Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0022859_Application (FTSE)_20070128
FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: (to be completed by DWQ) 1. Owner: la. Eastover Sanitary District Full Legal Name (company, municipality, HOA, utility, etc.) Z lb. Morgan Johnson O Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!) H lc. The legal entity who will own this system is: Q ❑ Individual ❑ Federal 0 Municipality 0 State/County 0 Private Partnership ❑ Corporation ® Other (specify): Ce Id. PO Box 1083 le. Fayetteville O Street Address City LL Z lf. North Carolina lg. -283021083 Z State Zip Code O lh. (910) 323-3973 li. (910) 323-5224 1j. mjohnson126@nc.rr.com aH ( Telephone Facsimile E-mail j 2. Project (Facility) Information: J 2a. Phase I, Eastover Sanitary Sewer Improvements 2b. Cumberland a CountyWhere Project is Located a Brief Project Name (permit will refer to this name) 1 < 3. Contact Person: Q 3a. Kevin Lindsay, District Engineer Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. (910) 692-5616 3c. klindsay@hobbsuphcurch.com Phone Number E-mail 1. Project is ® New ❑ Modification (of an existing permit) If Modification, Permit No.: 2. Owner is ® Public (skip to Item B(3)) 0 Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one) 0 Retaining Ownership (i.e. store, church, single office, etc.) or 0 Leasing units (lots, townhomes, etc. - skip to Item B(3)) 0 Selling units (lots, townhomes, etc. - go to Item B(2b)) ❑ Public Utility (Instruction III) 0 Homeowner Assoc./Developer (Instruction IV) O 3. Fayetteville Public Works Commission (PWC) i'� Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project Q 4a. Cross Creek Water Raclamatnin Facility Ah nMDnGQ a+ nir•rwo-2nG7_. �. NJ HOBBS, UPCHZIRCH ASSOCIATES, P.A. CONSULTING ENGINEERS P.O. BOX 1737, 300 S.W. BROAD STREET SOUTHERN PINES, NC 28388 (910)692-5616 Exactly Four hundred and no / 100 Dollars 'AY O THE )RDER )F: N. C. DENR NC BB&T Branch Banking and Trust Company 66-112/531 DATE 10/11/2006 AFTER 90 DAYS § Q,P4 AMOUNT $400.00 AUTHORIZED SIGNATURE Details on back. 11' [''AST `i'RACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 1 Aw QG -71 State of North Carolina Department of Environment and Natural Resources Division of Water Quality FAST -TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS (Pressure sewers systems are not to be included as part of this application package) INSTRUCTIONS: Indicate that you have included the following list of required application package items by checking the space provided next to each item. Failure to submit all required items will lead to your application being returned as incomplete or additional processing and review time. This form may be photocopied for use as an original. ® 1. Application Form - Submit one original and one copy of the completed and appropriately executed application form. Any changes to this form will result in the application being returned. The Division of Water Quality (Division) will only accept application packages that have been fully completed with all applicable items addressed. You do not need to submit detailed plans and specifications unless you respond NO to Item B(12). ® II. Application Fee - Submit a check in the amount of $400 made payable to: North Carolina Department of Environment and Natural Resources (NCDENR). ❑ I11. Certificates of Public Convenience and Necessity — If the application is being submitted in the name of a privately -owned public utility, submit two copies of the Certificate of Public Convenience and Necessity (CPCN) which demonstrates that the public utility is authorized to hold the utility franchise for the area to be served by the sewer extension. If a CPCN has not been issued, provide two copies of a letter from the North Carolina Utilities Commission's Public Staff that states that an application for a franchise has been received, that the service area is contiguous to an existing franchised area, and/or that franchise approval is expected. The project name in the CPCN or letter must match that provided in Item A(2a) of this application. ❑ IV. Operational Agreements — Submit one original and two copies of a properly executed operational agreement if the sewer extension is permitted by a private applicant and will be serving residential or commercial lots (e.g., houses, condominiums, townhomes, outparcels, etc.) that will be sold to another entity. If the applicant is a homeowners' association, use Form HOA 02/03. If the applicant is a developer, use Form DEV 02/03. EVEN IF THE PROJECT WILL BE TURNED OVER TO A MUNICIPALITY, FORM DEV 02/03 IS REQUIRED. ® V. Flow Acceptance Letters — If the owner of the downstream sewers and/or WWTF is different from the applicant, submit two copies of a flow acceptance letter from the owner of the downstream sewers and WWTF, if different. Flow acceptance letters must contain the following minimum information: applicant and project name, amount of flow accepted, and name and permit number of the receiving sewers/WWTF. The flow acceptance must not expire prior to permit issuance and must be dated less than a year prior to the application date. Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific flow acceptance letter. VI. Map — Submit an 8.5-inch by 11-inch copy of the portion of a 7.5-minute USGS Topographic Map along with this form. The map should identify the entire project area location as well as the closest downslope surface waters as clearly as possible. Each map portion must be labeled with the map name and number, the identified location of the sewer line and pump stations, and be of clear and reproducible quality. For instance, if the project involves 4 miles of interceptor sewer that traverses over or near several different waterbodies (or counties, basins, etc.), the map should have location ID's shown for each different waterbody (where the sewer line is within 100 feet of such waterbody - see Instruction VII). This location ID is self chosen and used to cross reference the location in Section C of the permit application. ® VII. Stream Classifications — Section C • If any portion of the project is within 100 feet of any down slope surface water, Section C must be completed for the pertinent sections. • If the entire project area is a minimum of 100 feet away from any down slope surface waters BUT there is a pump station involved where a history of power outage is to be used to provide adequate design storage instead of dual feed or permanent or portable generator, Section C must be completed to demonstrate that the closest down slope surface water is Class C (see 15A NCAC 2H .0219(h)(3)(D)). • Use the guidance document entitled, "Determining Watershed Classifications for Form FTA 02/03 (Fast -Track Sewer Systems)" available from http://h2o.enr.state.nc.us/ndpu or by contacting the appropriate regional office. FTA 02/03 I FASTATt4,CK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 2 ❑ VIII. Environmental Assessments — If this project is subject to an Environmental Assessment (EA) [15A NCAC 01C .0500], this application can not be used. Send the project application on Form PSFMGSA 10/99 to the Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Applications can not be processed until a Finding of No Significant Impact (FONSI) or Environmental Impact Statement (EIS) has been issued. A copy is to be submitted with that permit application. ® IX. Certifications — Section D The application must be certified by both the applicant and a North Carolina Registered Professional Engineer (PE). The applicant signature must match the signing official listed in Item A(1b). The PE should NOT certify the application if he/she is unfamiliar with 15A NCAC 2H .0200, the Gravity Sewer Minimum Design Criteria (most recent version) and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (most recent version), as applicable to the project. Certification by a PE who is unfamiliar with these documents is subject to NC Board referral. THE COMPLETED FTA 02/03 APPLICATION PACKAGE, INCLUDING ALL SUPPORTING DOCUMENTS AND $400 FEE, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 59 Woodfin Place Asheville, North Carolina 28801 (828) 251-6208 (828) 251-6452 Fax Avery, Buncombe, Burke, Caldwell, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, McDowell, Mitchell, Polk, Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Fayetteville, North Carolina 28301 (910) 486-1541 (910) 486-0707 Fax Anson, Bladen, Cumberland, Harnett, Hoke, Montgomery, Moore, Robeson, Richmond, Sampson, Scotland Mooresville Regional Office 919 N Main Street Mooresville, North Carolina 28115 (704) 663-1699 (704) 663-6040 Fax Alexander, Cabarrus, Catawba, Cleveland, Gaston, Iredell, Lincoln, Mecklenburg, Rowan, Stanly, Union Raleigh Regional Office 1628 Mail Service Center Raleigh, North Carolina 27699-1628 `; ; '2; 57, 1703 (919) 571-4718 Fax Chatham, Durham, Ed , gecombe Franklin, Granville, Ha!:',...., Johnston, Lee, Nam', Nuttnampton, Oian❑e_ Person, Vance, Wake, Warren, Wilson Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 (252) 946-6481 (252) 975-3716 Fax Beaufort, Bertie, Camden, Chowan, Craven, Currituck, Dare, Gates, Greene, Hertford, Hyde, Jones, Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 395-3900 (910) 350-2004 Fax Brunswick, Carteret, Columbus, Duplin, New Hanover, Onslow, Pender Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, North Carolina 27107 (336) 771-4600 (336) 771-4631 Fax Alamance, Alleghany, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Stokes, Surry, Watauga, Wilkes, Yadkin For more information, visit our web site at: http.//h2o.enr.state.nc.us/ndpu/ FTA 02/03 i FAST4R,4CK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! 1. Owner: la. Eastover Sanitary District Full Legal Name (company, municipality, HOA, utility, etc.) Z lb. Morgan Johnson bcation Number: e(be'complet completed by DWQ) WQ0022859M 0 Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!) lc. The legal entity who will own this system is: ❑ Individual ❑ Federal ❑ Municipality n State/County n Private Partnership El Corporation Z Other (specify): 0 ld. PO Box 1083 LL Street Address 1f. North Carolina Z 0 1 h. (910) 323-3973 1 i. (910) 323-5224 State Telephone Facsimile () 2. Project (Facility) Information: a2a. Phase I, Eastover Sanitary Sewer Improvements d Brief Project Name (permit will refer to this name) Q 3. Contact Person: • 3a. Kevin Lindsay, District Engineer NFORMATION 1 e. Fayetteville City 1 g. -283021083 Zip Code 1j. m'ohnson126. nc.rr.com E-mail 2b. Cumberland County Where Project is Located Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. (910) 692-5616 3c. klindsa Phone Number y@hobbsuphcurch.com E-:;pail 1. Project is ® New 0 Modification (of an existino „iii) If Modification, Permit No.. 2. Owner ! Public (skip to ,11B(3)) 2a. If private, apt n v it be: ❑ Private (go to Item 2(a)) ❑ Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Leasing units (lots, townhomes, etc. - skip to Item 8(3)) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) 3. Fayetteville Public Works Commission (PWC) Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 2b. If sold, facilities owned by a (must choose one) ❑ Public Utility (Instruction III) ❑ Homeowner Assoc./Developer (Instruction IV) 4a. Cross Creek Water Reclamatoin Facility Name of WWTF 5a. Eastover Sanitary District PWC 15b. 18 inch Owner of Downstream Sewer Receiving Sewer Size 4b. NPDES # NC0023957 WWTF Permit No. 5c. W00022859 8 The origin of this wastewater is (check all that apply): W a ® Residential Subdivision ® Car Wash ® Apartments/Condominiums 0 Institution ® Mobile Home Park ❑ Hospital ❑ School ® Church ® Restaurant ® Nursing Home ® Office ® Other (specify): Hotel .............. .... ... . 7 Volume of wastewater to be permitted in this project: 0 gallons per day . If the permitted flow is zero, indicate why: ❑ Interceptor Line - Flow will be permitted is subsequent permits that connect to this line ® Flow has already been allocated in Permit No. WQ0022859 ❑ Rehabilitation or replacement of existing sewer with no new flow expected Permit Number of Downstream Sewer (if known) 100 % Domestic/Commercial 0 % Industrial % Other (specify): FTA n1inz 1FAST-TRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4 9 Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(I)(1-2) must be approved prior to submittal of this application. Submit a separate request to the Division of Water Quality, Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 in accordance with 15A NCAC 2H .0219(I)(3). The Eastover Approach Main (WQ0022859) is currently,- .. permitted for 1,000,000 GPD and currently using less than 100,000 GPD. The three pump stations and two gravity lines in this project that will tie into the Approach Main will produce approximately 170,000 gallons per day based on the following calculations: 357 residences x 360 gal /residence; 100 motel/rest home beds x 120 gal/bed; 4,000 SF of church schools x 40 gal/15 SF; 3,000 SF of restaurant x 40 gal/15 SF; 200 day care students x 15 gal/student; 32 commercial WC x 250 gal/WC 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 15-inch 12-inch 0 10-inch W 8-inch H6-inch 0 c-) 0 H 11. 2 0 IL Z H 2 a 12. ENTER TOTAL LINE LENGTH IN MILES Length (feet) 8,473 520 Gravity or Force Main (use the pull down menu) Gravity Gravity 9,389 Gravity 29,830 Gravity 9,283 Force Main 10.9 Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID (self chosen - as shown on Design Flow Operational Point plans for cross-reference) (MGD) GPM @ TDH .063 280 @ 75 initial E4 .14 310 @ 82 future .02 180@22.4 E5 .04 220 @ .28 .056 210 @ 71 FR 10 "115@76 2 Does the sewer system comply with the Minimum Desigi 0..' •ia for tha Fact Traci, Permitting of Pump S}-+H r,s and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and as a ® Yes ❑ No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested: Power Reliability Option (1- dual line feed; 2- permanent generator w/ATS; 3- portable generator w/telemetry; 4-wet well storage) SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? ❑ Yes ❑ No ® N/A Sedimentation and Erosion Control Plan? ® Yes ❑ No ❑ N/A Stormwater? ❑ Yes ❑ No ® N/A FTA 02/03 `FAST-tRACK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 5 0 CZ U) —J V 2 re cn V cn Z 0 a LL F- ce W 0 1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: ❑ A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody. AND, ® A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map (self chosen - as shown on map for cross-reference) 1 2 3 Name of Waterbody Gum Log Canal trib to Locks Creek Reece Creek County Cumberland Cumberland Cumberland Waterbody Stream River Basin Index Cape Fear 18-28-1 Waterbody Classification C Cape Fear 18-28 C Cape Fear 18-28-2 C Submit the 8.5" x 11" topographic map as required in Instruction VI regardless of whether a classification is provided! Applicant's Certification: 1, Morgan Johnson, attest that this application for Phase I Eastover Sewer Improvements has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. la. Signing Official Sig ature 2. Professional Engineer's Certification: r7? cam„ 4 / / z Date / attest that this application for Phase I Eastover Sewer Improvements has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. Kevin S. Lindsay Professional Engineer Name 2b. Hobbs, Upchurch & Associates, P.A. Engineering Firm 2c. .P.O. Box 1737 Address 2d. Southern Pines 2e. NC City State 2g. (910) 692-5616 2h. (910) 692-4795 Telephone Facsimile 2f. 28388 Zip 2i. klindsay@hobbsupchurch.com E-mail F_� G ILL, O 027502 *to-0,4P :2 r- v6 Seal, Signature & Date FTA 02/03 Name: VANDER Date: 3/1/2006 Scale: 1 Inch equate 2000 feet I ► b381.. i 1• 107i3014T d.t a1i ► ri14E1. Location: 035° 05' 57.0" N 078° 47' 17.2" W Caption: Phase 1, Eastover Sanitary Sewer Improvements Copyright (C) 1997, Maptech, Inc. PRELIMINARY PUMP STATION / FORCE MAIN DESIWL CALCULATIONS PROJECT: EASTOVER 4, EASTOVER SANITARY SEWER SYSTEM, PHASE I DATE: DECEMBER-05 CUMBERLAND CO., NC PUMP STATION DESIGN: A. WASTEWATER FLOWS EXPECTED INITIAL CUSTOMERS RESIDENTIAL= 110 *360/RES= 39,600 REST HOME BEDS 50 *I20/BED= 6,000 MOTEL BEDS 50 *120/BED= 6,000 RESTAURANTS SF 3000 *40/15 SF= 8,000 DAY CARE PERSONS 100 *15/PER= 1,500 SVC STA WC 10 *250/WC= 2,500 COMMERCIAL= 24,000 TOTAL INITIAL 63,600 FUTURE FLOW 140,000 I. PROJECTED FLOWS 2. PEAK FLOW V AR 2004 FLOW 70,000 r,Pn x 3.00 = 210,000 GPD I YR. Q, PEAK = 145.83 GPM B. YEAR 2024 FLOW 140,000 GPD x 2.50 = 350,000 GPD 20 YR. 7rAK = 243.06 GPM 3. TARGET PUMPING RATE USE 280 GPM FOR INITIAL TARGET PUMPING RATE USE 250 GPM FOR FUTURE TARGET PUMPING RATE B. PUMP STATION / FORCE MAIN DESIGN CRITERION THE EASTOVER 4 (E-4) PUMP STATION WILL BE DUPLEX CONFIGURATION WITH ABOVE GROUND SELF -PRIMING PUMPS. THE STATION DISCHARGE PIPING ON THE PUMP STATION SITE WILL BE CONFIGURED TO ALLOW FOR BY-PASS PUMPING. EMERGENCY POWER GENERATION WILL BE INCLUDED ON -SITE. I. PIPING A. STATION PIPING B. FORCE MAIN PIPING SUCTION: DISCHARGE: H-W FRICTION COEFFICIENTS: H-W FRICTION COEFFICIENTS: C. TOTAL FORCE MAIN LENGTH D. TARGET PUMPING RATE (10-YR.) VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE HEADLOSS IN FM PER 1,000 FT. (C=I40) E. TARGET PUMPING RATE (20-YR.) VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE HEADLOSS IN FM PER 1,000 FT. (C=120) 2. WET WELL DIMENSIONS AND ELEVATIONS A. B. C. D. E. F. G. H. I . J. K. L. M. N. INSIDE DIMENSIONS, AREA (SF) PUMP STATION RIM ELEVATION CENTERLINE PUMP ELEVATION INVERT OF INFLUENT LINE HIGH LEVEL ALARM LAG PUMP ON LEAD PUMP ON PUMP OFF Low LEVEL ALARM BOTTOM WET WELL DETENTION VOLUME FORCE MAIN HIGH POINT FORCE MAIN DISCHARGE ELEVATION CYCLE TIME : PUMP ON TIME PUMP OFF TIME PUMPING CYCLE DETENTION TIME IN FM= 159 4 " D.I.P. 4 " D.I.P. C= 140 C= 120' 6"PVC 4,350 FT. 280 GPM (INITIAL SERVICE) (END OF SERVICE) C= 140 (INITIAL SERVICE) C= 120 (END OF SERVICE) 3.18 FPS 6.19 FT. 250 GPM 2.84 FPS 6.67 FT. YR. - 2004 8.00 FT. DIA. 50.24 100.00 FT. MSL 102.50 FT. MSL 94.42 FT. MSL 93.92 FT. MSL 92.92 FT. MSL 92.42 FT. MSL 90.92 FT. MSL 90.42 FT. MSL 89.42 FT. MSL 563.69 GAL. 122.50 FT. MSL 121.50 FT. MSL YR. - 2024 R nn rT 100.00 FT. MSL 102.50 FT. MSL 94.42 FT. MSL 93.92 FT. MSL 93.42 FT. MSL 92.92 FT. MSL 90.92 FT. MSL 90.42 FT. MSL 89.42 FT. MSL 751.59 GAL. 122.50 FT. MSL 121.50 FT. MSL 2.44 MIN. 4.92 MIN. 11.60 MIN. 7.73 MIN. 14.03 MIN. 12.65 MIN. MIN ?4 SF @280 GPM 11.58 3. STATIC HEAD: FORCE MAIN MAX. ELEV. PUMP OFF ELEV. TOTAL STATIC LIFT 4. FRICTION LOSSES: A. PUMP STATION PIPING 130.00 FT. 90.92 FT. 39.08 FT. NOMINAL FITTING / VALVE DIAMETER DESCRIPTION EQUIVALENT LENGTH TOTAL EQUIVALENT # PER FITTING / VALVE LENGTH %ri. I CA./ (FT.) 6 ci)4-INCH 4-INCH STRAIGHT PIPE - - 13.08 4-INCH SWING, CHECK. VALVE I 39.00 39.00 90 - DEGREE BEND 2 ; 8.00 16.00 4-INCH STRAIGHT PIPE 4-INCH SWING, CHECK VALVE 4-INCH PLUG VALVE 4-INCH 90 - DEGREE BEND B. FORCE MAIN PIPING: UBTOTAL SUCTION PIPING 4 4.00 8.00 SUBTOTAL DISCHARGE PIPING 1 68.08 8.50 39.00 4.00 32.00 93.50 TOTAL 4' DIA. STATION PIPING NOMINAL DIAMETER FITTING / VALVE DESCRIPTION # EQUIVALENT LENGTH PER FITTING / VALVE (FT. / EA.) TOTAL EQUIVALENT LENGTH (FT.) 6-INCH STRAIGHT PIPE (PVC)) - - 4,350 6-INCH CHECK VALVE 0 120.00 0.00 6-INCH . 45/90 - DEGREE BENDS 6 8.00 48.00 6-INCH PLUG VALVE 3 4.00 12.00 I TOTAL 6' DIA. PIPING 4,410.00 5. NET POSITIVE SUCTION HEAD (AVAILABLE) STATIC SUCTION LIFT = NPSH(A) = P(ATM.) - (SUCTION LIFT + SUCTION FRICTION + VAPOR PRESSURE) = NPSA REQUIRED REPRIME AVAIL= REPRIME REQ= 161.58 1 25 FT 10.08 FT 14.92 OK 19.26 FT. 6 FT. AVAILABLE -REQUIRED = 13.26 FT--O.K. 6. PROJECTED SYSTEM CURVES O 0 0 -J U- STATIC HEADLOSS I FRICTION HEADLOSS VELOCITY HEADLOSS TOTAL HEAD (BEGIN SERVICE) TOTAL HEAD (END SERVICE) vi FLUID n HORSEPOWER n (INITIAL) , PUMP STATION (BEGIN SERVICE) FORCE MAIN (BEGIN SERVICE) PUMP STATION (END SERVICE) FORCE MAIN (END SERVICE) (GPM) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) 0 39.08 0.00 0.00 0.00 1 0.00 0.00 39.08 39.08 _ 0.00 50 39.08 0.30 1.13 0.40 1.50 0.01 40.51 40.98 1.02 100 39.08 1.07 4.06 1.43 5.40 0.02 44.23 45.93 2.23 150 39.08 2.27 8.60 3.02 11.44 0.05 50.00 53.58 3.79 200 39.08 3.87 14.65 5.14 19.48 0.08 57.67 63.78 5.83 250 39.08 5.84 22.13 7.77 29.43 0.13 67.18 76.41 8.48 280 39.08 7.20 27.29 9.58 36.30 0.16 73.73 85.12 10.43 330 39.08 9.76 36.99 12.98 49.19 0.22 86.05 101.48 14.34 380 39.08 12.67 48.02 16.86 63.86 0.29 100.06 120.09 19.20 430 39.08 15.93 60.36 21.19 80.27 0.37 115.74 140.91 25.13 480 39.08 19.53 73.98 25.97 98.39 0.46 133.04 163.90 32.25 530 39.08 23.45 88.86 31.19 118.19 1 0.56 151.96 189.02 40.68 580 39.08 27.71 104.99 36.86 139.64 0.67 172.45 216.25 50.52 630 39.08 32.29 122.34 42.95 162.72 0.79 194.51 245.54 61.89 680 39.08 37.19 140.91 49.47 187.41 0.93 218.11 276.88 74.91 730 39.08 42.41 160.68 56.40 213.70 1.07 243.23 310.25 89.68 780 39.08 47.94 181.63 63.76 241.56 1.22 269.86 345.62 106.31 830 39.08 53.78 203.75 71 3 270.99 1.38 297.99 382.97 124.91 88u 39.08 59.93 227.0470 25' ' ° 7n -n1.96 1.55 327.59 422.29 145.60 930 39.08 66.38 88.28 334.4b 1.73 35o.(,e 463.55 168.46 980 �? ^R . _ " ' 277.06 97.26 368.49 1.92 391.19 5ub. i J lb' 1000 39.08 75.91 287.61 100.96 382.52 2.00 404.60 524.57 � 204.35 I C. PUMP SELECTION I. DUPLEX NON -CLOG SUBMERSIBLE SEWAGE PUMPS A. SELECTED PUMP T4A3S-B B. PUMP DISCHARGE 4 INCHES PUMP SUCTION 4 INCHES C. MOTOR HORSEPOWER 15 HP D. MOTOR SPEED 1625 - RPM E. ELECTRICAL SERVICE 240 VOLT 3 PHASE F. IMPELLER DIAMETER 9 3/4 INCHES G. SOLIDS 3 INCHES H. TARGET Q v. HD.: 280 GPM @ 75.00 FT. TDH 2. ESTIMATED PUMPING RATE (ONE PUMP RUNNING) PUMP CAPACITY: 280 GPM @ 74 FT. TDH 3. ESTIMATED PUMPING RATE ENQ OF SERVJCE (I PUMP) PUMP CAPACITY: 250 GPM/EA. @ 76 FT. TDH TOTAL HEAD 100 95 90 85 80 PUMP CURVE (Q) FLOW (GPM) 2(Q) FLOW (GPM) TOTAL HD. (FT.) 0 0 92.00 50 100 89.00 100 200 85.50 150 300 82.50 200 400 80.00 250 500 77.00 300 600 74.00 350 700 71.50 75 70 65 60 55 50 45 40 -wo.-- 35 30 25 20 15 10 5 0 0 50 100 150 200 250 300 350 400 GALLONS / MINUTE 15 10 5 0 HORSEPOWER ! 50% EFF. GORMAN RUPP T4A-B ""'m'"""SYSTEM CURVE (INITIAL) Two PUMPS IN PARALLEL SYSTEM CURVE (END) HORSEPOWER @ 50% EFF. PRELIMINARY PUMP STATION / FORCE MAIN DESIGN CALCULATIONS PROJECT: EASTOVER 5, EASTOVER SANITARY SEWER SYSTEM, PHASE I CUMBERLAND CO., NC PUMP STATION DESIGN: A. WASTEWATER FLOWS EXPECTED INITIAL CUSTOMERS RESIDENTIAL= 50 *360/RES= 18,000 REST HOME BEDS 0 *120/BED= 0 MOTEL BEDS 0 *120/BED= 0 RESTAURANTS SF 0 *40/15 SF= 0 DAY CARE PERSONS 0 *15/PER= 0 COMM/PUBLIC WC 10 *250/WC= 2,500 COMMERCIAL= 2,500 TOTAL INITIAL 20,500 FUTURE FLOW 40,000 1. PROJECTED FLOWS 2. PEAK FLOW DATE: DECEMBER-05 A. YEAR 2004 FLOW 20,500 GPD X 3.00 = 61,500 GPD I YR. Q, PEAK = 42.71 GPM B. YEAR 2024 FLOW 40,000 GPD X 3.00 = 120,000 GPD 20 YR. Q, PEAK = 83.33 GPM 3. TARGET PUMPING RATE USE 190 GPM FOR INITIAL TARGET PUMPING RATE USE 180 GPM FOR FUTURE TARGET PUMPING RATE B. PUMP STATION / FORCE MAIN DESIGN CRITERION THE EASTOVER 5 (E-5) PUMP STATION WILL BE DUPLEX CONFIGURATION WITH ABOVE GROUND SELF -PRIMING PUMPS. THE STATION DISCHARGE PIPING ON THE PUMP STATION SITE WILL BE CONFIGURED TO ALLOW FOR BY-PASS PUMPING. EMERGENCY POWER GENERATION WILL BE INCLUDED ON -SITE. I. PIPING A. STATION PIPING B. FORCE MAIN PIPING SUCTION: DISCHARGE: H-W FRICTION COEFFICIENTS: H-W FRICTION COEFFICIENTS: C. TOTAL FORCE MAIN LENGTH D. TARGET PUMPING RATE (10-YR.) VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE HEADLOSS IN FM PER 1,000 FT. (C=130) E. TARGET PUMPING RATE (20-YR.) VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE HEADLOSS IN FM PER 1,000 FT. (C=130) 2. WET WELL DIMENSIONS AND ELEVATIONS A. B. C. D. E. F. G. H. I . J. K. L. M. N. INSIDE DIMENSIONS, AREA (SF) PUMP STATION RIM ELEVATION CENTERLINE PUMP ELEVATION INVERT OF INFLUENT LINE HIGH LEVEL ALARM LAG PUMP ON LEAD PUMP ON PUMP OFF LOW LEVEL ALARM BOTTOM WET WELL DETENTION VOLUME FORCE MAIN HIGH POINT FORCE MAIN DISCHARGE ELEVATION CYCLE TIME : PUMP ON TIME PUMP OFF TIME _ PUMPING CYCLE FM DENETION TIME= 86 YR. - 2004 6.00 FT. DIA. 128.00 FT. MSL 130.50 FT. MSL 114.17 FT. MSL 113.67 FT. MSL 112.67 FT. MSL 112.17 FT. MSL 110.67 FT. MSL 110.17 FT. MSL 109.17 FT. MSL 317.08 GAL. 134.00 FT. MSL 128.10 FT. MSL 1.80 MIN. 22.27 MIN. 24.08 MIN. MIN 4 " D.I.P. C=140 C= 120 6 " PVC 770 FT. 28.26 181 GPM 176 GPM C= 140 C=120 2.06 FPS 2.76 FT. 2.00 FPS 3.49 FT. YR. - 2024 6.00 FT. DIA. 128.00 FT. MSL 130.50 FT. MSL 114.17 FT. MSL 113.67 FT. MSL 113.17 FT. MSL 112.67 FT. MSL 110.67 FT. MSL 110.17 FT. MSL 109.17 FT. MSL 422.77 GAL. 134.00 FT. MSL 128.10 FT. MSL 2.78 MIN. 15.22 MIN. 18.00 MIN. (INITIAL SERVICE) (END OF SERVICE) (INITIAL SERVICE) (END OF SERVICE) 28.26 SF 3. STATIC HEAD: FORCE MAIN MAX. ELEV. PUMP OFF ELEV. TOTAL STATIC LIFT 4. FRICTION LOSSES: A. PUMP STATION PIPING 130.00 FT. 110.67 FT. 19.33 FT. NOMINAL DIAMETER FITTING / VALVE DESCRIPTION # EQUIVALENT LENGTH PER FITTING / VALVE (FT. / EA.) TOTAL EQUIVALENT LENGTH (FT.) SUCTION SIDE 4-INCH STRAIGHT PIPE - 21.33 4-INCH. SWING CHECK VALVE 1 39.00 39.00 4-INCH ,90 - DEGREE BEND 2 8,00 16.00 SUBTOTAL SUCTION PIPING 76.33 DISC SIDE 4-INCH STRAIGHT PIPE - - 18.50 4-INCH SWING CHECK VALVE 1 39.00 39.00 4-INCH i PLUG VALVE 1 4.00 4.00 4-INCH 90 - DEGREE BEND 4 . 8.00 32.00 SUBTOTAL DISCHARGE PIPING 93.50 v1AL 4• EY!A. Si0411V1% i mmu B. FORCE MAIN PIPING: NOMINAL DIAMETER FITTING / VALVE DESCRIPTION # EQUIVALENT LENGTH PER FITTING / VALVE (FT. / EA.) TOTAL EQUIVALENT LENGTH (FT.) 6-INCH , STRAIGHT PIPE (PVC)) - - 770 6-INCH '` CHECK VALVE 0 120.00 _ 0.00 6-INCH- 45/90 - DEGREE BENDS 4 8.00 32.00 6-INCH PLUG VALVE 2 4.00 8.00 TOTAL 6' DIA. PIPING 810.00 5. NET POSITIVE SUCTION HEAD (AVAILABLE) @ 181 GPM REPRIME AVAIL= REPRIME REQ. 169.83 19 FT 18.33 FT 0.67 OK STATIC SUCTION LIFT = 19.83 FT NPSH(A) = P(ATM.) - (SUCTION LIFT + SUCTION FRICTION + VAPOR PRESSURE) = 11.5528 FT. NPSA REQURED = 5.00 FT. AVAILABLE -REQUIRED = 6.55 FT. O.K. 6. PROJECTED SYSTEM CURVES Flow (0) STATIC HEADLOSS FRICTION HEADLOSS VELOCITY HEADLOSS TOTAL HEAD (BEGIN SERVICE) TOTAL HEAD (END SERVICE) FLUID HORSEPOWER (INITIAL) PUMP STATION (BEGIN SERVICE) FORCE MAIN (BEGIN SERVICE) PUMP STATION (END SERVICE) FORCE MAIN ,(END SERVICE) (GPM) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) (50% EFF.) 0 19.33 0.00 0.00 0.00 0.00 0.00 19.33 19.33 0.00 20 19.33 0.06 0.04 0.08 0.05 0.00 19.43 19.46 0.20 40 19.33 0.21 0.14 0.28 0.18 0.00 19.68 19.79 0.40 60 19.33 0.44 0.29 0.58 0.39 0.01 20.07 20.31 0.61 80 19.33 0.75 0.49 0.99 0.66 0.01 20.58 20.99 0.83 100 19.33 1.13 0.75 1.50 0.99 0.02 21.22 21.84 1.07 120 19.33 1.58 1.05 2.10 1.39 0.03 21.98 22.85 1.33 140 19.33 2.10 1.39 2.79 1.85 0.04 22.86 24.01 1.62 160 19.33 2.69 1.78 3.58 2.37 0.05 23.85 25.33 1.93 176 19.33 3.21 2.12 4.27 2.82 0.06 24.72 26.48 2.20 181 19.33 3.38 ?.24 4.49 2.97 0.07 25.01 " 26.86 2.29 190 19.33 3.70 2.45 4.91 3.25 0.07 25.54 27.57 2.45 210 19.33 4.45 2.94 �.^! .... " ^ , 26 Al 29.25 2.84 230 19.33 5.26 3.4,, 7.00 4.63 0.11 28.18 31. v, 3.27 250 _ 19.33 , 6.14 4.06 8.17 5.41 0.13 29.66 33.03 270 19.33 7.08 4.69 9.41 6.23 0.15 31.24 35.12 4.26 29G 19.33 8.08 5.35 10.75 7. H 0.17 32.93 37.36 4.82 310 i9.33 9.14 6.05 1?.!6 8.05 0.19 34.71 39.73 5.44 330 19.33 10.26 6.79 13.65 9.04 0.22 36.60 42.23 6.10 350 19.33 11.44 7.57 15.22 10.07 0.25 38.59 44.87 6.82 370 19.33 12.68 8.40 16.86 11.17 0.27 40.68 47.63 7.60 390 19.33 13.98 9.25 18.59 12.31 0.30 42.87 50.53 8.44 C. PUMP SELECTION I. DUPLEX NON -CLOG SUBMERSIBLE SEWAGE PUMPS A. SELECTED PUMP T4A3S-B B. PUMP DISCHARGE 4 INCHES PUMP SUCTION 4 INCHES C. MOTOR HORSEPOWER 5 HP D. MOTOR SPEED 950 RPM E. ELECTRICAL SERVICE 240 - VOLT 3 PHASE F. IMPELLER DIAMETER 9 3/4 INCHES G. SOLIDS 3 INCHES H. TARGET Q V. HD.: 181 GPM @ 25.00 FT. TDH 2. ESTIMATED INITIAL PUMPING RATE (ONE PUMP RUNNING) PUMP CAPACITY: 181 GPM @ 25.00 FT. TDH 3. ESTIMATED END SERVICE PUMPING RATE (ONE PUMP RUNNING) PUMP CAPACITY: 50 45 40 35 0 30 a W a 25 f- 0 1- 20 15 10 5 176 GPM/EA. @ 26.80 FT. TDH PUMP CURVE (Q) FLOW (GPM) 2(Q) FLOW (GPM) TOTAL HD. (FT.) 0 0 32.00 50 100 30.00 100 200 28.00 150 300 26.00 180 360 25.25 200 400 24.50 250 500 23.00 300 600 22.00 0 0 50 100 150 200 250 300 GALLONS / MINUTE 15 10 5 0 HORSEPOWER 0 50% EFF. GORMAN RUPP T4A-B SYSTEM CURVE (INITIAL) Two PUMPS IN PARALLEL SYSTEM CURVE (END) -HORSEPOWER @ 50% EFF. PRELIMINARY PUMP STATION / FORCE MAIN DESIGN CALCULATIONS PROJECT: PUMP STATION DESIGN: A. WASTEWATER FLOWS EASTOVER 6, EASTOVER SANITARY SEWER SYSTEM, PHASE I CUMBERLAND CO., NC EXPECTED INITIAL CUSTOMERS RESIDENTIAL= 130 *360/REs= 46,800 REST HOME BEDS MOTEL BEDS CHURCH SCHOOL DAY CARE PERSONS COMM/PUBLIC WC COMMERCIAL= TOTAL INITIAL FUTURE FLOW 1. PROJECTED FLOWS 2. PEAK FLOW A. YEAR 2004 FLOW 56,133 GPD B. YEAR 2024 FLOW 100,000 GPD 3. TARGET Pt.'!'. " USE USE 0 *I20/BED= 0 *120/BED= 2000 *40/15 SF= 100 *15/PER= 10 *250/WC= x x 0 0 5,333 1,500 2,500 9,333 56,133 100,000 3.00 2.50 168,400 GPD 250,000 GPD 210 GPM FOR INITIAL TARGET PUMPING RATE 190 GPM FOR FUTURE TARGET PUMPING RATE DATE: DECEMBER-05 I YR. Q, PEAK = 116.94 GPM 20 YR. Q, PEAK = 173.61 GP?.. B. PUMP STATION / FORCE MAIN DESIGN CRITERION THE EASTOVER 6 (E-6) PUMP STATION WILL BE DUPLEX CONFIGURATION WITH ABOVE GROUND SELF -PRIMING PUMPS. THE STATION DISCHARGE PIPING ON THE PUMP STATION SITE WILL BE CONFIGURED TO ALLOW FOR BY-PASS PUMPING. EMERGENCY POWER GENERATION WILL BE INCLUDED ON -SITE. I. PIPING A. STATION PIPING SUCTION: 4 " D.I.P. DISCHARGE: 4 " D.I.P. H-W FRICTION COEFFICIENTS: C= 140 C=120 B. FORCE MAIN PIPING 6 " PVC H-W FRICTION COEFFICIENTS: C='140 C=120 C. TOTAL FORCE MAIN LENGTH 3,670 FT. D. TARGET PUMPING RATE (10-YR.) 210 GPM VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE 2.38 FPS HEADLOSS IN FM PER 1,000 FT. (C=140) 3.63 FT. E. TARGET PUMPING RATE (20-YR.) 190 GPM VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE 2.16 FPS HEADLOSS IN FM PER 1,000 FT. (C=I20) 4.02 FT. 2. WET WELL DIMENSIONS AND ELEVATIONS A. INSIDE DIMENSIONS, AREA (SF) B. PUMP STATION RIM ELEVATION C. CENTERLINE FUMP ELtvA i wrJ D. INVERT OF INFLUENT LINE E. HIGH LEVEL ALARM F. LAG PUMP ON G. LEAD PUMP ON H. PUMP OFF I. LOW LEVEL ALARM J. BOTTOM WET WELL K. DETENTION VOLUME L. FORCE MAIN HIGH POINT M. FORCE MAIN DISCHARGE ELEVATION N. CYCLE TIME : PUMP ON TIME _ PUMP OFF TIME _ PUMPING CYCLE YR. - 2004 8.00 FT. DIA. 99.50 FT. MSL 102.00 FT. MSL bV.2/' FT MSL 80.69 FT. MSL 80.19 FT. MSL 79.69 FT. MSL 78.19 FT. MSL 77.69 FT. MSL 76.69 FT. MSL 563.69 GAL. 139.50 FT. MSL 136.20 FT. MSL 3.30 MIN. 14.46 MIN. 17.76 MIN. FM DETENTION TIME= 170 MIN 50.24 YR. - 2024 8.00' FT. DIA. 99.50rFT. MSL 102.00 FT. MSL 80.94 FT. Nc'r 80.69 F F. N'SL 80.19 FT. MSL 79.69 FT. MSL 78.19 FT. MSL 77.69 FT. MSL 76.69? FT. MSL 563.69 GAL. 139.50 FT. MSL ,136.20 FT. MSL 4.68 MIN. 8.12 MIN. 12.79 MIN. (INITIAL SERVICE) (END OF SERVICE) (INITIAL SERVICE) (END OF SERVICE) 50.24 SF 3. STATIC HEAD: FORCE MAIN MAX. ELEV. PUMP OFF ELEV. TOTAL STATIC LIFT 4. FRICTION LOSSES: A. PUMP STATION PIPING 130.00 FT. 78.19 FT. 51.81 FT. NOMINAL FITTING / VALVE DIAMETER DESCRIPTION EQUIVALENT LENGTH TOTAL EQUIVALENT # PER FITTING / VALVE LENGTH (FT / EA ) (FT.) SUCTION SIDE 4-INCH STRAIGHT PIPE - - 25.31 4-INCH SWING CHECK VALVE I 39.00 39.00 4-INCH 90 - DEGREE BEND 2 8.00 16.00 4-INCH 4-INCH:. `I) 4-INCH'- 4-INCH STRAIGHT PIPE SWING CHECK VALVE PLUG VALVE 90 - DEGREE BEND B. FORCE MAIN PIPING: 4 OTAL SUCTION PIPING 39.00 4.00 8.00 SUBTOTAL DISCHARGE PIPING 1 80.31 18.50 39.00 4.00 32.00 93.50 TOTAL 4' DIA. STATION PIPING 173.81 NOMINAL DIAMETER FITTING /VALVE DESCRIPTION # EQUIVALENT LENGTH PER FITTING / VALVE (FT. / EA.) TOTAL EQUIVALENT LENGTH (FT.) 6-INCH STRAIGHT PIPE (PVC)) - - 3,670 6-INCH CHECK VALVE 0 12000 0.00 6-INCH_ . 45/90 - DEGREE BENDS 3 8.00 24.00 6-INCH PLUG VALVE 2 4.00 8.00 I TOTAL 6' DIA. PIPING 3,702.00 5. NET POSITIVE SUCTION HEAD (AVAILABLE) STATIC SUCTION LIFT = 23.81 FT NPSH(A) = P(ATM.) - (SUCTION LIFT + SUCTION FRICTION + VAPOR PRESSURE) = NPSA REQUIRED AVAILABLE -REQUIRED REPRIME AVAIL= 25 REPRIME LIFT= 22.31 2.69 OK 7.39 FT. 5 MANUF. CURVE 2.39 OK 6. PROJECTED SYSTEM CURVES FLOW (Q) STATIC HEADLOSS FRICTION HEADLOSS VELOCITY HEADLOSS TOTAL HEAD (BEGIN SERVICE) TOTAL HEAD (END SERVICE) FLUID HORSEPOWER n (INITIAL) , PUMP STATION (BEGIN SERVICE) FORCE MAIN (BEGIN SERVICE) PUMP STATION (END SERVICE) FORCE MAIN (END SERVICE) (GPM) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) 0 51.81 0.00 0.00 0.00 0.00 0.00 - 51.81 51.81 0.00 10 51.81 0.02 0.05 0.02 0.06 0.00 51.87 51.90 0.26 30 51.81 0.12 0.37 0.17 0.49 0.00 52.30 52.47 0.79 50 51.81 0.32 0.95 0.43 1.26 0.01 53.08 53.50 1.34 70 51.81 0.60 1.76 0.79 2.34 0.01 54.18 54.96 1.92 90 51.81 0.95 2.81 1.26 3.73 0.02 55.58 56.82 2.53 110 51.81 1.38 4.07 1.83 5.41 0.02 57.28 59.07 3.18 130 51.81 1.87 5.54 2.49 7.37 0.03 59.26 61.71 3.89 150 51.81 2.44 7.22 3.25 9.60 0.05 61.52 64.71 4.66 170 51.81 3.08 9.10 4.09 12.11 0.06 64.05 68.07 5.50 190 51.81 3.78 11.18 5.03 14.87 0.07 66.85 71.78 6.41 210 51.81 4.55 13.46 6.05 17.90 0.09 69.91 ° 75.85 7.41 230 51.81 5.39 15.92 7.16 21.18 0.11 73.22 80.25 6.51 250 51.81 6.28 18.58 8.36 24.71 0.13 76.80 R5. u0 9. / U -; 3. 51.81 7.24 21.42 9.64 28.49 0.15 R^.' : 90.08 10.99 290 5(.'' 8.27 24.45 11.00 32.52 0 " 84.69 95.49 12.40 310 51.81 9.35 �' " � � 0.19 89.01 101.23 13.94 330 51.81 10.50 31.05 13.97 41.30 0.22 93.58 107.29 15.60 350 51.81 11.71 34.62 15.57 46.04 0.25 98.38 113.67 17.39 370 51.81 12.98 38.37 17.26 51.03 0.27 103.43 120.37 19.33 390 51.81 14.30 42.29 19.03 56.25 0.30 108.71 127.39 21.41 • C. PUMP SELECTION 1. DUPLEX NON -CLOG SUBMERSIBLE SEWAGE PUMPS A. SELECTED PUMP B. PUMP DISCHARGE PUMP SUCTION C. MOTOR HORSEPOWER D. MOTOR SPEED E. ELECTRICAL SERVICE F. IMPELLER DIAMETER G. SOLIDS H. TARGET Q V. HD.: T4A3S-B 4 INCHES 4 INCHES 15 HP 1550 RPM 240 VOLT 3 PHASE 9 3/4 INCHES 3 INCHES 280 GPM @ 75.00 FT. TDH 2. INITIAL SERVICE ESTIMATED PUMPING RATE (ONE PUMP RUNNING) PUMP CAPACITY: 210 GPM @ 70.00 FT. TDH 3. END OF SERVICE ESTIMATED PUMPING RATE (ONE PUMP RUNNING) TOTAL HEAD PUMP CAPACITY: 100 95 90 85 80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 0 50 100 190 GPM/EA. @ 72.00 FT. TDH 150 200 GALLONS / MINUTE 250 PUMP CURVE (Q) FLOW (GPM) 2(Q) FLOW (GPM) TOTAL HD. (FT.) 0 0 83.00 50 100 80.00 100 200 77.00 150 300 74.00 200 400 71.50 210 420 71.00, 250 500 68.50 300 600 66.00 300 15 0 GORMAN RUPP T4A-B SYSTEM CURVE (INITIAL) Two PUMPS IN PARALLEL SYSTEM CURVE (END) HORSEPOWER @ 50% EFF. Bouyancy Equation Pump Station Wet Wells Assumes that the Pump Station is empty Project: HUA Project #: Date: Eastover Sanitary District, PS E4 CU0301 May 25, 2006 Description Symb Buoyant Force of Psta Fb(p) = Specific Weight(H2O) S(w) = Weight of PS W = Volume acted on v1+2+3 = Total Weight of Psta W(p) Effective Wt of Overburden Soil Value 50,742.92 62.40 47,235.59 813.19 47,235.59 = 12,364.94 W(Psta) + W(soil) = Fb= Weight Differential (W(Psta) - Fb) IF: W(Psta) + W(soil) > Fb(Psta) IF: W(Psta) + W(soil) < Fb(Psta) Factor of Safety: 1.175 Pump Station Detail Unit Ibs lb/cf Ibs Equation Fb(p)=S(w) *V Specific Weight of Water Ibs See Detail 59,600.5 Ibs 50,742.9 Ibs 8,857.6 Ibs THEN, station is protected against buoyancy. THEN, buoyancy may be probable. Top of Slab EL: 100 1 112 Soil Grade EL: 99.7 ` Slab 8 4 Cylinder height 118.96 All Dimensions in inches Top of Siaii EL R9.4 Bottom of Slab EL 88.4 IL 4► V-3 V-2 96 --♦ V-4 V-1 V-3 3.96 Rim -soil ©ver- Burden 1 V-1 V-2 V-3 V-4 V Total Weight of Station Overburden Soil Volume Overburden Specific Weight Effective Weight of Soil = swtsoil) - sw(water) Overburden Soil Weight 1[u 89.36 cf 45.61 cf 678.22 cf 498.28 314.90 cf 47,235.59 Ibs 214.67 cf 120 # /cf 57.6 # /cf 12,364.94 Ibs 12 123 MH Bouyancy.xls Page 1 Bouyancy Equation Pump Station Wet Wells Assumes that the Pump Station is empty Project: HUA Project #: Date: Description Buoyant Force of Psta Specific Weight(H2O) Weight of PS Volume acted on Eastover Sanitary District, PS E5 CU0301 May 25, 2006 Symb Fb(p) = S(w) = W = V1+2+3 = Value 53,307.64 62.40 51,112.21 854.29 Total Weight of Psta W(p) 51,112.21 Effective Wt of Overburden Soil = 17,844.12 W(Psta) + W(soil) = Fb= Weight Differential (W(Psta) - Fb) IF: W(Psta) + W(soil) > Fb(Psta) IF: W(Psta) + W(soil) < Fb(Psta) Factor of Safety: 1.294 Unit Ibs lb/cf Ibs Ibs Equation Fb(p)=S(w) *V Specific Weight of Water See Detail 68,956.3 Ibs 53,307.6 Ibs 15,648.7 Ibs THEN, station is protected against buoyancy. THEN, buoyancy may be probable. Pump Station Detail Top of Slab EL: 128 88 Soil Grade EL: 127.7 Slab 8 V-2 Cylinder height 217.96 All ^;,pensions in inches Top of Slab EL 109.2 Bottom of Slab EL 108.2 i 12 H V-3 72 V-4 V-1 V-3 4.08 Over - B,izdon Rim -soil 71 1 V-1 V-2 V-3 V-4 V Total Weight of Station Overburden Soil Volume Overburden Specific Weight Effective Weight of Soil = sw(soil) - sw(water) Overburden Soil Weight 104 58.99 cf 28.16 cf 767.14 cf 513.54 340.75 cf 51,112.21 Ibs 309.79 cf 120 # /cf 57.6 # /cf 17,844.12 Ibs 12 MH Bouyancy.xls Page 2 la a Bouvancv Equation Pump Station Wet Wells Assumes that the Pump Station is empty Project: HUA Project #: Date: Eastover Sanitary District, PS E6 CU0301 May 25, 2006 Description Symb Value Unit Buoyant Force of Psta Fb(p) = 103,307.82 Ibs Specific Weight(H20) S(w) = 62.40 lb/cf Weight of PS W = 81,384.22 Ibs Volume acted on V1+2+3 = 1,655.57 Total Weight of Psta W(p) 81,384.22 Ibs Effective Wt of Overburden Soil = 34,447.68 W(Psta) + W(soil) = Fb= Weight Differential (W(Psta) - Fb) IF: W(Psta) + W(soil) > Fb(Psta) IF: W(Psta) + W(soil) < Fb(Psta) Factor of Safety: 1.121 Equation Fb(p)=S(w) *V Specific Weight of Water See Detail 115,831.9 Ibs 103,307.8 Ibs 12,524.1 Ibs THEN, station is protected against buoyancy. THEN, buoyancy may be probable. Pump Station Detail Top of Slab EL: 99.5 1 112 Soil Grade EL: 99.2 Slab 8 V-2 Cylinder height 265.72 All Dimensions in inches Top of Slab EL 76.7 Bottom of Slab EL 75.7 ♦+ 12 4 V-3 96 ► V-4 V-1_ V-3 4.08 I Rim -soil ©vet: Bi+rderi: 269.64 H 10ir 1 V-1 V-2 V-3 V-4 V Total Weight of Station Overburden Soil Volume Overburden Specific Weight Effective Weight of Soil = swtsoil) - sw(water) Overburden Soil Weight 132 95.03 cf 45.61 cf 1,514.93 cf 1,113.01 542.56 cf 81,384.22 Ibs 598.05 cf 120 # /cf 57.6 # /cf 34,447.68 Ibs 12 MH Bouyancy.xls Page 3 , �a • WILSON A. LACY, COMMISSIONER TERRI UNION, COMMISSIONER LUIS J. OLIVERA, COMMISSIONER MICHAEL G. LALLIER, COMMISSIONER STEVEN K. BLANCHARD, CEO/GENERAL PUBLIC WORKS COMMISSION OF THE CITY OF FAYETTEVILLE MANAGER ELECTRIC & WATER UTILITIES January 23, 2007 Mr. Morgan Johnson Eastover Sanitary District P.O. Box 1083 Fayetteville, NC 28302 Subject: Phase I Eastover Sanitary Sewer Improvements Dear Mr. Johnson: 955 OLD WILMINGTON RD P.O. BOX 1089 FAYETTEVILLE, NORTH CAROLINA 28302-1089 TELEPHONE (AREA CODE 910) 483-1401 FAX (AREA CODE 910) 829-0207 Enclosed, please find a flow acceptance letter from PWC for the subject project. In accordance with the documentation provided to this office, the flow acceptance letter is for 170,000 gallons per day. Please note that this flow was previously permitted as part of the Eastover Approach Main project. _..::;;t +Fiat PWC has not approved the plans for this project. our comments on the plans directly to Mr. Kevin Lindsay, P F once our comments have been addressed, PWC wi;. ^pnd you a letter "'i'i lining the plans. Should you have any questions or require additional information regarding this project, please contact Mr. John Allen at (910) 223-4734. Your cooperation is appreciated. Sincerely, P .: LIC WORKS COMMISSION (J 4 / Joseph E. Glass, P.E. Manager Water Resources Engineering Enclosure cc: Tr t Allen (DENR) Kevin Lindsay Bill Berry Project file BUILDING COMMUNITY CONNECTIONS SINCE 1905 AN EQUAL EMPLOYMENT OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER si • Hobbs, Upchurch & Associates, P.A. Consulting Engineers 300 S.W. Broad Street • Post Office Box 1737 • Southern Pines, NC 28388 January 26, 2007 JAN 1 8 Trent Allen Fayetteville Regional Office 225 Green Street, Suite 714 Fayetteville, NC 28301 RE: Sewer Permit Modification Phase I, Eastover Sanitary Sewer Improvements For Eastover Sanitary District HUA No. CU0301.320 Dear Trent: Please find the attached Sewer Permit for the project referenr-..� above. An erosion control permit has been obtained (Cumbe-2006-174). The per —:,Led amount is zero because the flow w-,c already permitted as part of WQ0022859. If you should ?��•. ;:,,y ;,,;; , 4,.,:stions or concerns regarding this information, please do not hesitate to contact this office. Sincerely, HOBBS, UPCHURCH & ASSOCIATES, P.A., Kevin Linds(y, P.E. Project Manager Cc: Morgan Johnson, Eastover Sanitary District Tom Cooney, Cumberland County Utilities Director John Allen, Fayetteville PWC Southern Pines, NC • Telephone 910-692-5616 • Fax 910-692-7342 • e-mail: info@hobbsupchurch.com Myrtle Beach • Nags Head • Charlotte • Beaufort