HomeMy WebLinkAboutNCC213556_ESC Approval Submitted_20210615TOWN of
WAKE FOREST
EROSION AND SEDIMENT CONTROL
LAND DISTURBING PERMIT
LETTER OF APPROVAL
June 7, 2021
Pinellas Corporation
Attn: Joseph Lassiter
8311 Bandford Way, Suite 1
Raleigh, NC 27615
RE: Project Name: Rosedale Subdivision Phase 1
Permit No: 2021-00000063
Location: 1916 Averette Rd
Wake Forest, NC 27587
Acres Approved: 68.0 acres
Submitted By: Priest, Craven and Associates, Inc.
Date Approved: June 7, 2021
Dear Mr. Lassiter:
301 S. Brooks Street
Wake Forest, NC 27587
t 919.435.9400
www.wakeforestnc.gov
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the
Town of Wake Forest, as well as a digital copy at least one week prior to the preconstruction
meeting. The land disturbance permit shall expire two (2) years from the date of approval and can be
renewed in one-year increments.
Per Section 12.3.2 of the Unified Development Ordinance (UDO), a copy of the approved erosion
control plan shall be on file at the job site. Also, this letter gives the notice of our right to
periodically inspect the jobsite to ensure compliance with the approved plan as outlined in the
UDO.
Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and
Local water quality laws, regulations, and rules. This approval does not supersede any other permit
or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form. You are requested to file an amended forth if there are any changes
in the information. Please set up a preconstruction conference with all parties involved through the
Planning Department. A preconstruction meeting must be held with the Town prior to starting any
work, including installation of erosion control measures, demolition, any clearing and grubbing or
earth moving activities.
Be aware that your project is subject to the NPDES General Stormwater Permit NCGO1000
(Construction Activities). The Town will no longer distribute the NCG01 permit, you will have to
obtain the permit from NC DEMLR. To receive a Certificate of Coverage, you must submit an
electronic Notice of Intent with this approval letter. You will also need to have copies of the
compliance plans sheets, (Ground Stabilization and Material Handling, and Inspection,
Recordkeeping, and Reporting), if they were not included in the approved erosion and sediment
control plan.
Sincerely,
Carrie Mitchell, PE
Environmental Engineer
Town of Wake Forest