� J— / TAX PARCEL 1\10y269-22201 / \ \\\ \ i v , rcE — TCE --- ti c�N�O�fS 0 C QUAIL HOLLOW GOLF COURSE Irj ROJ ECT AREA y� b � pM uN pR �2 Jv� VICINITY MAP N TS • hays below. II before you dig. SCALES VERTICAL 0 2 4 1 inch = 40 ft. 1 inch = 4 ft. PRELIMINARY PLANS - NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: CDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 TCF M �'IV �STI NG VSTALL) 'IST.) ?OP) )ROP) 21 +00 22+00 23+00 24-+00 25+00 26+00 27+00 28-1-00 29+00 30+00 ISEv SS VA \ \ — — — DO EXIST. PROPERTY — st, vM i LINE (TYP.) ��\ v rN M 0.3 A v � — v_—i/// \ \ Nv\ .1 \ \ i� /� \ 2f `��r \\ \� \\\�� �\ _�� �\ ABANDON f357 LF �� j�,� I 1 — \ \-----_�\� �� \, _ --- -32-19-SEVENEAG-LE-S-� — —- \ I — - ------ \ \�—_=-ERtC-D-ALt�RT$cDOLTN K_ALPE T------�� \ r TOP OF BANK (TYP.) �2f ss T \ v / �, wv v� v vv `v OF EXIST. SANITARY // ��/ /� v v� —� _ ��� \ \ \ \ — DEED IREF 04-999-861 wIH-2415 \ — _ — SEWER_TAX-RAacE�Na: 2G93�z68 T9 C,S, RI �65.OU�F��247SE�%ENE7CGLES D� / - --- - ---- - (D INV. IN �61.3 -CAME v v I A \ �� v v v d OU T 561.1 \ \ --- � \ 3237 SEV€1�t-E�LES RD- \ \ \ \ &-D" \ T�-YY W HAR IS \ \ //� \ \ _ \ JN-DADA-HENDRFCK� _ �/ - - - / EXIST. FENCE (TYP.) - - / \ \ `!' \ \ DEEP R 82-54 \ \ \ \ DEED REF:�15"40--44 ' AF �\ V — / 20' TOP OF BANK \ A 'TAX PARGELNO �0937 1 \ \ EXIST. MANHOLE TO V ATAX PARCEL NO: 20938209 /' - , BUFFER (TYP.) \\ \ \ \ ` \\ BE ABANDONED \ \ \ \ - - -- 00 / PROVIDE 8" EXTERNAL DROP PER O v v // / \ 0 AF _'/ Ox �A / a \ ss V A / / v v v — , v © } CW STD. REPLACE CONE WITH I / \ �y ) �\ �. A v �s F \ \\ // v — „� 0 FLAT TOP SECTION/WATER-TIGHT EXIST. 35GAS C SS ' — FRAME AND COVER �- - 0 i 0 © 8 (TYP.) S \ � €� EASEMENT F o O v \ 'II 5 I vv v C \ �-A \v v 0 0 ° ° III \ \ EXIST.15'SANITARY \ ass v -v A _ �,( V A-� °---- RIM 574.75 /E / 1 v \ V A \ i \ -! v. S SS \ SEWER EASEMENT (TYP.) \ \ I _ - _ E \ Q I \ r _— t3 E INV. IN 56 / �\ \ C' St— E — I NV. OUT 567.9 \ CF SF v l / \ / S O MH-241057 J 3 1 M \ �— \\ -- 3U1 S rl 3 SSE 31+00 M-568.07 — w�, •a+� ,—� 3:a 301 301_ 3 3 Q -SSE \ V. IN ��+ ?.y 3a1 3 SSE 30 F- W I I 01-T 564.2 e� 3 3 S E N W 3ss� \\\ \ SSE S \ \ \ \ \ \ !Qi 3 SE SSE 2LW35 W = PE U1 PF/��I \�\ cw�•71'd7"F3 3S © 3SS 3SS Z w PTCE = T TO PROP. 20' TEMPORARY \ S@C % +oo ss SS ' PE Tc1- Act - \ F o �, CONSTRUCTION _ \ \ \� \ \ 3S SS PE �.� PE ° TC ° _ 0¢ 2\ \ 3SS TCE _ — — Q — _ — — 0' J � EASEMENT TYP. a \ \ �\\ \ \/I � � © t� .�—..•-f.�-'.�"� \ \ I \ \ \ \ PF TCF — -•."� © / / — — --"�� • -L - _ _ _ \ - _ ------------- - � / \ � �i d \ i \�• � � i i %'� ULLEN CRC \ \ ©�% � � � �.,�✓ — — — — — — — F — — PROP. 30 PERMANENT �... MCM...�/ \ 0 �"-�' — — i \\ \\ \\ ` �\ `\ P \ TCF; L.. � i ���` /� � � /.. �-�--- ��— \ EASEMENT (TYP.) ��` / �� \PROP. 15 TEMPORARY / .� �, - i _ _ - _ _ _ - - _ ------- REROUTE 23*p0 �d T' CONSTRUCTION------ _ cF - EXISTING LATERAL EASEMENT (TYP.) `- - EXIST. IRRIGATION ' � \ \ \ � � � \ � - � - � � � N?`3•s9soy Jd TC � � � (SEE SHEET 12) /�WATER PIPE \ - F - - l — _ \ \ STA. 20+87.53 - -- w / o - (APPROX.) (TYP.) Q ROP. MH 8 �(�� \ So¢o6' �d \ / \ - / / / / �� /PROP. 20 PERMANENT 16 _ \ # ` \ TCF / ` EASEMENT (TYP.) — BEGIN PIPE BURSTING EXIST. IRRIGATION - — 567.71 \ (\\� \ o 4�00 \ �d (TRENCHLESS INSTALL) - - , SPRINKLER (APPROX.) (TYP.) \ - , �\ / F \ F W 2$ vv SAND TRAP — — 62.27 \�\\\\Q--� \� \\� �\ ` - �\ 25�� TCF �d 2lkp0N-- _ _ \ 265 EXIST. IRRIGATION \ � \ \\ // — �d � v\ \V \� / SANDTRAFr� \ p� / �Yj / / -- VALVE APPROX. TYP. \ (APPROX.) )�Vv v ��Yl—-- A� �� \\�\—� J A F %(cE \ \ \ C J l \ PF — — 26 / / �cE / STA. 28+57.41 / J A�2 / PROP. MH # 1 / ENEAGLES STA. 25+. 8 P eE i 16E 7 RIM = 574.92 PROP. MH #9 —�� c — — — — \ — ----\—' QU IL HOLLOW _ -� E COUN�RYCLU RIM — 571.37 CF DEEDREF:024_7 1 / / - // / / ------ ��-- ��\ / -TAXPARCEL NO: 2 56101 ! vvv� PROP. 20' TEMPORARY- v• tD - / 1 / / / - CONSTRUCTION / /- �v�EASEMENT (TYP.) — QUAIL HOLLOW GOLF COURSE ECT AREA VICINITY MAP N TS 3 • hays below. II before you dig. SCALES VERTICAL 0 2 4 1 inch = 4 ft. PRELIMINARY PLANS - NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 i 704-919-1900 LICENSE NO. P-0601 ■ ■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■I�■■■■ski■ ■■■■■■■■■!!! :i■■■■■■■■ ■■■■■�71l9►�■ : �i■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■L�!I �i■■l�i� �■■■■■■■■!� 1��3■■■■■■■■ ■■■■■ilk �!■■I �!■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■�I`Mli■■i� ki��i i■■■■■■■■� �!!�1■■■■■■■■ ■■■■■il ��■� �i■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■iI�W■■■��i31 ■■■■■■■■■!! ��!■■■■■■■■lliii■■I■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■iill `�■■iii`iii i■■■■■■■■■ I ■■■■■■■■i� ��ir ®��� ii■! �■■■■■■■■■ ■■■■■■■■■■ ■iiiiii■■■ ■■■■■■■■■■ ■■■■■■■■■■ i�i�■i � .:�:�i� G�■I�i■■■■■■ ■■®i . i■■■■ 11■■■■■■irk iiii■ii�7■i.�� �■+■II■■■`�i■ ■■■■■■■®i� l�i�■■■■■■■ ■■■■■■■■■■ ■■■■■■■ems■ ■■■■■■I■�■■ ■■��■■■■��!■� ■■■■■■■■■■ ■■■w■_.■■■ ��■■■�I■■■n ■�■■■■■■■■ ■■■■■■■■■� ■■�►�■■■■■■ ■■■■■■■■■■ ■■iiii■■■■ ■■■■■1'��ii�ili■ ■■■■■■■■■� �■■�liili�.' iii :' \ Illiii�i■■■ �3,��1■■11■■■11'�ifiii�ii�i■■■■ ■�■■■■■�t�� �■_.._�_--- ■■■►�■■��� : �■■■■■■■■■ ■■■■■�■-.■■ ■■■■■■■■■■ ■■■■■i■■��n ■■■■■■■■r,�l� ■■■■�I■■■■■ gin■■■■.����. _ - - �_____ -� . II. /���i�■■■■ ■■■■■■■■■■ ■■■■■I■Il��iiilrlli■ ■■IY■■■■ill■ ■■i���■''��-- i■■ I ■■■■■■■■■■ �___��...■ oil iifiYl ■■iii■■■■■■ ■■m aw■■■■ _ _ '.. �,>.;-- ■■__�.-.----0""Mml---�.� ■■■■■■ ■■■■■ ■I�■ �Q 33 ��oi i ■■■■if Illlrltilii��llll�illi■ ■■■■■■ei■■ ■■__�----- - ..: - 'J■■■■i■I� iii■■■■■■■ I �■iiii■ii■ ■■■■■■ ■■Ili �L�i■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ _�����.■■■ �iiYA��li�!�'ii■■ ■■■■■■■■■■ ■■I ■■■■■■■■'i �i■�lii©■■■■■ �i;����ii!� ■■■■■■ ■■i�� �ii�iiii■i■ ii■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■iiflii�if�■■■ ■■■■■■■■■■ ■■I �■■iii■� �■■■■■■■■■ iiiiii■ii■ ■■■■■■ iiii ��i�i'�i�ii�li'll� �i■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ����■■■■■■■■■■■■■■■■■■■■■■■■FVAW", �rr.� �■■■■■■■■■■■■■■■■■■■■■■■■■ ram.- ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■iriii�■�i■■■■■■■■■■■■■■■■■■■■■■■■■�liri���i`?.��Il�i■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ 31 +00 NOTES: 1. CONTRACTOR TO VERIFY SERVICE IS ACTIVE. DO NOT REINSTATE INACTIVE SERVICES. / / I coy- EXIST. 35' GAS / I 3-16 J — EASEMENT (TYP.) A IFAtP�E�T _ _ 4) 361 / 1 38208 — r s y SSE i ' 1`'�A I J — 32+00 33+00 34+00 35+00 3 6 + 0 0 - EXIST. PROPERTY LI N E (TYP.) — — = ; \ INSTALL VIA ^PIPE TBURSTING i EXIST. IRRIGATION WATER — — PIPE (APPROX.) (TYP.) — — — \ 'T — — EXIST. IRRIGATION — xj — _ — SPRINKLER (APPROX.) (TYP.) 37+00 38+00 39+00 40+00 Property Owner Information Parcel No Owner Last Owner First Propery Address Deed Ref PID 53 SEVEN EAGLES HOMES ASSOCIATION C/O THE HARRIS LAND CO NA 25991-859 20938298 54 THE HARRIS LAND COMPANY NA 06144-067 20938205 55 HARRIS LAND CO (THE) NA 06144-067 20938299 INSTALL VIA PIPE BURSTING (TRENCHLESS INSTALL) Soft Digs Sample ID Utility Type Station Station Offset (ft.) Coordinates Depth to Utility (ft.) Easting Northing TH-4 Gas 36+73 - NA NA 2.89 TH-5 Water 36+38 5 E NA NA 4.82 TH-6 Electric 36+24 6 E NA NA 1.83 STA. 36+98.82 MH 240028FEXIST. IM = 581.88 _ _ _ - ------ — -- MH-240�28 $443 WIN-G�DBOIJ�NE — — ' /� _ i — f I I I I M 5s1. 8 �'R III I/T HENDRICK & ROBERT RICE / i 1 I I L / �VV. IN 5�73.3 Ct �INV. OUT7 1 REED-R€€:16508-286-- TAX PARCEL NO: 20938203 .- — 1 INSTALL VIA PIPE BURSTING / /. rim% = = = —�� ' INSTALL) / //! ExIST. 4" — � TREN HLESS /NSTA / SERVICE (TYP.) ZZA ` \ 57 1 '��� / I� �ji A. 40+87.24 (IST. MH 24004 M = 585.94 �o �G �s9'< G(f N�G�fS `JO -E C ROJECT AREA 7 QUAIL HOLLOW y GOLF COURSE oN` 1 JN pR �2 VICINITY MAP N TS hays below. II before you dig. SCALES VERTICAL 0 2 4 1 inch = 4 ft. PRELIMINARY PLANS - NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: CDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. APPROVALS (SEALS) N.C.R.L.S. (AS BUILT)F- N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 fiiTs� ffiffill II ' 590 • I 590 580 580 S N 3 OP.—F2" SE 8. 2 L P 11N55.50-8 (X T) 570 FW 0 565 565 .j 41 +00 - - RIM 58 .94 INV. Iq 75.5 m INV. I 75.5 D INV. T 575.3 n -' 3D- m 3D1 3 1 �' m = m 00 + U1 4�:- O —_ + — O 42+00 EASEMENT EXTENDS TO WINGED BOURNE NO CONSTRUCTION ACCESS a ,o o n�1� PROP.20'PERMAN \ EASEMENT (TYP.) �Z-� - _II_ - -- I I \ \ JIB -- -- -�\\� -- EXIST. 8" SANITARY SEWER PIPE TO REMAIN - - - (D _ _ IN PLA'C/E, (TYP.) - - - m om ..°°9 X- W \ 8407-WFI AB\H HEK A AHWET M H V ' EED REF:29020�94� 1X V A \ T� PARCEIL N�: 2Q93 1 \, EXIST. 15' SANITARY \ \ 58,5 SEWER EASEMENT (TYP.) I A \ SSE s� ss ---�© ss �d� s�' — (I 0 Ss' 9 /.3SS CP � ©° � j77 In �21 MCMULLEN CREEK TRIR- _ TA. 40+87.24 XIST. MH 24004 -- ---- PROP. 20' PERMANENT \ _ I I \\\\\ EASEMENT (TYP.) VA\lM EXIST. PROPERTY = 585.94 LINE (TYP.) PROP. 15' TEMPORARY CONSTRUCTION EASEMENT (TYP.) (D - _- -_0 J 8410 EAGLE GLEN -----_---0 MICHAEL-KAFiN ° _ —DEED- 25451-3� — — — — — — — — / 0 \ — — — — TAX PARCEL NOy20938232 ° 580 580 ' I w� • ' 1 STA PRO +35 . CL 12 AN UT Q RIM 57100 PN EAS MEN I2" 15710 5 0 STEEL AS AIN (AP ROX ) 5 L n NV= 565.00 SAN. SEWER1 0% IT 560 1 FL 560 _ FL l = 68.1 2 FLl=6 7 FLl=6 4 DO 5 5 rt 5 5 1 + 0 0 2+00 8" COLLECTOR PROFILE SCALE: 1 "=40' HORIZ. 1 "=4' VERT. 37QO/GLENEA�iLES RD — QUAILL HOLLOW_ 4 + 0 0 COU,N'I RY CLUB — 3,)i w DEED REF: 02437-57 - EXIST. IRRIGATION - - / / / � ;TAX PARCEL Nam: 20956101 � � �Ol / 3a \ SPRINKLER (APPROX.) (TYP.) \ / / /� �d w EXIST. IRRIGATION WATER - PIPE (APPROX.) (TYP.) PROP. 30' PERMANENT \ \ 3�% / 65'g3 �W 21+00 EASEMENT (TYP.) 62'2�'f \ \Z \ /� PE _ pF IL M PROP. 20' TEMPORARY / _ 2g+00 P� PROP. 15' TEMPORARY CONSTRUCTION EASEMENT (TYP.) CONSTRUCTION EASEMENT (TYP.) 41 PROP. 20' PERMANENT EASEMENT (TYP.) _- - - - - - C7 its �.. �- EXIST. 15' SANITARY SEWER EASEMENT(TYP.) N ...�. \ _STA 2+35 �L ��.. ° � aiN a N icW'� � R A EXIST MANHOLE TO BE - - - _ PROP CLE N 57(K_ � / SEWER OUT \�� © PROP. 4 CROSSING ABANDONED TYP. EXIST. 8 SANITARY - - - - - - © A. (TYP.) 3Dl 33i - - 3�J1 3D� SEWER PIPE TO REMAIN 3d 3d 3d ` 3d °dd 3d AT EXIST. GAS MAIN \� IN PLACE (TYP.) SSE + SSE e °3SE 1S4T21 47 E SSE 5 z+0 S SSE SSE �\ \ 30+0� ° © , )= E 3 S E SS E 3 S E E 3SS E 3SS �� \ \' _ _ \ E/ \ S - TCE - - TICE TICE TCE TCE TICE \ TCE G • ; MH-2410 S S G SS RI 574,75 ' — — \ IN OUT 5 �F INV. IN 568.1 V.k INV. IN 56 I� X U \ SS / INv. our 567.sHo9 9 3 EXIST. SAN. _ S 3 / 3 Quail llow li nment: STA. 29+59. 13 — — SEWER PIPE F \\ Lateral Reroute: STA. 0+00 TO BE ABANDONED ,s ASS PROP. MANHOLE # 11 (TYP.) 3219 SE EN EAGLES RIM = 571.39 ERIC D ALPERT X � ° � 8 v,* ®° vf © 07 \ STA. 2+26.35 V A / DEED REF��999-861 �6' © ° © ROP. MH # 12 \ TAX PARCEL NO: 20938208 0 © © © (D �- 0; I _ _ \ = 570.42\ \ ©° A \ \ \ RIM ��/V A ,3iSEVEN EA - \ \\ ✓ // \ \\ - EXIST. PROPERTY - - / , _ .LW IVI H:_NDRIC - - ----- - - -DEEA RE-F:-11540-442 --- ---- / / \ - LINE (TYP.) � - - - ` - - TAX PARCEL RO:_�0�38209On CONTRACTOR TO VERIFY INVERT ELEVATION OF r EXISTING LATERAL PRIOR TO CONSTRUCTING NEW bir-0 �- - --\ MAIN AND CONSULT WITH ENGINEER REGARDING INCREASING SLOPE AND/OR RAISING DOWNSTREAM INVERT ELEVATION OF PROPOSED MAIN. I I I I W ECT AREA QUAIL HOLLOW GOLF COURSE 3 VICINITY MAP N TS V Know what's IIle ow. Call before you dig. GRAPHIC SCALES HORIZONTAL VERTICAL 0 20 40 0 2 4 1 inch = 40 ft. 1 inch = PRELIMINARY PLANS - NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: CDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 i 704-919-1900 LICENSE NO. P-0601 CHARLOTTE CHARLOTTE WATER W6TER CHARLOTTE NORTH CAROLINA Scales PLAN 1" = 40' PROFILE Hor. 1" = 40' Vert. 1" = 4' MCMULLEN CREEK TRIBUTARY AT QUAIL HOLLOW REPLACEMENT SEWER STA 40+00 TO END & LA TERAL TO SERVE 3237 SEVEN EAGLES RD No. I Date I By Revision LANDTEC SRK Surveyed By Designed By SRK JLD Drown By Project-Engr Approved By Date Sheet Of 12 1 22 600 600 •I . Q to IN Il. C 590 A = ao 5901 + CL.m i T, A 4112 Q JE1M = 56.2 580 9 PROP. .0 12" F PVC o 580 IN 564 1.5L IN 552 15 0 RO 1 V I „E E 0.16 '6 L FL l = 74 8 2 R P. FLI=B 3 (E. LA.) JAM Dr- r-T 11111FU.11411ro FL 0 T 5 4. 0- 1 - 5 0 560 0+00 1 +00 2+00 3+00 4+00 OUTLET STRUCTURE EXIST.12 SANITARY RIM ELEV. 580.15 SEWER PIPE TO REMAIN IN PLACE (TYP.) RIP/RA CONC. FL ME i �I \ SSS �'OF MH-241116 \ \ / RIM 582.12 1 __ 15' SANITARY INV IN 577.2 (SE) SEWER EASEMENT INV IN 574.6 (MB 18 PG 157) INV OUT 574.6 PROP 10' PERMANENT 12" SANITARY SEWER MAIN PROFILE SCALE: 1 "=40' HORIZ. 1 "=4' VERT. EXIST. UNDERGROUND BAC(COTyNECT OT) TELECOM (APPROX) (TYP.) MH-241128 RIM 592.90 EDGE OF WATER INV IN 587.0 (LAT) J� SURFACE (TYP.) INV IN 586.5 (LAT) INV OUT 586.0 SANITARY SEWER EASEMENT 15' PSDE N 'o (MB 21 PG 867) (MB 21 PG o m \ \ 867) m 0' PSDE (MB / 1 PG 867) 45 /,INV 578.7/ N__--3810 GLENEAGLES RD EXIST. 15' SANITARY QUAIL HOLLOW #3 POND MH- 24 SEWER EASEMENT HOMEOWNERS ASSOC WSEL: 580.15 RIM .95 (TYP.) DEED REF: 06012-528 INV I 576.��W) owl TAX PARCEL NO. 2091152 INV 5� .7 (N), STA. 0+00 I V 0 575. EXIST. MH 241121 RIM = 582.32 BEGIN CONSTRUCTION, CORE EXIST. MANHOLE, STA. 2+28.36 INSTALL RUBBER BOOT, & EXIST MH 24112 i PLUG EXIST. 12" MAIN RIM = R$8 e?Q IM �8 y' EXIST. SAN. SEWER PIPE INV IN 576.4 (N) y� TO BE ABANDONED 20' SANITARY INV IN 5,ZU (W) SEWER EASEMENT INV U 5.2 (MB 21 PG 867) 3D1 - •/ O / 3J1 301 3Dl � ;; � � P CONC. FLUME SSE \ 0 1+ o 2+0 N36'33'41 "W `Q INNNNNNNNNNNNNNNN 194.04' PE PE PE-- \ NV 584 55- _ _ TCE TCE STA 2+ 15 40 TER H-2 126 \ RIM 90.28 S IN IN 584.7 S IN 579.4 (0. DROP)\ V OUT 579.3 WATER VAULT RIM 589.28 1INV OUT 584.0 18" RCP WATER BLOW -OFF CONC. CONTAINMENT STRUCTURE CONSTRUCTION ACCESS DRIVE (SEE THIS SHEET) MH-2411 1 OP. MH 1 -2411 7 REQUIRED TRAFFIC EASEMENT (TYP.) RIM 582.32 - _ # �� RIM �9 .30 CONTROL PER DETAIL 4-C PROP. 20' TEMPORARY INV IN 580.3 +/- (LAT) RlM 585.95 �O INV IN 578.4 IN 575.078.3 CONSTRUCTION EASEMENT (TYP.) INV INV OUT 74574 j�� j / ' NV T W .8 15' PSDE (MB N 2 10 0 18 PG 157) 12. 6 FIBER OPTICS � END CONSTRUCTION, CORE EXIST. STA. 0+21,35 (APPROX. LOCATIO MANHOLE INSTALL RUBBER 46 47 ROP. MH # 1 A 3900 SEMINOLE CT RIM = 584.33 3904 SEMINOLE CT GREGORY A CURRIE & WILLIAM 0 L HUTCHINSO JENNIFER M CURRIE DEED REF: 33342-826 DEED REF: 33016-421 N08'38'10"W TAX PARCEL NO. 20921147 TAX PARCEL NO. 20921148 21.35' / PROPERTY STORM DRAINAGE LINE (TYP.) �p5 ,,EASEMENT (TYP.) A 3901 SEMINOLE CT GRAPHIC SCALES / DAVID L FRANCIS & HORIZONTAL VE TICAL io BETTY L FRANCIS oSj DEED REF: 2 0 20 40 0 4 TAX PARCEL NO.O. 20921921149 �pS 1 inch = . 1 inch = 4 ft. \ BOOT, & PLUG EXIST. 12" MAIN TEMPORARILY REMOVE 4" R MAIN (A ROX. LOC TIO ORNAMENTAL STONE EDGE -OF -PAVEMENT (TYP.) AND RESET. REMOVE & REPLACE FLUME TO GAS MAIN (TYP.) MATCH EXIST. BACK -OF -CURB (TYP.) SIDEWALK (TYP.) 11CIC tiq�\83J 0+00 GRAPHIC SCALES HORIZONTAL VERTICAL 0 10 20 0 1 2 1 inch = 20 ft. 1 inch 1 -1- 0 0 ACCESS DRIVE PROFILE SCALE: 1 "=20' HORIZ. 1 "=2' VERT. EXIST. CURB TO REMAIN I nnr[�e+ n^ A n PROP. SLOPE 2:1 EDGE OF WATER SURFACE (TYP.) PROP. TEMPORARY CONSTRUCTION EASEMENT (TYP.) PRELIMINARY PLANS - NOT FOR CONSTRUCTION EDGE -OF -PAVEMENT (TYP.) GAS MAIN (TYP.) BACK -OF -CURB (TYP.) _t I G r SIDEWALK (TYP.) CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: CDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. No. I Date By =fig i PROP. SLOPE 1.5:1 yyy yy��\ may\ y.yyy \ VER y W .ET) - POND WSEL: 580.15 PROP. PERMANENT EASEMENT (TYP.) pamor e1 6; 12 QUAIL HOLLOW GOLF COURSE VICINITY MAP N TS -1 • V Know what's below. Call before you dig. CDOT: 1. NO EXCAVATION WITHIN THE CLEAR RECOVERY ZONE SHALL BE LEFT OPEN OVERNIGHT. 2. CONTRACTOR SHALL RESTORE ANY DAMAGED CURB. 3. PROPERTY TRAFFIC CONTROL SHALL BE MAINTAINED AT ALL TIMES IN ACCORDANCE WITH THE CDOT WATCH MANUAL DIAGRAM 12. 4. CDOT APPROVED PERMIT AND PLANS SHALL BE ONSITE AT ALL TIMES. CONTRACTORS ARE TO HAVE IMMEDIATE ACCESS TO ALL TYPICAL TRAFFIC CONTROL DEVICES (ARROW) BOARDS, TYPE II & III BARRICADES, REFLECTORIZED BARRELS, CONES, SIGNAGE AND QUALIFIED FLAGMENT ON SITE. 5. NEITHER CONSTRUCTION EQUIPMENT NOR OPEN EXCAVATED AREAS SHALL BE LEFT WITHIN RESIDENTIAL RIGHTS -OF -WAY OVER NIGHT, UNLESS OTHERWISE APPROVED BY CDOT INSPECTION STAFF OR PERMISSION GRANTED BY PRIVATE PROPERTY OWNER OUTSIDE CITY RIGHT-OF-WAY. APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) F N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE, NORTH CAROLINA Scales PLAN V=40'/1"=20' PROFILE H or. 1'=40'/1"=20' Vert. 1"=4'/1 "=2' LANDTEC MLH Revision Surveyed By Designed By MCMULLEN CREEK TRIBUTARY AT QUAIL HOLLOW GLENEAGLES ROAD SEWER RELOCATION & ACCESS ROAD MLH JLD Sheet Of 13 22 Drown By Project-Engr Approved By Date EXIST. 12" HIGH PRESSURE �� A \ V ��/ �- - - _ - - _ - - A V / COMMU TY F ODPLAIN \ - - _ _ / - -_ v v (FUTURE) (TYP.) _ / i GAS MAIN TYP. � `\� � � � _-----___--����/--v v `\ /� l ` l l� �I � /`` // //// //// // // v ' STA.' 1 +65.96 � - � � EXIST. 35' GAS EASEMENT TYP. � � 5� v /� � � � _ � / ` / / ` / � � PROP. MH #1 (TYP.) \ _ - \ / / / / / / z' FEMA FLOODPLAIN (TYP.) w G� V �M=:552•Q2 � PROP. TEMPORARY CONSTRUCTION EASEMENT TYP. zz uail Hollow Alignment: STA- -0 I Exist. McMullen Creek Trunk: -S-TA: -V + 0 _ — — — — SEX/5/. MH-241402 -_— --- ----- —�/ //\\ �\ \\ \\\ 32 l HR = 549.85 _--- _ _ / /// 3 �9� ALE EAGLESRD — — — - QLLOW �du�� cLu\6 -- __--- -— \ `�\ ��- /////i i///�/ /i//i/� /� / \ \ _ _ / / / / j PROP. PERMANENT - EXIST. MH 241444 3 / bE LT R F: y2437 57 \ / / / / / / j p�4 � / / / -� �CULVERT (SEE SHEET - N // - - - - - - - - PROP. 50 PERMANENT \A \ , b:� v - / / / / / - n 3d N w // - -----_ ----- \\TAX\PARtE N �09561 1\ // / / //// //// / 60F22) _-- RIM - 556..d'� EASEMENT TYP. /i - / / g„ I I \---- ----- ---- EXIST.30'SANITARYn- ----- - - ------------- _SEWER EASEMENT TYP. sE C ) — rn SS - ----- - -_3dA\ / / /03 \ 3� --- d- 3d -� 3d 3d 3d �A _ _"i "!i / ii = /j// /d / /// / 7 SSA l3(1 �h - - - �3�� ��'- = / ' / / SSE r �{ S 1\ G / _ �fit-� SS ------ 35 / — SS� _ �/ S5 SS // II Ln S SSE- _ - / - - - - - - - - - - - - - - - - - ' �� / / / �/� / SSA S3 SS / i /]S'S / / + SEr z7:�ss I S — /-- O --0- - - / o I SS —ASS SS —SS ��- ----- ---- ----- ---�� S-� _----T �\ - 1 ss SS S� //// , sq -----— ss ss_� $sue — q, �—,---------- ------ - - S // SS/S S� SST--- -- Off/ =S/355i 3SS S S / 3SS g - 3SS _ - _----- ----- —� ASS� / _ ------------_ ---- _ 3 3s, — ///// --- ---- --- �sr 3ss — 0//' �� — _ — 3Ss _ — — — — — 3S5 77— — 3ss — _ — 3 SS 3SS_ / �c / m EXIST MH 241410 — — — RIM 554.7� COMMUNITY ENCROACHMENT FEMA �E— // AREA (TYP.) FLOODWAY (TYP.) 'A33N:) N3llf1WOW E --------------------- ... E MCMULLEN CREEK E E E E E E CENTERLINE PER GIS (TYP.) / NOTES: 1. SEE REHABILITATION PLAN SHEETS FOR PROPOSED MANHOLE REHABILITATION ON MCMULLEN CREEK INTERCEPTOR 3 3 3 3 3 SS / SS 1 4909 LINDSTROM DR R JACOB FOREMAN -� SS BRUCE W LOCK MDR DEED REF: 29957-752 DEED 378-391 TAX PARCEL NO. 20933245 S \ 4851 DR TAX P EL 0. 20933244 S SS PAUL C GGIBSON IBBO DEED REF: 06902-396 r TAX PARCEL NO.220933243 \ 843 LINDSTROM 4917 LINDSTROM DR SS �- 555 WILLLAM H WELL , LISA M HOOD �_ SS i EED R : 055�-955 DEED REF: 09618-723 555 4835 LINDSTROM DR /TAX PARCEL w20933 2 TAX PARCEL N0. 20933246 550 \ �- STANLEY PAULROSTAS I DEED REF: 06998-310 SS\ SS TAX PARCEL NO. 20933241 I'll 4827 LINDSTROM DR 4"��IjROM DR M _ / - - - _ COMMUNITY FLOODPLAIN \ W / j / / / / / _ PROP. 20' PERMANENT `�' �' - - �� (FUTURE) (TYP.) EASEMENT (TYP.) W a \ \ p \ FEMA FLOODPLAIN EXIST. 15 SANITARY 3700 GLENEAGLES RD V SEWER EASEMENT (TYP.) c� QUAIL HOLLOW - - A (TYP.) V A v EXIST. IRRIGATION PIPE - / W v" COUNTRY CLUB / / / / WDEED REF: 02437-571 (APPROX.) (TYP.) TAX PARCEL NO: 20956101 EXIST. IRRIGATION SPRINKLER (APPROX.) (TYP.)- i� w Prop: McMullen 30/n Relay: STA. 0+00 �i PROP. 20' TEMPORARY /Exist. McMullen Creek Trunk: STA. 12+87 66 30• �Dl a \ CONSTRUCTION EASEMENT (TYP.) - / PROP. 50 PERMANENT EXIST. MH—#241449 - 3d , EASEMENT (TYP.) / V \ v Rl � 55�1.23 - � 8•a,R EXIST. 30' SANITARY W e,e a� 3d SEWER EASEMENT (TYP.) � 3d 3d 3jl V A \ V A v v � � -McMull Join Relay.* STA. 3+74.02 / SE iN 3j1 \ \ \ \ \ \ � o+oo ss �s W � 3d Proms _ _ y: / 3 — / SS — v v v v Exist. McMullen Creek Trunk: STA. 16+61.68 3 / SE �— — Ss sS' 14f sSE �'���� EXIST:- MH-241465 ,N� /N r+oa �� �_ — RLM =-553.65 ----- --- S SS SS _3SS 6 .p 3SS rr� v SSE 3,1 _ / -1 S�-- - z4 - qpr\ —3j1 - S__ nS ��S ----- "q -- r c e - sE u' r SS�S------__-'R EXIST. CREEK (TYP.) ----� -- - -_- ----__ / _ m m SASS 3Ss 3ss - - - - - _ �Ap<F 374 02, s•" \ _ \ / / ; / / \ SS 3SS / / / rZ. 3SS SSE <r 0 C) qsy 3+0p — m ►, _ - -- - -- -- 3SS 10. 61 AA°<<r j SE / .O �/ q rr 4 3+7 .0f`� O -� / / --_ ----_ \ 9s'0.9 *44 J� \ - - - - - - lp _ - _ - - - - - - — _ _ • / — — — �_- ___ -. � . Ate, ?• / f<�! - --- /\ �i - EXIST. PROPERTY - \ 'a•, �F tip, F 8'wac �. ,� - - - - Ri �' _ LINE (TYP.) _ — - E REM±364 LF 30" SANITARY SEWER AND REPLACE a"F<�, s ,r / s, _ — MCMULLEN CREEK /,\ �� \ � E \� F CENTERLINE (TYP.) 8 � / SEWER (C905 PVC DR21) MATCH EXIST. INVERTS%.*4�f 8"w.�ti0 E 3 Nor COMMUNITY a \ \ \ \ - - e ` - \ \ \ \ \ \ \ \ \ - - / / ,• / rz. �2QBALTUSROL LN ENCROACHMENT AREA (TYP.) FEMA r \ \ \ \ \ \ \ \ \ _ - - - - - wey�r \ s wtiH�r� WATERS CONS UCTION CO INC / FLOODWAY (TYP.) / EXIST. 35 GAS \ \ / - / sF d DEED REF: 04 267 \ 3 EASMENT (TYP.) A A A - / rf.sr����� TAX PARCEL NO. 209211 Ci 4000 KINGSCOTE CIR JAMES R HOOD DEED REF: 06862-273 A J TAX PARCEL NO. 20933251 � \ \ \ \\ \\ `\ `, \ \ ��� 5 IC, VICINITY MAP N TS • • V Know what's below. Call before you dig. GRAPHIC SCALE 0 20 40 1 inch = 40 ft. PRELIMINARY PLANS - NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: NCDOT ENCROACHMENT NO: MUNICIPALITY. CHARLOTTE DISTURBED AREA: 11.6 AC. APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 / / / 8430 DOUBLE EAGLE GA WY \ \ \ I / IAMES STEWART KIN \ PARCEL N0: 2092011 \ L�SSG DEED flEF: 315)5-221 I \ 424 DOUBLE EAGLE GATE W8 DOUBLE EAGLE GATE WY / \ ,yVN GARV WALLER HAR18§IE�LA B IORDACEDENN & PHILLIP 1 JORDAt� RM'\ Tax PARCEL .x o03s-3o1 / Tax PARCEL NO: zo9zou3 8912 axOUBLE aflcEL rvoGZEGA E 0 z09z01 CAMDEE IANEC OMPA V L DEED REF' 0 LI D 2 OUB 8406 DOUBLE EAGLE GATE WY IEEA m CAMDEELANDCOMPANY LLC I E TAX DEED REF NO 2029i'0e26 ��W G ALLER WY ATE�g RM' Y(pRyVgT MH-240050 UNITED PROPERTIES GROUP LLC EEDREI 2-3-2 DO TA PARCEL N0.20920127 840D DOUBLE EAGLE GATE WY CAMDEE LAND COMPANY LLC 3007 WALLER WV M17 DOUBLE EAGLE GATE WY 8Ay TAX vaRCEErv0�2D92D123 1� UNITED PROPERTIES GROUP LLC UNITEDDPROREPRTIES GROUP LL y TA% PARCELN0. 20920128ED :324209201 / DEED REF 32387-AM TAX PARCEL N019 209201 �I — — —rem 8411 DOUBLE EAGLE GATE m I _ MATTHEW HAMILTON SELLERS �­ Tax PARCEL NT.5.' 1511. \ I N _ I 3138 SHILLINGTON PL EDDWADRRDPR2GEBHART EE TAX PARCEL N009.2094355-]31216 C I I 1 32GD SHILLINGTON PL VIRGINIo A DE TAX PARCEL NO. 20943215 it EXIST. RETAINING WALL (TYP ) 8405 DOUBLE EAGLE GATE WY 'PW CAMDEE LAND COMPANY LLC U 1 DIED RIC NIA RAN— TAXPARCELN0: 2092C124 � NGED B R/W DUR�E(pR/V 0 G I 3208 SHILLINGTON PL ATO DDAV FD BGAY \ MH-240048 m _'ARCE1N0.209A321A \ �^ d RAN M H-240047 \ \ 3216 SHILL ON PL 1 m PAUL D D I I PROP. 15' TEMPORARY CONSTRUCTION PROP. CIPP REHAB PIPE I TAXPARCELo. EASEMENT (TYP.) (TYP.) PROP. 20' PERMANENT EASEMENT (TYP.) i 1 I V I 32 6 GTON PL I I \ 5 N T AI MAN EXIST. 15' SAN. SEWER I w I \I EXIST. 8" SAN SEWER R943212 842 URNE 74 EASEMENT (TYP.) K TOPHERCAR OLU I i PIPE (TYP.) 1 8443 IN BOURNE 1 1R1111/THENDRIC &ROBERTRI I d 8407 WI O O \ MH-240406 MH-240028 axP1REE'10 °D&9iszoa I I A. HEK EEDflE:& io-wgT H \ MH-240404 I U I `- PARCEL N0:2D93 p_ \ H-240027 I I I I l I o \e �SAINNDDTRAP 1 SANDTRAP 1 I— 331 9a s5 31� , —T 5 3d �6E3 E 11s5 55 3---56 5 TCE — TCE MCMULLEN 1424 EAGLE GLEN ELLIS RHYNE DAVIS & LISA E DAVI6\ DEED E TW(PAR<ELP: 13533-111 NO: 20938216 / SEWER (TYP.) 0 E —�— TCE TCE — TC — CREEK TRIB I I I III EXIST. UNDERGROUND ELECTRIC (APPROX.) (TYP.) 'n,V SSE SSE ss 1- 55 55 355- 351— �StA- - x M H-240049 8410 EAGLE GLEN MICHAEL DIED RE, 2_L E31 TAX PARCEL N0: 20938232 EXIST. IRRIGATION VALVE (APPROX.) (TYP.) 8406 EAGLEGLEN R ELLISON & SHARVN DREF DEED I � DEED RE6.w \ ITAX PARCEL NO. 8 ONORSR NY0 OE Q )-6]0 I I E 6 — E 11EF: NO.058 1 T DflCEL I 1 CEL No. \ \ x L \ \C EL E.RELN0.2 6805 HONORS Cr STEVE ENKINS TAXPaac[rrvD. INS1a1711 A 3225DEEDRL 4—PL JO END SSMAN TAX 09AA3L 2 MH-240448 Z - \ G) :..A, 011/ 11 PROP. 20' PERMANENT D s� -� EASEMENT (TYP.) r\ 3 E0.CEENO.-023111 SHILLINGTON " — CIP=� CIPP CIPP CIPPE% \ PEP P 3ss P —3¢� sCI�P=� \ MH-240409 \ \ / MH-240439 \w� j EXIST. IRRIGATION / PIPE (APPROX.) (TYP.) t EXIST. IRRIGATION SPRINKLER (APPROX.) (TYP.) LLINGT PL MCG RE M\240434 M H-24043( 3101 SEVEN EAGLES TRUST IF HENDRICK III IRREVOCABLE & RDBERT C RICE 3133 TAX PARCEL NO: 20938204 40 IT 0 84 441 J R III I/T 9k �.1C, ss\ I e\ 8424 EAGLE GLEN TAX REF:235-70 ELLIS RHYNE DAVIS & LISA E DAV EL NDsaD93Rz / N 6 d MH-240033 s. GRAPHIC SCALE 0 50 100 1 inch = 100 ft. MANHOLE REHABILITATION PROJECT Existing Manhole Rim to Bench and Invert Channel Pipe Connections ID Invert Clean Manhole Frame and Cover Rehabilitation Interior Wall Rehabilitation Rehabilitation Rehabilitation Install water -tight frame and cover or dish MH-240049 10.6 Rebuild bench and invert Seal pipe connections insert due to flooding MH-240028 9 Rebuild bench and invert Seal pipe connections MH-240027 9.4 Replace frame and cover Rebuild bench and invert Seal pipe connections MH-240406 8.5 IDebris Removal Raise to grade; Reset frame and cover Cementitious Lining (1/1 and structural) Cementitious Lining (1/1 and structural) Seal pipe connections Replace frame and cover; Install water -tight MH-240409 7.8 Debris Removal frame and cover or dish insert due to Rebuild bench and invert Seal pipe connections flooding MH-240430 7.6 Debris Removal Replace frame and cover MH-240448 8.9 Replace frame and cover PIPELINE REHABILITATION SCHEDULE PIPE UPSTREAM DOWNSTREAM DISTANCE CLOCK LOCATION PIPE TV PIPE DATE PRE TV DATE REHAB REQUIRED ASSET MH MH FROM POSITION ADDRESS DIAMETER LENGTH MATERIAL COMPLETED COMPLETED SEWER ID UPSTREAM MH (inches) (feet) REHABILITATION 8400 Double GM-14898 MH-240050 MH-240048 See Note 1 CIPP Lining of lateral Eagle Gate Way GM-14900 MH-240047 MH-240049 8 308.1 VCP 1/9/2019 CIPP Lining GM 14931 I MH-240430 MH 240409 8 225.5 VCP 1/10/2019 CIPP Lining Note 1: Distance not known as defect found via smoke testing MANHOLE REHABILITATION PROJECT Existing Manhole Rim to Bench and Invert Channel Pipe Connections ID Invert Clean Manhole Frame and Cover Rehabilitation Interior Wall Rehabilitation Rehabilitation Rehabilitation MH-240017 8.4 Rebuild bench and invert Seal pipe connections MH-240012 9.7 Install frame -chimney seal Rebuild bench and invert Seal pipe connections Replace frame and cover; Install water -tight MH-241539 4 frame and cover or dish insert due to flooding (cover defective) PIPELINE REHABILITATION SCHEDULE PIPE UPSTREAM DOWNSTREAM DISTANCE CLOCK LOCATION PIPE TV PIPE DATE PRE TV DATE REHAB REQUIRED ASSET MH MH FROM POSITION ADDRESS DIAMETER LENGTH MATERIAL COMPLETED COMPLETED SEWER ID UPSTREAM MH (inches) (feet) REHABILITATION 8443 Eagle Glen GM-14895 MH-240033 MH-240027 See Note 1 Replace Broken Cap Charlotte GM-14607 MH-24003 MH-239996 332.7 1 3 13219 Seven Eagles Rdl 8 1 420.3 1 CIPP 1 1/7/2019 1 To hat lateral connection Note 1: Distance not known as defectfound via smoke testing SS SS SS ccr ccr PE PE TICE TICE CIPP CIPP CIPP PB PB \`may O LEGEND EXIST. SANITARY SEWER PIPE EXIST. SANITARY SEWER EASEMENT PROP. PERMANENT EASEMENT TEMPORARY CONSTRUCTION EASEMENT PROP. CIPP REHAB PIPELINE PROP. PIPE BURST PIPELINE PROP. REHAB MANHOLE EXIST. MANHOLE EXIST. SEWER LATERAL GRAPHIC SCALE 0 50 100 1 inch = 100 ft. PRELIMINARY PLANS NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCD£Q PERM/T N0: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. �o GPI ,`O� SO PROJECT ARE 0z �Q EPGLE RID. G1-EN — I QUAIL HOLLOW �$F GOLF COURSE O Z� �v VICINITY MAP N TS • V Know what's below. Call before you dig. PROJECT AREA i RD QUAIL HOLLOW GOLF COURSE VICINITY MAP N TS APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 i 704-919-1900 LICENSE NO. P-0601 CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE, NORTH CAROLINA MCMULLEN CREEK TRIBUTARY Job No. File No. Scales AT QUAIL HOLLOW PLAN t" = 100' REPLACEMENT SEWER PROFILE N/A H or. Vert. N/A PIPELINE REHABILITATION PLAN No. I Dote I By I Revision LANDTEC SRK Surveyed By Designed By Sheet Of SRK JLD 15 22 Drown By Project—Engr Approved By Date MH-233173 DR LIPPI 1143 =NCASTLE DR RD PARKINSO "EF: 3�385-706 M H-233171 M H-233169 MH--239636 M H-239639 RNE RAH BELK A. 3 d ti I \ \011 GREENCA LE DR ANDREW AH *TAX RE PL DEED RE : 46 N II WHITE AX PARCEL 17911248 911 791125 EEXIST. 8" PVC SAN. SEWER (TYP.) 3 8019 GREEN STILE DR HN A DRA AUGH EED REF: 3177 207 TA PARCEL NO. 1 1249 O 3 z � RD A SR L D REF: 17' PARCEL NO. MH-233184 8101 GREEN CASTLE RD HEIDI HODA KABLAWI DEED REF: 33951-540 TAX PARCEL NO. 20950102 3901 AYRSHIRE P MOSEN MOTALEI DEED REF: 08898-740 AX PARCEL NO. 179112 MH-233193 SHARON RD (CDOT) R/w D D REF: 34048-682 TAX PA EL NO. 209501 MH-233197 3 3 or 6701 S AR RD 17-2 IH B RR ER REF: 2269- 46 TAX PA L 0. 209 0142 � I PROP. CIPP REHAB PIPF (TYP 1 3908 qRSHIREPL MATTHEW JQSEPH SANICOLA - DEED REF 31059-055 TAX PARCEL . 17911261 I 3900 AYRSHI E PL DAVID K HOFFMAN DEED F: 2-779 3 T NO.17911262 EUN-MI YU REF: 32702-682 tCEL NO. 20928E / H-239940 I \ 3 SHAR N RD R ALD E RICHARDSON ED REF: 25715-735 IT ARCEL NO.20928617 t O .... O 1519 M H 239917 _ 3 \ E 32475EVENE 55- SEE\\ ` CAMERC ss 5 Ss \ E &O TAX PARCEL NO u i O 55 _ GRAPHIC SCALE 0 25 50 1 inch = 50 ft. MANHOLE REHABILITATION PROJECT Existing Manhole ID Frame and Cover Rehabilitation Interior Wall Rehabilitation Bench and Invert Channel Rehabilitation Pipe Connections Rehabilitation MH-233193 Frame chimney seal Rebuild bench and invert PIPELINE REHABILITATION SCHEDULE PIPE ASSET ID UPSTREAM MH DOWNSTREAM MH DISTANCE FROM UPSTREAM MH CLOCK POSITION LOCATION ADDRESS PIPE DIAMETER (inches) TV LENGTH (feet) PIPE MATERIAL DATE PRE TV COMPLETED DATE REHAB COMPLETED REQUIRED SEWER REHABILITATION GM-6307 MH-239925 MH-239909 8 293.0 VCP 1/17/2019 CIPP Lining GM-6308 MH-239902 MH-239643 See Note 1 8918 Winged Bourne CIPP Lining of lateral GM-22085 MH-239915 MH-239917 See Note 1 9133 Winged Bourne Replace Broken/Missing Cleanout Caps GM-22089 MH-239927 MH-239923 See Note 1 9147 Winged Bourne Cl PP Lining of lateral GM-22090 MH-239923 MH-241506 8 305.4 VCP 1/8/2019 CIPP Lining GM-22091 I MH-239643 MH-239636 I See Note 1 1 8934 Winged Bourne Replace Broken Cap GM-22223 I MH-241481 MH-382003 1 1 6 1 1 8 1 187.9 1 VCP 1 1/10/2019 1 Cl PP Lining (roots, cracks) Note 1: Distance not known as defect found via smoke testing LEGEND SS SS SS _CCE SSE PE PE TCE TCE CIPP CIPP CIPP PB PB O EXIST. SANITARY SEWER PIPE EXIST. SANITARY SEWER EASEMENT PROP. PERMANENT EASEMENT TEMPORARY CONSTRUCTION EASEMENT PROP. CIPP REHAB PIPELINE PROP. PIPE BURST PIPELINE PROP. REHAB MANHOLE EXIST. MANHOLE EXIST. SEWER LATERAL GRAPHIC SCALE 0 50 100 1 inch = 100 ft. PRELIMINARY PLANS NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. �� pG PROJECT AREA RO �O GLENEp,GLE RD. QUAIL HOLLOW GOLF COURSE ae �o G� 2� � G VICINI I Y MAF' N TS • V Know what's below. Call before you dig. RD- QUAIL HOLLOW �cF GOLF COURSE O PROJE AR VICINITY MAP NIS APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 i 704-919-1900 LICENSE NO. P-0601 CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE, NORTH CAROLINA MCMULLEN CREEK TRIBUTARY Job No. File No. Scales AT QUAIL HOLLOW PLAN vARIEs REPLACEMENT SEWER PROFILE NSA H or. Vert. NSA PIPELINE REHABILITATION PLAN JOSE ARMARIO & MARIANEIA ARMAR No. Dote I By Revision LANDTEC SRK SRK JLD Sheet Of16 22 Surveyed By Designed By Drown By Project—Engr Approved By Date 1 3929 CARMELACRES DR 1 CHRISTOPHER MATTHEWS REEDREF \ TAX PARCEL NO.2o926221 I T DEED EF:032017 62B AD PARCEL O.2D921211 I� GRAPHIC SCALE 0 50 100 1 inch = 100 ft. MANHOLE REHABILITATION PROJECT Existing Manhole ID Frame and Cover Rehabilitation Interior Wall Rehabilitation Bench and Invert Channel Rehabilitation Pipe Connections Rehabilitation MH-241449 Install flat top -section Epoxy lining Epoxy lining MH-241465 Install flat top -section Cementitious Lining Cementitious Lining MH-241452 Cementitious Lining Cementitious Lining MH-45319 Epoxy lining Epoxy lining 36 m D mn rn O �-f SE C rn _315-3ES / C i i 4011 EARN ­ TAX PARGELND.: 4DE3CARN-L`TE LN KEVIN, ­\ DEED REF � A TAX PARCEL NO. 2D934117 \ (CDO 7 OBALTUSROL "DES W CANN 7812 BAL L IN / r Jo2z�?° \ \ \ M H-241459 CHARLES E RREE / I %PARCEL ° TA% A EE O'20921 33 / / O 4423EA LEIS ARDRo�! EXIST. 100 YEAR LEN/ GSOC I \ DEEDREFCY06o931161\ FLOODPLAIN (TYP.) \ \ \ s\\ \ XPAre \ l COMMUNITY 100-YEAR _ 7830 BALTUSROL LN / THOMAS RKURTZ IV FLOODPLAIN (TYP.) RE,: 30346-641 / 1 �{OD E 4TH IT -TH FLOOR 1 RA EC KLENBURG COUNTY 1DEED REF: 08345-383 TAX PARCEL NO. 11'3 126 \� I � I �V I I I I 1 I4912 QUAIL CANYON DR / TAX PARCEL RREENozDsD134 / 926 pDALCANYONDR DEEDIO IRONKI, DR ITAX PARCEL NO 2111111 EXIST. IRRIGATION SPRINKLER (APPROX.) (TYP.) COMMUNITY 100-YEAR MH-521736 EXIST. IRRIGATION FLOODPLAIN (TYP.) EXIST. 100 YEAR PIPE(APPROX.) (TYP.) FLOODPLAIN (TYP.) j 1 RE, MH-241474 1 --- m - \ i , PROP. 20' TEMPORARY �� — — l COMMUNITY 100-YEAR 1 I ° \ CONSTRUCTION EASEMENT ; / FLOODWAY (TYP.) ✓I \ MH-241465 1 EXIST. 8" VCP SAN. m 3700 GLENEAGLESRD w° ° \ / / EXIST. 12" VCP SAN. FEMA SEWER PIPE (TYP.) Low CouNTRv uB / \ _ r / SEWER PIPE (TYP.) N I \L FLOODWAY (TYP.) DEEDREF9243)E)1 `"� ° /� ° TA%PARCEL NO'. 209E630 1 — — — — — — — — — — � J /Q,W V / — — — — — /331 PE / PE ssF O7620 IN ff dell��•:/—WATERS CONSLTUTR SrRROnN EB-IN2 \ / / / 1 / 33 EE \ r .• TAX IARCEE NO. 20921127 \ I � � y �ce � s� �r F � • � � v 4 PROP. 50' SEWER s� MH 78253'"PE/ESE j u tE' rssp EASEMENT MH-241449 EXIST. 30' SEWER EASEMENT EXIST. 30" SAN \ EXIST. 30" RCP SAN /� a 3a SEWER PIPE v �.._ SEWER PIPE (TYP.) bbE�nE 3 __ 3E � MH-241452 v Z/ 1 , _ � � 3 4 3a v33 v v MH-36834 69 9 \ / 399 u 9=E�99E d — f E \ —355 ss S ssE d t 3 3J -r—�S S SSE — SSE SSF \ iT• � \ \ ... �.. 355 3 a 4000 NINGSCOTE CIR E / JAMES R HOOD 4001 KINGSCOTE CIR DPs EED REF: 06862-273 JOHN HARWO BEACHAM TAPARCEL NO. za9332DEED DEED329 TAX P ELNo. 2 3252\ \ ZA 1 \ 3 MH-241442 \ MH 241439 4006 KINGSCOTE CR TAX PARCELNO.H 3225 21 \ \ 6797 LOUISBU RG SQUARE IN \ / DA DEED LEE ARMBRUST �IIv E MPl�kA`o El SEE Pg \ \ \ 1 \ 7700 BALTJ KEV 1 \ TAx PARCNLNO.Ozo9H21129 \ 1 1 MH-241448 \ a \ \ �\ a \ \ / \ \ S 36 1 I I 0 F: 33663 ZpgRGE ))13 BALTU6R L L N0. 20321208 30 DEED GARY HANCOCK TAD 09 ] DALNUERDL LN DLDRI I I CEL —SS— TH BALTU OL LN TD REF:1 VASES 6. 288 TAl AR<EL N0. 20921130 I 4001 CARMELACRES DR STEVEN BRUCEPATTERION DEEDTAX PARCEL NO.20926219 —36D 399 �39D EE — 39 � P. —R- 13001 GENERAL DR TFRRI I MCC:IRT )416 DALTUE LL' LN \ \ I AND- KEL6 E :NO3 6- IA% PARCEL N0. 20921 I I I 7829 BALTUEROL DRDE / IASON WHITE 21 ETAX PARCELF: 032°921 LTUSREHL LN E CY RAIMINI TAX PARCEL ND. 2 01214 \\\\ / % TA%PAflCEL NO. 20921- / I \-- \ / ^ \ 7900 BALTUSROL LN MICEE RCEL No,DMOND \s\ \ r✓ \ / 40 CA1K TIE LN �/� 1 UAS ER 1 \ \ \ AJPARCELNDCAT1131 COMMUNITY 100 YEAR \ EE„°69'2 rF 1 773D BALTUSROL IN RE . \\\ \ PARC'lOHN DCA?O FLOODWAY (TYP.) \ 1 ` \•31, •G :g. \ I / FEMA _ / I 7912 BALTUSROL IN a \ I FLOODWAY (TYP.) \ IEPARCEL HARRIS 1 TAX PARCEL N0. 20921136 J \ EXIST. 30' SEWER _ _ MH 241511 \ EASEMENT \ l ' —✓� MH-241542 EXIST. 30" SAN \ \ x \ \ \ \ _\ /� r SEWER PIPE \ \ \ \ MH-241551 s — — SSE 4E�69E _ — - MH 256242 MH 256245 SSE— s 6E " 66E_ _ _ 96E SS �SSE uE �. ES — EE E S—ES 355— _�! 355\ SSE SSE EEt—EE�EEESS --35E-3 —� — SSE EEE v \ M H-241512 M H-241536 s E6 69 .. 355— \ 3SS 355— —...—" --- �• 355 3EE —" _..— N ... ... �... ..—... ..,- 4900QUAIL YO DR MH-256241 — — — - — — — _ _ —�— _ — — - "'� ... -� \ TAYLOREDREF SANTRP "-1 DE32R36-3RDS � AxPARGELND.2D93D136 MH-241485 M H-256243 .. 99 SS EE �/ 4906 IL — D 4410 DEEPWOOD DR — ss Tar PAPC 111.RCEL No zo930135 s \ --ss— /' STEVEN C BOST 4328 DEEPW /A n AM MC DEED REF:04086A91 MOELARE 3A 1 4918 oUAIL CANYON DR TA%PARCEL N0. 2092]119 RAN PARCEL NO. D"D 49340UAR CANYON DR HELE M GLESSNER H �RNI TA%PAreCEL rvo.2o930133 4844 QUAIL CANYON DR / TAx PARCEL No. zo93o131 I SERGIOAKOPPANV DEED PARCEL O. 24Ao6 4418 DEEPWOOD DR D PARCEL N0. 2093013] SHERRY P ROGERS � (� MANHOLE REHABILITATION PROJECT Existing Manhole ID Frame and Cover Rehabilitation Interior Wall Rehabilitation Bench and Invert Channel Rehabilitation Pipe Connections Rehabilitation MH-241459 Install flat top -section Epoxy lining Epoxy lining MH-256245 Install flat top -section Cementitious Lining Cementitious Lining Seal pipe connections MH-241511 Cementitious Lining Cementitious Lining Seal pipe connections MH-241542 Install flat top -section Cementitious Lining Cementitious Lining Seal pipe connections MH-241551 Cementitious Lining Cementitious Lining PRELIMINARY PLANS - NOT FOR CONSTRUCTION CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT N0: NCD07 ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. LEGEND SS SS — SSE SSE PE PE TICE TICE CIPP CIPP CIPP PB PB 1 1 O EXIST. SANITARY SEWER PIPE EXIST. SANITARY SEWER EASEMENT PROP. PERMANENT EASEMENT TEMPORARY CONSTRUCTION EASEMENT PROP. CIPP REHAB PIPELINE PROP. PIPE BURST PIPELINE PROP. REHAB MANHOLE EXIST. MANHOLE EXIST. SEWER LATERAL Rp. 9, QUAIL HOLLOW GOLF COURSE VICINITY MAP N TS PROJECT AREA II tt-1 wD Know what's below. Call before you dig. Rp. 9 GRAPHIC SCALE 0 50 100 1 inch = 100 ft. QUAIL HOLLOW GOLF COURSE VICINITY MAP N TS PROJECT AREA APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) F N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE NORTH CAROLINA Job No. File No. Scales PLAN 111 = 100' PROFILE N/A H or. Vert. N/A As Built Date LANDTEC SRK Surveyed By Designed By MCMULLEN CREEK TRIBUTARY AT QUAIL HOLLOW REPLACEMENT SEWER PIPELINE REHABILITATION PLAN Sheet Of SRK JLD 17 22 Drown By Project—Engr Approved By Date No. I Dote I By Revision / \ 0B 4%CARIUSTIE LN ARCEL NO.,D31 wxITEmnasxn J ED CREF ;BEAN \ / f TAXDEDREF 04369984 Z Ew ME6ADOILERA ARCEL NO. T PARCEL N0.20934149 AA EAflCEL NO. 2WM139 EXIST. 100-YEAR \ 2093014 / r / FLOODPLAIN (TYP.) ti r � \ / / \ 40 STIELN COMMUNITY 100-YEAR \ RO RT W 0 HERMAN � 1130934114 FLOODPLAIN (TYP.) ITEMARsxR 7031 WHITEMARSH CT1 1 OVAL POINT— �\ IEFEREr PAUL6182 ARNOUSTIE UN 2 0 CARNOU T DEED REF. 16)61-Bzz A LOHAVICHA \ MCMULLEN HOMESxASSOC 32- �y\ yMPA0.CmEL�N0.320934101 \ EEDRF 2) TAN PAR CEL 48 CEL N0.2 20334106 / / JEAN \ COMMUNITY 100-YEAR \ \ / Ax REF: °� 2 / FLOODWAY (TYP.) / MH-241098 / \SS 6932 C4 flON GIEN / FEMA \ 421 aRN USTIE LN / \CE — — FLOODWAY (TYP.) \ ANDREEWD L ORGE _ 0 49-62 / \ TA%PARCEL NO. 209341 � _c ===ssE ssE SSE ssE ssE ssE ssE ssE / \35y� ��... EXIST. 30" RCP \ SAN. SEWER (TYP.) MCMULLEN CREEK _ _ _ _ MH 241093 TRIB. (TYP.) — EXIST. PROPERTY _ LINE (TYP.) 4311 DEEw DN P I 11.3 ARPAR ELND.2D92,3D2 I DEEDPEP.D,R63 . I in — in 1-311 TARPAN_.0­ER EDC- ZR92, 4242 W P=PCog AO .nME DOE- ETH Ao6 PP EL N0�2092% S Off' S MH-241124 EXIST. PROPERTY LINE (TYP.) I EXIST. UNDERGROUND TELECOM (APPROX.) (TYP.) \ s<\ \ n \55 �.• SSE \ — 6 � \ MH-241101 PO B )9D32 \ A EE HOOLLO SOM858550` \ \ \ �J TAX PAPCE N \22°' MH-241104 � s\ MH-241106 EXIST. 12" SAN. SEWER PIPE (TYP.) \ 4S 3810 GLENEAGLES RD QUAIL HOLLOW #3 HOMEOWNERS ASSOC DEED REF: 06012-528 TAX PARCEL NO. 2091152 --- In In \ In � / PROP. 10' PERMANENT EASEMENT (TYP.) EXIST. 20' SAN. SEWER EASEMENT (TYP.) \J SDE �� SDE �� SDE SDE SDE SDE SDE OF Spy �J \ \ A S�F s 4 �sr 3900 SEMINOLE CT GREGORY A CURRIE & \ JENNIFER 33 CURRIE DEED REF: 33016-421 TAX PARCEL NO. 20921148 MH-241121 L m N m In = IneF M H-241116 .Ln 46 3904 SEMINOLE CT WILLIAM 0 L HUTCHINSON DEED REF: 33342-826 TAX PARCEL NO. 20921147 M GRAPHIC SCALE 0 50 100 1 inch = 100 ft. MANHOLE REHABILITATION PROJECT Existing Manhole ID Frame and Cover Rehabilitation Interior Wall Rehabilitation Bench and Invert Channel Rehabilitation Pipe Connections Rehabilitation MH-241067 Install flat top -section Cementitious Lining Cementitious Lining MH-241080 Install flat top -section Cementitious Lining Cementitious Lining MH-241111 Install flat top -section GRAPHIC SCALE 0 25 50 1 inch = 50 ft. SANITARY SEWER REHABILITATION PROJECT UPSTREAM DOWNSTREA GM PIPE TV PIPE DATE PRE TV DATE REHAB REQUIRED MH MH NUMBER DIAMETER LENGTH MATERIAL COMPLETED COMPLETED SEWER (inches) (feet) REHABILITATION MH-241126 MH-241124 GM-21233 8 30.1 VCP 10/29/2015 INSTALLCIPP MH-241124 MH-241125 GM-21234 12 129.7 VCP 10/29/2015 INSTALLCIPP PERFORM A POINT REPAIR STARTING 189.4' DOWNSTREAM OF MH-241129 GOING DOWNSTREAM ENDING AT 201.4' (12' REPAIR) TO REMOVE BROKEN PIPE MH-241129 MH-241127 GM-20746 8 268.0 VCP 10/20/2015 PERFORM A POINT REPAIR STARTING 238' DOWNSTREAM OF MH-241129 GOING DOWNSTREAM ENDING AT MH- 241127 (30' REPAIR) TO REMOVE A SAG AND OFFSET JOINTS INSTALLCIPP MH-241127 MH-241125 GM-21230 8 26.9 VCP 10/29/2015 INSTALLCIPP MH-241120 I MH-241126 I GM-2122351 8 1 74.2 1 VCP 1 10/29/2015 INSTALLCIPP CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. NCDEQ PERMIT NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. LEGEND SS SS SSE SSE PE PE TCE TCE CIPP CIPP CIPP PB PB O EXIST. SANITARY SEWER PIPE EXIST. SANITARY SEWER EASEMENT PROP. PERMANENT EASEMENT TEMPORARY CONSTRUCTION EASEMENT PROP. CIPP REHAB PIPELINE PROP. PIPE BURST PIPELINE PROP. REHAB MANHOLE EXIST. MANHOLE l� QUAIL HOLLOW GOLF COURSE 3 VICINITY MAP N TS V Know what's below. Call before you dig. QUAIL HOLLOW GOLF COURSE VICINITY MAP N TS 3 APPROVALS (SEALS) N.C.R.L.S. (AS BUILT) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 CHARLOTTE CHARLOTTE WATER W6TER CHARLOTTE NORTH CAROLINA MCMULLEN CREEK TRIBUTARY Job No. Scales File No. AT QUAIL HOLLOW PLAN VARIES REPLACEMENT SEWER PROFILE NSA H or. Vert. N/A PIPELINE REHABILITATION PLAN As Built Date LANDTEC SRK SRK JLD Sheet Of18 22 No. Dote By Revision Surveyed By Designed By Drown By Project—Engr Approved By Date WEIR LENGTH (L) STE �nRE FENG�f: o`N FILTER FABRIC 0 N GENERAL NOTES: 1. WIRE FENCING SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 4. WIRE FENCING SHALL BE AT LEAST #10 GAGE WITH A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 5. TURN SILT FENCE UP SLOPE AT ENDS. 6. WIRE MESH SHALL BE MIN. 13 GAGE WITH MAXIMUM 12" OPENINGS. 7. WIRE AND WASHED STONE IS REQUIRED TO BE SHOWN ON PLANS AT THE TOE OF SLOPES GREATER THAN 10 FEET VERTICAL (2:1 SLOPE) 8. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 9. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 10. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. F 4'-0" MINIMUM 2'-I0" MIN. KI4 STEEL POST - *K FE4c*G - F&TER FABRIC 15 *ASHED STONE MAINTENANCE NOTES: 1. FILTER BARRIERS SHALL BE INSPECTED BY THE CONTRACTOR OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. NOT TO SCALE TEMPORARY SILT FENCE FENCE MATERIAL: ORANGE, UV RESISTANT HIGH TENSILE STRENGTH POLYETHYLENE LAMINAR BARRICADE FABRIC -1 4'-0" O.C. STEEL POST MINIMUM SEE APPROVED PRESERVATION P REQUIRED RADIU OF TREE BARRIE 5' TYP, GAS MAIN DETAIL 1-A 1" STEEL PLATE, 8" THICK TIMBER MATS, OR APPROVED EQUAL TO BE INSTALLED OVER GAS MAIN. MIN. 5' BEYOND MAIN EACH SIDE. GRADE 1" STEEL PLATE, 8" THICK TIMBER MATS, OR EQUIVALENT TO BE INSTALLED OVER GAS MAIN. MIN. 5' BEvnnin LnAIKI C:Arru QMC: PIFmmnNT (.A:� rpn,; DETAIL 1-D PLAN VIEW OF ROOT ZONE ONE FCC INCH OF OR 1/2 FOR PRUNING SEE WHICHEVI INTERNATIONAL SOCIETY OF ARBORICULTURE SPECS. DEAD TREES AND SCRUB OR UP GROWTH SHALL BE CUT FLUSH ADJACENT GRADE. NO GRUBBIN ALLOWED UNDER DRIP LINE. 2"x4" STANDARDS + 1 "x4" RAILS OR ORANGE SAFETY FENCING MAY BE USED. • CITY OF CHARLOTTE �rn LAND DEVELOPMENT STANDARDS INCLUDES CHARLOTTE ETJ NOTES: 1. CONTRACTOR SHALL COORDINATE WITH PIEDMONT GAS TO FIELD LOCATE GAS MAIN. 2. INSTALL ORANGE SAFETY FENCE 5 FEET EACH SIDE OF GAS MAIN. ONE SIDE ONLY WHERE CONSTRUCTION ACCESS DOES NOT REQUIRE BOTH SIDES. 3. COORDINATE LOCATION OF GAS LINE CROSSINGS WITH PIEDMONT GAS. NO CROSSING SHALL BE UNPROTECTED. 4. EQUIPMENT CROSSINGS SHALL BE BETWEEN PERPENDICULAR TO MAIN UNLESS OTHERWISE APPROVED. MINIMUM 60 DEGREES TO GAS MAIN AT OCATIONS. ORANGE SAFETY FENCE (AS REQUIRED) NOTES 1. REMOVE ALL BARRIERS UPON COMPLETION OF PROJECT. 2. LANDSCAPING PLANS SHALL SHOW THE LOCATIONS OF ALL TREE PROTECTION FENCES. 3. REFER TO CITY OF CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS SECTION 01000 FOR GENERAL SPECIFICATION REGARDING TREE PROTECTION. TREE PROTECTION DETAIL RK MULCH, PLACE BARK i AT AREAS NOT CTED BY BARRIER. 40.02 EXISTING GRADE STEEL FENCE POST (TYP) 8' (TYP) 4' - 12O OF SO R 5A7 FOACE OF OUTLET CLASS B EROSION CONTROL STONE SILT CHECK FENCE PLA FLOW StCIIUN ALUNG FLNUL 24" HIGH SILT CHECK FENCE CLASS B EROSION V-g" CONTROL STONE SILT CHECK 12" OF N0. 57 STEEL FENCE MASHED STONE POST ° 18" AT CENTER FLOW o 0 \� FILTER FABRIC SECTION ALONG FENCE STONE OUTLET DETAIL DETAIL 1-6 NOTES: 1. ACCESS ROAD SHALL BE 12' IN WIDTH. 2. WHEN USED FOR TEMPORARY REPAIR OF EASEMENT, WIDTH AND LENGTH SHALL BE AT DIRECTION OF ENGINEER. PERMANENT ACCESS ROAD NOTES: APPLICABLE AT ALL POINTS OF INGRESS & EGRESS UNTIL SITE IS STABILIZED, FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED. SURFACE NOT TO SCALE DETAIL 1-E NOTES: a. GRAVEL PAD TO BE 12'x 50' AND 6" THICK MINIMUM b. TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS IS TO BE PROVIDED. c. ENTRANCE(S) SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. d. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY; KEEP SOME HANDY. e. ANY MATERIAL WHICH STILL MAKES IT ONTO THE ROAD MUST BE CLEANED UP IMMEDIATELY. TEMPORARY CONSTRUCTION ENTRANCE/EXIT DETAIL 1-F BRIDGEMAT 1 /4 SUPPORTED 1 /4 SUPPORTED - L - WATER DIVERSION STREAM WATER DIVERSION STREAM BANK SECTION A -A I I 1 /4 SUPPORTED I STREAM y� 1 + f I I i BRIDGE MAT SEGMENTS A A L I I l l I PLAN + STREAM BANK (TYP.) BRIDGEMAT NOTES: BRIDGEMATS ARE HEAVY WOOD OR STEEL PANELS PLACED OVER A STREAM OR DITCH CHANNEL, USUALLY FOR TEMPORARY CROSSING. OTHER NAMES INCLUDE DRAGLINE MATS, SKIDDER BRIDGES OR PONTOONS. WHEN BRIDGEMATS ARE CAREFULLY INSTALLED, USED, AND REMOVED, THEY TYPICALLY DO A VERY GOOD JOB OF PROTECTING WATER QUALITY. BMPS FOR BRIDGEMATS 1. WHEN SITE CONDITIONS ALLOW, SELECT A STREAM CROSSING LOCATION THAT HAS THESE CHARACTERISTICS: - NARROW CHANNEL WIDTH. - FIRM, STABLE STREAMBANKS. - SOLID FOOTING ON EITHER SIDE TO SUPPORT BRIDGEMATS AND EQUIPMENT. - HIGH, LEVEL GROUND ON EACH SIDE. 2. CREATE A SOLID -SURFACE CROSSING THAT PROVIDES A BARRIER OVER THE CHANNEL TO MINIMIZE DEBRIS, SOIL, AND OTHER MATERIALS FROM FALLING INTO THE WATER. 3. KEEP EQUIPMENT OUT OF THE CHANNEL DURING INSTALLATION AND REMOVAL OF THE CROSSING UNLESS DOING SO iS NECESSARY FOR HANDLING THE BRIDGEMATS. MINIMIZE THE AMOUNT OF OVER -HANG FROM LOGS, TREES, OR TRUCKS/TRAILERS THAT MAY DISTURB THE CHANNEL OR APPROACHWAYS. 4. CONTROL RUNOFF AND/OR CAPTURE SEDIMENT ON THE APPROACHWAYS. SEE PART 1 AND PART 2 OF THIS CHAPTER FOR POSSIBLE OPTIONS. 5. AS NEEDED, PERIODICALLY INSPECT THE CROSSING AND TAKE ACTION TO PROVIDE FOR SAFETY WHILE PROTECTING WATER QUALITY FROM RUNOFF, DEBRIS, SOIL, OR OTHER POTENTIAL POLLUTION FACTORS. 6. STABILIZE THE APPROACHWAYS AND CROSSING LOCATION IN ACCORDANCE WITH FPG .0203 AND .0209 OF THE NC FOREST SERVICE. BRIDGEMAT STREAM CROSSING (ALTERNATE OPTION FOR HIGH USE CROSSINGS) APPROVALS (SEALS) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 DETAIL 1-C lu Know what's below. Call before you dig. PRELIMINARY PLANS NOT FOR CONSTRUCTION NCDEQ PERMIT NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. DETAIL 1-G A CITY OF CHARLOTTE DEPARTMENT TIE TO EXISTING GRADES AT MIN. 3:1 SLOPE PER TABLE PER TABLE RIP RAP LINER PER TABLET 1 II IIIIII_ PER TABLE PER TABLE III, ,=III _ TOP OF RIP RAP = EL. NOTED ON PLAN RIP RAP CHANNEL LAYER OF NCDOT TYPE 2 FILTER FABRIC NOT TO SCAL Grass Lined Ditch Channel Ditch Bottom Side Slope Side Slope Top Width Permanent Temporary Ditch Ditch Type Station Depth Comments Slope (%) Width (LF) Left Right (LF) Lining Liner 1 DETAIL 2-A BANKFULL BENCH 700 g!m` COIR WRAPPED SOIL LIFT 2' (MIN} 3 UVESTAKE BANKFULL C e-97 BENCH ■ BANKFULL TOP OF BRUSH & N 6" ABOVE DOWNSTREAM HEAD OF RIFFLE SOIL •' BACKFILL g NOTFS: 1. N.Ix LAYERS OF 50[L WITH COARSE WOODY DEBRIS. 130% [O BE FROM LIVE MATERIAL OF -� '4 rH ,aI.5VE5PECiBSI, BRUSH FILL 2 W RAP A LAYER OF TOPSOIL WITH COIR FIBER MATTING AND PLANT W ITH IJVE STAKES PER THE flMINJ-1' MAXI PLANfINGPLAW 1I' AAEN. DIA. CROSS LIMBS 3 REFER TO THE WOOD TOE STRICTURE TABLES FOR 57PUCTURESTART AND END STATIONS. FOOTER LOGS 8' [ NI 2' STATIONS ARE ALONG THE PROPOSED CENTERLINE ALIGN MW. MI d WOODY DEBRIS SHALL NOT EXTEND INTO THE CHANNEL MORE THAN 2 FEET. 3. NO WOOD MATERIALS SHALL BE DEAD OR ROTRNG, WOOD TOE SECTION i�sc� d� CDIR WRAPPED SOIL LIFTS SHALL HAVE A MAX HEIGHT OF 1.5 FT PER LIFT AND MLIL"tPLE LIFT' MAY RE REQUIRED TO CONSTRUCT THE SAWS TO THE REQUIRED DIMENSIONS STEP T STEP 2 STEP 3 STEP 4 7 THE UPSTREAM AND DOwNSTREAM ENDS OF THE WOOD TOE SHALL SMOOTH LY TRx. SI"i Y FOOTER LOGS CROSS LIMBS BRUSH FILL SOIL LIFT VERTICALLY (ALONG THE BANK FOR APPROXIMATELY 10 LINEAR FEET LONGITUDINALLY) TO TIE INTO OTHER IN -STREAK. STRUCTURES SUCH AS ADJACENT CONSTRUCTED RIFFLES. F'ER THE CONSTRUCTION DRAWINGS. ' BANKFULL BANK PROTECTION BENCH ' H (SOIL LIFT) 1 r �I POOL ExcnvnrL BELOW BRUSH 'Ct \ IY MEN. DIA. FOOTER LOGS ON APPROX. 2' CENTERS AND ANGLED V UPSTREAM CROSS LIMBS SET APPROX. J PERPENDICULAR TO FOOTERS AND SOIL ADDED BRUSH FILL ANGLED TO FILL IN VOIDS UPSTREAM WITH SOIL ADDED TO FILL IN VOIDS WOOD TOE DETAIL 2-B SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND 1, INSTALL SPECIAL STILLING BASINS AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA, 1 THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK SITE TO THE SPECIAL STILLLING BASIN, 1 INSTALL UPSTREAM COFFER DAM AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION, DISCHARGE INTO CREEK 4, INSTALL THE DOWNSTREAM COFFER DAM AND PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA, THE PUMP AND HOSE FOR SEDIMENT FILTER BAG STREAM BANK TEMPORARY SPLASH PAD SPECIAL STILLING BASIN (AS DIRECTED AT THE THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK TIME OF CONSTRUCTION) AREA, THIS WATER WILL ALSO FLOW INTO A SPECIAL STILLING BASIN, EXISTING GROUND PUMP HOSE STREAM 5, THE CONTRACTOR WILL PERFORM STREAM RESTORATION WORK IN DE*ATERING PUMP ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL 6, CONSTRUCTION SEQUENCE. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SEDIMENT AND o ►57 STONE 13ASEFLO�y LINED *TH TO BE INSTALLED AT DIRECTION OF ENGINEER DEWATER BEFORE REMOVAL OF THE COFFER DAM, REMOVE COFFER DAM, FILTER FABRIC v v v CLASS B RIPRAP Q COFFER DAM PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DAM FIRST, FOR DRAINAGE 1 I WORKING (LOCATE AS DIRECTED AT THE TEMPORARY 7, ONCE THE WORKING AREA IS COMPLETED, REMOVE THE STILLING BASINS (NON-�yOVEN) Iva MR AREA TIME OF FLEXIBLE 0 HOSE A AND STABILIZE DISTURBED AREAS TO SPECIFICATIONS AS SHOWN ON - CONSTRUCTION) 1 PLANS, APPROPRIATE SIZE NOTES- IMPERVIOUS SHEET EXISTING y CHANNEL A NOTES- RIP RAP PAD MiN. THICKNESS B" AT THE DESIGNER'S DISCRETION, ALTERNATE DEWATERING UNDER RIPRAP TEMPORARY PIPING r 1 , EXCAVATION SHALL BE PERFORMED IN ONLY DRY SECTIONS OF CHANNEL UNLESS DRAINAGE AREA EXCEEDS 6 SOUARE MILES, STRUCTURES MAY BE USED (i,e, SEDIMENT TANKS, FILTER BOX, STRAW BALE/SILT FENSE PIT), HOWEVER, REGARDLESS OF THE COFFER DAM 2. COFFER DAMS SHOULD BE USED TO ISOLATE WORK AREAS FROM DEWATERING STRUCTURE USED, ALL MUST BE SIZED AND PROFILE VIEW STREAM FLOW, OPERATE TO ALLOW ALL PUMPED WATER TO BE FILTERED TO / 3, THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE PREVENT SEDIMENTS FROM ERODING AND MOVING OFF SITE, STABILI DIN ONE WORKING DAY, 4, EACH PUMP AROUND PUMP SHOULD ADEQUATELY CONVEY BASE FLOW COFFER DAM (LOCATE AS 5. VOLUMES, WORK IN CREEK SHALL BE PLANNED TO MINIMIZE THE NUMBER OF TEMPORARY DEWATERING STRUCTURE (SPECIAL STILLING BASIN) PUMP AROUND PUMP DIRECTED AT THE TIDE OF 6, DAYS OF DISTURBANCE, THE CONTRACTOR IS TO OBSERVE THE LOCAL WEATHER FORECASTS PROFILE VIEW CONSTRUCTION) AND NOT BEGIN WORK IN THE CREEK UNLESS AT LEAST THREE DAYS WITHOUT RAIN IS ANTICIPATED, 7, FOR LARGER CREEKS CONSTRUCTION SHOULD OCCUR ON ONE SIDE OF TYPICAL PUMP AROUND SETUP THE CREEK AT A TIDE, PER DETAIL 4-E, THE FIRST SIDE SHOULD BE PLAN VIEW STABILIZED BEFORE BEGINNING CONSTRUCTION ON THE OPPOSITE SIDE. SCALE: NTS NOTE: ALL DISCHARGE FROM DEWATERING THE WORK AREA SHALL BE PUMPED TO EITHER A TEMPORARY SEDIMENT TRAP OR DEWATERING SILT BAG PER DETAILS PRECAST CONCRETE PLASTIC LINER BOTH SIDES OF CONC. BARRIER BARRIER & PLACED UNDER SAND BAGS WATER LEVEL —\ (FIELD VERIFY) SANDBAGSAT ANY OPENINGS PLAN OR 3' TYP. BUT NO HIGHER THAN TOP OF BANK SECTION AA 3' MIN. CLASS B BEDLI` SANDBAGS 5 1 KLAIVI bYF'A_`).`3 & ULVVA I LKIINU DETAIL 2-D NATER LEVEL FIELD VERIFY) NOTES: 3. ALTERNATIVE COFFER DAM MATERIAL IS ACCEPTABLE BUT SHALL BE APPROVED BY THE ENGINEER. 1. MATERIAL FROM THE CREEK BED SHALL NOT BE USED FOR COFFERDAM. 4. CIRCULAR OR RECTANGULAR CONFIGURATION MAY BE USED FOR 2. CREEK BED SHALL BE DISTURBED THE MINIMUM REQUIRED FOR CONSTRUCTION. CONSTRUCTION AND WILL BE RESTORED TO ORIGINAL CONTOURS WHEN WORK 5. FOR MINOR STREAMS, CONTRACTOR SHALL EXTEND COFFER DAM ACROSS IS COMPLETE. CREEK UPSTREAM AND DOWNSTREAM OF THE REPAIR SECTION TO FACILITATE STREAM BYPASS PUMPING. PUMP AROUND TO BE USED TO BYPASS FLOW AROUND CHANNEL REHABILITATION WORK. SCALE: NTS COFFER DAM DETAIL 2-E STEEL SUPPORT FRAME VIeV YV 1 ILVV 1 VV WORK AREA RETAINED WATER UP TO 12 FEET DEEP IL /—FABRIC MEMBRANE IMPERVIOUS FABRIC SEALING SHEET INSTALLATION OF FRAMEWORK PLACING MEMBRANE DE -WATERING BY PUMPING SECTION VIEW Typical— — — — Top of Bonk ANCHOR TRENCH COMPACT FILL VEGETATED GEOGRID HEIGHT SOIL LIFT H FACE HEIGHT 2/3 H OR 4' MIN. PROPOSED TOP OF BANK NORMAL BASE 1/1 NCDOT TYPE 2 FILTER FABRIC COARSE BACKFILL PLAN VIES/ TOP YUIDTH OF EXISTING TOP yECE ATED OF BANK f11'.4iTlinIn ' `� ` 1 II J0 01�� 1�CC 10 - - - - - - - - - WIN � VEGETATEDVA GEOGRID 'IN STAKI ACIET) _ILL BOULDER TOE PROTECTI HEIGHT ANCHOR DETAIL H TRENCH DEPTH TRENCH ANCHOR ACKFILL STAKE EROSION TRENCIII CONTROL WIDTH APPROVALS (SEALS) AATTING NCHOR TRENCH TAKTH ES r . LING) '--SOIL LIFT FACE HEIGHT FINAL CHANNEL GEO ETRY TO ATCH PRE -CONSTRUCTION CHANNEL GEOMETRY, POST CONSTRUCTION STREAMBANK CANNOT ENCROACH BEYOND EXIST, STREAMBANK INTO CHANNEL, -- — — — — — — — — — — — — —— TYpicol--- Top of Bank -1 1-1 I 1-1 1111 1=111=III=III=1I 1 EXIST, CHANNEL GEOMETRY IIIIIIIIIIIII � 1 I—III=III=III=III=11 EROSION CONTROL MATTING IIIIIII I 1-1 111 I II 1=1 11=1 11=1 11=1 11=1 11=1 i 1=1 i I- i III—III—III=IIIIII-III—III-11 LIVE CUTTINGS COIR MAT GEOTEXTILE WRAPPED SOIL LIFTS �— ------Tygital--- Bankfill CONSTRUCTION NOTES L FBI for soil lilts to be comprised of planlable topsoil free of slicks, stones, and debris. 2, Sook live cuttings a minimum of 24 nourse and up to 5 days before planting to promote establishment, 3. Excavate unstable stream bank to reveal a stable cut lace. Establish hot bench at base of cut slope. Excavate trench along toe of slope for Installation of boulder protection, 4, Install Tooter boulder *Ith Coarse bockfhl plated behind looters Make sure to fill voids bet*een and behind boulders, B. Install header boulders setback from looters and resting an Coarse bockfill,Coorse backfli to be placed at a thickness equal to the height of the header rocks, 6, Loy natural fiber mat over Coarse fill and header boulder. Place soil Till 101 to a vertical depth per design and Comp firmly, Pull mot over Till and staple in place, 7. Loy live cuttings in Criss -Cross pattern across surface of lilt (8-12 cuttings per linear Toot), No more than 6 inches at budding end of Cuttings should extend post the front of Till, e, Cover live cuttings *Ith layer of topsoil to make layer an even and flat surface for next lilt, Repeat sob lilt process per design, 9. Top sob Till to consist of compact Ill lyropped in non -*oven erosion conlyd molting, Ootting Should overlap existing top of stream bank and be slaked in anchor trench per design. Once erosion Cantrd molting is stoked in anchor trench, backfbl soil to be Compacted MATERIAL SPECIFICATIONS 1 Boulders: Fools and header rocks must be large enough to achieve design height and resist movement during peak flo* events. Boulders should be rectangular and uniform in shape and size *Ith a minimum Intermediate axis of 3 feel, 2, Coarse aggregate: Should be properly stied not to be mobilized during peak Bo* events, Salvaged alluvial material during trenching COn be used. 3. Erosion Control Filler fabric f0-12 oz non -*oven geo-lextbe specific to aggregate separation, 4, Coir Matting (Natural Fiber). Machine produced 14oven un-seamed degrodobie natural fiber fabric hith on outer and Inner Toyer lied together at reeggular intervals, 5, Sol Lift Fill, Either 1009 Tooppsoil or 5OX Topsoil Iyllh 599 SOtisloctary Sob Moterio, (A57M D 2487 soil groups GAT, GP, GM. SW. SP. SM, GC. Sr- ML. and CL), BOULDER TOE DETAIL 2-C N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 BOULDER TOE PROTECTION -- —— Typical — —_ Normal Flow Streambed — Elevation FOOTER BOULDER PRELIMINARY PLANS NOT FOR CONSTRUCTION NCDEQ PERMIT NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE • DISTURBED AREA: 11.6 AC. ALL CONSTRUCTION SHALL BE IN ACCORDANCE Know what's below. WITH CHARLOTTE WATER STANDARD Call before you dig. SPECIFICATIONS. PORTADAM DETAIL 2-F A CITY OF CHARLOTTE DEPARTMENT O� 1n 7 W m ZONE A X. (UPLAND ZONE) N 0 (UPPER SLOPE) — (LOWERN SLOPE) NOTES: 1, ANCHOR COIR FIBER MAT AS SHOWN IN 'DETAIL 3-D, DETAIL E' (THIS SHEET), 2, COIR FIBER MAT, ROLANKA BIOD-MAT 70, OR EQUAL (TSTAKING DETAIL ' H S S EET)S ER 0 D MIX POR INS ALLATION OF MAT PER DETAIL 3—E (THIS SHEET), 3, FILTER FABRIC, NCDOT TYPE 2 4, KEY IN CLASS 1 RIP RAP 24" THICK WITH JOINT PLANTING AS SHOWN IN 'DETAIL 3-D, DETAIL C' (THIS SHEE T) 5. RIP RAP PLACEMENT WIDTH VARIES ALONG STREAMBANKS, SEE 'EROSION CONTROL' SHEETS FOR QUANTITIES. NO RIP RAP SHALL BE PLACED WITHIN THE CREEK BED. 6, PRE AND POST CONSTRUCTION CHANNEL GEOMETRY AND ELEVATIONS SHALL MATCH. APPROX. TOP OF STREAM BANK SCOUR LINE 2/3 H OR 4' 3 MIN. H Xy- Xy- Xy Ny N � / IN\ �, \ � " CREEK BE coMPACTE BACKFILL PROPOSED SANITARY SEWER NORMAL LLEVEL F-MAX, SLOPE 1,5:1 STREAMBANK RESTORATION DETAIL 3-A 2 T6IND BEYONDRIP COIR FIBER MAT WITH LIVE STAKING AS SHOWN IN 'DETAIL 3-D, DETAIL D' (THIS SHEET) SEED MIX PRIOR TO INSTALLATION OF MAT PER DETAIL 3-E (THIS SHEET) PROPOSED SANITARY SEWER (BELOW CREEK RFF1 TYP ) RIP RAP WIDTF VARIES (SEE 'EROSION CONTROL' 97 PLAN VIEW OF RIP RAP PLACEMENT LIMITS DETAIL 3-B ZONE A EXISTING TREES AND VEGETATION "1 EXISTING TOP OF BANK EXISTING TREES )N • ZONE B 2/3 H ZONE C OR 4' MINIMUM • EXISTING TOE OF SLOPE — — FLOW � CREEK CENTERLINE �NOF PLAN VIEW SPACING PATTERN FOR LIVE STAKING AND JOINT PLANTING DETAIL 3-C 1y/AX TE ROOT SYSTEM: RIPARIAN ZONE TYPE OF PLANTING CoMMoN NAME BOTANICAL NAME OR 1 �I U SPACING LIGHT CONDITIONS SOIL CONDITION SUFACE (S) OR TAP (T) "SI - HEIGHT, DZETER" SPECIAL NOTES BENEFITS 1) DECIDUOUS TREE RED MAPLE ACER RUBRUM 30' MIN. SUN MOIST OR DRY TAP / SV-2' 60' TO 90' / 2.5' SEEDLINGS OR CONTAINER (3-15 GAL) CUTTINGS IN JUNE FROM LOWER BRANCHES ZONE A PERSIMMON DIOSPYROS VIRGINIANA L. 30' FULL SUN / PART SHADE MOIST OR DRY DEEP TAP 20' TO 70' / 1' - 2' SEEDLINGS OR CONTAINER (3-15 GAL) "UNDERSTORY SPECIES„ DEEP ROOTS, FRUIT HIGHLY USED BY WILDLIFE" (UPLAND ZONE) TULIP POPLAR LIRIODENDRON TULIPFERA L. 30' SUN MOIST DEEP TAP ROOT 10' - 20' 80' TO 120' / 2'-3' SEEDLINGS OR CONTAINER (3-15 GAL) WILLOW OAK OUERCUS PHELLOS 304 MIN. SUN MOIST OR DRY TAP / S V - 6' Sd - 90' / V-2' "SEEDLINGS, CONTAINER (3-15 GAL) OR DIPPLE ACORNS OVER AREA" "SLOW GROWING , TRANSPLANTS EASILY" 2) EVERGREEN TREE AMERICAN HOLLY ILEX OPACA 154 MIN, SUN/PART SHADE MOIST OR DRY STRONG TAP ROOT / S V-104 40'-70' / V-2' SEEDLINGS OR CONTAINER (3-15 GAL) "MIXED HARDWOOD FOREST, BRIGHT RED BERRIES" SOUTHERN MAGNOLIA MAGNOLIA GRANDIFLORA 304 MIN. SUN MOIST OR DRY DOMINANT DEEP TAP 60`-80` / 2'-3' SEEDLINGS OR CONTAINER (3-15 GAL) TRANSPLANTS EASILY CAROLINA HEMLOCK TSUGA CAROLIANA 20' SUN/PART SHADE MOIST OR DRY MAJOR TAP ROOT / S V-6' 40` TO 60' / 2' SEEDLINGS OR CONTAINER (3-15 GAL) "SLOW GROWING, LONG LIVED, TOPSTORY SPECIES" 3) DECIDUOUS SHRUB AMERICAN BEAUTYBERRY CALUCARPA AMERICANA 3' MIN. FULL SUN / PART SHADE DRY 15' X 10' SEEDLINGS OR CONTAINER (3-5 GAL) FAST GROWING CATAWBA RHODODENDRON RHODODENDRON CATAWBIEN 10' SUN MOIST OR DRY 15' X 10' SEEDLINGS OR CONTAINER (3-5 GAL) "FAST GROWING, FORMS THICKETS" HUCKLEBERRY, GOOSEBERRY VACCINIuM STAMINEUM 8' MIN. SUN MOIST OR DRY 20' X 15' SEEDS, SEEDLING, CONTAINER (1-5 GAL) OR CUTTINGS FAST GROWING 4) EVERGREEN SHRUB YAuPON ILEX VOMITORIA 8' MIN. SUN MOIST OR DRY 15' X 10` SEEDLINGS OR CONTAINER (3-15 GAL) FAST GROWING LEUCOTHOE LEUCOTHOE SP, 4' MIN, SHADE/PT.SUN MOIST "SEEDLINGS OR CONTAINER (3-15 GAL). GROWS TO 6` TALL" 5) BUNCH/TURF GRASS MIX 1 (FULL SUN) BROOM SEDGE ANDROPOGON VIRGINICus 10t OF MIX SUN DRY OR MOIST "S 6" FERTILIZE WITH 20 POUNDS/ACRE 19-19-19 FLOWERS; STABILIZING PERRENIAL: CLUMPY ZONE B 1) DECIDUOUS TREE RED MAPLE ACER RUBRUM 30' MIN. SUN WET OR DRY TAP / SV-2' 60' TO 90' / 2.5' SEEDLINGS OR CONTAINER (3-15 GAL) CUTTINGS IN JUNE FROM LOWER BRANCHES WATER OAK OUERCUS NIGRA 30' MIN. SUN WET OR DRY S V - 6' 5d - WO- / 1'-24 "SEEDLINGS, CONTAINER (3-15 GAL) OR DIPPLE ACORNS OVER AREA" "CAN TOLERATE SOME FLOODING, TRANSPLANTS EASILY, FAST GROWTH" (UPPER SLOPE) 2) EVERGREEN TREE AMERICAN HOLLY ILEX OPACA 15' ON. SUN/PART SHADE WET OR DRY STRONG TAP ROOT / S 1'-10' 40'-70' / 1'-24 SEEDLINGS OR CONTAINER (3-15 GAL) "MIXED HARDWOOD FOREST, BRIGHT RED BERRIES" SOUTHERN MAGNOLIA MAGNOLA GRANDIFLORA 30' MIN. SUN WET OR DRY DOMINANT DEEP TAP 60'-80' / 2'-3' SEEDLINGS OR CONTAINER (3-15 GAL) TRANSPLANTS EASILY 3) DECIDUOUS SHRUB SILKY DOGWOOD CORNUS AMOMUM 2' MIN. FULL SUN / PART SHADE WET OR MOIST 10, X 8' LIVE STAKE OR JOINT PLANTING FAST GROWING ELDERBERRY SAMBUCUS CANADENSIS 3' MIN. FULL SUN / PART SHADE WET OR MOIST 10' X 10' LIVE STAKE OR JOINT PLANTING FAST GROWING PROLIFIC BERRIES 4) EVERGREEN SHRUB POSSUMHAW ILEX DECIDUA/VERTICILLATA 8' MIN. SUN MOIST OR DRY SEEDLINGS OR CONTAINER (3-5 GAL) LEUCOTHOE LEUCOTHOE SP. 4' MIN, SHADE/PT.SUN MOIST OR DRY SEEDLINGS OR CONTAINER (3-5 GAL) 5) BUNCH/TURF GRASS "SEE SECTION A. ABOVE" FERTILIZE WITH 20 LBS OF 19-19-19 PER ACRE AT TIME OF SEEDING ZONE C I) DECIDUOUS SHRUB SILKY DOGWOOD CORNUS AMOMUM 2' MIN. FULL SUN / PART SHADE WET OR MOIST 10' X 8' LIVE STAKE OR JOINT PLANTING FAST GROWING BLACK WILLOWSALIX NIGRA 2' MIN. FULL SUN / PART SHADE WET OR MOIST LIVE STAKING RECOMMENDED (LOVER SLOPE) 2) BUNCH/TURF GRASS "SEE SECTION A. ABOVE" NOTE: REFER TO USDA )NEBSITE AT HTTP://PLANTS.USDA.GOV/PLANTS FOR ADDITIONAL DETAILS FOR ANY OF THE LISTED SPECIES PLANTING SCHEDULE RIPARIAN ZONE (PIEDMONT REGION) DETAIL 3-E SPACING PER PLANTING SCHEDULE • SPACING PER PLANTING SCHEDULE • NCDOT CLASS 1 PLAIN RIP RAP 24" THICK 7 ESTALISHED FOR BN ORMATOLANT N ONL ��VN SCOUR LINE 0 / 2/3 H OR 4' MIN, 0 o= CREEK BED 0 p FILTER FABRIC 0 36" LIVE CUTTING (DORMANT) 0 SEE PLANTING SCHEDULE FOR DENSITY LAYOUT EXISTING o GROUND o 0 DETAIL C JOINT PLANTING (IN RIP RAP) INSTALL COIR FIBER MAT OVER SEED PER PLANTING SCHEDULE +' ESTABLISH D PLANT SHOWN 4 FOR INFORMATION ONLY o 0 INSTALL SPLIT 2" X 4" X 30" o DEAD STOUT STAKES PER p SPECIFICATIONS OR STAPLE PER MANUFACTURERS REOUIREMENTS 30" LIVE CUTTING (DORMANT) SEE PLANTING SCHEDULE FOR DENSITY LAYOUT 0 3� nA DETAIL D op LIVE STAKE (IN EARTH) EXISTING GROUND DETAIL 3-D APPROVALS (SEALS) EXISTING TOP OF -BA f =L I i 12" 6" IR FIBER REINFORCEM�fV TURF T N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE C4 CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 PRELIMINARY PLANS NOT FOR CONSTRUCTION INSTALL SPLIT 2" X 4" X 30" DEAD STOUT STAKES PER SPECIFICATIONS OR STAPLE PER MANUFACTURERS REOUIREMENTS DETAIL E HIGH PERFORMANCE TURF REINFORCEMENT MAT ANCHOR DETAIL NCDEQ PERMIT NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. 0ALL CONSTRUCTION SHALL BE IN ACCORDANCE Know what's below. WITH CHARLOTTE WATER STANDARD Call before you dig. SPECIFICATIONS. CHARLOTTE CHARLOTTE WATER WJ)TER CHARLOTTE NORTH CAROLINA Job No. File No. MCMULLEN CREEK TRIBUTARY Scales AT QUAIL HOLLOW PLAN - REPLACEMENT SEWER PROFILE Hor. - Vert. DETAILS Sheet Of CW SRK SRK SMM 21 22 No. Date By Revision Surveyed By Designed By Drawn By Project—Engr Approved By Date A CITY OF CHARLOTTE DEPARTMENT �x M ell3E n ru�o �p /p dr FLA �r el e 4 �P . 12" THICK CLASS A RIVEA APRON ON FILTER FAB GRADE SURROUNDING TOQIRECT FLOW TO NEWVERT . 1 ' CVP FLARED / END SECTION 1 X APPR Pr OF BANK i / EX. 00" SEWER INSTALL ADDITIONAL / FILL THIS AREA TO f REPAIR ERODED DITCH. / 11X// �c�5 ` / 36 LF 18" HDPE, �1 SECTIOFLAR�Dl 12" THICK CLASS A RIP RAP APRON ON FILTER FABRIC (150 SF) f r ADDITIONAL PERM, EASEMENT f 142 S � CULVERT DETAIL 4-A DIAGRAM 12 WORK AREA IN THE THRU LANE (STREET WITH 3 LANES) DOWNSTREAM EUFFER TAPER W33R W9-3L (35 MPH (35 MPH OR LESS)OR LESS) N9.3 VYI1-4 WI-R W1-L (OVER (OVER g 35 MPH) 35 MPH) VARIES BUFFER TAPER ((350')) ((350')) ((250')) one � am N21� W9-3 In214 NOTES: 1. SPACING - 25 M-PH OR LESS (SPACING) - 30 & 35 M.P.H. ((SPACING)) - 40 M.P H. OR MORE 2. TYPE III BARRICADE REQUIRED ONLY ID WORK ZONE IS LEFT UNATTENDED OVERNIGHT. 3. IF CLOSURE IS LONG-TERM (SEE SECTION 17). PAVEMENT MARKING SHALL BE REVISED TO MATCH THE TRAFFIC PATTERN. ARROW PANEL 4. IF BIKE LANE IS PRESENT THE PROPER CLOSURE IS REQUIRED USING SIGNS DISPLAY AND CONES. REFER TO DIAGRAM 31. (IF USED) DETAIL 4-B LEGEND Q CONES/DRUMS HTYPE III BARRICADE SIGNS ® WORK AREA ARROW PANEL EXISTING GROUND COMPACTED v/i//j BACKFILL Q \\j\\j\ /�//�// UNDISTURBED co EARTH C-905 (TYP.)(SEE NOTES O.D. NOTE 2 / THIS DETAIL) HAUNCHING COMPACTED INITIAL /i\/ (1/8 PIPE DIA.) BACKFILL \\/\\ // /�%/ _ _ %j\jj NCDOT #57 STONE w NOTE 3 :5 1/2O.D.-- \� ca MIN. 6" BEDDING i�\\ ____ ___ ___ ___ ___ __%� FOUNDATION NOTE 1 PIPE EMBEDMENT NOTES: 1. STABILIZATION STONE REQUIRED WHEN SOIL CONDITIONS ARE UNSTABLE. 2. CLEAR DISTANCE NOT LESS THAN 6" EACH SIDE. 3. 18" MINIMUM VERTICAL TRENCH WALLS ABOVE TOP OF PIPE. 4. INITIAL BACKFILL SHALL BE PLACED IN 6" LIFTS AND COMPACTED. INITIAL BACKFILL SHALL CONTAIN NO MATERIAL OVER 1 1/2" IN DIAMETER, FROZEN LUMPS, OR DEBRIS. 5. BACKFILL SHALL BE COMPACTED TO 95% STANDARD PROCTOR DENSITY. C-905 NOTES: 1. PIPE AND FITTINGS 14" THROUGH 24" SHALL MEET THE REQUIREMENTS OF AWWA C905 DR 25, EXCEPT WHERE DEPTH OF COVER IS LESS THAN 3 FEET AND DR 18 SHALL BE USED. 2. THE BELL SHALL CONSIST OF AN INTEGRAL THICKENED WALL SECTION WITH AN ELASTOMERIC SEAL. THE WALL THICKNESS IN THE BELL SECTION SHALL CONFORM TO THE REQUIREMENTS OF SECTION 6.2 OF ASTM D3139. 3. THE PIPE SHALL BE MANUFACTURED TO CAST IRON OUTSIDE DIAMETER IN ACCORDANCE WITH AWWA C900/C905. 4. THE SEAL SHALL MEET THE REQUIREMENTS OF ASTM F477. 5. STANDARD LAYING LENGTHS SHALL BE 20'. 6. THE PIPE SHALL BE COLORED GREEN FOR IN -GROUND IDENTIFICATION AS SEWER PIPE. NEW PIPE EMBEDMENT C-905 PVC PIPE MAXIMUM TRENCH WIDTH TABLE Pipe Size Depth < 6' 6' < Depth < 12' 12' < Depth 6"ID 2.6' 4.6' 6.6' 8"ID 2.7' 4.7' 6.7' 10"0 2.9' 4.9' 6.9' 1 2"!D 3. 1' 5. 1' 7.1' 14"0 3.3' 5.3' 7.3' 16"0 3.4' 5.4' 7.4' 1 8"!D 3.6' 5.6' 7.6' APPROVALS (SEALS) N.C.P.E. GAVEL & DORN ENGINEERING, PLLC. 6730 FREEDOM DRIVE CHARLOTTE, NORTH CAROLINA 28214 704-919-1900 LICENSE NO. P-0601 DETAI L 4-C • Know what's below. Call before you dig. PRELIMINARY PLANS NOT FOR CONSTRUCTION NCDOO PERM1 T NO: NCDOT ENCROACHMENT NO: MUNICIPALITY: CHARLOTTE DISTURBED AREA: 11.6 AC. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. A CITY OF CHARLOTTE DEPARTMENT McMullen Creek Tributary at Quail Hollow Sanitary Sewer Replacement June 1, 2021 Attachments CWS Project No. 2019-0062 Attachment E: Temporary Culvert Details V C, m v C .2! N O Q O O 00 a E U d 4 � Z Z W 2 ai CP LL p V U NOTES: Q rCD i coo 1, REMOVE THE STRUCTURE WHEN NO u SURFACE FLOW DIVERSION LONGER NEEDED. (NOT TO EXCEED 1 C1� YEAR). SURFACE FLOW DIVERSION 2. ENSURE THAT DESIGN FLOW VELOCITY • I— =1 AT THE OUTLET OF THE CROSSING 6" WASHED STONE 11=III=III=III=III= 1=III=III—III—III—I STRUCTURE IS NON —EROSIVE FOR THE =III=III=III=III—I RECEIVING STREAM CHANNEL. 1=III=III=III=I I_I—I O 1=III-III-III-III-II F" I=1 I I=1 I I=1 I I=1 I I -I I =III=III=III=1 I I III111 3. ADDITIONAL MEASURES MAY BE I_I 1=1 I_II I I =-I I III=III-III-III-III REQUIRED BY THE EROSION CONTROL U =III=III=III _ COORDINATOR OR CITY ENGINEER J Z BASED ON SITE SPECIFIC CONDITIONS. n / Wi 0 U W STREAM BANK =III-- 111=III-11 W O� U Q -III=III-III- 6" WASHED STONE F Q Q W -Ili=lli=lli=lli Q - -III-111-IT-IT-u III-III=III=III=III= LINE CREEK BOTTOM WITH :D d III=III=III=III=III=III FILTER FABRIC 00 W (f) I1=1I1-I I IM I1El I IM I1El I 111=III=rl—laI el I laIIaI1=1 W Q' III=III=III=III=III-III-III-III- TOP BANK 000 0o TOP BANK 11=111=11IM I IF I IF I IF I I-111-I O o H II=III=III=III=III=III=III=11_I=11 o RIP RAP o 0 0 0 0 0 0 0 0 o O Y W W I1=III=III=III-III-III-III-III-III F I1=111=111=III-III-III-III- I -II J W J /2 11=I I I=I I IM I I -I I I-11 Ml11=1 1- Q' W W 1=111=III=III=III=III=III=11 wPE oiA�1ETER OR 12" Q of U) 1=III=IIL=III=111 1111=111_ WHICHEVER IS GREATER (� IL=1 ==111111I-11L-III RING FILTER AS REQUIRED BY INSPECTOR. = U U Z O RIP RAP LU J Q J O Of CL U W H- 30" TEMPORARY CULVERT PIPE LL O N O co N 2 � J LLJ N W �5 2 O U) z Df 0 J W J W a F Y W U U 0 U U7