HomeMy WebLinkAboutNC0023086_Compliance Evaluation Inspection_20210614
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED.
June 14, 2021
Zelerie Rogers
Town of Fontana Dam
Email: zelerie.rogers@fontanavillage.com
SUBJECT: Compliance Inspection Report
Town of Fontana Dam WWTP
NPDES WW Permit No. NC0023086
Graham County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Town of Fontana Dam
WWTP on 6/01/2021. This inspection was conducted to verify that the facility is operating in
compliance with the conditions and limitations specified in NPDES WW Permit No. NC0023086. The
findings and comments noted during this inspection are provided in the enclosed copy of the inspection
report entitled "Compliance Inspection Report". Additionally, a Technical Assistance Inspection Report will be
forthcoming.
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Lauren Armeni with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
lauren.armeni@ncdenr.gov.
Sincerely,
Daniel Boss, Assistant Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: LF
Dennis Pilkington, ORC
DocuSign Envelope ID: 86EF2E97-D247-4F6B-A91F-1D3048248B41
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0023086 21/06/01 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Town of Fontana Dam WWTP
Fontana Village Resort
Fontana Dam NC 28733
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
11:00AM 21/06/01 17/11/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Daniel Dennis Pilkington/ORC/828-498-2271/
Other Facility Data
01:00PM 21/06/01 22/10/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Zelerie Rogers,PO Box 128 Fontana Dam NC 287330128/Town
Administrator/828-498-2107/
Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self-Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Lauren E Armeni DWR/ARO WQ/828-296-4500/
Timothy H Heim DWR/ARO WQ/828-296-4665/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: 86EF2E97-D247-4F6B-A91F-1D3048248B41
6/14/2021
6/14/2021
6/14/2021
NPDES yr/mo/day
21/06/01
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Lauren Armeni and Tim Heim with the Asheville Regional Office conducted a Compliance
Evaluation Inspection of the Town of Fontana Dam WWTP on June 1, 2021. This inspection was
conducted to determine whether the facility is being operated and maintained in compliance with
NPDES Permit No. NC0023086. Dennis Pilkington (ORC) and Jason Duke (BORC in training) were
present and assisted in the inspection.
The Engineer's Certification was signed for the Fontana Dam WWTP improvements on October 4,
2019 that verified all improvements outlined in the AtoC were completed. It was decided that a tablet
chlorination-dechlorination system be installed instead of the planned chlorine gas disinfection
system due to cost. Mr. Pilkington confirmed that they have both chlorination/dechlorination tablets in
storage if needed, but these are currently not being used because the permit does not have fecal
coliform limits.
Bar Screen - It is recommended to cover the debris from the bar screen to keep it contained during
drying, making it less of a health hazard.
Secondary Clarifier - Mr. Pilkington mentioned that Secondary Clarifier #2 is stirring up TSS when the
arm is turned on, causing effluent limit violations. Mr. Heim (ARO Engineer) conducted a Technical
Assistance Inspection on the same day and will further assist the Town with this issue.
No deficiencies were noted during the inspection.
NC0023086 17 (Cont.)
Page#2
DocuSign Envelope ID: 86EF2E97-D247-4F6B-A91F-1D3048248B41
Permit:NC0023086
Inspection Date:06/01/2021
Owner - Facility:
Inspection Type:
Town of Fontana Dam WWTP
Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Mark Bentley with Earth Environmental analyzes process control parameters each
Monday, which includes MLSS, DO, and checking the sludge blanket with a sludge
judge.
Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Page#3
DocuSign Envelope ID: 86EF2E97-D247-4F6B-A91F-1D3048248B41
Permit:NC0023086
Inspection Date:06/01/2021
Owner - Facility:
Inspection Type:
Town of Fontana Dam WWTP
Compliance Evaluation
Record Keeping Yes No NA NE
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Comment:
Flow Measurement - Influent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
The flow meter is new and was installed and calibrated two weeks ago by KDT Service
Technologies. The chart recorder is digital and all data is transferred to a computer
every fifty days.
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
At the time of the inspection, debris from the Bar Screen was spread out on the
concrete behind it. Mr. Pilkington said the debris was spread out to dry before placing it
in the trash. See summary for details.
Comment:
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Page#4
DocuSign Envelope ID: 86EF2E97-D247-4F6B-A91F-1D3048248B41
Permit:NC0023086
Inspection Date:06/01/2021
Owner - Facility:
Inspection Type:
Town of Fontana Dam WWTP
Compliance Evaluation
Aeration Basins Yes No NA NE
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
In Aeration Basin #1 (smaller basin), the one diffuser was shut off because the nozzle is
still broken. Mr. Pilkington indicated that they are having trouble finding parts because
the basins are so old; however, he said it does not affect DO levels or the treatment
process. Aeration Basin #3 (farthest to the right) is primarily used as an aerated
equalization/overflow basin. Wastewater from the Water Treatment Plant goes into a
wet well at the WWTP, is pumped into Aeration Basin #3, and is then distributed to the
headworks of the plant.
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
Mr. Pilkington said the sludge blanket level was measured last week at 1' out of 12' in
Secondary Clarifier #2. Secondary Clarifier #1 is still not in operation. Weirs are
cleaned every two weeks. The digester is now in operation, so the scum can be
returned to the headworks or the digester.
Comment:
Aerobic Digester Yes No NA NE
Is the capacity adequate?
Is the mixing adequate?
Is the site free of excessive foaming in the tank?
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
The digester is 16' deep and was put back online in 2019. The sludge from the
digesters is pumped and taken to an approved landfill. The supernatant from the
digester goes into a wet well and is pumped back to the headworks of the plant.
Comment:
Page#5
DocuSign Envelope ID: 86EF2E97-D247-4F6B-A91F-1D3048248B41
Permit:NC0023086
Inspection Date:06/01/2021
Owner - Facility:
Inspection Type:
Town of Fontana Dam WWTP
Compliance Evaluation
Disinfection-Tablet Yes No NA NE
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?0
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de-chlorination?
Tablet disinfection is available if needed; however, it is currently not in use because
there are no fecal coliform limits in the permit.
Comment:
De-chlorination Yes No NA NE
Type of system ?Tablet
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de-chlorination substance stored away from chlorine containers?
Are the tablets the proper size and type?
Tablet de-chlorination is available if needed; however, it is not currently in use because
there are no fecal coliform limits in the permit.
Comment:
Are tablet de-chlorinators operational?
Number of tubes in use?
Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Flow is measured only from the influent.Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
The pipe is underwater and could not be observed.Comment:
Page#6
DocuSign Envelope ID: 86EF2E97-D247-4F6B-A91F-1D3048248B41
Permit:NC0023086
Inspection Date:06/01/2021
Owner - Facility:
Inspection Type:
Town of Fontana Dam WWTP
Compliance Evaluation
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
The composite sampler was replaced 1.5 years ago and is now flow proportional.Comment:
Standby Power Yes No NA NE
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
The generator automatically exercises weekly on Mondays.Comment:
Page#7
DocuSign Envelope ID: 86EF2E97-D247-4F6B-A91F-1D3048248B41