Loading...
HomeMy WebLinkAboutNC0037508_Upgrade & Expansion_20111222A7A F1bENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary December 22, 2011 Mr. Cary McSwain, County Manager County of Moore PO Box 905, 1 Courthouse Circle Carthage, North Carolina 28327 Subject: Interim Inspection Moore County Water Pollution Control Facility Upgrade & Expansion Project No. CS 370 496-02 Dear Mr. McSwain: RECEIVED DEC 2 3 2011 OR-FAYETTEVI LLE REGIONAL OFFICE The Construction Inspection Group (CIG) of the Construction Grants and Loans Section performed' an interim inspection for the state and federally funded portion of subject project on Tuesday December 13, 2011. This interim inspection was conducted in conjunction with the monthly progress meetings which are conducted on the 2na Tuesday each month at 10:00 am, preceded by a field inspection at 9:00 am. Location of. the Progress meeting is in the conference room at Wharton Smith's construction trailer at the Moore County Water Pollution Control Plant on Addor Rd. Contract completion dates remain unchanged; June 6, 2012 for the solids handling portion of the project and April 2, 2013 for the remainder. Please note CG&L's address, telephone numbers and section name will be changing in January 2012. You should review this report; take actions or provide responses as indicated and then file for your records. You will need to keep project records for 3 years following completion of the project. If you have any questions please contact me at (919) 715-6219 or via e-mail gerald.horton@ncdenr.gov. Sit erely, tJ Gerald W. Horton, PE Environmental Engineer Construction Inspection Group cc: Randy Gould, PE, Public Works Director, Moore County Adam Kiker, PE, Hobbs Upchurch & Assocs. Southern Pines office Belinda Henson, Fayetteville Regional DWQ Office CIG - Mark Hubbard, PE, Gerald Horton SRF F:\SHARE\Project Management Branch\Group - Construction Inspection\Projects (Active)\MOIRE CntyWWIT Expn SRF gv:h\Int lnsp II-12-dd MUBRE.duc Construction Grants & Loans Section An Equal Opportunity/Affirmative Action Employer One NorthCarolina , aturallu Moore County WPCF Upgrade & Expansion CS 370 496-02 Preconstruction meeting and Interim Inspection of December 13, 2011 Page 2 of 4 GENERAL CONCERNS / RECOMMENDATIONS / ACTION ITEMS —Please note UPDATES on Comments and Concerns noted in previous progress meetings (for reference) will be italicized. 4. Owner and Engineer are requested to have submittal log available for review and discussion at all monthly progress meetings until all submittals have been approved. 5. CG&L requests Inspection logs and testing reports be available for review at all meetings. 6. Please have record drawing (as-builts) markups available for review at all meetings. 9. Dec. update: subcontractors list was provided to CG&T, at December meeting. Please indicate which are D,M, or WBEs? [Nov.] - CG&L requested list of all subcontractors presently utilized as well as those anticipated to be used on project. Those of Disadvantaged , Minority, or Women's Business Enterprise status should be so designated on the list. The subcontractors list will be used to check for Davis Bacon compliance, hence Owner is advised to provide this list immediately. Further, the list will be used at CG&L's final inspection to determine how close project comes to achieving goals. 10. Dec. update: CG&L reminded Owner and Engineer that O&M manual preparation and approval by CG&T, is required on SRFprojects. [Nov] -CG&L advised that this project requires preparation of an Operation & Maintenance Manual. The manual must be approved by the 90% draw. The Owner is also required to review the O&M manual and comment or certify that it satisfactorily addresses their needs. The O&M preparation guidance document and Owners review certification may be found on CG&L's website - http://portal.ncdenr.org. 11. Dec. update: CG&T, requested Owner put a discussion of 'phasing and maintaining operations" during construction on the monthly agenda. [Nov.] - CG&L reminded all present that proper un-interrupted conveyance and treatment of Owner's wastewater during construction is an NPDES permit requirement and a loan assurance by Owner. 13. Dec. update: CG&T, hereby acknowledges receipt of SOV in excel format. [Nov] - CG&L requested an electronic copy of the Schedule of Values (SOV) once approved by Owner and/or Engineer. Engineer advised this will be forthcoming in about 7 days. Please provide CG&L with SOV in electronic format. 15. "Description of Eligible Work" in the November 15 letter, page 3 of 6. [Nov.] -CG&L hereby requests Owner, through Engineer to confirm in writing the accuracy of the scope of the work as stated below in heading - "Description of Eligible work" . 16. Dec. update: IMPORTANT - CG&T, received subcontractor list at December meeting, however status needs to be annotated on the list and the list already needs updating. [Nov] CG&L requested updated lists of subcontractors for both contracts identifying which are DBEs. [Nov]-CG&L requested copy of Wharton -Smith's subcontractor list. 17. CG&L at next [Jan.] meeting, requests Owner be prepared to discuss long times and open items on the RFI or "Request and Answer Log" handed out at December meeting. Specifically, will the information impact the project completion date. LOAN DISBURSEMENTS As of December 22, CG&L files indicate there have been no requests for reimbursement. CONTRACT: Wharton Smith, Inc., (WS) PO Box 471028, Monroe, FL 32747 tele: 704 525- 5695 Unlimited -Building, Public Utilities (Water Lines & Sewer Lines) PU (Water Pur. & Sewage Disp.) Lic # 38755, Proj. Mgr.: Brian Klauka, Supt: Forest Anderson 407 402-5460 Moore County WPCF Upgrade & Expansion CS 370 496-02 Preconstruction meeting and Interim Inspection of December 13, 2011 Page 3 of 4 CONSTRUCTION INSPECTION Observations of WS construction and progress since notice to proceed: 1. Nov. - Dec. areas for clarifiers, aeration basins footings have been excavated 2. placed digester concrete footing slab 3. stockpiled excavation north of final clarifier #3 and to an area south of chemical building outside of fence 4. placed stone for and began forming 2nd stage AB footing 5. rerouted pipe and made connections near 2nd stage AB for sludge to digesters 6. proceeding on demolition work on existing splitter boxes 7. dewatered, investigated and took measurements for replacement/refurbishment to existing clarifiers equipment CHANGE ORDERs — none yet received at CG&L RFPs Status -- current RFIs Status -- there are 6 requests for information outstanding, oldest (sludge flow meter FE-B2) is 63 days old, 4 others are over 24 days old. Is RFI log correct or in need of updating. Age of RFIs is not acceptable. Refer to comments items #17 on page 2 herein. Project Schedule -- W-S indicates they are slightly behind on the sludge facilities and ahead elsewhere on the written schedule of current SUBMITTAL Status- the submittal log provided at the December meeting indicated several submittals (-16) have been under review for a very long time. CG&L requests Owner discuss and provide plan for more expeditious review and handling of the submittals, further please identify or discuss which submittals are critical to the project schedule. Inspectors logs/Work Orders - inspection logs were reviewed at December's meeting and deemed adequate. CG&L hereby requests inspection logs and all test reports be available for review at all meetings. As-builts or Record Drawings - were reviewed, however there is nothing to annotate yet. Please have record drawings available for review at all progress meetings. Davis Bacon - Summary results / Contractor or Sub DBE noted with * Wharton -Smith Sinns & Thomas QL Management update on Davis Bacon efforts : total Davis Bacon Certified payrolls interviews conducted status 2 completed on file with Owner 2 completed 2 completed 6 interviews total conducted to date for Crowder and subs "completed" in the above table means interviewed, Certified payroll received, in agreement with DB interview, on file, and compliant with applicable Wage Rate determination. Please update the Subcontractor list, QL Management doesn't appear on the handout of Dec. 13. Also, please note which if any subcontractors on the list are DBE, WBE, or MBE. Refer to comment #16 page 2. Wage Rate Determination posted & complies Moore County WPCF Upgrade & Expansion CS 370 496-02 Preconstruction meeting and Interim Inspection of December 13, 2011 Page 4 of 4 Progress Meeting List of Attendees (only those who signed roster): Randy Gould Rich Smith Mary Munz David Laurita • George Yankay (field mtg. only) Adam Kiker, PE . Jason Caviness Brian Klauka Forrest Anderson Kris Trouteaud Brad Rawls Paul Laughlin Scott Jiran Gerald W. Horton, PE Moore County Construction Manager rgould@moorecountync.gov Moore County Construction Manager rsmith@moorecountync.gov Moore County rmmunz@moorecountync.gov Moore County dlaurita@moorecountync.gov ORC, Moore County WPCF gyankay@moorecountync.gov Hobbs Upchurch Assoc akiker@hobbsupchurch.com Hobbs Upchurch Assoc j caviness@hobbsupchurch.com Wharton -Smith Inc., Project Manager bklaulca@whartonsmith.com Wharton -Smith Inc., Supt. fanderson@whartonsmith.com Wharton -Smith Inc. ktrouteaud@whartonsmith.com Wharton -Smith Inc. brawls@whartonsmith.com Wharton -Smith Inc. plaughlin@whartonsmith.com Sinns & Thomas (electrical contractor) NC Construction Grants & Loans gerald.horton@ncdenr.gov < END Progress Meeting Report > 910 638-9287 910 947-4300 ofc 910 315-6055 c 910 947-4305 ofc 910 215-7079 c 910 281-3146 ofc 910 789-2658 c 910 638-9185 c 910 692-5616 ofc 910 639-7718 c 704 674-4679 c 704 525-5695 ofc 407 6402-5460 c 704 557-5225 c 704 525-5695 ofc 772 370-5301 c 864 323-1078 c 407 383-7175 c 407 696-6042 ofc 919 715-6219 ofc.