HomeMy WebLinkAbout20190210 Ver 2_Compliance Evaluation Inspection_20210615Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20190210
NCDOT - NC 69 Widening (A-0011C)
Clay
NCDOT - NC 69 Widening (A-0011C)
NC DOT Division 14 - Sylva
6/14/2021
Routine
Site Inspection (DOT)
Version: 2 Status:Issued
Project Type:Road/Highway Widening
Region:Asheville
Longitude:-83° 49' 32''+35° 00'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on June 14, 2021. Reid Whitehead
and Nick Adams were present during the inspection. The following are items that need attention:
~ Station L 180+25 RT (Blair)- Outlet protection above rip rap needs maintenance. Stablize exposed soils on slope from
sewer line work.
~ Station L 147+00 RT - Inlet to slope drain needs maintenance. Excavated spoils need to be stablized and not discarded
adjacent to measure. Outlet adjacent to JS needs maintenance.
~ Station L 130+00 RT (Anderson) - Residual sediment less than 2 inches reported and observed in old pond bottom.
Does not need to be removed at this time. Continue to monitor. If more than 2 inches accumulates, then this will require
removal. A wetland seed mix should be applied to the saturated areas after site is stable.
~ Station L 131+50 LT - Maintain inlet protection at stormwater box.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20190210
6/14/2021
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2