HomeMy WebLinkAboutSW5210601_Design Calculations_202106101667 Thomas A. Betts Pkwy., Rocky Mount, NC 27804
Phone: 252-446-3017 - Fax: 252-446-7715
k4CLA Firm License: C-0569 - www.mackgaypa.com
Mack Gay Associates, P.A.
Engineering - Surveying - Planning
STORMWATER CALCULATIONS
MANUAL
St Stephen Missionary Baptist Church
S Pine Street,
Spring Hope, Nash County, North Carolina
May 22, 2021
Prepared by:
Phillip Joyner, Jr., PE
Rol
--`SEAL
036848
40
-"', /� . "�" -i "��
. 0
I/l/11111iWk
TABLE OF CONTENTS
SECTION I .................................... Stormwater Narrative
SECTION 2 .................................... USGS Map, Soils Map, Surface Water Classification
SECTION3 .................................... Deed
SECTION 4 .................................... Supplement EZ Cover Page, Drainage Areas Form, Wet Pond Form,
Level Spreader — Filter Strip Form
SECTION 5 .................................... Wet Pond Calculations
SECTION 6 .................................... Level Spreader Calculations
SECTION 7 .................................... Runoff Calculations
SECTION 8 .................................... Pipe Network Calculations
SECTION 9 .................................... Drainage Areas Summary
SECTION 10 .................................. Nutrient Calculations
STORMWATER NARRATIVE
STORMWATER MANUAL NARRATIVE
The 14.98 acres property is currently wooded with an open area in the project area. The
purpose of this project is to construct a new church faclity, This project requires stormwater
runoff peak flow management and first flush treatment. The project will result in 2.64 acres of
built upon area and 0. 13 acres of impervious area for the water quality pond permanent pool.
The project will disturb 5.1 acres.
This project will utilized a water quality pond that discharged to a level spreader and filter strip.
The water quality pond and level spreader and filter strip were designed according to
the current NC BMP Manual.
The water quality pond will treat the first 1.0" flush per NCDEQ requirements and will
manage the peak flow. The pond will detain and route the post -development peak
flows from the 1 and 10 year storms to less than the pre -development flows.
See stormwater summary below:
STORMWATER RUNOFF SUMMARY
1 -yr
Storm
1 0-yr
Storm
I 00-yr
Storm
POND PRE -DEVELOPMENT
0.29
6.43
17.2
POND POST -
DEVELOPMENT
11.32
24.2
38.8
POND ROUTING
1 0.27
1 1.27
1 2743
all flow is in ds
USGS MAP, SOILS MAP, SURFACE
WATER CLASSIFICATION
z
m QZ .9 W
cc
t:
0
z
CL
C,
U)
m ".9 at
auMEC DUOUBE 019066C OZMBK Mccw
C) M
04
M.W a &
U)
cn
U) .?!
= 2
0
V)
C,
o6
x
.20
2 clnj
>
ID
FA
rz
0
m"a.0
z
0
0
U.
z
a.
a
z
LU
(D
LU
—j
IL
U)
M,
CL
c
'o,
tu
tm
L
re
E
0
U)
tf
--.d
L)
L
1
L" m
1'-
v Q)
C%4
0 M E
.0 a
m
M .76 Z�
-0
0
.2
-�g CrO
' '
W M =) ID
'v'
cc
r)
r E
E ro Lo
(D
A-
U)
w (D
La
0 tn a)
'm
Z
C:-
, 0
CL
W
uD
>
d)
is
'D E, <4
- 3.,
E
LLJ
" ,
m ca -_,a
m
n-
m 41
8 CL 2 ac,
�O C: CL cn M
c
8
ca
-0
LO E '3�
41
L)
m
2.2 Z5
co
z :3
'o
C>U,
'COL
m
>
I
2Q
(D
C.
0
E
2, m
>
0 'a
C:
a
fn
2
') 4; Q (D
i-�
E Z
c
:3
E T
d)
co
(U
> CL Z
CL
-0
W
-0
13- c
- - -
E
en
U) U3 ti- .2
Ica
0
— =
-E :3
E
rc
<
o
a)
C:
_0
0
m
E r
lou
e)
Z5
aj
"
COO)
Z
.0
0 r-
m
U)
a
0-
0 'm m
Sc
L65 Im
2- (Eu
U:3 -0
E 0
cn
'D
5 a
0
= c E
CL ca
C�
E CD
U
2
cr
.2 (D -2
2
<
Q. g
a 23
M
0
A 2:'
E
m
=
cn
U) -0
2
CL
CL
d)
0 'm
r L4 r 0
al
C',
om
Ln
L6
E :!5
o
Lu E
cL E
LO)
<
Cj
o V)
m
c
(U
LL
CL
m -6
U)
ca
<
U)
U) 75
49
0
rL 0
co ro
co
U)
cn
0
to
;5
<
lu
0
0
94
13.
Z. 'E=
c
D
C
:3
C
:3
CL
9
—
ui
:3
Lo
0
to
0
to
0
U)
a
in
I
co
L)
0
3
m
41
CL
m
(D
cm
U)
w
0
(n
(n ca
0
co
Lm
13
C)
04
CD, 0
E2 "
04 ,
E�4 M
>1
CD
U)
>"a
U)
U)
U)
m
z
d)
0
z 0
Soil Map —Nash County. North Carolina
Map Unit Legend
—MIP Unit Symbol Map Unit Name Acres In A01 Percent of AOI
St Stephens
FaB
Faceville loamy sand, 1 to 6
2.3
21.1%
percent slopes
GhB
Georgeville-Urban land
0.8
7.3%1
complex, 0 to 6 percent
slopes
GoA
Goldsboro fine sandy loam, 0
5.1
46�5%
to 2 percent slopes
RaA
Rains fine sandy loam, 0 to 2
2.7
25.1%
percent slopes, Southern
Coastal Plain
Totals for Area of Interest
1019
100.0%
tw,% Natural Resources Web Soil Survey 912212020
61�m— Conservation Service National Cooperative Soil Survey Page 3 of 3
SuKace Water Classifications:
Stream Index: 28-55-2
Stream Name: Hendricks Creek
Description: From source to Sapony Creek
Classification: C;NSW
Date of Class.: December 31 1989
What does this Class. mean? More info
River Basin: Tar -Pamlico
DEED
We 1 001 �
10MINMINVINNININ
Doc jo: 00852-1850002 TVSe,�4�Rl?
:$061 1 .39 AM
2013 at I :
MOAr9V 00 pace I of 2
'
Revenue Tax: $110-00
Nash Countv North carolina
Anne J. r%1vin R&Ojeter of Deeds
BK2683 Pc;45-46
Prepared by: Michael D. Gaynor
Fields & Cooper, PLLC
Post Office Box 757 This instrument prepared by Michael D. Gaynor
Nashville, NC 27856 a licensed North Carolina attorney. Delinquent
taxes, If any, to be paid by the closing attorney
ExciseTax: $110.00 to the county Tax Collector upon disbursement
of closing proceeds.
Tax Parcel(s): 005503
X, V—.9 rej .5 X1*j A W,
GENERAL WARRANTY DEED
NASH COUNTY
THIS DEED, made this day of June, 2013, by and between Jim D. Jung, unmarried, whose
address is 1002 N. Bend Dr, Raleigh, NC 27609 (hereinafter sometimes collectively referred to as
"Grantors"), and The Trustees of St. Stephen Missionary Baptist Church whose address is PO Box 75,
Spring Hope, NC 27882 (herein referred to as "Grantee"). All provisions of this Deed apply in the plural
sense where there is more than one Grantor or Grantee and all penons, firms, corporations, associations,
partnerships, individuals, males or females shall be deemed fully included, and the masculine gender shall
be construed to mean feminine or neuter, singular or plural, where such construction is necessary to make
any provision of this Deed applicable to any person, persons, firms, corporations, association, thing or act
at any time.
WITNESSETH:
That the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby
acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee
simple, all that certain lot or parcel of land situated in Nash County, North Carolina, and more particularly
described as follows:
File No. 13-0104A
Being all of that certain tract or parcel of land containing 14.98 Acres as shown on plat of survey
entitled, "Boundary Survey for Mr. Jim D. lung, Mannings Township Nash County, North Carolina"
dated 4-5-13 and revised 5-29-13 by Civiltek East recorded in Plat Book 38, Page 213, Nash County
Registry, said plat being fully incorporated herein as a part of this description. Being the identical
property conveyed to Jim D. Jung by deeds recorded in Deed Book 1034, Page 677, Nash County
Registry and Deed Book 1174, Page 199, Nash County Registry.
45
Book: 2683 Page: 45 Seq: 1
We 3 0013
For Further Refererice: Tax ]D# 005503
The hereinabove described property does not include the primary residence of the Grantor.
To Have And To Hold the aforesaid lot or parcel of land and all privileges and appurtenances
thercto belonging to the Grantee in fee simple. And Grantor covenants with Grantee, ffiat Grantor
is seized of the premises in fee simple, the title is marketable and free and clear of all
=cumbrances, and that Grantor will warrant and defend the title against the lawful claims of all
persons whornsoever except for the exceptions hereinafter stated.
Title to the property heminabove described is subject to the following exceptions: subject
to all restrictions, rights of way, easements and permits of recoA if any.
In Witness Whereof, the Grantor has hmmto set his hand and seal, or if corporate, has caused
this instrument to be signed by its duly authorized officers and its sea] to be hereunto affixed by authority
of its Board of Directors, the day and year first above written.
State of North Carolina
Wtk-" ____County
a Notary Public for said County and State, 4q , " 11 �%
hereby certify that Jim D. Jung personally appeared before me and acknowledged the due execution,
pf
foregoing instrument.
Witness my hand and official seal this day of June, 2013.
S
Notary Public
31- 15
My Commission Expires.
0
bnox�%t 46 A c
Book-. 2683 Page: 45 Seq: 2
SUPPLEMENT EZ COVER PAGE,
DRAINAGE AREAS FORM, WET POND
FORM, LEVEL SPREADER - FILTER
STRIP FORM
SUPPLEMENT-EZ COVER PAGE
F_ FORMS LOAVE
PROJECT INFORMATION
1 Project Name
2 Project Area (ac)
4._[�urfa!V c)
Wqteir�k _
5 !Is this lq�02q_tl! �hor imtDansity'7
6 1 Does this Droiect use an off -site SCM?
COMPLIANCE WITH 02H.1003(4)
L7 Width of vegetated selib - acks p
8 Will the vegetated setbackremIt vegetated?
9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)?
1 0 Is streambank stabilization proposed on this projectl
St Stephens Missionary Baptist Church
14.85
.13 (wet pond pemi anent pool)
Hlgh
No
50'
Yes
NIA
No
NUMBER AND TYPE OF SCIVIs:
11 Jnfiltratiqn�stem
12 Bioretention Cell
13 Wet Pond
14 Stormwater Weiland
15 Permeable Pavement
[,Sand
16 Filter
17 Rainwater Harvestin�(RWH)_
18 Green Roof
19 Level Spreader -Filter Strip (LS-FS)
20 -Disconnected I m pervious Surface (DIS)
21 ]Treatment
Swale
22
Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
I LORIVIS LC�ALD�p
DESIGNER CERTIFICATION
27
Name and Title:
Phillip R Joyner, Jr, -Project Engineer..
28
Organization:
Mack Gay Associates, PA
29
Street address:
1667 Thomas A Betts Pk%
30
City, StMe, Zip.,
Rocky Mount, NC 27804
31
Phone number(s):
252-446-3017
32
Email:
phillip@mackgaypa.com
Certification Statement:
I certify. under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the beat of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
C A 1? 0
—SS16. 4,
z cL SEAL
o36848
ZZ
jc)�
SignAure of Designer
I- —Z ?_ - &2-1!
Date
DRAINAGE AREAS
I
Is this a hiq�_dqnsity project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Does this project hiive low density areas?
No
4
If so, number of low densl!� drainage areas _
0
Is alf/part of this project subject to previous rule
5
versions?
No
FORMS LOADED
r)PAINA('.F ARFA IMPnIPMATIC)N Entira�gi-ter'
—4 Type of SCM
- 5 Total drainage area (sq fl)
Wet Pond
- 165528
185528
7
0n;Tit-e-drainage area (sq fl)
-6
7 Offsite drainage area (sq ft)
8 Total BUA in project (��ft)
New BUA on subdivided lots (subject to permitting)
9 (Eq_ft)
114998sf
1
New BUA not on subdivided lots Fsub—jec;t to
permittina) (sf)
114998sf
I I
Offsite 8 A (sq ft)
12
Breakdown of new BUA not on subdivided lots:
- Parking (s- ftL__
96944 sf
- Sidewalk (s
3623 sf
- Roof (sq ft)
14431 sf
- Roadway (sq
- FutureisqB
—below(
- Other, please specify in the comment box
ft) ___
13
New infiltrating permeable pavement on
subdivided lots (sq ft)
14
New Infiltrating permeable pavement not on
subdivided lot§,_fsq ft)
15
1�il�sting BUA that will remain (not subject to
1permittin )_tqqftL_
16
Existing BUA that is already permitted (sq ft)
17
Existing BUA that will be removed
18
Percent BLIA
69%
1.0 in
9314 cf
19
Design stqn�lnches)__
volume of SCIVI (cu ft)
.20 JDesign
21 Calculation method for design volume Simple Method
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(sy
WETPOND
RUrainage area number
211 Minimum required treatment volume (cu ft)
GENERAL MDC FROM 02H .1050
Yes
3; Is the SCM sized to treat the Sw �orn all surfaces at build -out? -7-
4 is the SCM away from contarni not soils?
5 '[What are the side slo
_pea of the SCM (H-.V)?
6 Does; the SCM have retaining walls, gabion walis or other engineered
side slopes 7
—7] Are -the inlets, outlets, and receiving stream protected from erosion
—.(Ip-year storm)?__
8 1 Is there an overflow or bypass for inflow volume in excess of the
:design volume?
9 What is the met�w dewatering the SCM for maintoriance?
fE�
10 if jpli4 - heSCMbec ar�ed out after construction?
CIe,_will the
ii 7boes the maintenance access comp-ly-with General MCC (8)?
12 Does the drainage easemen com.
- t ply with General MDC�_(9)?
13�If the SCM 'is on a single family lot, does (will?) the plat comply with
G,rieira MDC (10)?
14 Is there an O&M Agreement that complies with General MDC (11)?
151 Is ere an O&M Plan that complies with GeneraFMDC ("2 ?
10Des the SCM follow the device senACMPIC-L-
171 Was the SCM designed by an NC licensed professional?
kNET P-6ND'MDCjFft0-M 02'H
18 Sizing method used
19 L.Has a stagelstoraq ided in the calculations?
� Elevation of the excavated main pool depth (bottom of s it
20
.1; re
21 � Elevation of the main pool bottom (top of sediment removal) (fmsI)
22 1. Elevation of the.bottorn of the vegetated shelf (fmsI)
i3� bwation of the permanent pool (fms])
24 � Elevation of the top of the vegetated shelf (firrist)
25,1 -Etevation of the temporary pool (fmsl)
26 Surface area of the main permanent pool (sq�are feet)-_
27 V-0-1—ume -o-f —the ma -in- t
1p�r
- . _T�nent pooh(cubic.fee
28: Average depth of the main pool (feet)
29 Average dep4h equation used
30 If using e�uation 3, main pool perimeter feet)
31 If using equation 3, width of submerged veg. shelf feet)
32, Volume of the forebay (cubic feet)
33]-IsO isl -20% of the volume in the main pool?
1�1�1e�n�ut depth for forebqy ino
L
35 1 Design volume of SCM (cu ft)
361 Is th�-o—utlet an -o—dfice or a weir?
37i iforifice, orifice diameter (inches)
Yes
3:1
No
Yes
Yes
Pump (preferred)
Yes
Yi
Y1
Yes
Yes
Yes
Yes
253.00
254,00
259�00_
259.00
260.00
260.34
4173
16253 cf
3.90 R
Equation 2
3099d
Yes
12 in
52516 of
Orifice
.38i If weir, weir height (inche�
39 ' I wei, w " length
740t5r:a�wd1wri'tirri, for th ry 3
_pool (days)
Are the inlet(s) and outlet located in a manner that avoids short-
411 - ... -- YeB
Are k>erms or baffles provided to improve the flow path?
Det"Jorebay at entrance ( , inches)
Pep" forebay at exit (inches)
Does water flow out of the forebe in a non -erosive menner7.
Wid�the�eqetated_�Ihelf (feet)
Slope vegetated shelf (H;V)
Does the orifice drawdown from below the top surface of the
Does the pond minimize impacMts to the receiving channel from the 11-
so Are fountains proposed? (If Y, please provide documentation that
— i M09�Us MSCL— — — - — — — — - —
51 FI.. trash rack or other device provided to protect the outlet system?
the darn and embankment planted in non -dumping turf gross?
F-53 Sped�of tur'f thaTW116sused on the dam and embankment
Has a planting plan been proviidpqfq�tha� vegqta�ed shelf?
ADDITIONAL INFORMATION
55 Please use this space to provide any additional information about the
wet pond(s):
No
36 in
yes
6 ft
Yes
Yes
No
Yes.
yes
Yes
wet?Qnd 1 9:40 PM 5/19/2021
LEVEL SPREADER - FILTER STRIP (LS-FS)
1 Drainage area number - I I
2 Design flow rate of SCM (cfs) 1 1.50
the SCM sized to treat -the SW from all surfaces at build -out? Yes
Is the SCIVI located away from contaminated soilv__ Yes
What are the side slopes of the SCM_(t.A?__ N/A
Does the SCM have retaining walls, gabion walls or other engineered N/A
side slopes?
4
5
6
7
—_(I
Are the inlets, outlets, and receiving stream protected from erosion
Q7year storm)?
Yes
8 � Is there an overflow or bypass for inflow volume in excess of the
design �Iume?
Yes
9 Wh-at is the method for dewatering the SCM for maintenance?
NIA
NIA
10! If applicable, will the SCM be cleaned out after construction?
11. Does the maintenance access comply with General IVIDC (8)�
Yes
12 Does the drainage easement complTwithGeneral MDC (9)?
Yes
13 If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
14i! Is there an O&M Agreement that complies with General MDC (11)?
Yes
15:
Is there an O&M Plan that complies with General ----Yes
16 Does the SCM follow the device specific IVIDC? Yes
17 Was the SCM desl9red by an_NC licensed professional? yes—
LS-FS MDC FROM 02H.1059
1 . 8 1:
Length of level spreader (feet)
20 ft
19
Does the LS-FS reoeive flow from the drainage area or another
SCM?
Yes
20
Flow rate to LS-FS during desi.9n storm (cfs)
21
is a bypass devioe provided?
No
22
If ye , what Is the b)Tass device?
23
Ithe
Is this LS-FS designed to reoeive flow from the drainage area during
10-year storm?
241
Has a blind swale been Provided?
yes
25
5
Does the blind swale provide for uniform overtopping of the level
s reader?
Yes
26
What material will be used for the level spreader?
Concrete
27 Will the construcUon tolerance be < 0.25 inch along the level
spread r length?
Yes
28 Will -the level spreader be straight or convex in plan view?
Yes
29 Height of the drop from the level spreader to the transition zone
(inches)
3 In
24 In
—
30 Width of the transition zone (inches)
31 Protection for the transition zone
e
32, Width Otht_filt�r s!E!p (feet)
___�kq_qje
30 ft
331
Is the filter strip free of draws and channels?
Yes
34�
Has this been verified in the field?
35 Slope of the filter sbrip (%)
5%
36 Is this slope uniform across the entire filter strip?
Yes
37 Will the first 12" of soil be adjusted if needed to promote plant
growth?
Yes
38 Will the filter strip and side slopes be planted with non -clumping,
I deep-rooted sod?
Yes
39 1 Species of sod that will be used
Bermuiia or —Tall —
Fescue
Yes
40 Will soil be temporarily stabilized until permanent vegetation is
established?
ADDITIONAL INFORMATION
41 Please use this space to provide any additional information about the
level spreader -filter strip(s):
Lev-el spreideFis designed to handle the 1 0-year storm therefore bypass
piping Is not required.
LS-FS 1 8:04 PM 5/19/2021
WET POND CALCULATIONS
WATER QUALITY POND DESIGN CALCULATIONS
AREA SUMMARY
PERMANENT POOL SIZING
acres
sf
Permanent Pool 16253 cf
Drainage Area 3.8
165528
Permanent Pool 4173 sf
Pervious Area 1.16
50530
Average Depth 3.9 ft
Impervious Area 2.64
114998
ENTER SA/DA TABLE WITH 4.0'
Impervious Cover 69%
RUNOFFVOLUME
Simple Method
RUNOFF COEFFICIENT CALCULATION
R,=0.05+0.9*[A
R,=Runoff coeefficient (runoff (in)/rainfall (in), unitless
IA=Impervious fraction
Rv� 0.675263
VOL UAM CAL C ULA TION
V=3630*RD*Rv*A
V=Volume to be controlled for the design Storm (ft)
Rj�=Design Rainfall Depth (in) 1.0" or 1.5"
A=Watershed Area (acres)
Rainfall Capture Depth I inch
Runoff Volume 9314.58 ef
SA/DA (from tabie) 2.3 Piedmont
Minimum Area 3724 sf
Permanent Pool Area 4173 sf
Permanent Pool Area Acceptable
1
PERMANENT POOL STAGE -STORAGE TABLES
AMNPOND
Area
Incremental
Cumulative Volume
Elevation
(sf)
Volume (cf)
(cf)
Bottom of Sediment Storage 253
1421
Bottom of Pond 254
1804
1613
1613
255
2218
2011
3624
256
2661
2440
6063
257
3134
2898
8961
258
3639
3387
12347
Permanent Pool 259
4173
3906
16253
FOREBAY
Elevation Area Incremental Cumulative Volume
(sf) Volume (cf) (cf)
Bottom of Sediement Storage
255
Bottom of Forebay
256
472
236
236
257
750
611
847
258
1123
937
1784
Permanent Pool
259
1507
1315
3099
Permanent Pool Total
16253
cf
Forebay to Main Pond
19.1%
OK
TEMPORARY POOL
STAGE -STORAGE TABLES
AUINPOND + FOREBAY
Incremental
Elevation
Area
Cumulative Volume
Volume
Permanent Pool
259
5680
0
260
8231
6956
6956
261
9712
8972
15927
262
11305
10509
26436
263
13012
12159
38594
264
14832
13922
52516
2
DRAW DOWN CALCULATIONS
OFMCECALCULMONS
Q�CD*A*V(2*g*Ho) Q=Discharge Rate (cfs)
A= Area of orifice Of) g=Acceleration of gravity
Ho --Driving Head fTom orifice centroid to water surface (typically use
HO/3 for decreasing head)
Coefficient of Discharge
Orifice Size
Orifice Size
Orifice Area
Temporary Pool Head
Driving Head
Discharge Rate
DRAWDOWNPERIOD
Discharge Time
0.6
1.5 in
0.13 ft
0.012 sf
1.26 ft
0.399 ft
0.037 cfs
2.9 Days
LEVEL SPREADER CALCULATIONS
Level Sreader Calculations
Receives flow from Wet Pond
I 0-year storm flow
1.5
cfs
Minimum Level Spreader Length
I 01/cfs
15
ft
Actual Length
20
ft
Vegetated Filter Strip Width
30
ft
Transition Zone Width
24
in
Transition Zone Material
#57 Stone
Vegetated Filter Strip Slope
4.80%
RUNOFF CALCULATIONS
Table of Contents Project Name:
Hydrology Studio v 3.0.0.19 05-19-2021
BasinModel Schematic ...................................................................................................................................... I
Hydrographby Return Period ............................................................................................................................ 2
1 -Year
HydrographSummary .................................................................................................................................. 3
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, Pre Development ................................................................................. 4
Hydrograph No. 2, NRCS Runoff, Post Development ................................................................................ 5
HydrographNo. 3, Pond Route, Wet Pond ............................................................................................. 6
DetentionPond Reports - Wet Pond 1 ....................................................................................... 7
2 - Year
HydrographSummary ................................................................................................................................ III
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, Pre Development ............................................................................... 12
Hydrograph No. 2, NRCS Runoff, Post Development .............................................................................. 13
Hydrograph No. 3, Pond Route, Wet Pond ............................................................................................ 14
10 - Year
HydrographSummary ................................................................................................................................ 16
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, Pre Development ............................................................................... 16
Hydrograph No. 2, NRCS Runoff, Post Development ............................. I ... I ............................................ 17
Hydrograph No. 3, Pond Route, Wet Pond ............................................................................................ 18
100 - Year
HydrographSummary ................................................................................................................................ 19
Hydrograph Reports
Hydrograph No. 1, NRCS Runoff, Pre Development ................................................................................ 20
Hydrograph No. 2, NRCS Runoff, Post Development .............................................................................. 21
HydrographNo. 3, Pond Route, Wet Pond ............................................................................................ 22
Basin Model Project Name.
Hydrology Studio v 3.0.0.19 05-19-2021
Pre DevelopmW Post Dwdopmerd
Wet Pond
Hydrograph by Return Period
Hydrology Studio v 10.0.19
Project Name:
05-19-2021
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak Outflow (ds)
I-yr
2-yr
3-yr
6-yr
10-yr
25-yr
50-yr
100-yr
I
NRCS Runoff
Pre Development
0.293
1.439
6.431
17.19
2
NRCS Runoff
Post Development
11.32
14.84
24.20
38.80
3
Pond Route
Wet Pond
0.269
0.617
1.272
27.43
Hydrograph 1 -yr Summary
Hydrology Studio v 3.0.0.19
Project Name:
05-19-2021
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(ds)
rime to
Peak
(hm)
Hydrograph
Volume
(CUM
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(Cuft)
I
NRCS Runoff
Pre Development
0.293
12.03
2,299
2
NRCS Runoff
Post Development
11.32
11.97
23,132
—
3
Pond Route
Wet Pond
0.269
15.30
14,248
2
261.01
16,065
Hydrograph Report Project Name.
Hydrology Studio v 3.0.0.19
Pre Development
05-19-2021
lw,�,L �,
Hydrograph Type = NRCS Runoff Peak Flow = 0.293 cfs
Storm Frequency = 1-yr Time to Peak = 12.03 hrs
Time Interval = 1 min Runoff Volume = 2,299 cuft
Drainage Area = 3.8 ac Curve Number = 55
Tc Method = User Time of Conc. (Tc) = 5.0 min
Total Rainfall = 2.87 in Design Storm = Type 11
Storm Duration = 24 hrs Shape Factor = 484
QP 0.29
ds
0.3-
0.28-
0.26-
0.24-
0.22-
0.2-
0.18-
0.16-
0.14-
0.12-
0.1-
0.08-
0.06-
0.04-
0.02-
0 . . . . . . . . .
0 1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Time (hrs)
F1
Hydrograph Report Project Name.
Hydrology Studio v 3.0.0.19 05-19-2021
Post Development
Hydrograph Type
= NRCS Runoff
Peak Flow
= 11.32 cfs
Storm Frequency
= 1-yr
Time to Peak
= 11.97 hrs
Time Interval
= I min
Runoff Volume
= 23,132 cuft
Drainage Area
= 3.8 ac
Curve Number
= 87*
Tc Method
= User
Time of Conc. (Tc)
= 5.0 min
Total Rainfall
= 2.87 in
Design Storm
= Type 11
Storm Duration
= 24 hrs
Shape Factor
= 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
1.16 61 Pervious
2.64 98 Impervious
3.8 87 VVeighted CNI Method EnVloyed
1
1
1
QP = 11.32 cfs
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Time (hrs)
6
Hydrograph Report Project Name:
Hydrology Studio v 3.0.0.19 05-19-2021
Wet Pond
Hyd. No. 3
Hydrograph Type
= Pond Route
Peak Flow
= 0.269 cfs
Storm Frequency
= 1-yr
Time to Peak
= 15.30 hrs
Time Interval
= 1 min
Hydrograph Volume
= 14,248 cuft
Inflow Hydrograph
= 2 - Development
Max. Elevation
= 261.01 ft
Pond Name
= Wet Pond I
Max. Storage
= 16,065 cuft
Pond Routing by Storage Indication Method
Center of mass
detention tirne= 11.88 hrs
E
E
L
;9
cr
Qp = 0.27 cft
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
Time (hrs)
— Development — Wet Pond
6
Pond Report
Hydrology Studio v 3.0.0.19
Wet Pond 1
LU
User Defined Contours
Description Input
Stage
Movation
(ft)
(ft)
Bottom Elevation, It 259.00
0.00
259.00
Voids 100.00
1.00
260.00
Volume Calc None
2.00
261.00
3.00
262.00
4.00
263.00
6.00
264.00
Stage -Storage
Project Name:
05-19-2021
Stage -Storage
Stage I Storage Table
ContourArea
Incr. Storage
Total Storage
(sqft)
(Cuft)
(Cuft)
5,680
0.000
0.000
8,231
6,956
6.956
9,712
8,972
16,927
11,305
'10,609
26.436
13,012
12,159
38,594
14,832
13,922
52,516
0 5000 10000 15000 20000 25000 30000 35000 40000 45000 50000
Total Storage (cuft)
Contours — Top of Pond
w
a
7
Pond Repoft Project Name:
Hydrology Studio v 3.0.0.19 05-19-2021
Wet Pond 1 Stage -Discharge
Orifices
Culvert I Orifices
Culvert
Orifice Plate
Rise, in
15
1.5 3
Odfice Dia, in
Span, in
15
1.5 10
No. Orifices
No. Barrels
I
1 1
Invert Elevation, ft
Invert Elevation, ft
259.00
259.01 260.85
Height ft
Orifice Coefficient, Co
0.60
0.60 0.60
Orifice Coefficient Co
Length, ft
55.6
Barrel Slope, %
1
N-Value, n
0.013
Weirs
Weirs
Riser*
Ancillary
1 2 3
Shape / Type
Box
Broad Crested Rectangular
Extiltration, in/hr
Crest Elevation, ft
263.15
262.5 262.3
Crest Length, ft
16
20 3
Angle, deg
14 (4:1)
Weir Coefficient Cw
3.3
3.3 3.3
1
'ftUtW thioWh C~.
Stage -Discharge
264
263
262
261
260
259
5
3
0
2
1
0
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170
Discharge (ds)
Top of Pond — Culvert — Piser — Orifice — Broad Crested —Orifice —Total Q
i
=31VTOM
Hydrology Studio v 3.0.0.19
Wet Pond 1
Project Name:
OS-19-2021
Stage -Storage -Discharge Summary
Stage
(ft)
Elev.
(ft)
Storage
(cuft)
Culvert
(cfs)
Orifices, ds
Riser
(ds)
Weirs, cfs
Pf Riser
WS)
Exfil
We)
User
(cfs)
Total
I (cfe)
1
2
3
1
2
3
0.00
259.00
D.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.00
260.00
6,956
0.056 ic
0.056
0.000
0.000
0.000
0.000
0.056
2.00
261.00
15,927
0.244 ic
0.079
0,165
0.000
0.000
0.000
0.244
3.00
262.00
26,436
1.109 Ic
0.093
1.016
0.000
0.000
0.000
1.109
4.00
263.00
38,594
1.536 ic
0.109
1,427
0.000
25.20
0.000
26.74
5.00
264,00
52,516
12.25 oc
0.000
0.000
0.000
150.3
0.000
162.6
Suft key. ic - MAN coftd. 0c - MW conW, s - subImMad weir
Pond Report Project Name:
Hydrology Studio v 3.0.0.19 05-19-2021
Wet Pond 1 Extended Detention
Stage (ft)
Ln I:J
tn
00
Co
Ln
P-
tn
E
E
Ln
L.A
C
r
Un
E
r
0
0-
to
Ln
6
Ln
Cy
X
M
12
Ln
U
>
a
M. 14 0 ON
to U) Ln
N N N (1)) A913
C\I
10
Hydrograph 2-yr Summary
Project Name:
05-19-2021
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(Cfs)
Time to
Peak
(hm)
Hydrograph
Volume
(Cuft)
Inflow
Hyd(s)
Maximum
Elevation
(11)
Maximum
Storage
(Cuft)
I
NRCS Runoff
Pre Development
1.439
12.00
4,775
2
NRCS Runoff
Post Development
14.84
11.95
30,662
—
3
Pond Route
Wet Pond
0.617
13.38
21,681
2
261.26
18,678
tT
Hydrograph Report Project Name:
Hydrology Studio v 3.0.0.19 05-19-2021
Pre Development Hyd. No. I
Hydrograph Type
Storm Frequency
Time Interval
Drainage Area
Tc Method
Total Rainfall
Storm Duration
= NRCS Runoff
= 2-yr
= 1 min
= 3.8 ac
= User
= 3.47 in
= 24 hrs
Peak Flow
Time to Peak
Runoff Volume
Curve Number
Time of Conc. (Tc)
Design Storm
Shape Factor
= 1.439 cfs
= 12.00 hrs
= 4,775 cuft
= 55
= 5.0 min
= Type 11
= 484
QP 1.44 ds
2-
1.9-
1.7-
1.6-
1.4-
1.3-
1.2-
0.9-
0.8-
0.7-
0.6-
0.5-
OA-
0.3-
0.2-
0.1
01
. . . . . . . .
0 2
3 4 5 6 7 8
9 10 11 12 13 14 15 16 17 18 19 20
21 22 23 24 25
Time (hrs)
12
Hydrograph Repoft Project Name.
Hydrology Studio v 3.0.0.19 05-19-2021
Post Development
Hyd. No. 2
Hydrograph Type
= NRCS Runoff
Peak Flow
= 14.84 cfs
Storm Frequency
= 2-yr
Time to Peak
= 11.95 hrs
Time Interval
= 1 min
Runoff Volume
= 30,662 cuft
Drainage Area
= 3.8 ac
Curve Number
= 87*
Tc Method
= User
Time of Conc. (Tc)
= 5.0 min
Total Rainfall
= 3.47 in
Design Storm
= Type 11
Storm Duration
= 24 hrs
Shape Factor
= 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
1.16 61 Pervious
2.64 Be Impervious
3.9 al Walghted CN Method Employed
Op = 14.84 ds
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Time (hrs)
13
Hydrograph Report
Hydrology Studio v 3.0.0.19
Project Name.
05-19-2021
Hyd. No. 3
Hydrograph Type
= Pond Route
Peak Flow
= 0.617 cfs
Storm Frequency
= 2-yr
Time to Peak
= 13.38 hrs
Time Interval
= 1 min
Hydrograph Volume
= 21,681 cuft
Inflow Hydrograph
= 2 - Development
Max. Elevation
= 261.26 ft
Pond Name
= Wet Pond I
Max. Storage
= 18,678 cuft
Pond Rouhng by Storage Indication Me#W
Center of mass detention time = 8.75 hrs
QP = 0.62 cfs
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
Time (hrs)
— Development — Wet Pond
14
Hydrograph 1 0-yr Summary
Hydrolociv Studio v 3.0.0.19
Project Name.
05-19-2021
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(Cfs)
71me to
Peak
(hre)
Hydrograph
Volume
(Cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(Cuft)
1
NRCS Runoff
Pre Development
6.431
11.97
14,224
2
NRCS Runoff
Post Development
24.20
11.96
51,281
—
3
Pond Route
Wet Pond
1.272
12.90
42,089
2
262.34
30,598
16
Hydrograph Repoft Project Name:
Hydrology Studio v 3.0.0.19 05-19-2021
Pre Development Hyd. No. 1
Hydrograph Type
Storm Frequency
Time Interval
Drainage Area
Tc Method
Total Rainfall
Storm Duration
= NRCS Runoff
= 1 0-yr
= I min
= 3.8 ac
= User
= 5.04 in
= 24 hrs
Peak Flow
Time to Peak
Runoff Volume
Curve Number
Time of Conc. (Tc)
Design Storm
Shape Factor
= 6.431 cfs
= 11.97 hrs
= 14,224 cuft
= 55
= 5.0 min
= Type 11
= 484
QP 6.43 ds
7-
6-
5-
4-
0
3-
2-
ml
0 1
J I I I I
I I I I I i I I I
0 1 3
4 5 6 7 8
9 10 11 12 13 14 15 16 17 18 19 20
21 22 23 24 25
Time (hrs)
16
Hydrograph Report Project Name:
Hydrology Studio v 3.0.0.19 05-19-2021
Post Development
Hyd. No. 2
Hydrograph Type
= NRCS Runoff
Peak Flow
= 24.20 cfs
Storm Frequency
= 1 0-yr
Time to Peak
= 11.95 hrs
Time Interval
= 1 min
Runoff Volume
= 51,281 cuft
Drainage Area
= 3.8 ac
Curve Number
= 87*
Tc Method
= User
Time of Conc. (Tc)
= 5.0 min
Total Rainfall
= 5.04 in
Design Storm
= Type 11
Storm Duration
= 24 hrs
Shape Factor
= 484
* Composite CN Worksheet
AREA (ac) CN DESCRIPTION
1.16 61 Pervious
2.64 98 Impervious
3.8 07 Weighted CN Method Employed
Op = 24.20 cfs
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Time (hrs)
17
Hydrograph Report
Hydrology Studio v 3.0.0.19
Project Name:
05-19-2021
Hyd. No. 3
Hydrograph Type
= Pond Route
Peak Flow
= 1.272 cfs
Storm Frequency
= 1 0-yr
Time to Peak
= 12.90 hrs
Time Interval
= I min
Hydrograph Volume
= 42,089 cuft
Inflow Hydrograph
= 2 - Development
Max. Elevation
= 262.34 ft
Pond Name
= Wet Pond I
Max. Storage
= 30,598 cuft
Pond Routing by Storage Indication Method
Center of mass detention time = 6.64 hsJ
QP = 1.27 dr,
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
Time (hrs)
— Development — Wet Pond
18
Hydrograph 1 00-yr Summary
Project Name.
05-19-2021
Hyd.
No.
Hydrograph
Type
Hydrograph
Name
Peak
Flow
(Cfs)
Time to
Peak
(hrs)
Hydrograph
Volume
(Cuft)
Inflow
Hyd(s)
Maximum
Elevation
(ft)
Maximum
Storage
(Cuft)
I
NRCS Runoff
Pre Development
17.19
11.97
34,822
2
NRCS Runoff
Post Development
38.80
11.95
84,834
—
3
Pond Route
Wet Pond
27.43
12.02
75,406
2
263.01
38,707
19
Hydrograph Report Project Name:
Hydrology Studio v 3.0.0.19 05-19-2021
Pre Development Hyd. No. I
Hydrograph Type
Storm Frequency
Time Interval
Drainage Area
Tc Method
Total Rainfall
Storm Duration
= NRCS Runoff
= I 00-yr
= I min
= 3.8 ac
= User
= 7.50 in
= 24 hrs
Peak Flow
Time to Peak
Runoff Volume
Curve Number
Time of Conc. (Tc)
Design Storm
Shape Factor
= 17.19 cfs
= 11.97 hrs
= 34,822 cuft
= 55
= 5.0 min
= Type 11
= 484
QP 17.19 ds
19-
18-
17-
16-
15-
14-
13-
12-
11-
:910-
9-
8-
7-
6-
5-
4-
3-
2-
1-
J
. . . . . . .
r-r-r-r-r
. . . . . . . . . . . . . . . . . . . .
. . . . .
0 1 2 3
4 5 6 7 8
9 10 11 12 13 14 15 16 17 18 19 20
21 22 23 24 25
Time (hrs)
20
Hydrograph Report Project Name.,
Hydrology Studio v 3.0.0.19 05-19-2021
Post Development
Hyd. No. 2
Hydrograph Type
= NRCS Runoff
Peak Flow
= 38.80 cfs
Storm Frequency
= I 00-yr
Time to Peak
= 11.95 hrs
Time Interval
= I min
Runoff Volume
= 84,834 cuft
Drainage Area
= 3.8 ac:
Curve Number
= 87*
Tc Method
= User
Time of Conc. (Tc)
= 5.0 min
Total Rainfall
= 7.50 in
Design Storm
= Type 11
Storm Duration
= 24 hrs
Shape Factor
= 484
* Composite CN Worksheet
AREA (sc) CN DESCRIPTION
1.16 61 Pervious
2.64 98 Impervious
3.8 87 Weighted CNI Method Employed
cr
Op = 38.80 ds
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Time (hrs)
117
Hydrograph Report
Hydrology Studio v 3.0.13.19
Wet Pond
Project Name:
05-19-2021
Hyd. No. 3
Hydrograph Type
= Pond Route
Peak Flow
= 27.43 cfs
Storm Frequency
= 1 00-yr
Time to Peak
= 12.02 hrs
Time Interval
= 1 min
Hydrograph Volume
= 75,406 cuft
Inflow Hydrograph
= 2 - Development
Max. Elevation
= 263.01 ft
Pond Name
= Wet Pond 1
Max. Storage
= 38,707 cuft
Pond Routing by Storage fridication Method
Center of mass detention time = 2.99 hts
QP = 27.43 cfs
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1S 16 17 18 19 20 21 22 23 24 25 26 27
Time (hrs)
-- Development ---- Wet Pond
22
PIPE NETWORK CALCULATIONS
CL
LA
VI
CD
a
2
Ln
.2
Co
Q- NO
C-4
le
cn
CL
L"I
CD
CD
E
w
z
CL
c:
CD CD C) C) CD 0
C) CD CD CD CD CD 0 0 C) 0
In r-� L6 c3i r-�
P- co to (0 (D Lr) U)
IN 04 N 04 C4 C%j C\j 1714 IN IN
C)
U')
co
ul l?6*L9?
193
Ul 1-9,M
191
U')
ul !76'L9Z
193
1 no i
�L'L 97 TD3
ul 1919Z
10H
ul I
L19Z 19H
Ul �
Q'LQ? 11)H
4no �s'LW
TDH
Ul LE'55Z
'13 'AUJ
Ul OO'Lg?
'1� 'ALJI
ul LE'557'13
'AUJ
r-n,o:a7
T4 WIA
LO
C)
ce)
LU
0
C)
193
_0
S'
10H
.9?
00'6S�
'13 'AUJ
OS19Z
13 'PUJE)
I lepno - c
0+0 L21S
CD
0
0
0
0 CD
C)
C) 0 0 a
0 C)
C)
0
0 C)
C) 0 C) C)
> U� cli
6 P-�
L6
cli 0) t-�
r-- I--
C14 (N
r--
CN
co
IN
to
CA
(D
IN
(D UD U') U')
IN CA N C4
L? C3
CD
0
rA
CL
6
E
. 2'
CL
C?
C.
1 .2
0 C) CD C) CD
C� C� C� C� C� C� C� C�
CY) m U'j cr) 0)
I— f-- (0 (o w (0 CD LO LO
N 04 C\l 04 N C\l N N N
ul 6L'e9r 103 C)
ino Eq,Zq!
IE)]
00
m
ul �TZ91.'
19H
InO SE79-7
19H
Ul ES"09Z'3
'AUJ
r)O'aV'09? '
3 'AUJ
C>
0 VV9? 'I
I W N
i:-go
- g,g94
L ejS
CD
CD
CIA
CD
U')
CD
00
bD
to
CD�
co
ul
E619Z 1E)l
4nC
Eg,ZgZ 193
ul
6919Z 19H
ino
U79Z lE)H
C�
ul t
"'6SZ '13
Ul 0
YM '13 'AUJ
L)
ul L
"6SZ '13 'AUJ
MO 9
!'65Z '13 'AU]
U)
STSK
*13 LuN
_0
N30
- 00+0 IBIS
0 C) CD C) C) C:) CD Q C)
CD C:) C) 0 C) CD CD CD
> C'i t-� t6 C15 6 r-�
Q)
rl- (D to w (o LO LO
UJ C14 N N CN C\l N N N N
CD
r1i
CL
6
C3
M
z
CIO
CL C�
_0
0
L
CD a 0 0 0 0 0
C� C� C? C� C� C? q C� C� C�
U') co CD I- M m 0) r—
F- P.- r., C.0 (D (D C-0 CD U') Ln
N C14 N N N N N N N N
i C) C
N L)
CD
ino LS'E97ID3
4110 STEW IDH
.. -- ..". C>
'AWI
ine
F.
0 o,v9z T
wl Nd
H
J - V6
131S
C)
01)
C)
LO
C)
co
0
C) LL
LO
0
It
0
C>
CD
ul 6L 9
193
4110
� S:-z,9Z
193
ul FS79?
!DH
CD
41
u W E96
it)FF-
Ul
FS'097'I'
'AUI
U)
Ino
Bt7'09? 'I:
'AUI
c
01179z,13
wN
(D
Z-
90 - 00+(
eis
c) (n 0 0 CD 0 0 C) C) C)
C� q q q C? C� C? q 9 q
> r- U) ce) C3) I,- U*) CIO cr) r-
-2 rl- fl- rl- r- �o f.0 (D (0 CD U-) LO
LLJ cli C%4 N N N N cq N 04 rq C4
Ln
CD
0
CD
E
ci
2
a-
N
0 0 0 0 0 CD C) C) 0 0
C) C) C) C) C CD CD 0 CD 0 C:) CD
0) P-: L6 C6 r-1: L6 cli
to CD co to flo LO LO
C\1 N N N N CN
CD L)
N m
Ino EE197
103
LZ
1no 9S
E9Z 19H
no 66771)?
'13 'AUJ
0
001S
F *13 WW_j
co
Z-10 S,
36+L 81S
CD
C14
C!
C)
C)
w
CID
(0
C)
U1 LS'L9?
ISO
;no WER
193
ul LLU9Z
IDH
1no 9SUZ
19H
;Z -!� 'Atli
CD
Ul 001
Z'13 'AUJ
ul LE'6
Z'13'ALJI
mo 92'6
? '13 'AUJ
SO'S
B WN
CD
�-83 -
)0+0 EIS
CD 0 C) CD C� CD CD
C) CD CD CD CD C) CD to CD CD
> co L6 C�i
N cq N N CN CN N N CN