Loading...
HomeMy WebLinkAbout20210465 Ver 1_2019-01242 NWP 14 Tearsheet_20210601 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id.SAW-2019-01242 County:Rockingham U.S.G.S. Quad:NC-Ruffin GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: NCDOT Division 7 Attn:Wright Archer III,PE Address: PO Box 14996 Greensboro,NC 27415 Size(acres) —4 Nearest Town Ruffin Nearest Waterway Wolf Island Creek River Basin Roanoke USGS HUC 03010103 Coordinates 36.498441,-79.541754 Location description: The project area is located at NCDOT Bridge 106 over Wolf Island Creek on SR 1902(Dibrell Road), near Ruffin,in Rockingham County,North Carolina. Description of projects area and activity:This verification authorizes the discharge of clean fill material associated with replacing an existing bridge(Bridge 106 on SR 1902)in place.The project includes permanent impacts to 0.046 acre(280 linear feet)of stream channel(bank stabilization—no permanent loss)and 0.003 acre of riparian non-riverine wetlands (mechanized clearing),and temporary impacts to 0.030 acre(83 linear feet)of stream channel for construction access and dewatering including a temporary work causeway. Applicable Law(s): ©Section 404(Clean Water Act,33 USC 1344) ❑Section 10(Rivers and Harbors Act,33 USC 403) Authorization: Regional General Permit Number and/or Nationwide Permit Number:NWP 14 Linear Transportation Projects SEE ATTACHED RGP or NWP GENERAL,REGIONAL AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 4/30/2021, and the enclosed plans, Surface Water Impacts Permit, Permit Drawing Sheets 1 through 6, received via email on 4/30/2021.Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order,a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified,suspended or revoked. If,prior to the expiration date identified below,the nationwide and/or regional general permit authorization is reissued and/or modified,this verification will remain valid until the expiration date identified below,provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit,activities which have commenced(i.e.,are under construction)or are under contract to commence in reliance upon the nationwide and/or regional general permit,will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration,modification or revocation,unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act(CAMA),prior to beginning work you must contact the N.C.Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,State or local approvals/permits. If there are any questions regarding this verification,any of the conditions of the Permit,or the Corps of Engineers regulatory program, please contact David E.Bailey at(919)554-4884 X 30 or David.E.Bailey2@usace.army.mil. Date:2021.06.01 11:35:00 Corps Regulatory Official: 04'00' Date: 6/1/2021 Expiration Date of Verification: 03/18/2022 SAW-2019-01242 SPECIAL CONDITIONS 1. The U.S. Fish and Wildlife Service's (USFWS's) Programmatic Biological Opinion (PBO) titled, "NCDOT Program Effects on the Northern Long-eared Bat in Divisions 1-8", dated November 6, 2020, contains agreed upon conservation measures for the NLEB. As noted in the PBO, applicability of these conservation measures varies depending on the location of the project. Your authorization under this Department of the Army permit is conditional upon your compliance with all applicable agreed upon conservation measures in the PBO,which are incorporated by reference in this permit. Failure to comply with the applicable these conservation measures would constitute non-compliance with your Department of the Army permit. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its PBO, and with the ESA. Date: 40 -04 00' Corps Regulatory Official: 1 1:34: 0 041.06.01 ' Date: 6/1/2021 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public.To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Copy furnished: Jerry Parker,NCDOT,P.O.Box 14996,Greensboro,NC.27415-4996 Ryan Conchilla,NCDEQ-DWR, 1617 Mail Service Center,Raleigh,NC 27699-1617 I lighwdy North Carolina Department of Transportation / Storzil Vater- Highway Stormwater Program ^, ; STORMWATER MANAGEMENT PLAN \\ (Version 2.07;Released October 2016) FOR NCDOT PROJECTS WBS Element: 17BP.7.R.126 TIP No.: B-5355 County(ies): ROCKINGHAM Page 1 of 1 General Project Information WBS Element: 17BP.7.R.126 TIP Number: B-5355 Project Type: Bridge Replacement Date: 3/1/2021 NCDOT Contact: Galen Cail Contractor/Designer: David Holmes Address: 1020 Birch Ridge Address: 1020 Birch Ridge Raleigh,NC 27610 Raleigh,NC 27610 Phone: (919)707-6711 Phone: (919)707-6715 Email: gcail@ncdot.gov Email: dkholmes ncdot. ov City/Town: County(ies): ROCKINGHAM River Basin(s): Roanoke CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length(lin.miles or feet): 612' Surrounding Land Use: RURAL Proposed Project Existing Site Project Built-Upon Area(ac.) 0.5 ac. 0.5 ac. Typical Cross Section Description: 0.02 Normal Crown 0.02 Normal Crown Annual Avg Daily Traffic(veh/hr/day): Design/Future: 300 Year:2025 Existing: 150 Year: 2012 General Project Narrative: Bridge 780106 is located on SR 1902 in Rockingham County.The existing crossing over Wolf Island Creek on SR 1902(Dibrell Rd.)is a six span bridge(6 @ 30',total length (Description of Minimization of Water 180')with reinforced concrete caps on timber piles(#1-5 crutches:ppc cap&steel piles),and sits at a 90 degree skew. The proposed structure is a four span,4 @ 60'24" Quality Impacts) Cored slab,with a 240'total length.This new bridge will sit at a 90 degree skew on 4.0'high end bent caps,with 42"high concrete bridge barrier rail.The bridge opening will increase from 1406 sq.ft.to 2262 sq.ft.Stream banks will be armored with class II rip rap for bank stabilization.The existing stable ditches will be maintained.Proposed cut ditch south east of the bridge carries 1 cfs of roadside drainage allong the fill slope parallel to an adjacent wetland.Construction of the ditch will cause a minimal amout of mechanized clearing in the wetland.Maximum 2:1 side slopes will be utalized. The proposed project drainage systems include 1 outlet pipe northwest of the bridge.The system outlet discharges 0.9 cfs into the overbank. Deck drains will be utalized in overbanks only,including proposed rip rap swale under deck drains. Waterbody Information Surface Water Body(1): Wolf Island Creek NCDWR Stream Index No.: 22-48 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? No Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) r 1 STATE STATE PROJECT REFERENCE NO. SHEET TOTAL NO. SHEETS N1 \NI i �- x $1� �,,,,�<< < 254 _� 1 .-1 Ilk • ( k lit • \ _ , N.C. 177111 )'1 , \ .126 1 STATE PROJECT NO. ]F..�.]PE®J.NO. DESCRIPTIONI kW • A ‘,,r, • / 171313 1 .12 LVLT1N�; 1::::4 ,. 4,1ry , 1 I • r 4 L I i' 36 101 � '� , .,i • / . . ROCKINGHAM COUNTY ,,,,,,,,a, , 109 \ „/ -4-4 . PIS _, 1 ' 10 - 110 _ - � \' I LOCATION: BRIDGE NO. 106 OVER WOLF ISLAND CREEK ON SR 1902 (DIBRELL ROAD) e1�• / !. TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE ' I... ' eit, .. . d'-'/ Ciii) I I /13 97 183 �'/ ' VICINITY MAP hiamilL11114114 (NOT TO SCALE) • • • • • OFF-SITE DETOUR WETLAND AND SURFACE WATER IMPACTS PERMIT 0,,„,„- -----Nat 1...) es24 . , . \, , \I% r PIS I IY.,' f (4 • *4yJ s BEGIN PROJECT 17BP.7.R.126 .),j }I -L- POT Sta. 12+50.00 BEGIN BRIDGE , ° END BRIDGE -L- Ste. 14+57.00 / k 1 -L- Ste. /5+97.00 6......_ .P11111114 0_I a Y / ., I ' cc O 3 I rillill i 7 Lo // \ END PROJECT 17BP.7.R.126 -few W`g, ! -L- POT Sta. 21+00.00 \, co O C z N_ __— r T y I I � TO U� z-9—�,, I J---L Z SR 1902 15-- x� I / �j5 iy O �, f ./ I - -—— —wLe— — -----——wee. — .-- Z CAI LU f /I �5� ]5� / — -- _ _ w d wiB— Ac \ A 3 K L.L J , END APPROACH SLAB A ,„B -L- Ste. 17+09.00 i ' BEGIN APPROACH SLAB o —L— Ste. 14+45.00 � 'S C -is J$_ o , is, , ED L m to • • C) 0) [114 DOCUMENT NOT CONSIDERED FINAL m UNLESS ALL SIGNATURES COMPLETED coC.) r ' I ' " ' ( Prepared in the Office of Mott MacDonald for 1 ROADWAY DESIGN ENGINEER " PLANS PREPARED BY: E ;..._ _ DESIGN DATA PROJECT LENGTH DIVISION 7 0 PO Box 700 F s NORTH CAROLINA DEPARTMENT OF TRANSPORTATION NORTH C (919) 552-2253 NC27526 2018 STANDARD SPECIFICATIONS WI ti'`' 4�° ADT 2012 = 150 LENGTH ROADWAY TIP PROJECT = 0.115 MILES MACDONALD w08 MOTT 919) 552-2254 ww.mottmacco(max) Ce ��" ADT 2025 = 300TIM JORDAN, PE T2 VIIIII4 ✓� YPROJECT ENGINEER P.E. LETTING DATE: LICENSE NO. F-0669 } SIGNATURE: u o LENGTH STRUCTURE TIP PROJECT = 0.046 MILES HYDRAULICS ENGINEER ik y� V = 55 MPH GALEN CAIL, PE V ? 'S HYDRAULICS ENGINEER O� TOTAL LENGTH TIP PROJECT = 0.161 MILES N a ��� OF TItN'- •'� SUB REGIONAL TIER o E .� LOCAL NCDOT CONTACT: TIM POWERS, PE 0 C111) DIVISION BRIDGE PROGRAM MANAGER P.E. cS � v, J J \ J \ J J J/ SIGNATURE: J ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- PROJECT REFERENCE SHEET NO. 17BP.7.R.126 - ROCKINGHAM 106 DENOTES IMPACTS IN PERMIT D RAW I N G ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER SURFACE WAT E R SHEET 2 OF 6 ///7> DENOTES TEMPORARY IMPACTS IN SURFACE WATER MOTT MACDONALD I& E,LLC MOTT MACDONALD I& E,LLC LICENSE NO. F-0669 LICENSE NO. F-0669 ` DOCUMENT NOT CONSIDERED FINAL �� UNLESS ALL SIGNATURES COMPLETED * * * * DENOTES MECHANIZED �/ Prepared in the * * * CLEARING Office of: M M Box 700 * * * * MOTT Fuquay-Varina,NC 27526 MACDONALD www.mottmac.com --ICO O I O D__)\ \ 1 1 CT 0 Iv( ll W V 1,_? ) ' 1 LU tY W DECK DRAINS REQUIRED 1 v 8 X 6 SLOTS ON 5 CENTERS m y CLASS II RIP RAP B� GIN I V BRIDGE _ UP TO ELEV. 500.2 (TYP.) =L- STA. 14 + 62 TO 15 + 50 LT I (STRUCTURE PAY ITEM) 0. -L - Ste. /4 +5569\ L STA. 14 + 62 TO 15 + 50 RT DECK DRAIN 4 DISSIPATOR PAD I- ND BRIDGI- i 1.0 CLASS B RIP RAP SEE DETAIL C In M EST. 3 TONSRAP ` —L — Steo /6 +980 3/ m EST. 10 SY GEOTEXTILE EST. 40 TONS RIP r EST. 140 SY GEOTEXTILE EXCAVATION NB APPAOAC/ / SLAB EST. 35 CY DDE LIMITS - TEMP. / —L — Ste0 /( +O9 /9 w 15" CSP4 . .,, CAUS / Z Wi'ELBOWS I O SI WOODS ce WOODS > )+ Z *j PDE PDE PDE I 'DE POE ' B E "' 50/ TAPER m _ PbE w .: -,, PDE _-� .-��-�� E E E E E ; Agrail --I 0_ 1 imo ��■.—������LU ������'���►�/►��� tW4tskJ.L. F - - E- - _ - - - - - - - -- - - - - - - - -- - - - - ram' ' tiar. \ !�'���� ^�/ MOMst'i�1r `� �� �tiYYY'r��ti� iid 6� � !.- ��ram_ Na, r�iit 4 ■ A'`� /4��yA r1,1,- atio — i �.. .r 1,. y . wI n 4i r��,//////warnort� /in.mip111iiii► titi T T T T I N, 6 — — TB GI ; ��Asom►�� -Inv-vim���►'��v �rr�1�1�1�1�ate%�,, i��. 4 �����W i!�t A11101 4 W41:91.4111P- - - - Ø • 0 o al . S 46° 07' 31.3" E TB 2 GI - �� �������`�1k,41„������i1,01���!�i~cater , r � •i �ittelem���00 flimitaliatir miaow" 10 ��Ito �,��i�I'/.'.IiM:�MVAVli�iiW�/%�lili►.MW %Wrli�r�R��� 11■W► MVAMf�.� aA?il PINI�_'.►��r Mal•..1�mlir Mt_ rwl"..I_w.afYti3=ti .wiww � r Ar _� pY?' I��I����►/�►_►/�►,'��I- — ►�►►/�►.'T� % �ritYy�ti, �111,�1I�%,�,,, v /'•,••I "'I'M�I�I �, �� dirooman F 'r-- n a..40014000. r* 4444.41ZAkootilleil A",404$41, ill' I' waits . ,r4itr'tittittaill nnn r.r- -(---(7,-77-7-C-7___:rfln— --(- --11— CD - BEGIN SBG F • 1ffiU11i '* * ,�������,� — E 17 + 2 8 LT & RT W 0 0 D S ,y � r �-.�,r.Y.�� , y:� ' , # 4 i0il, AP'-irig§f — ` ' `�� ' ...„-- 0_ NAtjaktolow VP" - * # _____ — CO 'S." , # . — W L B — -- N. 153' W041.3 - BL- • " ���4400 �� Is , . pi) v �. V V V E ' pD g PpE — wL B V s JS F T / — �� 0 - �S TB V� �pE --, �, ,, (, W L B — — — _ �� `/ /I TB �- _ � ' SPECIAL CUT DITCH — — nfl_ 1e �ftE3 � WOODS SEE DETAIL B — — A/LB __ - - - F a �� / v� I I c- �� ( j �� �� ao V BANK STABILIZATION0 4o SITE 2 h SEE DETAIL D rs � - STANDARD V DITCH N } EST. 445 TONS RIP RAP .;, �v6 SEE DETAIL A 25 , 0 25 , 50 , 75 , • o .� EST. 590 SY GEOTEXTILE c� FLJ EST. 25 CY DDE ••••• s EST. 565 CY DDE �F,� �s\ CRAP - C CCq PROJECT REFERENCE SHEET NO. 17BP.7.R.126 - ROCKINGHAM 106 X DENOTES IMPACTS IN PERMIT DRAWING ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER '/ SURFACE WATER SHEET 3 OF 6 ///T/ DENOTES TEMPORARY \ , IMPACTS IN SURFACE WATER MOTT MACDONALD I& E,LLC MOTT MACDONALD I& E,LLC / LICENSE NO. F-0669 LICENSE NO.F-0669 ` DOCUMENT NOT CONSIDERED FINAL �� UNLESS ALL SIGNATURES COMPLETED * * * DENOTES MECHANIZED ...- IPrepared in the � Office M r ' * * CLEARING M PO Box 700 MOTT Fuquay-Varina,NC 27526 MACDONALD www.mottmac.com / /_ /� �� IIIIIIIIII I��I��IIIIII �� \ \ < ! I I\\\\\\\ LEI ������� y; 1 0 �� / I� IIIIIIIII I'�I111111\I ����� %=��� /�% �/ IIIIIIIIII \II1111111\I1, c v vy� -- _ /� / i � IIIIIIIIII �I I I I I I I I I I I � �� / L - - / / ci IIIIIT, 111I I II II I I I/ \ O N��(j III// / N I 11�1', III111I11III. I I , LU v v=_/i � ) � I � V Iljllllll IIIIIIIIIi I "' \ _ � / // vv / ' IIIIIII IIIII\IIII1 I I LLI \ /) \ V I ' llllll�l /111111111 � / \ ,,_ _ � ' / � //IIIIII / 11I1IIII �� �Q � - //i // DECK DRAINS REQUIRED / 1 �/ / illo w �, �, / /IIIIIIIIr / IIIIIII CLASS II RIP RAP Nvv �- \ 2%; 8 8 XX, 6 SLOTS ON 5 CENTERS / ,°PI /1111 I�II�lIIII �, UP TO ELEV. 500.2' TYP. 5 I--G/N BRIDGE _ S I I 111I ( ) I ' I Illl\ \ \\=�Q°viii// i L STA. 14 + 62 TO 15 + 50 C� \ I IIIII I II 1111III \ ��I (STRUCT1 R€, PAY ITEM) _ _ _��� ! - - 5tc0 -L- STA. 14 + 62 TO 15 + 50 R�\ / fillip 111 \ �. — l / III I ' I , \ / I I I II d �� / V / / IIIIIII I� 1IIIIIll -4 - III/ 1 > DECK DRAIN / MJ � I I ��i III \ III I I� v I I I ND BA/DGF - - - CLASS B RIP RAP SEE DETAIL C J ��'\ - - IIIII L 6 1 1 \ I Q M EST. TONS ,'�'� /�'il' v vv,-vv i' I y v Sta. 16 +98.31 �� In S . 3 EST. 40 TONS RIP RAP I I c II 10 \ v y I 18' \ 00 co EST. 10 SY GEOTEXTILE EST. 140 SY GEOTEXTILE EXCAVATION ! I ' 11 V/\ \ \\ I \ I I— /V AFFRO/CI / SIT AB Q EST. 35 CY DDE LIMITS ��1 /� TEMPI\\ III \ \ I - - .. ��; cAUs ', ` ' ' l 5tc0 /(' +Q9 /9 w 15" CSP j ,/\yvvAy \ II \ Ili N III z /� W/ELBOWS SIB V�\I , \iI i,- I "dIP // \r'-' 4 artaitit*, I \ �� I I III )0 -) / \NI ' 1 ' b \ Ibb '',/ 6i :: C I I I w j AA — \ PDE PDE I PDE .pE E 1 I. ' N 11�p �0 TAPER v v mil° .�,tib's*tii:iLykAlti‘41 \ E E E E ,dittirlitiall 46 / /,'-‘ " Mt Iii lie , . , , -- -- - -F- - - - - - - _ __----=-------____4 _ ____„,__ CL — ---T% ----_- --Y/ _coy-- ' ----- ---- 4N, ' — ii .11111MAic-w_N.Air. --W. ALAN....4b.A. AkAak ...Alk_ AMPAhr, - Aro AA A : vaittilliPlitlisigratiatiam-1 — - — ggdillihiutga#+ 1,-* *.-4P _-_ _-- tk,7_7_ i: 7_ ___ ___ _ __ _ _ __ _ __ ____ __ _ _ _ _zcz, Q � ' _ ,— , .... .ai ..0-7�-� . .fi�7.Aft,./.:....'tii'�IomI.�� id,.L���7 til:�`e tI.���_ �4 1.i.-&-i �A, Ill minw . - 1_1 — _ V ll — ♦ ������ -ftz -� 7���U oP z w• �r`-a1—str w�r�Ir���-J na Llu- -roe az� rr� , i• .' I.a gamin - \lIW.twors �.1-a:ilea _ 11.. .1111 � /�i��������� — � ���- - �.�r®�a.�ww�—��oIil � i� �Cwrss�e =� ; ►�Q� �. eks�ti;i..��s� .® w���e.�_dlriisi` _ _ o Q1 le in_ 1 ANFAINCIrattaltaiVtil 'itatlistilitt_H 11 v ° #111 ° —L — TB GI ? �w�ih =���:��®�;��.���rN � � ��r��.Ir� elqb Nistoo � ;® � �ii����!'� , % , — — —zQ — — — — — — — — — — — tou,-] - A L o 1 .. c\I S 4 6' V l / a TB 2 GI - / .,������ 4_ �tm'MLA =67:A'�►�u"SS i- H - I W . -I- �10 - i omos•���'�,1 / _ -- r �� � �������� I�����7 It a►A i Y W i .Hwy�.. .te r ei .wr��. �•iiu lTlt �� �� -- `. ! Ai l'T'� �fraWal�1.��:�7rIi7R TCAT 7►�®� �7�'i77W��7r/��O�F/'aZ7ZTri lZ7 - 11 :'Z' Ml r� 'I'aM if• =111:b�7��=1r4=.�. I••II��/It soirk E _ __ _ — -F- —--—-- _ , -___7_ _ __ ,- .__ _ _ _ fillallsipmputti lir - -IrtipNioNiroeT- ; --,0,04gPliezigagimoleAr vitas ing111 i -�u - - - - — _ - --� Yi '_�7Y� r �r >� eti��� i S � � . /� �. \�� A` i►v�.!-�,hti' Y *� ?1 do - � — — -- - - - -- - - �-,- - — IS BEGIN SBG -_ , o_ _ _ _ y ..sm. - . ` �geopatell tt ���at o sow gISIO# p � w,• \ , 1 . I i __ .�*moo _ E - - —- — _ - - - _` _4144:141117116.1141n — --( )'')-- - ' __ _-,,,_,,,,-___ ____ - - _ __ ___----,. ...._ ___ __ _ ic— _ •- + 28 CT & RTCO ' - — — - -- ,,,)--)- 4_)--)---- ,_-,- ' 71 L — WDOD� �7 ' �tir�� , ,/� i; l � ^ I J ���� � ���i�`'� - - - — _ _ E� 1 _ fe&WW iti6 M — CO \ �'--, 0 04011�iot e �� ��' •C (- °� vp III l q A A. - �= VV L i —�,.-) _ _ - — — 1,--..„413041,- ---000.---- 4°-10____ 1111 — V .V -- — --- — — — �� ° � � / I / o _ Wig — --- — — p „ / l � ° P � / � /qi � j_ V \i �� � � -=_ / � � I � `� '1 \ � / I/ / j '\ 1 � / I SPECIAL CUT DITCH - - - � � — I :Ill �o ��!�/iii � �� � -�$ i / / l / I I I I i _ SEE DETAIL B =� _ _ ��g / � // ��� ��� == WOODS I / 1 II Imo— � � — — / ;=��' SITE 3 iol !; /y I I I I I � _ — ���/� � ���i�A>�� \„ --'1 I— � ,'III / I \ l V A�IIV Av \ \ I - - - ; _� ( � / - - , ;��ll� i/i% i�/ �� — � �' „�,J p II \ \ I I W �', II — � _ / �� N _ U iz z / L ,d�� Ij , \ � SITE 29 �/ Illy\\ \ i 1 V ��I \ \ �� 8 /�//, / BANK STABILIZATION / �I\\��I �,� 1\\\ \� / a �'� % \ � - SEE DETAIL D D �\I \, \ ) <s \QR -� ���\\ 1 - -STANDARD V DITCW // % � �� - - \ � �l Cv F� � ���� � -, I SEE DETAIL A • CNI a� } %/� / \ EST. 445 TONS RIP RAP \\ ,o, - _����-� ��� L ■ ■ ■ ■ � ' 25 ' 50 ' 75 , o E .� �I ����� � EST. 590 � Y GEOTEXTILE II \ \� �� ��, \ �\\ y���� II EST. 25 CY DDE �� ■•■•■•■•■ ° � Il i/ � �� � � /L / L EST. 565 CY DDE �_�_ �� = C ,� � ���_�, , \�� \� GRQ SC �\ CNI -0 vi PROJECT REFERENCE SHEET NO. PE RM I T D RAWI N G 17BP.7.R.126 - ROCKINGHAM 106 ROADWAY DESIGN HYDRAULICS j DENOTES IMPACTS IN S H E ET 4 0 F 6 ENGINEER ENGINEER ii /// SURFACE WATER //i�! \ 0, P��IELI1�'1[INA 1'Y PLANS DENOTES TEMPORARY IMPACTS IN SURFACE WATER DO NOT USE >i�� CONSTRUCTIONDETAIL D ^ � DETAIL B INCOMPLETE PLANS BANK STABILIZATION N "V� DETAIL A DETAIL C DO NOT USE FOR R/W ACQUISITION * * * DENOTES MECHANIZED (Not to Sale) m O STANDARD 'V' DITCH SPECIAL CUT DITCH DECK DRAIN DISSIPATER SWALE * * * I- (Not to Scale) * * * * CLEARING Excavation (TYP) Front 2'(TYP) 1/ Ditch W MOTT MACDONALD I& E,LLC NWS Natural Natural Natural 0t Slope LICENSE NO. F-0669 1.5:1 Slope p \...r) D/ Ground ?. 1Ground Ground ?.X 1,'1ec NATURAL NATURAL or flatter mD v!, GROUND A GROUND DOCUMENT NOT CONSIDERED FINAL Geotextile (TYP) , Min. D=1Ft. UNLESS ALL SIGNATURES COMPLETED Min. D= 1Ft.\-1 Type of Liner= Class II Rip Rap co' d -L- STA. 16+60 TO 16+97 RT -L- STA. 16+97 TO 17+20 RT GEOTEXTILE & RIP RAP Prepared in the -L- STA. 14+37 TO 15+96 \ \ -I M -L- STA. 16+46 TO 16+63 m v> ! Type of Liner= CLASS B Rip-Rap PO Box 700 t- " MOTT M Fuquay-Varina,NC 27526 cow-4 FT MACDONALD www.mottmac.comramericas d=0.2 FT 0 1 NOTE: SWALE TO BE CENTERED UNDER DECK DRAINS VERTICAL SCALE HORIZONTAL SCALE -L- STA. 14+65 TO 15+70 LT & RT m\ \ 7.01.2.LiggIO' 1i11 'r 25'UM co 41' r:::).-1.- li DECK DRAINS REQUIRED • 8" X 6" SLOTS ON 5' CENTERS ',m ''' UPCLATO SS IIELEVRIP .5 BEGIN P PROJECT l7BP.7.R.126 BEGIN BRIDGE 500.2' (TYP.) N -L- STA. 14+62 TO 15+50 LT 1 -L- POT Ste. /2+50.00 -L- Ste. /4+55.69 -L- STA. 14+62 TO 15+50 RT (STRUCTURE PAY ITEM) l DECK DRAIN END PROJECT 17BP.7.RJ26 mDISSIPATOR PAD r END BRIDGE -L- POT Ste.2/+00.00 EST CLASS3 TONS RAP SEE DETAIL C ` -L- Ste. 16+98.31 I EST. 10 SY GEOTEXTILE EST. TONS RIP RAP ` `. k EST. 140 SY GEOTEXTILE EXCAVATION END APPROACH SLAB EST. 35 CY DDE LIMITS TEMP. cAUSv -L- Ste. 17+09.19 Y / 15" CSP � 4 / W/ELBOWS SI a -L- PC Ste. 22+39.77 WOODS ta W60C' N\� N WCBN <i PDE- - PDE PDE ••DE PDE 'DE • v 1 /V=49469, �&� \ WOODS m �_ �. p�E 11 p PDE SAIL �� -� iII �, F E E E E E E E \ 11 I EXISTING R/IN �' pD EXISTING R/W O @mu._�������Alrffk -141.1 ♦���A.. di* HeP W*..i��It mrnu - - - E� - - - - - - - - - - - - - -A��0����♦� .�� ter,.. .: , �. ..'. a - \ E F 1�i1�1i► i\ ♦♦♦♦♦♦♦��♦�+:.1�i�r ,i �y' 4��I�illfh,��ti \� �/ vomit r �►,� F T T T T T T T T I * ♦✓♦_f .wi w t. Ayr /� l e.64 di•t ilifir oni 4111* I j O SR /902 N� TB i L�1►������W�h �' �'�'iifi 1i . . �htr �, .��.4. ►.►�� ! N� O/BRELL RD b -L- ��/: 1���;�i1�����l����a�����������iiq I! 1 ,■ `:. i :i���lima� pg o SR 1902 DIBRELL RD ,s, &BST o . g .- l9'85 " S 46° 07' 3/.3" E TB 2G1 /.G ��:♦:♦:♦:�::i�i�:i�% :♦::i,' . ■' �� ;r !::_:_.,�l ■ iv dr - - - - - - - ��v -** 4 -A1F4•Wilt ;F'..:A ! is t i i1 •'/���'1%f. ‘11111111111111111111 mila: ���♦�♦�♦!►.,►�i ♦AW,�,�.; ,�y_�. �. <'r s.,yy -11I1t1�♦1♦ 1ffi�o1�i»f F - - - - / ExISTING R/w t. ♦. .. 4 �A �lflf�ll�i♦t�J� i�Uii lri% ` / f lfi+ ♦ fit... w + v v 'BL-104 EXISTING R/W /�.���i.11ri.l•'d' �4 .�II��♦,I {f ff/ / - - - - - - - - BEGIN SBG F rr F �yf ���� W00DS PDE E WOODS +28 LT & RT w WOODS MI '•e �x= fl�`_�y%� .� �r//%//► E _� 'i' - - in + y, ��`1 �''r, ► �e . ._, � pp - wa- - - - - - - -wLB- - - - WLB_ _ -BL-102 �j wB - - - l t."�f' -B -1 3 , in) I'S .DE , ' r' WOODS "%� l� 5 TB ' p� / - -WLB N - \ "N, 15 �S V T���- Y � WLB- � � �< /TB SPECIAL CUT DITCH - - - e\ 7 ��� 7 /jB/Te SITE 3 WOODS SEE DETAIL B - _wee_ - \ -L- PT Ste 24+00.00 ' N /� -L- PT Ste. 11+60.23 `� , __ -WLa- / SITE 2 \"�e� _ _wLe- BANK STABILIZATION 1 o`� - - / SEE DETAIL D �s Z STANDARD V DITCH / \ �- -L- PC Sta. 10+00.00 EST. 445 TONS RIP RAP It <% SEE DETAIL A EST. 590 SY GEOTEXTILE \ , 0 EST. 25 CY DDE EST. 565 CY DDE c. ✓s 50' 0' I D' 150' c BEGIN APPROACH SLAB ••••• -L- Ste. 14+44.82 ems, �i5 GRAPHIC SCALE 0 L a I �I w �' L _. ›... in = i•iiiiiii_ I_______ ■ EN ■■1Lel co T +-5-0.: ; 7L Ic1Bill 1■1111111 ■■III■II■ I2ZI.�el!fAI.1- ■�==■ Z-- STA. 13 +00.00 1E1111111 I ■■■■1.III'II. STA. 20 +50.00 L''' - : . o' EL = 02.: I!!_____________ I .8 1 filli z 14 III 1111111 'RIDGE 15+77 0 17+ 50.00 PI 19+ .: : ■■o '-"""'-" E ia''o. 4 CAP, EACH, 503.77' EL =- 5.2.4, 5' MILL 510 IGIIIIIII_I� /.4 5 __■■■_■u,:�- 110 VC_ 150 __■ - 0 (+JIL�4.:IsIll _ _ (- •.5867% 11111.1 500 - - TT ■■I�■I..■I.■I. _pmeimii -- I _ _ - _ _ _ - _ 0.4 . III. cc,01 ♦♦17 ill%►�i1♦ ♦4 „� ► � R8 ' DG• HYDRA( LI C DATA _` . _ _.�.m�I E!i1r'■/M■I I■=■■�`! U M� ►jlf "J=®■■ - - IZ�f:7T� , � r►�w� 4 9 0 ►� - ' ■ ' P11111.11W - - ,ri,a��ra��iir��w.,i�r rnSri �w��S �/ '' .rESlC-N REINENCY - 2'1 YRS m '• � i - 4�cuss II P RAC I �� Al i11�ItNi11.1 =�`.5=-4 .� ► ►� SIGN ATION 4 7. FT _ SI T 1 5:1 (2 FT THICK) 1 i ill�ipa . a O (NORMAL TO CAP) (TYP.) or `, ' i■ASE Dl CH I GE = 9,1/40 CFS (STRUCTURE PAY ITEM) IIIIII e ; ►:ASE FR QU,�ntCY = /01I YRS 480 �, %ASE W E! , VAT ON = 4:'9.? FT EXCAVATE TO u' ERT�P PING /ISCHARGE = 15 000 CFS c ELEV=494.0 I o. z iPVERTOP"/NG REQUENCY = 5110 YRS .E A '� I1 RTOP"/NG LEVATI•N = 5o .6 FT s� , 470 WIW BANK STABILI T 0 ►SATE OF SU I EY = • /10/19 W-'CLASS II RIP •P . +•. (SI OPE 1S 1) o : • K •TAB LIZATI S.E�EV 'tTIQ I. • 5.rIV, 'S II IPB RA �T DATE OF ► RVEY = 4%5.7 FT :L 4:S.r' . < (►' PIPE 1.5: ) D ' 1 t, 01-10 2U19 N ' EX NATION = 1710 CY 460 kxX (STIUCTURE !AY ITEM 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PROJECT REFERENCE SHEET NO. PE RM I T D RAWI N G 17BP.7.R.126 - ROCKINGHAM 106 S ROADWAY DESIGN HYDRAULICS j! \\ DENOTES IMPACTS IN H E ET 5 0 F 61 ENGINEER ENGINEER / SURFACE WATER PM ELIMINA 1'Y PLANS //i�! DENOTES TEMPORARY IMPACTS IN SURFACE WATER \ ., \ \ DO NOT USE FOR CONSTRUCTION DETAIL D 0 ^ � DETAIL B INCOMPLETE PLANS BANK STABILIZATION N "V� DETAIL A DETAIL C DO NOT USE FOR R/W ACQUISITION * * * * DENOTES MECHANIZED (Not ta sale) m O STANDARD 'V' DITCH SPEC(ALatCaUs Scale) DECK DRAIN DISSIPATER SWALE (Not to Scale) (Not to Scale) CLEARING Excavation (TYP) \� Front 2'(TYP) x\� Ditch w MOTT MACDONALD I& E,LLC NWS ta Natural Natural Natural \°t Slope LICENSE NO. F-0669 1.5:1 Slope p / , \ Ground �.1 Ground Ground ?./ D 1'• \,yet NATURAL NATURAL eo flatter m \??‘-) , D \Min. D=1Ft. GROUND GROUND DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Geotextile (TYP) F- Min. D= 1Ft. Type of Liner Class II Rip Rap co' d GEOTEXTILE & RIP RAP Prepared in the N -L- STA. 16+60 TO 16+97 RT -L- STA. 16+97 TO 17+20 RT Office of: M -L- STA. 14+37 TO 15+96 '' M INSET INTO NATURAL GROUND -L- STA. 16+46 TO 16+63 m v> ! Type of Liner= CLASS B Rip-Rap PO Box 700 t- "r MOTT M Fuquay-Varina,NC 27526 w w-4 FT MACDONALD www.mottmac.comVamericas 4 d=0.2 FT O 1 NOTE: SWALE TO BE CENTERED UNDER DECK DRAINS VERTICAL SCALE HORIZONTAL SCALE s' ! -L- STA. 14+65 TO 15+70 LT & RT �' " 1 2i:i1111■11...!.. i'' " 2 S0' 0 �� / � �// _ �/ f f�/ DECK DRAINS REQUIRED / ������I��� / �i������ ��� �Q \ �. - \\\, L / BEGIN BRIDGE $ -X b SLOTS ON 5 CENTERS IlilI / I CLASS II RIP RAP L TA. 14+ 2 T 1 + L, / BEGIN PROJECT l7BP.7.R.126 ->` �/ S b O 5 50 T col III 'll���"° ( :\\ \ UP TO ELEV. 500.2' (TYP.) / /°/ /� �� \ _b/// I I Il l 1 (STRUCTURE PAY ITEM) POT Sta. 12+50.00 _- bd� - Sta. 14+55.69 -L- STA. 14+62 TO 15+50 R �� III I ll���� ! / 1 l -L7/i ¢- \ I I � r END PROJECT l7BP. b v / // 7.R.126 \ bb - i ///� C DECK DRAIN It ill �� y // - - -aqa _ LASS B RIP RAP SEE DETAIL C l�\t �� END BRIDGE -L- POT 5t6 21+000O - ` - 5 'Ps- II / \ �� DISSIPATOR PADb� \ lII l�l \ - - - EST. 3 TONS �1l �j 1 = -L- Sit, l6+98.3/ \ � I C - _ _ -- EST. 40 TONS RIP RAP1� I / �E64� EST. 10 SY GEOTEXTILE EST. 140 SY GEOTEXTILE EXCAVATION [ ���, ��� �I I ��b�/END APPROACH SLAB �� r- I I I� \ = `' ey - - �n - EST. 35 CY DDE LIMITS V���I TEMP. '! A -L- - Baas \ P I Il� � / \ \ cA�:1„,' s �1 Sta. 17+09.19 t / _ �� I /1/\ \ A� \�_jam - 15" CSP ��(� ; \ \I/ �` I ) - - + -� //itiV A /k \ \ \ �_a9a� WELBOWS sl' 1, �� \ , / / L PC Sta. 22 9 7�m- ti �� ( � hi \,,,, ,� _ _ �a�� \ /WOODS 111 ���� �� 1 �, _ / ) / -0( - 7=4946g i1 Sb" I �� \ W00 S \ ----\ \ PDE- PDE PDE DE 4p hE s E / asp 1 b`6i � � - ���A ��/ �� / ��"� 1 /\� 7� 6V �Q���WI y�` PDE E E -E - _E E�� E E � j 4 3`SC)/L I= G, G ��_ . -,�\� -sb° -I _ - _�y� b- - / ��/� \ � �� �.�� dUl�l/ �Ill1ih? I�,�� F P i �96a \ " - - i F \ \ -__1/ / I 4_ �lUUO Il��� _ - ® _ - - - r _ - 1 ,�\ _ i♦ 7 mere,_�������e?t��a=E�t� ��r�i��� /,.. ®� - - -- - - =�66 - - = - J / . / /�rh +F-ittWn 4041� ia`A®� ����'�G - - - tibe - J _��� = _ - - ©5� 1 _ - - - - _ s _ ? '�6►fii�L®�',1+.'-►'ar :a.�e'�".,:4�. •� �r'. �1/►��' _= � _b° _ _b-_ - - - - = bb=_- F - - - � _ J63 v iR s r® v `*yQ�� z►♦ �y i 1i��.wW' � a �r ebb _2 c �. -J 664 b ��-(_ �-9��I ������� 14t� _"•'���` �� inl,�lry ,Wi 111 �� 2%�jl ,- _ _ 7- _- _ _ Bbb -� ,� -005 /� ae- .� �s��%�����'����.►®®o���, 6`. �pI��]�,� ,e - - -yams 000 zlzs -ses/ /� / o//�� _, / T T T T T T T T WI liiil . ..7�VG � 1� �L���Iwl��1 +^''_..® I�., i05 �. - •/ _/902 D/BRELLRD �G N TB % i���-6��i�•�s= , �s:a�i„�.. �, �,..`. = .,:=_,��. - - - _ - - nl / 02 �BRELL RD / �_/ --za -L- / �r,+0I♦� iri- �w-ii i iiiii/ ui s A� � A a i4 �fU����' t/ -zas /" SR 19 ' /9 BST / I o N ° . ��/. .� ������ ���iii/� R��a iy ti -U;..ai r�� � � e� L � ��I ,, Q r9'85 / 7________J____:: - 7. S 46 07 31.3 E- TB 2GI I% !--.." -!.`'� i�i '...„4,6 �' osi wws o a ,L vi rro , _° f`' ��v7=5� S _ n��;-'&�yyf�Y,;i � -iwo.y�4ln�l� '���D■� � 1' ►- ' a' - m•/ 9�- �_500 - - .il� I�"=��.��,��L���. �� 4 �r�i:a� r�iL�P j�l I� �� � ' •� .� - - 500 9 50 __ _- ®l - / / \ r n1 . . ?�? L ��• \' GID�®v�1 r �1 A br/ �� _� w ..."' �bx-v >•. -4•.a - - s ' - se0 / / / X1� uz _{/ yyyy a _' `�G am .y .�- su��I � - 4'i'� - -- --- -- 7-5' - -_ - l��i.'�i �i ���A1,1 �}*�474*. •� "0- *mar 4 � �iy 1 ��.. _ - -a,= - 4.,-- 497 4 , -_498- \/ _ - - - - - - _ Ll !'J '/..3. �`6PAr�. __: _ _.,,��' 1 �.I►a. �-.'J ` = to / /- 494- _ - - _ - -- - q@ V ri 4:ar- �R 9 - - - - - 495 l -B � .95 - W 96 - - ■ .ti#r S.� , se - .e. /1 0y "i Z' �11i - - - `= - - -a9a - � - / - - - ___ -_- EI�TING R/ - - _'�_===..■i��r��" �'i8� f $ i sid �� 1�j A, �I��I -fi _ - _- - / l / n - i�-a95 BEGIN SBG �� �4d4- y,± AG#�Ac �c . ? �► , I lil ",, "� ' _ 9aDS QD �r E N. \ _ -- _ _ WOODS \\ -+2 8 LT & RT W ODD ? hC @"� �i1.``�'J ! �• / - /i�' ����- _ E -E �_ _ b- \ F / \ \ 12 C / / J / 9 -f ( � �- 4.�3'' 0. � _0. �1�/..-• ,b4��. ^ ,.'.�.� -- �.� t�.�'.T, /.��� W. 497_ �- 1 �i' WOODS _ \ \\S 1 �:i 1 _ l "7 � Sao \ '� �� j a � //- . - _. /, '. �'i / �_ - �i,b � ���\ V \\ �- L v 5t0 o- s r��. i/� D % z � QDE �� � I /a� /;.o WL6 = -- � -a9 99 \\ / k / / _ _ice' _ ii P i l �./v� f L - - 3 \ \ e I, ( \49 v= _�i-as i �5. / - °� / 4 - = - -WC@ _ \ °$ \ \ \ \ f/ �� \-=��% � a- - ) P l,/ Kf^ /( / ( .`i (/ I SPECIAL CUT DITCH - _ / �e\ (\ \ \\\� - \\ \ a\ / / / / / �_� � \ ( WOODS I SEE DETAIL B -w e= _ b, Ac \ \� �\ ��L �T Sta. 24+IO.00 \ 6 09 -ll� . SITE 3 / A II � -AV�������V \ \ _ L PT Eta. 11 60.23 A _>> / 1 1 I - _ _ _ / _��� N NN\\ \ V \ I wLe-C //� `� AFC ibb 1/// ���// // dA� °�- DI \ \\IWII I SITE 2 ^ \ \ ��/�a _ �_ -wL -� ' J -�'93\ \\�\ \\\\\\\ \ \L �. ���\ 4�\ l 7 -, / � BANK STABILIZATION ' 04.l\\ \\lr /�� I �\ l \ �\���\\ \sue\\ \ <N P / / SEE DETAIL D �� ,r 9as. \ STAWARD V DITCH \ / \� \ 9 \ \se\ ) 1 / /l /�%/ \ 6a \N. _ l - 49 b> EST. 445 TONS RIP RAP ��\\�1 'S6. ; SEE DETAIL A L J J N \ \\ \> \ S \''' \ ss \ -L- PC Sta.10 k0 .00 �1/// \ 1 \ \ \ 1 a SST. 590 SY GEOTEXTILE 3 e \ \ EST. 25 CY DDE \/; ) �9� a /�///� ( f rr(C 's \\ (/ - / vEST:5G5 CY DDE \�\ y\���\\ \ \ \ i ��\��eN 9`\�'' 1 - I / ��'- 1 ��� A\ I �� , ��1 50' 0'� 50'� \vim\�I 0' .A �150' (r////ice_ -��/Q / \�- __--Li �n�� \bs� \� �` • • • • ■ �'�) ✓� / ////J j9�/// APPROI C 45 LA - --\ 3��\\\\ �\\ 4s`\ �,f � - -j r - � � R■ ■�■ ■SCALE r, °' / / ) l 1 0 w 3 Q L. il . . . . . . . Ln M BEGIN PROJECT ► n u: �I ,03 STA, 12 +30.00 BEGIN GRADE] END G'7. 9 is.. : I - STA. 13 +00.00 STA. 20 +50.00 W EL = 502.20' EL = 502.82' - z 14 0 K RIDGE CE STA. "5+77 0 -L- - PI = 17+ 50.00 - PI = 1-9+ 75.00 z ` re-- 9" Bt BEAM �' MILL i S'A �: 4(a)60' EACH, SKEW 90° EL - 503.77' EL = 502.45' MILL TO /4DEEP CAPS VC - 110' VC = 150' w 510 EXIST I EL . = 503.16' K - 118 K - 139 • TO . . )--- EXIST _ " REMOVE / ° FXISTINs I / BRIDGE I /_ - - - - i (+)0.!4ff _ (-1O.58,67% _ _ - - - - - - °' 500 Ir�i�i�i�i�i'i�i�:�i�i��i, i4'111-I ►������+al BRIDGE HYDRAULIC DATA - - - 3y DEPTH - - - _ ---- / _ w �.. TEMPORA�IL ►1�1r - - = PaEP 1►;�� ��, � _ ,P SIGN DISCHARGE6260CFS 490 r F I , ` u E1 E,j .PESIC-N REQUENCY - 25 YRS 0 CLASS II RIP RAF 1 K IL �'_ ai 1PESIGN W ELEVATION = 497.9 FT SI O 1 5:1 (2 FT THICK) . ., : 1.,, __ 1, . I ' 'ASE DISCHARGE = 9,040 CFS ° (NORMAL TO CAP) (TYP.) kI y' ` r �■ (STRUCTURE PAY ITEM) I ,:ASE FREQUEn�cY = loo YRS 480 /1 �, 1:ASE HW E!EVATION = 499.? FT EXCAVATE TO c� T e ELEV=494.0' + u ER OFFING DISCHARGE = 15,000 CFS I�VRTOPPING FREQUENCY = 500 YRS o t 4 II RT OPP/NG FLEV AT/ N = 501.6 FT sty 470 - WBANK STABILIZAT ON 5� w ��ATE OF SURVEY = Ol/10,�19 W✓CLASS II RIP RAP p +'. t (q OPE 1S 1) NORMAL WS N•r W,rLA SBANK II IPLI RA S.ELEVATION ELEV.-485.7' 71- (SLOPE 1.5:") p AT DATE OF SURVEY = 485.7 FT DAIt 01-10-2019 `n ' EX VATION = 1710 CY 460 m J �� (STF4UCTURE !AY ITEM) 10 11 12 13 14 15 16 17 18 19 20 21 22 23 lumiiimild X-3 ' + 140fl a e oa • � : � 2 .2 mommommommommp • �mmommommmmommp 0 1 n E i 37 402 . � ► :<� 100 i mom mommommomm � o 130 Imommommommomm ummommmm mom , ii140mom . mom 5/0 � __ mommommommo IMEHEMEMEHLEHMEMEMEENSIMMENHEMENNEHEILEHMENHEMELEHMENHEMELIMEHEMENECI PERMITrmommommummommommrommommommommormommommimmommommommommommimmornmommommormomminommomm I S E T 6R OFI bG_........ ......... ....... ........ MEMMEMMEMMEMMEMMEM • , .................. MEMMEMMEMMEMMEMMEM I !Immo' 9111Iiiiiiiiiiiii iiiiiiiiiiiiiiiiiii iiiiiiiiiiiiiiiiiii �� 0.020 0.020 __ . mommilmommummommommmommommom mommommommimmommommommommomm mommommommommommom mommommomm ME 500 i � .- - - -� eoz ,a � - - '��' '- IIIIIIIIIIIIIIIIIIIIIIIII -- IIIIIIIII 500 W W MEMMEMMEMEMMEMMEMEMMIMMEMMEMMEMMEMMEMMEMIMMEMMEMMEMMEMMEMMEMIIMMEmm x I 8 + 50. 00 III ' Pig 1111111111111111111111111111111111 11111111 MN 11111114P1111111,1111111P11111111111111111111111111111111111 411111111111111111111111111111111111111111111111111111115:1111111111M11119111111111911111111:1111=RESIESIMERS,=====igragra MiligraMESIESILI 15 i° in °11111111411111114111111111iiiiiiiiii iiiiiiii iiiiiiiii iiiiiiiiiiiiiiiiiiiiiiiiiiiilliiiiiiiiiiiiiiiiiiiIIIIIIIIIIIIIIII IIIIIIIIIiiiiimmli117. mmiiiim7147.71111111111 urommommommommommlommommommommommormommommommommormommommommommommimmommommilmmommommommommomm . Io.ozo o.aso �- � mommlimmommommommommormommommimmommommommommommormommommommommommormommommommommommimmommommommommommormommommommommomm � --_ _ �y= __ soza \Ca I„ � _ � i i � AllillilllilliiIIIMINIMIlillirillliillilllilliiiiiiiiiiiiiiiiiiiiiiiiiiimmrnmmrnmrnmrnmrnmrnmrnmmmmmmmmmmmmmmmmmmmmm.mrnmrnmmimmmmrnmmml====m==== w 490 0 ■4; IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ce .................... ................... ................... ................... ................................................ ....................................... ................... ................... .............................. ................... .......................................................... ................. .......... ................... ................... ................... ................... .................. W pm=m=mmpmmmmmmpmmmmmmpmmmmmmpmmm==m=millIlIlliIlliIllr 1 IIIIIIIIIIIIIII1 IIIIIIIIIIIIIIIIII1 IIIIIIIIIIIIIIIII• 1 ................ .......... ................... ................... ................... ................... .................. 1.-. 0mmimmommommommimmommemmommormommemmommomrommommommommimmomminmommommommommommommommomm cr mommommommormommommommommommommimmomm N mommommommormommommommommommommimmommommommirmommommommommommommommommimmommommomm. mommommommommommommommommommommommommommommommommommommommommommommommommommommommommommommommommommommormommommommomm v) mommommommommormommommommommommimmormommommomm _ I--- millimillimplimmillimillimillimplimillimillimplimillimilimillimilimillimplimillimilimil W EMEMElla � W mommommommommormommommormommommommommomm mommommommommommom mommommommommommomm mommommommommommom mommommommommommm WE 500 � �.4I1�1 N - ice' ' �\ = 490 1• m11111m \PEm.LI 490 rn I c: • 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 o �T �, 5�0 �� iiiiiiiii�����i���!���i���i�i�il�,� ._. %.111111111 iiiiiiii..111111111 iiiiiiii..111111111 iiiiiiii..111111111 iiiiiiiialliiiiiiiiiiiiiiimilliiimillimillimillielbartim! 114111111111111 (../.2 IIIIIIIIIIIIIII1 1111111111.1111111111111111111 iiiiiir . •••••• ••••••••••••••••••• ••••••••••••••••••• •••••••••••••••••• m'_ mommommommommommommommommommommommommommommommommommommommommommommommommommommommommommommormommommommommormommomommum mim MEM EMMOOMMEMEMEM >c MEMMEMMEMMEMMEMMIMMEMMEMEMMIMMEMEM I _ MEM MMEMMEMMEMMEMMEMMEM MMEMMEMMEMMEMMEMMEM MEMMEMMEMMEMMEMMEM Ea) '.,_ . ..... .......................................................... � \ -W EXISTING WETLAND BOUNDARY hi 111111-1111111111111111iiiiiiiiiiiiiiiiiiiiiiii11111111111111111111111111111111111111 iiiirilliiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiilmillialliiiiiiiiiiiiiiiiiiimilliiiiiiiiiiiiiiiimilliiiiiiiiiiiiiiiimilliiiiiimmmrnmmm mmmmmmmmmmmm --- -- -- '° • mm --- • mmmmil 1 lam •••••• mmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmm mmmmmmmmmmmmmmmmmmm mmmmmmmmmmm 1 - mommommommommommommommommommommommommommommommommommommommommommommommommommommommommommommommommomm 011111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111MEMEMEMME 1 7 + 0 0 0 0 ........................ r• EmmommoompoommommopmmommonpmmommonpEnnnEnnEnnEnnonnEnnomm Enimommi*thimmimmilismarm IIIIIIIIIIIIIIIIIIII1 . dill mommommommommommom mommommommommommm . ...................................... ................... .................. 1 1 ....... ................... .......... ................... ................... ................... ................... .................. � B R I D G E 1 + 98 . 31 III 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 ................ .......... ................... ................... ................... ................... .................. • ...1..11.........1........11.........1........11.........1........11.........1........11.................. ................. (z mmommommismommilimmaimE2 LEO. mmmammmommom iiiiiiiiiiiiiiii iiiiiiiiii iiiiiiiiiiiiiiiiiii iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii FmnmmimminiimmimmitmmimminiimmimmimmimminiimmimmitmmimminiimmimmimmimmiMEMimmimmimminlimmi ;--< illiilliiiiiillipilliiiiiiiiiillipilliiiiiiilli L 1---• mommommommompommommimmommommommimmommommommimmmommommovimmommommommimmomm '' _1 V � W I mmommom..aammommimmommommommommommom mommommommommommom mommommommommommm IW � 490 _Emmommommimmommommmommommommimmommommmommommommimmommommommommompoommommommommommommommomm �I 40 _smammEmmmimmm• ••••••••••••••••••• ••••••••••••••••••• ••••••••••••••••••• ••••••••••••••••••• mmm a H_�s 48T 34 sH�s1 N �, � 5 16 + 50. 00 ................. ................... .............................. ................... MEMMEMMEMMEMMEMMEMMEMMEMMEMMEMMEMMEMMEMMEMMEMMEMMEMMA 19MM o � 'a WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS — Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 15+80-16+43-L- Bank Stabalization 0.016 0.005 100 20 1 15+97-16+43-L- Temporary Causeway 0.023 53 2 16+60-17+20-L-RT Cut Ditch/Standard V Ditch 0.003 3 14+32-16+04-L-RT Bank Stabilization 0.030 0.002 180 10 TOTALS: 0.000 0.003 0.046 0.030 280 83 NOTES: i Site 1 -->Wolf Island Creek NC DEPARTMENT OF TRANSPORTATION Site 3-->Tributary to Wolf Island Creek DIVISION OF HIGHWAYS 3/1/2021 Length of temp causeway impacts are within length of permanent impacts along Wolf Island Creek. Rockingham County Brg#106 17BP.7.R.126 Revised 2016 09 09 SHEET 1 OF 1 Action ID Number: SAW-2019-01242 County: Rockingham Permittee: NCDOT Division 7 (Attn: Wright Archer III, PE) Project Name: NCDOT/ Bridge 106 / SR 1902 /Dibrell Road/Rockingham County Date Verification Issued: 6/1/2021 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date A.Determination of Jurisdiction: 1. ® There are waters,including wetlands,on the above described project area, that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC§1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC§403). The waters,including wetlands,have been delineated,and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore,this preliminary jurisdiction determination may be used in the permit evaluation process,including determining compensatory mitigation. For purposes of computation of impacts,compensatory mitigation requirements,and other resource protection measures,a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part 331). However,you may request an approved JD, which is an appealable action,by contacting the Corps district for further instruction. 2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403)and Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. 3. ❑ There are waters within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. 4. ❑ A jurisdiction determination was not completed with this request. Therefore,this is not an appealable action. However,you may request an approved JD,which is an appealable action,by contacting the Corps for further instruction. 5. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference the approved jurisdictional determination issued . Action ID: SAW- B.Basis For Jurisdictional Determination: See attached Preliminary Jurisdictional Determination Form. C.Remarks: D. Attention USDA Program Participants The delineation included herein has been conducted to identify the location and extent of the aquatic resource boundaries and/or the jurisdictional status of aquatic resources for purposes of the Clean Water Act for the particular site identified in this request. This delineation and/or jurisdictional determination may not be valid for the Wetland Conservation Provisions of the Food Security Act of 1985,as amended.If you or your tenant are USDA program participants,or anticipate participation in USDA programs,you should discuss the applicability of a certified wetland determination with the local USDA service center,prior to starting work. E.Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination,you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process(NAP)fact sheet and Request for Appeal(RFA)form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Mr.Philip A. Shannin Administrative Appeal Review Officer 60 Forsyth Street SW,Floor M9 Atlanta,Georgia 30303-8803 AND PHILIP.A.SHANNINc2 USACE.ARMY.MIL In order for an RFA to be accepted by the Corps,the Corps must determine that it is complete,that it meets the criteria for appeal under 33 CFR part 331.5,and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form,it must be received at the above address by N/A. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. _ /4 Date:2021.06.01 11:33:41 Corps Regulatory Official: .'�� -04'00' David E.Bailey Date of JD: June 1,2021 Expiration Date of JD: N/A NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: NCDOT Division 7 File Number: SAW-2019-01242 Date: 6/1/2021 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A P PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C L APPROVED JURISDICTIONAL DETERMINATION D 17 PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit(Standard or LOP)because of certain terms and conditions therein,you may request that the permit be modified accordingly.You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice,or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter,the district engineer will evaluate your objections and may: (a)modify the permit to address all of your concerns,(b)modify the permit to address some of your objections,or(c)not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections,the district engineer will send you a proffered permit for your reconsideration,as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit(Standard or LOP)because of certain terms and conditions therein,you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety,and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD,you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish,you may request an approved JD (which may be appealed),by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer,Wilmington Regulatory Division, MR.PHILIP A. SHANNIN Attn:David E.Bailey ADMINISTRATIVE APPEAL REVIEW OFFICER 69 Darlington Avenue CESAD-PDS-O Wilmington,North Carolina 28403 60 FORSYTH STREET SOUTHWEST,FLOOR M9 ATLANTA,GEORGIA 30303-8803 PHONE:(404)562-5136;FAX(404)562-5138 EMAIL:PHILIP.A.SHANNIN@USACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel,and any government consultants,to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation,and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer,Wilmington Regulatory Division,Attn:David E.Bailey,69 Darlington Avenue,Wilmington,North Carolina 28403 For Permit denials,Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer,Commander,U.S.Army Engineer Division,South Atlantic,Attn:Mr.Phillip Shannin, Administrative Appeal Officer,CESAD-PDO,60 Forsyth Street,Room 10M15,Atlanta,Georgia 30303-8801 Phone: (404)562-5137