Loading...
HomeMy WebLinkAboutNCG030562_DMR_20210202Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 02-02-2021 CERTIFICATE OF COVERAGE NO. N0003 0 5 6 2 FACILITY NAME New Buck Corporation COUNTY Mitchell PERSON COLLECTING SAMPLES Darren Duncan LABORATORY Pace Analytical Lab Cert. ## 12 / 40 Comments on sample collection or analysis: Part A. Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2020 SAMPLE PERIOD ® Jan -June ❑ July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ®Trout ❑PNA cc ❑zero -flow ❑Water Supply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 kWTRAL Ftl_ES p a SECTION ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks _ - 100 mg/L or 50 mg/L° 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 001 06-10-20 1.40 33.3 6.18 0.0056 <Q.Q05 0.0565 <5.0 0.0621 002 06-10-20 1.40 9.0 6.16 <0.005 <0.005 0.0873 <5.0 0.0873 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement. See General Permit, Section 8, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that cleflnition contained in the EPA Effluent Guidellnes for the facility subject to the requirement to sample (for metal finishing use the definition as found In 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/112018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed In the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (1TO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Steve Carpenter Name (Print name) Controller Title (Print title) Xl&_µme 02-02-2021 Signature Date Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tler 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 5o mg/V Parameter Code - "S29 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date:11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee --;--;z ) Date Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 3 of 3 New Buck Corporation P. O. Box 69 Spruce Pine, NC 28777 Phone: 828-765-6144 February 2, 2021 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699- l 617 Dear Sir: FAX: 828-765-0462 Please accept the late filing of the Stormwater Discharge Monitoring Report. I was asked to be a part of this ongoing process. We were all set for our first sample period for 2020. We received our sampling kit and waited for a measurable storm event which allowed us to take samples on June 10, 2020. 1 then hand carried them to Face Analytical in Asheville the next day. Here is where my problems began. I had earlier finished treatment for cancer. Before I received the test results from Pace Analytical, my wife had to have major surgery in Charlotte. Then four weeks later she had a second major surgery also in Charlotte. All this involved numerous follow up trips. As if this were not enough I battled kidney stones while helping take care of my Dad with dementia while he was hospitalized and died. Then, my sister and I were working on our Dad's estate when she died unexpectedly the week before Thanksgiving which left me as the primary care giver for my Mom. I have struggled trying to work enough to keep my job. This pandemic has been hard enough on our business. Needless to say, my personal situation added to that has made for a nearly impossible situation. I'm not trying to just give you a hard luck story but I need your understanding and help to move forward. I ordered and received the testing kit in mid -December for the second half of 2020. We have not had a measurable storm event since that time. We have had more snow than rain. The rain has not come within working hours. Thank you for your consideration. Respectfully. Steve Carpenter, Controller scarpenter@buckstove.com 'RECEIVED FEB 15 2021 ;ENTRAP. Fit.E5 DWR SECTION