Loading...
HomeMy WebLinkAbout20071017 Ver 1_Approval Letter_20070619Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen Sullins, Director Division of Water Quality June 19, 2007 Durham County DWQ Project No. 20071017 Bridge No. 158 on SR 1402 T1P No. B-3169 APPROVAL of NEUSE BUFFER AUTHORIZATION with ADDITIONAL CONDITIONS Dr. Gregory J. Thorpe, Ph.D., Environmental Management Director NCDOT PDEA 1598 Mail Service Center Raleigh, NC 27699-1548 . Dear Dr. Thorpe: You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of replacing Bridge 158 in Durham County: - Neuse Riparian Buffer Impacts Site Zone 1 minus =Zone 1 Zone 1 Buffer Zone 2 minus =Zone 2 Zone Z Buffer Impact Wetlands Buffers (not Mitigation Impact Wetlands Buffers Mitigation (sq ft) in Zone 1 wetlands) Required (sq ft) in Zone 2 (not Required (using (sq ft) (sq ft) (using 3:1 ratio) (sq ft) wetlands) 1.5:1 ratio) s ft 1 2,344 0 2,344 N/A 1,013 0 1,013 N/A Totals 2,344 0 2,344 0 1,013 0 1,013 0 * n/a =Total for Site is less than 1/3 acre and 1501ineaz feet of impact, no mitigation required Total Buffer Impact for Project: 3,357 square feet. The project shall be constructed in accordance with your application dated received June 11, 2007. This approval is valid for the Neuse Riparian Buffer Rules (15A NCAC 2B.0233). In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval is valid solely for the purpose and design described in your application (unless.modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 1501inear feet, compensatory mitigation maybe required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed below. Conditions of Certification: 1. The post-construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species. _ Ane Cazolina Transportation Permitting Unit 1V_ rth~urQ~~l~ 1650 Mail Service Center, Ralegh, North Carolina 27699-1650 ~7Q 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-68931 Internet: http:i/h2o.enr.state.nc.us/ncwetlands An Equal OpportunitylAffirmativeRction Employer - 50% Recycled/10% Post Consumer Paper F W q T~. Michael F. Easley, Governor Q /~ QC~ QG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources ` Uj r Coleen Sullins, Director ~ ~ Division of Water Quality U ~ 2. Strict adherence to the most recent version of NCDOT's Best Management Practices For Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of this approval. 3. Bridge deck drains should not discharge directly into the stream. Stormwater should be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of Stormwater Best Management Practices. 4. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstruction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody species by the end of the growing season following completion of construction. For the purpose of this condition, maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular DOT maintenance activities including mowing. The area with non-maintained buffers shall be permanently revegetated, with native woody species before the next growing season following completion of construction. 5. Pursuant to NCACISA 2B.0233(6), sediment and erosion control devices shall not be placed in Zone 1 of any Neuse Buffer without prior approval by the NCDWQ. At this time, the NCDWQ has approved no sediment and erosion control devices in Zone 1, outside of the approved project impacts, anywhere on this project. Moreover, sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as diffuse flow. . 6. All Stormwater runoff shall be directed as sheetflow through stream buffers at nonerosive velocities, unless otherwise approved by this certification. 7. If concrete is used during construction, a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 8. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 9. The dimension, pattern and profile of the stream above and below the crossing should not be modified. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 10. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 11. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 12. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 13. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 14. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. `one Carolina Transportation Permitting Unit 11VV~ ~"~uCat'~/ 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet: http://h2o.enr.state.nc.us/ncwetlands An Equal OpportunitylAfrirmative Action Employer- 50% Recycled110% Post Consumer Paper ~ V~ArF Michael F. Easley, Governor Q ~Q William G. Ross Jr., Secretary `QCl' pG North Carolina Department of Environment and Natural Resources ~ ~ Coleen Sullins, Director ~ Division of Water Quality Q '~ 15. A copy of this Neuse Buffer Approval shall be posted on the construction site at all times. In addition, the Neuse Buffer Approval and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. 16. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 17. Upon completion of the project, the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the approval has been completed. 18. Native riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 19. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 20. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and irnplementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 21. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored upon completion of the project. ~°e Carolina Transportation Permitting Unit ~ v"turQ~~l/ 1650 Mail Service Center, Raleigh, NoRh Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet: http:l/h2o.enr.state.nc.uslncwetlands An Equal OpportunitylAffrmativeAaion Employer- 50% Recycled110% Post Consumer Paper W AT Michael F. Easley, Governor F S, F William G. Ross Jr., Secretary , ~ O~ Q~ North Carolina Department of Environment and Natural Resources ` y- Coleen Sullins, Director Division of Water Quality ~ © ~ If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699. This certification and its conditions are fmal and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Rob Ridings at (9190 733-9817. inc rely, ~1~%~%~..___..... Coleen Sullins Director Attachment (Certificate of Completion form) cc: Chris Murray, Division 5 Environmental Officer Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office Travis Wilson, NC Wildlife Resources Commission Erica McLamb, NCDOT NEU DWQ Raleigh Regional Office copy File Copy NJon~e Cazolina Transportation Permitting Unit ' _ Eura~~~ 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-6893 f Internet: http•/lh2o enr.state.nc.us/ncwetlands An Equal OpportunitylAffirmative Action Employer - 50% Recycled/10% Post Consumer Paper