Loading...
HomeMy WebLinkAboutNCC213556_ESC Approval Submitted_20210615TOWN of WAKE FOREST EROSION AND SEDIMENT CONTROL LAND DISTURBING PERMIT LETTER OF APPROVAL June 7, 2021 Pinellas Corporation Attn: Joseph Lassiter 8311 Bandford Way, Suite 1 Raleigh, NC 27615 RE: Project Name: Rosedale Subdivision Phase 1 Permit No: 2021-00000063 Location: 1916 Averette Rd Wake Forest, NC 27587 Acres Approved: 68.0 acres Submitted By: Priest, Craven and Associates, Inc. Date Approved: June 7, 2021 Dear Mr. Lassiter: 301 S. Brooks Street Wake Forest, NC 27587 t 919.435.9400 www.wakeforestnc.gov This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the Town of Wake Forest, as well as a digital copy at least one week prior to the preconstruction meeting. The land disturbance permit shall expire two (2) years from the date of approval and can be renewed in one-year increments. Per Section 12.3.2 of the Unified Development Ordinance (UDO), a copy of the approved erosion control plan shall be on file at the job site. Also, this letter gives the notice of our right to periodically inspect the jobsite to ensure compliance with the approved plan as outlined in the UDO. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and Local water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form. You are requested to file an amended forth if there are any changes in the information. Please set up a preconstruction conference with all parties involved through the Planning Department. A preconstruction meeting must be held with the Town prior to starting any work, including installation of erosion control measures, demolition, any clearing and grubbing or earth moving activities. Be aware that your project is subject to the NPDES General Stormwater Permit NCGO1000 (Construction Activities). The Town will no longer distribute the NCG01 permit, you will have to obtain the permit from NC DEMLR. To receive a Certificate of Coverage, you must submit an electronic Notice of Intent with this approval letter. You will also need to have copies of the compliance plans sheets, (Ground Stabilization and Material Handling, and Inspection, Recordkeeping, and Reporting), if they were not included in the approved erosion and sediment control plan. Sincerely, Carrie Mitchell, PE Environmental Engineer Town of Wake Forest