Loading...
HomeMy WebLinkAboutWQ0022859_Application (FTSE)_20030714Michael F. Easley, Govemor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality July 23, 2003 Mr. Joseph Glass City of Fayetteville, Public Works Commission PO Drawer 1089 Fayetteville, NC 28302 SUBJECT: Permit No. WQ0022859 Eastover Approach Main Wastewater Collection System Extension Cumberland County Dear Mr. Glass: In accordance with your application received July 14, 2003, we are forwarding herewith Permit No. WQ0022859, dated July 23, 2003, to the City of Fayetteville, Public Works Commission for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H .0227 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minim Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted Ju- 2000 as applicable, unless specifically mentioned therein. Division approval is based on a of the certification provided by the North Carolina -licensed Professional Engineer name, application. It shall be the Permittee's responsibility to ensure that the as -constructed r appropriate design criteria and rules. Failure to comply may result in penalties in acr Carolina General Statute § 143-215.6A through § 143-215.6C, construction of add; replacement wastewater collection facilities, and/or referral of the North Carolina Professional Engineer to the licensing board. In accordance with provisions of Article 21 of Chapter 143, General Carolina as amended, and other applicable Laws, Rules, and Regulations, granted to the City of Fayetteville, Public Works Commission for the co• N. C. Division of Water Quality 225 Green Street -Suite 714 Fayetteville, NC 2830 Internet http://h2o.enr.state.nc.us/ndpu Customer Service 1- 800 623-7748 A 4 Mr. Glass Page 2 approximately 8,300 linear feet of 18-inch gravity sewer as well as approximately 6,900 linear feet of 10-inch force main as well as 20,000 linear feet of 12-inch force main to serve the proposed North Cumberland Regional Sewer System (NORCRESS), a County Water and Sewer District as part of the Eastover Approach Main project, and the discharge of 1,000,000 gallons per day of collected domestic and industrial wastewater into the City of Fayetteville, Public Works Commission Cross Creek Water Reclamation Facility's existing sewerage system, pursuant to the application received July 14, 2003 and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered as part of this permit. The sewage and wastewater collected by this system shall be treated in the City of Fayetteville, Public Works Commission Cross Creek Water Reclamation Facility (Permit No. NC0023957) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Grady Dobson at (910) 486-1541 extension 729. Sincerely, for Alan W. Klimek, P.E. Cumberland County Health Department Fayetteville Regional Office, Water Quality Section (WWTF Permit No. NC0023957) Mr. Kevin S. Lindsay, Hobbs, Upchurch & Associates, P.A. Water Quality Central Files PU f ti ► NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed prior to January 1, 2004 and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute § 143-215.1 C. a • t 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Upon completion of construction and prior to operation of these permitted facilities, a certification, a copy of the construction record drawings, as well as supporting design calculations for any pump stations permitted as part of this project shall be received from a North Carolina -licensed Professional Engineer certifying that the facilities have been installed in accordance with this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Main adopted June 1, 2000 as applicable; and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire project has been completed. A copy of the construction record drawings, indicating the facilities constructed in the phase being certified, shall be submitted with each partial certification. Mail the Engineer's Certification, one copy of the "Construction Record Drawings," and one copy of the supporting design calculations to the Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 2 f f i 11. Noncompliance Notification: The Permittee shall report by telephone to the Fayetteville Regional Office, telephone number (910) 486-1541, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Persons reporting such occurrences by telephone shall also file a written report in letter form within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Permit issued this the twenty-third of July 2003 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0022859 4 • i Z1111 1 r` Fast Track En¢ineerin2 Certification Permit No. WQ0022859 July 23, 2003 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION ❑ Partial ❑ Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the Eastover Approach Main, Cumberland County project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS FAYETTEVILLE REGIONAL OFFICE 225 GREEN STREET, SUITE 714 FAYETTEVILLE NC 28301 The Permittee is responsible for tracking all partial certifications up until a fmal certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. A t J • J1 Permit Number WQ0022859 Permit Tracking Slip 07/22/03 Program Category Non -discharge Permit Type. Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer grady.dobson Permitted Flow 1000000 Facility Fast Track Status Project Type In review New Project Version Permit Classification Individual Permit Contact Affiliation Facility Name Eastover Approach Main Location Address Owner Major/Minor Major Region Fayetteville County Cumberland Facility Contact Affiliation Owner Name PWC/Fayetteville Dates/Events Owner Type Government - Municipal Owner Affiliation Joseph Glass Post Office Drawer 1089 Fayetteville NC 28302 Scheduled Orig Issue App Received Draft Initiated Issuance 07/14/03 Regulated Activities Public Notice Apartment complex Car wash facility Condominium Restaurant School Wastewater collection Outfall NULL 733/e3 Effective Requested/Received Events Expiration Additional information requested Additional information received Waterbody Name Stream Index Number Current Class Subbasin USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: ,' 9 //,, (to be completed by DWQ) tvcr d .Q.? Z Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorizes signing' ffleiats!, 2003 1c. The legal entity who will own this system is: t_ ❑ Individual 0 Federal ® Municipality 0 State/County 0 Private Partnership 0 Corporation 0 Other (specify). ld. 955 Old Wilmington Road le. Fayetteville Street Address 1 f. North Carolina State 1 h. 310-223-4740 li. 910-829-0203 Telephone Facsimile 2. Project (Facility) Information: I Q 0 2a. Eastover Approach pproach Main 2b. Cumberland QBrief Project Name (permit will refer to this name) 3. Contact Person: Q 3a. Kevin S. Lindsay, PE, Hobbs, Upchurch & Associates Name and Affiliation of Someone Who Can Answer Questions About this Application .4'LICAZ'ION,for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 1. Owner: la. Public Works Commission, City of Fayetteville Full Legal Name (company, municipality, HOA, utility, etc.) 1 b. Joseph E. Glass City lg. 28301 Zip Code E-mail County Where Project is Located 3b. (910) 692-5616 Phone Number 3c. klindsay@hobbsupchurch.com E-mail 1. Proiect is 6a New fl Mntiifiratinn /nf an ovietinn normifl 14 II HOBBS, UPCHURCH & ASSOCIATES, P.A. BB&T CONSULTING ENGINEERS P.O. BOX 1737, 300 S.W. BROAD STREET SOUTHERN PINES, NC 28388 (910)692-5616 If RAndifinotin., Dnr...a Ist.. . (4-460 Exactly Four hundred and no / 100 Dollars PAY TO THE ORDER OF: N.C. DENR Branch Banking and Trust Company 66-112I531 DATE 7/1/2003 V AFTER 90 DAYS 33 4/ 1 AMOUNT $400.00 AUTHORIZED SIGNATURE ►al orrice U Other (specify): of wastewater to be permitted in this project: 1.000.000 gallons per day 8. If the permitted flow is zero, indicate why: ❑ Interceptor Line - Flow will be permitted is subsequent permits that connect to this line ❑ Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected FTA 02/03 FAST -TRACK !1PPLI(ATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 2 LI VIII. Environmental Assessments — If this project is subject to an Environmental Assessment (EA) [15A NCAC 01C .0500], this application can not be used. Send the project application on Form PSFMGSA 10/99 to the Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Applications can not be processed until a Finding of No Significant Impact (FONSI) or Environmental Impact Statement (EIS) has been issued. A copy is to be submitted with that permit application. ® IX. Certifications — Section D The application must be certified by both the applicant nd a -North Carolina Registered Professional Engineer (PE). The applicant signature must match the signing off ial listed in Item A(1 b). The PE should NOT certify the application if he/she is unfamiliar with 15A NCAC 2H .0200, the Gravity Sewer Minimum Design Criteria (most recent version) and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (most recent version), as applicable to the project. Certification by a PE who is unfamiliar with these documents is subject to NC Board referral. THE COMPLETED FTA 02/03 APPLICATION PACKAGE, INCLUDING ALL SUPPORTING DOCUMENTS AND $400 FEE, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 59 Woodfin Place Asheville, North Carolina 28801 (828) 251-6208 (828) 251-6452 Fax Avery, Buncombe, Burke, Caldwell, Cherokee, Clay, Graham, Haywood, Henderson, Jackson, Macon, Madison, McDowell, Mitchell, Polk, Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Fayetteville, North Carolina 28301 (910) 486-1541 (910) 486-0707 Fax Anson, Bladen, Cumberland, Harnett, Hoke, Montgomery, Moore, Robeson, Richmond, Sampson, Scotland Mooresville Regional Office 919 N Main Street Mooresville, North Carolina 28115 (704) 663-1699 (704) 663-6040 Fax Alexander, Cabarrus, Catawba, Cleveland, Gaston, Iredell, Lincoln, Mecklenburg, Rowan, Stanly, Union Raleigh Regional Office 1628 Mail Service Center Raleigh, North Carolina 27699-1628 (919) 571-4700 (919) 571-4718 Fax Chatham, Durham, Edgecombe, Franklin, Granville, Halifax, Johnston, Lee, Nash, Northampton, Orange, Person, Vance, Wake, Warren, Wilson Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 (252) 946-6481 (252) 975-3716 Fax Beaufort, Bertie, Camden, Chowan, Craven, Currituck, Dare, Gates, Greene, Hertford, Hyde, Jones, Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405 (910) 395-3900 (910) 350-2004 Fax Brunswick, Carteret, Columbus, Duplin, New Hanover, Onslow, Pender Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, North Carolina 27107 (336) 771-4600 (336) 771-4631 Fax Alamance, Allegheny, Ashe, Caswell, Davidson, Davie, Forsyth, Guilford, Rockingham, Randolph, Stokes, Surry, Watauga, Wilkes, Yadkin For more information, visit our web site at: http://h2o.enrstate.nc.us/ndpu/ FTA fly/(Al FASt'-TRACK rAPPLILATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 t v 2 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! : Application Number: /', //,, t (to be completed by DWQ) tf-, a��� 1. Owner: la. Public Works Commission, City of Fayetteville , .,4 t ) ' Full Legal Name (company, municipality, HOA, utility, etc.) k Z 1 b. Joseph E. Glass { 0 E lc. Signing The ■ Official legal entity Individual ■ Name and who will Federal own i1 Title (Please review this system Municipality is: ■ 15A NCAC State/County 2H ■ .0206(b) for authorize Private Partnership ■ p sig Corporation mg`lliffeia1sl� t— • 2003 Other (specify): C ld. 955 Old Wilmington Road 1 e. Fayetteville 0 LL Street Address City Z lf. North Carolina lg. 28301 Z State Zip Code 0 lh. I 310-223-4740 11 i. 910-829-0203 1 j. a () 2. —I O. 2a. Telephone Facsimile Project (Facility) Information: Eastover Approach Main 1 E-mail --- 2b. Cumberland p,. Brief Project Name (permit will refer to this name) i County Where Project is Located < 3. Contact Person: Q 3a. Kevin S. Lindsay, PE, Hobbs, Upchurch & Associates i 3b. (910) Name and Affiliation of Someone Who Can 692-5616 Answer Questions About this Application 3c. klindsay@hobbsupchurch.com Phone Number E-mail 1. Project is New • Modification (of an existing permit) If Modification, Permit No.: 2. Owner is ►Xl Public (skip to Item 8(3)) ■ Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one) • ■ • Retaining Ownership (i.e. store, church, Leasing units (lots, townhomes, etc. - skip Selling units (lots, townhomes, etc. - go single office, etc.) or to Item B(3)) to Item B(2b)) • • Public Utility (Instruction III) Homeowner Assoc./Developer (Instruction IV) Z 0 3. Fayetteville Public Works Commission (PWC) H Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 5 4a. Cross Creek Water Reclamatoin Facility 4b. NPDES # NC0023957 Name CC of WWTF WWTF Permit No. 0 5a. Fayetteville PWC 5b. 24 inch 5c. UNK Z Owner of Downstream Sewer Receiving Sewer Size Permit Number of Downstream Sewer (if known) H6. The origin of this wastewater is (check all that apply): 2 CC Ill a m ►Z1 ►1 ►�I 1 1 ►Z1 Residential Subdivision Apartments/Condominiums Mobile Home Park School Restaurant Office ►I 1Institution • ►i4 0 Car Wash 84 % Domestic/Commercial Hospital Church 16 % Industrial Nursing Home % Other (specify): ■ Other (specify): 7. Volume of wastewater to be permitted in this project: 1,000,000 gallons per day 8. If the permitted flow is zero, indicate why: ■ Interceptor Line - Flow will be permitted is subsequent permits that connect to this line • Flow has already been allocated in Permit No. ■ Rehabilitation or replacement of existing sewer with no new flow expected PTA IV) /n2 FAST-TRAeK!APPLIIATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4 A Z Z 0 V Z 0 H IC 0 Z B. PERMIT Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(I) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(I)(1-2) must be approved prior to submittal of this application. Submit a separate request to the Division of Water Quality, Non -Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 in accordance with 15A NCAC 2H .0219(I)(3). Initially, the Eastover Approach Main will receive and transmit sewage from the proposed North Cumberland Regional Sewer System (NORCRESS) a County Water and Sewer District that has applied for a separate permit for 440,000 gallons per day. Eastover Sanitary District, through which the Approach Main passes has received funding for a collection system. Due to the ongoing construction of the Fayetteville outer loop, the area is expected to grow and require up to 1,000,000 gallons per day. 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) 8,300 6,900 20,000 ENTER TOTAL LINE LENGTH IN MILES 6.67 Gravity or Force Main (use the pull down menu) Gravity Force Main Force Main Force Main Force Main Force Main Force Main 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Location ID f Power Reliability Option (self chosen - as shown on Design Flow (1- dual line feed; 2- permanent generator w/ATS; 3- plans for cross-reference) (MGD) portable generator w/telemetry; 4-wet well storage) El E-2 .045 1.0 Operational Point GPM Q TDH 180@16 1800 @129 2 2 12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable? ® Yes ❑ No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested: SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? ❑ Yes ❑ No ® N/A Sedimentation and Erosion Control Plan? ® Yes ❑ No ❑ N/A Stormwater? ❑ Yes ❑ No ® N/A FTA f 7/rlt FAST-TRACIOAPPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 5 t Z 0 ❑ A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody; AND LL N U) J U C. STREAM ❑ A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map (self chosen - as shown on map for cross-reference) 1 Name of Waterbody County UT -to Locks Creek UT -to Locks Creek UT -to Locks Creek UT -to Locks Creek UT -to Locks Creek UT -to Locks Creek Cumberland Cumberland Cumberland .......__ ...................._____.... _.. Cumberland ........................................ Cumberland .............._._.__._...................... Cumberland River Basin Cape Fear Cape Fear Cape Fear Cape Fear Cape Fear Cape Fear Waterbody Stream Waterbody Index Classification 18-28 18-28 18-28 18-28 18-28 18-28 C Submit the 8.5" x 11" topographic map as required in Instruction VI regardless of whether a classification is provided! 1. Applicant's Certification: 1, Joseph E. Glass, attest that this application for Fayetteveille Public Works Commission has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well . civil pe alties up to $25,000 per violation. l a. Signing!dfficial Signature Professional Engineer's Certification: 77o-03 Date I attest that this application for the Eastover Approach Main has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. Kevin S. Lindsay Professional Engineer Name 2b. Hobbs, Upchurch & Associates, P.A. Engineering Firm 2c. .P.O. Box 1737 Address 2d. Southern Pines City Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: 2e. NC 2f. 28388 State Zip 2g. (910) 692-5616 2h. (910) 692-4795 2i. klindsay@hobbsupchurch.com Telephone Facsimile E-mail Uniumum4pni 63 Seal,Signature & Date 1y 1 07ft° 48' O.00I W �. 076° 46' 0.00'I .:., 1, r ` antral H iRh 3° tI i + -'� ti; v 4 I3.7., 1 f tt• +4. .,- y , _ it �r - �AaaR4 moo 41 a' N.. 1 r:. • x /. 41 21 • / 1° ~ �/t/J�. 1. %••//gq �� �' I . � / ' / ` / C • ` \� , . \ , , ` Tower • t�, / • I. c. a • "/ • Y/jam■/{■f M .0,{ %(' • ..:. •`}¢ / . ; • S•,•. _/ .2, 'Zl�::.: �s . ' - hf �F- , .. " C .v{ I,• y_ I• G c .A // al ^ r r g fI 1.\• F Ci. /—IUU� -J /`� , 011, f ! - � • _ •` _...h .. ( .n -.," f �B74Ci f'eeofiisic- — [/,. \\ •I I I I` I I � 078° 48' I 0.00 W I` I I �� II 46' 0.004 W 1 r Name: VANDER Date: 6/20/2003 Scale: 1 inch equals 3333 feet Location: 035° 06' 01.8" N 078° 48' Caption: Eastover Approach Main 21.2" W opynght (C)1997, Maptech, Inc. Notes for Eastover Approach Main Water Crossings Location ID on Map Name of Water Body County River Basin Waterbody Stream Index Water Body Classification Notes 1 UT -Locks Creek Cumberland Cape Fear 18-28 C Will cross over existing culvert in roadside fill 2 UT -Locks Creek Cumberland Cape Fear 18-28 C Will cross under existing culvert in roadside fill 3 UT -Locks Creek Cumberland Cape Fear 18-28 C Will cross under existing culvert in roadside fill 4 UT -Locks Creek Cumberland Cape Fear 18-28 C Will directionally bore FM under culvert 5 UT -Locks Creek Cumberland Cape Fear 18-28 C Will cross under existing culvert in roadside fill 6 UT -Locks Creek Cumberland Cape Fear 18-28 C Will cross under existing culvert in roadside fill • t PRELIMINARY PUMP STATION / FORCE MAIN DESIGN CALCULATIONS PROJECT: PUMP STATION DESIGN: A. WASTEWATER FLOWS EASTOVER I, EASTOVER APPROACH MAIN DATE: JUNE-03 CUMBERLAND CO., NC NOTE: r0S P.S. tS opL Qv/Apv.)&- IrJTD ThE \O' FI"% f"` w A•44- ti 4 o FT. O J *2 u c u4- v vE w l Lc— P/L ,-4-- aim- f . d it 'FM t S co. t r ti?L.or es cJ - 2- - A s i2PA/V1 W eta? LAAL`-- IIe- P --`tToo s'PlL-7 . PS k o WASTEWATER FLOWS ARE BASED ON EXPECTED DEVELOPMENT AND CONNECTION TO THE EAST SIDE OF THE I-95/US 13 INTERCHANGE (45,000 GPD) WITH A GROWTH TO 60,000 BY 2024. THE FOLLOWING CALCULATIONS ARE BASED ON ELEVATIONS AND LINE LENGTHS FROM COMPLETED DESIGN SURVEY. I. PROJECTED FLOWS 2. PEAK FLOW SEWER SHED ESTIMATED 2004 ESTIMATED 2014 ESTIMATED 2024 GODWIN 10,000 'µfi 30,000 50,000.&A FALCON „'70,000Y 125,000 , '180,000'' WADE 1 "45.;.000'`; 125,000 210,000 WADE 2 125 000` 280,000 '•'4440,000 ESD I ' 45000 50,000 60;000 ESD 2 125;000 600,000 : 1,000,000 A. YEAR 2004 FLOW 45,000 GPD X 3.00 = 135,000 GPD 1 YR. Q, PEAK = 93.75 GPM 8. YEAR 2024 FLOW 60,000 GPD x 3.00 = 180,000 GPD 20 YR. Q, PEAK = 125.00 GPM 3. TARGET PUMPING RATE USE 180 GPM FOR INITIAL TARGET PUMPING RATE (180 IS MIN FOR 6" FM) USE 220 GPM FOR FUTURE TARGET PUMPING RATE (180 IS MIN FOR 6" FM) 4 B. PUMP STATION / FORCE MAIN DESIGN CRITERION THE EASTOVER I (E-I) PUMP STATION WILL BE DUPLEX CONFIGURATION WITH ABOVE GROUND VACUUM -PRIMING PUMPS. THE STATION DISCHARGE PIPING ON THE PUMP STATION SITE WILL BE CONFIGURED TO ALLOW FOR BY-PASS PUMPING. EMERGENCY POWER GENERATION WILL BE INCLUDED ON -SITE. I. PIPING A. STATION PIPING B. FORCE MAIN PIPING SUCTION: DISCHARGE: H-W FRICTION COEFFICIENTS: H-W FRICTION COEFFICIENTS: C. TOTAL FORCE MAIN LENGTH D. TARGET PUMPING RATE (10-YR.) VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE HEADLOSS IN FM PER 1,000 FT. (C=I30) E. TARGET PUMPING RATE (20-YR.) VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE HEADLOSS IN FM PER 1,000 FT. (C=I30) 2. WET WELL DIMENSIONS AND ELEVATIONS A. B. C. D. E. F. G. H. I . J. K. L. M. N. INSIDE DIMENSIONS, AREA (SF) PUMP STATION RIM ELEVATION CENTERLINE PUMP ELEVATION INVERT OF INFLUENT LINE HIGH LEVEL ALARM LAG PUMP ON LEAD PUMP ON PUMP OFF LOW LEVEL ALARM BOTTOM WET WELL DETENTION VOLUME FORCE MAIN HIGH POINT FORCE MAIN DISCHARGE ELEVATION CYCLE TIME : PUMP ON TIME PUMP OFF TIME PUMPING CYCLE YR. - 2004 8.00 FT. DIA. 125.50 FT. MSL 128.00FT. MSL 115.50 FT. MSL 113.50 FT. MSL 113.00 FT. MSL 112.50 FT. MSL 111.50 FT. MSL 111.00 FT. MSL 110.00 FT. MSL 375.80 GAL. 122.50 FT. MSL 121.50 FT. MSL 2.53 MIN. 12.03 MIN. 14.55 MIN. 50.24 4"D.I.P. 4"D.I.P. C= 125 C= 100 6[" PVC 40 FT. 180 GPM 2.04 FPS 3.13 FT. 220 GPM 2.50 FPS 4.54 FT. YR. - 2024 8.00 FT. DIA. 125.50 FT. MSL 128.00 FT. MSL 115.50 FT. MSL 115.00 FT. MSL 114.50 FT. MSL 114.00 FT. MSL 111.50 FT. MSL 111.00 FT. MSL 110,00> FT. MSL 939.49 GAL. 122.50 FT. MSL 121.50 FT. MSL 5.27 MIN. 22.55 MIN. 27.82 MIN. (INITIAL SERVICE) (END OF SERVICE) (INITIAL SERVICE) (END OF SERVICE) 50.24 SF d 3. STATIC HEAD: FORCE MAIN MAX. ELEV. PUMP OFF ELEV. 122.50 FT. I11.50 FT. TOTAL STATIC LIFT 11.00 FT. 4. FRICTION LOSSES: A. PUMP STATION PIPING NOMINAL FITTING / VALVE DIAMETER DESCRIPTION EQUIVALENT LENGTH TOTAL EQUIVALENT PER FITTING / VALVE LENGTH (FT. / EA.) (FT.) z 0 n15 N 4 INCH - ` STRAIGHT "PIPE: - - 25.00 4 INCH "-;: SWING CHECK VALVE 1 39.00 ` 39.00 °-:" ,"4 INGH,~. 90.- DEGREE BEND ` 2 8.00 " 16.00 SUBTOTAL SUCTION PIPING 80.00 61744keietli _0 w 4.ING f.;> 1104,414041611 STRAIGHT PIPE SWING.CHECK VALVE 3900 20.00' 39.00 PLUG VALVE 90 — DEGREE BEND 4.00', ., 8.00 4.00 32.00 B. FORCE MAIN PIPING: SUBTOTAL DISCHARGE PIPING 95.00 I TOTAL 4" DIA. STATION PIPING 175.00 NOMINAL DIAMETER FITTING / VALVE DESCRIPTION EQUIVALENT LENGTH PER FITTING / VALVE (FT. / EA.) TOTAL EQUIVALENT LENGTH (FT.) 4 6-INCH STRAIGHT. PIPE" (PVC)) 40 -INCH CHECK VALVE 2 60.00 120.00 6-lNcH- 45DEGREE "BENDS 1' 6.00 6.00 6-INCH PLUG VALVE 4.00 4.00 TOTAL 6" DIA. PIPING 170.00 5. NET POSITIVE SUCTION HEAD (AVAILABLE) NPSH(A) = P(ATM.) — (SUCTION LIFT + SUCTION FRICTION + VAPOR PRESSURE) = STATIC SUCTION LIFT = 14.86 FT. 16.50 FT cn1 O 0 co 0 .r.-A.r-:CACACACNCNNNNNN,. Os 0 L- 0 N 0 O 0 Co 0 o• 0 l- 0 N 0 o 0 co 0 o, 0 0 N 0 o 0 co 0 0 ' 0 r- 0 N 0 O 0 G1 13 3 v FLow(Q) 00000000000000000000o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ti �. STATICHEADLOSS �� • CNCOo• INa r. =• 22.20 1 20.37 000_,c_U,ivoOco�osu,:u+NN— — OWrcv03r,)iWN)sOCN�+o_o NN)o CA N V o — -- v+ r PUMP STATION (BEGIN SERVICE) FRICTION HEADLOSS 3.53 3.27 W iv 2.78 f 2.55 NN------o0 c(ANIN)CAAP.v-'ccn__,4ec,cAC"iv=• 000000^ C" u+ c,+ cn co FORCE MAIN (BEGIN SERVICE) NsoCT oic-,, 33.55 1 30.78 coN (N 25.58 W r:n 20.82 Ooo.F-r)o40v0.(n1.CAN _Inr.coc'o,,,C—"Oor o �uc,,o 00 T `i, PUMP STATION (END SERVICE) O o` r' N CAipi • V AO Co W03NNiv03o Co ,C) N (n O V 1 cm N0Oopioo 1 Cn CoN r CNwo� (n 1 r- ���., N T -1 FORCE MAIN ( END SERVICE) 0000000000000000000 U1.g-i-LA o CT N 4O CA(NN of N qD NNN CT CA CD •—•—•— O' 1 •—•— N O OO Co O. OO Cn i L 0.03 0 O PO T ... VELOCITY HEADLOSS CA (n ° 38.55 CA Q'r "4 CN CO 32.27 30.34 I 28.50 N CT 25.07 N CNN co .0o I 20.58I 00O>GIL 0' 01 'Do (COir 0 '0 CA IN) 01 cis 7 TOTAL HEAD (BEGIN SERVICE) coh Co — 55.33 -CcoccnN.0vr- 4D V v (N CT PO CT CA .4 CT 0 PO . — 0 N 29.57 �ccnn01 LA L iv Cn ro iv Co -�soo,Cn1-CN f- CT V CT rV 's Co O (n 01 r- O :� CA -n 71 v TOTAL HEAD (END SERVICE) o 4,Co436Ncn 0 so ,D co as 03 co V J or N 5.82 � C» r cno(n—vu+Ovt•rv.oCoor .0 f- U7 CA Cr �, — N O N CA N— 0 — �- O O sip O — O f- ns 0 be T rl FLUID HORSEPOWER (INITIAL) o' S3A8fl3 1431SAS 03103f ONd t 4 C. PUMP SELECTION 1. DUPLEX NON -CLOG SUBMERSIBLE SEWAGE PUMPS A. B. C. D. E. F. G. H. SELECTED PUMP PUMP DISCHARGE PUMP SUCTION MOTOR HORSEPOWER MOTOR SPEED ELECTRICAL SERVICE IMPELLER DIAMETER SOLIDS TARGET Q V. HD.: 4B2B SMITH '& LOVELESS, INC. 4 INCHES 4 INCHES 5 HP 875 RPM 460 VOLT 3 PHASE 8 1/2 INCHES 3 INCHES 180 GPM @ 15.85 FT. TDH 2. ESTIMATED PUMPING RATE (ONE PUMP RUNNING) PUMP CAPACITY: 180 GPM 3. ESTIMATED PUMPING RATE (TWO PUMPS RUNNING) PUMP CAPACITY: 40 35 30 a w a 25 �- 0 H 20 15 10 16.00 FT. TDH 210 GPM/EA. @ 17.50 FT. TDH PUMP CURVE (0) FLOW (GPM) 2(0) FLOW (GPM) TOTAL HD. (FT.) 0 0 19.00 50 100 18.25 100 200 17.50 150 300 16.50 200 400 15.75 250 500 14.75 300 600 350 0 50 100 150 200 GALLONS / MINUTE 250 300 350 15 700 HORSEPOWER @ 50% EFF. SMITH LOVELESS 48213 SYSTEM CURVE (INITIAL) Two PUMPS IN PARALLEL SYSTEM CURVE (END) -HORSEPOWER @ 50% EFF. • itqf2_w,14,1m1,1114_411 30 25 5 IIIII11111I11I111IIIIIIIIIIII111II11IIIIIIIIIHIIIIIIIIIIIIIIIIIIIIIIIIIIII II IIIIIIIIIIIiI IIIII II'' iI1IIIIIIi°111111IIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIININIIIIIIIIIIIIIIIII II'61il llr"i? tZ MP111IIIIIIIIII11111I111IIIIIIIIIIINIIIIIIIIIIIIIIIIIII tototipIiamI iumEiNlpINIIIIIIIIIIINlliimiINNiIIIINIIIIIII dliia. ium p Ia'I' � !1Itq IIIIII IIIIIIIIIIIINIII linglificiSkiiiii111111:111111 �l�"III��`'�IIIII 1n1 n In 11.1irn1ii1. ui.1u1.n. uii nI Iiii II' nI 1�ir�Nllu,• •,,t1aMAXIMUM STATIC SUCTION LIFT 20 FT. "I"IIIII �IPt� Irillll911lIIIUi n'°!1111I1111lIINnlI IIIIIIIIIIII IIIIIIIIIIIIIIIII III III II11111111111111111111111111111111111111 6211NIINnIhI�i�III 111111in.! 11t1I�1111.11 10....1111III11,1 HI 4nIIIIIIIIIIIIIIIIIIIIlI1111IIININiIiIN tt II'1 't ' Ei1111p'�1 mn,Ii114i!I llibu� ��111i1(Iililil �_�!!!llitti�illllllI II� II IIIIII IIINIIIIIIIIil 1111111111 .II,V�IlIiilg � iiiiil,�.. !;glum ''1 'ltllii °!!IIIIIIIIII!I IIIIIIIIIQIIII111It11IttllUI1N I "'1111 ItIIIIIIItI,. nl,t.. : I�il,�l'�:,, !I 91111iIIIl;�1�:�-.IlIllmll,.�_NIIIIIiltirs�,.. militipti I t i�,a,. ipilln"liiiwiimi ins ! li11914;11111111hhll ! t r it!' �u11II I ' "" h' IIIII iIIIIIIINN•iillii a iiu ii 11�`Iiil u„�.' ' il, ' �;;:�alcm,ui- W�111ifl IINIIIIII II'I G�IeI N,I�I1gl'�i,l�'gf��Wllltlll�;m��►:>nlaall,p�►.�. : t II �oii Niillll���olitl;I��, i„Hi'�ln�!IiiimmNinnii',��ltillllil;'„!e11IIl111m'°'11iiNNfNIIIIIINIIIIIINi IN1iIIliNNlll [�1 �nll ! � ,I� '��II ! vqI 1 1 .,Wt BIP' I i = HI EN Itt111.1II u llI11NIN!liitl�. �IIIIIIIIII Il h'inll,..ONillirn�v01111�I !1 NIIIIIIIIIII IIl:1!ll IIIIIII! ii lIIaI;.01u.._ _ , ,,,tlln..� . , ,f.. � t Nl�Itil�l�;l�lliI �111in1',1�I'11iIIlIi!ll�h11 1111111!!!ilIIPII i IIIIIIIIIIi iii iiSI I IIIII ff�.,IIII 1! INNII111N! 111111111 IN II6iiig��i�111110IIHIPItiiIIM!tthAYMiin!�!�t!!I'4''I°' 'ligigI 1!IllllL IEVIIIII NINI IINIINIIIINIINII II1IIIIH .I,v11tt ' li '"ul1N11111111in,,.fnun�,.. ,,,._IIII , n III il!lIIIII 1N11iI!111It,��...III; l=llllmlril,.. �: '`'111IIallllllll1i�11� "1gl!IIIII�=IIIIIII SUCTION PIPE 1. 1111EN 111 INNIIi�►IiliiilllN113tiEIn"Nltllllliisaa !!a�!leiilEalt►1.°t3II!!111Ia1�' 11111011111111 REQUIREMENTS' 11191 IIIIIO11I ':1111II 111111NI1:011 1111ii11114' ;1�1111nimi111t115--1N111111NI 1111111 I: 0-300 GPM 4" ill ! o IIIII 111111!llil ' ' �! ''�llfi''1JII IIIIIIIIIIIIIIICiIa�'!III IIIIII II 1300-600 GPM 6 : IIIIIJIIIIIIINIIIIIE'i lluln,,. 11. ,,::rr IIII � ; iiiiiiiii mum 1 i. 111111n1I111e JUIII II111 llllllllNIIIIIIIIIINN11111111Ni111 IN ! _z 011111111! lINN1NI11 MAX. FLOW IIIIIIlIIIIIli IIIIIII MAX. FLOW IIIIII IIIIIIIIIIl1I1II1!lIIilIN11111 Ill I I`11IIllllililllll!! I PIPING iII1NI11111I111lIIIIII 6PIPING" IIIIII IINIIIINIIIIIilIIIItNI!!Il!':I Ill 11 11111111i1IN1I1 !I it 1 r 1 111 1! IIIIIII IIIII 1111111 1 i 1111111 11111111111111111111111111111111111111 482E WET WELL MOUNTED PUMP STATION NON —CLOG PUMP CONSTANT SPEED PERFORMANCE 875 R.P.M. S4L22 IMPELLER MAXIMUM SOLID — 3" SPHERE 120 110 100 90 80 70 60 40 100 200 300 400 500 600 U. S. GALLONS PER MINUTE P. i jI I i11 HI Ir1; !' i t '; Iii' SUCTION PIPE i` tlIMBI t 11 . REQUIREMENTS 4•• DUllmommiumin , '300-600 GPM 6.. .1:600-600 GPM 6 ::1 U'::,ir. 1�1I t I 1 I{I{ ri i!a :I Il ite q !A r41 II L1�Aitl'IaI>7.• 'I r. lfllt ►a 1ItI '' W[.i _b,n If �61L, tryi 5 0 IIIIIll`I► �14` Ilmi I llhi I'it IIIIII IIIIIII! 30 •■i'!IIIIII 20iu. r :r:; ca'-MAX. FLOW :Z ll ill; ,..•..X" n 6•• DISCN. ;=ti • Ic:.. i':I '1, PIPING 100 200 400 4820/4C2D WET WELL MOUNTED PUMP STATION NON -CLOG PUMP CONSTANT SPEED PERFORMANCE 1760 RPM S4L23 IMPELLER MAXIMUM SOLID - 3" SPHERE Pi; ;ill;Ili 4YINNE11311111MIllll l tl��' "g2111BI IlIN1=1111f1 i= '1II11111',IN j{(�r,'i. L ' filfj Ijtp 1{j' i ill j 11.111f 1:11r:ti i•i''!',i�ii'i�1}��,[111; i s i IIIl111I1,'11 ' is •llRil Fi i n�°!Ii: �1. rt•i.1:.I Wit 1!.: 'I:I i 11 l,4i11 0.11 ....'11' :i .� ... 600 800 1000 1200 U.S. GALLONS PER MINUTE Smith 8 Loveless, Inc. November 1995 PRELIMINARY PUMP STATION / FORCE MAIN DESIGN CALCULATIONS PROJECT: EASTOVER 2 DATE: JUNE-03 CUMBERLAND CO., NC PUMP STATION DESIGN: A. WASTEWATER FLOWS INITIAL WASTEWATER FLOWS ARE BASED ON CURRENT WATER USAGE PLUS SOME SHORT TERM INCRESES IN DEMAND CAUSED BY THE AVAILABLILITY OF SEWER (SOME CURRENT CUSTOMERS ARE CONSTRAINED) AND PLANNED DEVELOPMENTS. LONG TERM FLOWS ARE BASED UPON THE TOTAL CAPACITY OF THE APPROACH MAIN GRAVITY LINE (810,000 GPD) PLUS ADDITIONAL FLOWS COMING INTO THE PUMP STATION FROM THE SOUTH FOR A TOTAL OF 1,000,000 GPD. THE FOLLOWING CALCULATIONS ARE BASED ON ELEVATIONS AND LINE LENGTHS FROM COMPLETED DESIGN SURVEY. I. PROJECTED FLOWS SEWER SHED ESTIMATED 2004 ESTIMATED 2014 ESTIMATED 2024 GODWIN 10,000 30,000 50,000 FALCON 125,000 .:`.I.B-•.0,0.00. WADE 1 125,000 21,0000 WADE 2 125,000 280,000 440,000 ESD;., 125,000 600,000 1;000,000 2. PEAK FLOW A. YEAR 2004 FLOW 125,000 GPD B. YEAR 2024 FLOW 1,000,000 GPD 3. TARGET PUMPING RATE 300 375,000 GPD 10 YR. Q, PEAK = 260.42 GPM 2.50 2,500,000 GPD 20 YR. Q, PEAK = 1736.11 GPM USE 800 GPM FOR INITIAL TARGET PUMPING RATE (704 IS MIN FOR 12" FM) USE 1800 GPM FOR FUTURE TARGET PUMPING RATE (704 IS MIN FOR 12" FM) B. PUMP STATION / FORCE MAIN DESIGN CRITERION THE EASTOVER 2 (E-2) PUMP STATION WILL BE QUADPLEX CONFIGURATION WITH ABOVE GROUND VACUUM -PRIMING PUMPS. THE STATION DISCHARGE PIPING ON THE PUMP STATION SITE WILL BE CONFIGURED TO ALLOW FOR BY-PASS PUMPING. EMERGENCY POWER GENERATION WILL BE INCLUDED ON -SITE. INITIALLY ONLY TWO PUMP OPERATING IN PARALLEL WILL BE INSTALLED. As DEMAND INCREASES, TWO ADDITIONAL PUMPS WILL BE PLACED IN SERIES WITH THE TWO INITIAL PUMPS. I. PIPING A. STATION PIPING B. FORCE MAIN PIPING SUCTION: DISCHARGE: H-W FRICTION COEFFICIENTS: H-W FRICTION COEFFICIENTS: C. TOTAL FORCE MAIN LENGTH D. TARGET PUMPING RATE (10-YR.) VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE HEADLOSS IN FM PER 1,000 FT. (C=130) E. TARGET PUMPING RATE (20-YR.) VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE HEADLOSS IN FM PER 1,000 FT. (C=I30) 2. WET WELL DIMENSIONS AND ELEVATIONS A. B. C. D. E. F. G. H. J. K. L. M. N. INSIDE DIMENSIONS, AREA (SF) PUMP STATION RIM ELEVATION CENTERLINE PUMP ELEVATION INVERT OF INFLUENT LINE HIGH LEVEL ALARM LAG PUMP ON LEAD PUMP ON PUMP OFF Low LEVEL ALARM BOTTOM WET WELL DETENTION VOLUME FORCE MAIN HIGH POINT FORCE MAIN DISCHARGE ELEVATION CYCLE TIME : PUMP ON TIME _ PUMP OFF TIME _ PUMPING CYCLE YR. - 2004 10.00 FT. DIA. 120.00 FT. MSL 122.50 FT. MSL 112.00 FT. MSL 109.00 FT. MSL 108.50 FT. MSL 108.00 FT. MSL 104.50 FT. MSL 104.00 FT. MSL 103.00 FT. MSL 2055.13 GAL. 117.00 FT. MSL 82.00 FT. MSL 2.88 MIN. 23.68 MIN. 26.56 MIN. 12;" D.I.P. 10 " D.I.P. C= 130. C= 130 12"PVC 19,200 FT. 800 GPM 78.50 1800 GPM C= 130. _r C= 130 2.27 FPS 1.69 FT. 5.11 FPS 7.59 FT. YR. - 2024 10.00 FT. DIA. 120.00 FT. MSL 122.50 FT. MSL 112.00 FT. MSL 111.50 FT. MSL 111.00 FT. MSL 110.50 FT. MSL 104.50 FT. MSL 104.00 FT. MSL 1103.00. FT. MSL 3523.08 GAL. 117.00 FT. MSL 82.00 FT. MSL 3.19 MIN. 5.07 MIN. 8.26 MIN. (INITIAL SERVICE) (END OF SERVICE) (INITIAL SERVICE) (END OF SERVICE) 78.50 SF ld 00'81 = 1d11 NOIiof1S Davis ld Oc'SI = (32111SS321d 210dVA + NOII31bd N0113f1S + 1d11 N0113fS) - ('Wlv)d = (v)HSdN (319V1IVAV) aV3H N0113f1S 3AIIISOd 13N 'S 1NIOd HOIR 01 H19N31 X0MddV) 0'7 I I I 9NIdld 'VIQ „ZI 7,7101 00'7 00'7 . 3A1VA 9flld HDNI-ZI. 07' 61 OL'6 Z' SON38: 332193Q'=- -' 1H3NI-ZI,'. 00'87 00'ZI 7 SQN38 aa8S3Q 06 H3NI-2I's 0+7 ((Ad) 3d1d:1HDIVMIS HDNI Z1,'' (•ld) H19N31 IN91VAIfO3 1V101 (•V3 / '1A) 3/OVA / 9NII11d glad H19N31 1N31VAIfO3 NOIldI DS9Q 3A1VA / 9NI111d 2131314V I Q 1VNIWON 02'L07'61 9NIdld 'VIQ 21 1V101 1 -rind ION N3HM 00'7Z 00 7.?;`., 9 3A'1 'A' Sflld HONI-Z1 02'L8 S0N38:3321M; SP 13NI..Z.L < 00'96 00.Z'6I,; ('Id) H19N31 IN31VAIf1O3 1V101 .61 00'ZI -_ 8 ((DAd) 3d1 ±H9IV211S H 3N1 ZI' ('V3 / 'IA) 3A1VA / DNIllld 213d H19N31 1N31VAIfO3 NOI1d1213S3a 3A1VA / 9NI111d 21313WVIQ 1VNIW0N 11fld ION SI 3NI1 N3HM -rind SI 3N11 N3HM ld OS'ZI 'kJ OS'ZZ- 11fld N3HM :SNIdld NIVW 33210d '8 Z'7 0081 2'2 0091 S'Z 0071 0'Z 0001 7' I 0001 0' 1 008 (1d)avH Nd9 :9NIdld „01/M SNOIIVIS dWfld 7/Z 392IV1 21321l13VdfNVI.4 Woad :S3SS01 N0113121,d '7 3A-IVA 3VA/21IV 01 dd0-d 1d11 311V.S 1V101 '8 3921VHDSIQ I,4A Ol ddO-d ldll 311V±S 1V101 'V 'IA 0S701 'id 00'Lll 'A313 AA() dWfld 'A313 'XVN NIVN 33210d .av3H 311VIS '2 • 1 e j • 6. PROJECTED SYSTEM CURVES 0 0 O J L N O - - J W U- M LU U Z Q _J � v 0) (/) N 0 -J Q W U 1- 4 H Cn J J I F O Z W Z_ J LINE HEADLOSS PUMP STATION >- CO H N O O 0 > W (GPM) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) (FT.) (60% EFF.) 600 -22.50 12.50 19.29 0.11 0.50 0.05 13.16 3.32 650 - 22.50 12.50 22.37 0.13 0.60 0.05 13.28 3.63 700 -22.50 12.50 25.66 0.15 0.70 0.06 13.41' 3.95 750 - 22.50 12.50 29.16 0.17 0.90 0.07 13. 6 4' • `' 4.30 800 - 22.50 12.50 32.85 0.19 1.00 0.08 13.77 4.64 NOT FULL TDH CONTROLS 850 - 22.50 12.50 36.75 0.21 1.10 0.09 15.44 5.52 900 - 22.50 12.50 40.85 0.23 1.20 0.10 19 65: 7.44 950 -22.50 12.50 45.15 0.26 1.30 0.11 24.06; 9.62 1000 - 22.50 12.50 49.64 0.28 1.40 0.13 28.6 12.07 1050 - 22.50 12.50 54.33 0.31 1.60 0.14 33.57 14.84 1100 - 22.50 12.50 59.22 0.34 1.80 0.15 38. 6'7 17.90 1150 - 22.50 12.50 64.29 0.37 1.90 0.17 43.86_ 21.23 1200 -22.50 12.50 69.56 0.40 2.00 0.18 '49.24`.. 24.87 1250 -22.50 12.50 75.01 0.43 2.10 0.20 544. 81 - 28.83 1300 - 22.50 12.50 80.66 0.46 2.20 0.21 6057 33.14 1350 - 22.50 12.50 86.49 0.50 2.40 0.23 6b 62 37.85 ASSUMES SMALLER PUMPS 1400 - 22.50 12.50 92.51 0.53 2.50 0.25 72.76 21.43 1450 -22.50 12.50 98.72 0.57 2.80 0.26 79;28 24.19 1500 -22.50 12.50 105.11 0.60 2.90 0.28 "85 79 `- 27.08 1550 - 22.50 12.50 111.68 0.64 3.10 0.30 ,92 58 : 30.20 1600 - 22.50 12.50 118.43 0.68 3.20 0.32 99. 45- 33.49 1650 - 22.50 12.50 125.37 0.72 3.40 0.34 106.61 37.02 1700 -22.50 12.50 132.49 0.76 3.60 0.36 113. 5 40.77 1750 - 22.50 12.50 139.79 0.80 3.80 0.38 121.47- 44.73 1800 - 22.50 12.50 147.27 0.85 4.00 0.41 /29.17: 48.93 1850 - 22.50 12.50 154.93 0.89 4.20 0.43 53.36 1900 -22.50 12.50 162.76 0.93 4.60 0.45 145.31 58.10 1950 -22.50 12.50 170.77 0.98 4.80 0.48 153.55 63.01 ASSUMES LARGER PUMPS IN SERIES • C. PUMP SELECTION I. QUADPLEX ABOVE GROUND VACUUM PRIMED A. SELECTED PUMP 8D4D SMITH 8 LOVELESS, INC. B. PUMP DISCHARGE 10 INCHES PUMP SUCTION 8 INCHES 10 FUTURE C. MOTOR HORSEPOWER 5 HP 50 FUTURE D. MOTOR SPEED 875 RPM 1170 FUTURE E. ELECTRICAL SERVICE 460 VOLT 3 PHASE F. IMPELLER DIAMETER 11 INCHES 14'I/3 FUTURE G. SOLIDS 3 INCHES H. TARGET Q V. HD.: 800 GPM @ 13.70 FT. TDH 1. FUTURE Q V. HD: 1800 GPM @ 129.00 FT. TDH 2. INITIAL ESTIMATED PUMPING RATE (ONE PUMP RUNNING) PUMP CAPACITY: 800 GPM @ 13.70 FT. TDH 3. FUTURE ESTIMATED PUMPING RATE (SERIES. 50 HP) PUMP CAPACITY: 1800 GPM/EA. @ 129.00 FT. TDH TOTAL HEAD 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 COMPOSITE PUMP CURVE (Q) FLOW TOTAL HD. TOTAL HD. (GPM) (FT.) (FT.) 0 22.50 200 20.50 400 18.25 SINGLE 5 HP 600 15.80 DUPLEX II" 700 14.50 IMPELLER 800 /3.70 1000 10.70 1200 8.00 1400 142.00 SERIES 50 HP 1600 136.00 QUADPLEX 1800 /29.00 14.3" 2000 123.00 IMPELLER 2200 115.00 140 - 120 - 100 - 80 - 60 - 40 - 20 0 200 400 600 800 1000 1200 1400 1600 1800 2000 GALLONS / MINUTE HORSEPOWER @ 60% EFF. SINGLE SMITH LOVELESS 8D4D SYSTEM CURVE 50 HP 8D4D @ 1170 RPM • HORSEPOWER @ 60% EFF. TOTAL HEAD IN FEET 8C4D-804D '•••••••••••••••••••••••••••••••• ••• WET WELL MOUNTED PUMP STATION NON —CLOG PUMP CONSTANT SPEED PERFORMANCE 1170 RPM S8M42 IMPELLER MAXIMUM SOLID — 3" SPHERE 0 500 1000 1500 O3000 2500 U.S. GA'LONS PER MINUTE 60 50 40 30 2' 10 0 3000 3500 8C4D — 8D4D WET WELL MOUNTED PUMP STATION SON—CLOG---RUMR CONSTANT SPEED PERFORMANCE 875 RPM S8M42 IMPELLER MAXIMUM SOLID — 3" SPHERE MAX MUM ALLOWABLE S'ATIC SUCTION LIFT soo •GPM ....1:11 :.:I ..: s°:::".:.='f.=:.. ��::•: iMIN FLOH a:::•:.: •::g Eirma:::i .t ,:e ; .— :e: ..3::............':s2::....:lr5333::.� 1000 1500 2000 2500 3000 3500 U.S. GALLONS PER MINUTE 22— Smith 8 loveless, Inc. November 1995 41, PRELIMINARY PUMP STATION / FORCE MAIN DESIGN CALCULATIONS PROJECT: WADE 2--NORCRESS, SANITARY SEWER SYSTEM DATE: JUNE-03 CUMBERLAND CO., NC PUMP STATION DESIGN: �1 OTE: Th U P.S . t s S E ►°A'ZA-TQ e( S A. WASTEWATER FLOWS cog_ Te No' CUI I t&A` O (26% tc.)/•) .. SJ d'- S y,5-Fi��l P M,�0o se-pNATE-y, Cyr tT ►S Tlie es. INITIAL WASTEWATER FLOWS ARE BASED ON CURRENT WATER USAGE PLUS SOME SHORT TERM INCRESES IN DEMAND CAUSED BY THE AVAILABLILITY OF SEWER (SOME CURRENT CUSTOMERS ARE CONSTRAINED) AND PLANNED DEVELOPMENTS. LONG TERM FLOWS ARE BASED UPON THE TOTAL NORCRESS ALLOCATION IN THE APPLOACH MAIN (400,000 GAL/DAY) ASSUMING THAT FUTURE FLOWS FOR EACH TOWN WILL BE PROPORTIONAL TO CURRENT DEMAND (TOTAL CURRENT WATER USAGE IS UNDER 100,000 GALLONS PER DAY. SIGNIFICANT GROWTH IN THE AREA IS LIKELY DUE TO THE 1-13 "OUTER LOOP" PROJECT WHICH WILL PROVIDE HIGH SPEED ACCESS TO FAYETTEVILLE AND FORT BRAGG FROM THE PROJECT AREA (I-95). THE FOLLOWING CALCULATIONS ARE BASED ON ELEVATIONS AND LINE LENGTHS FROM COMPLETED DESIGN SURVEY. 1. PROJECTED FLOWS SEWER SHED ESTIMATED 2004 ESTIMATED 2014 ESTIMATED 2024 GODWIN 000 30,000 0000 FALCON 125,000 3j180O WADE 1 125,000 `10000 =' WADE 2 125,000' 280,000 1+0000 ESD I 2. PEAK FLOW 020.0 600,000 1 0.00,000 A. YEAR 2004 FLOW 125,000 GPD X 3.00 = 375,000 GPD 10 YR. Q, PEAK = 260.42 GPM B. YEAR 2024 FLOW 440,000 GPD X 3.00 = 1,320,000 GPD 20 YR. Q, PEAK = 916.67 GPM 3. TARGET PUMPING RATE USE 700 GPM FOR INITIAL TARGET PUMPING RATE (490 IS MIN FOR 10" FM) USE 770 GPM FOR FUTURE TARGET PUMPING RATE (490 IS MIN FOR 10" FM) • or -I i , 7: 4 B. PUMP STATION / FORCE MAIN DESIGN CRITERION THE WADE 1 (W-I) PUMP STATION WILL BE DUPLEX CONFIGURATION WITH ABOVE GROUND VACUUM -PRIMING PUMPS. THE STATION DISCHARGE PIPING ON THE PUMP STATION SITE WILL BE CONFIGURED TO ALLOW FOR BY-PASS PUMPING. EMERGENCY POWER GENERATION WILL BE INCLUDED ON -SITE. I. PIPING A. STATION PIPING B. FORCE MAIN PIPING SUCTION: DISCHARGE: H-W FRICTION COEFFICIENTS: H-W FRICTION COEFFICIENTS: C. TOTAL FORCE MAIN LENGTH D. TARGET PUMPING RATE (10-YR.) VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE HEADLOSS IN FM PER 1,000 FT. (C=130) E. TARGET PUMPING RATE (20-YR.) VELOCITY IN FORCE MAIN AT TARGET PUMPING RATE HEADLOSS IN FM PER 1,000 FT. (C=I30) 2. WET WELL DIMENSIONS AND ELEVATIONS A. B. C. D. E. F. G. H. I . J. K. L. M. N. INSIDE DIMENSIONS, AREA (SF) PUMP STATION RIM ELEVATION CENTERLINE PUMP ELEVATION INVERT OF INFLUENT LINE HIGH LEVEL ALARM LAG PUMP ON LEAD PUMP ON PUMP OFF Low LEVEL ALARM BOTTOM WET WELL DETENTION VOLUME FORCE MAIN HIGH POINT FORCE MAIN DISCHARGE ELEVATION CYCLE TIME : PUMP ON TIME _ PUMP OFF TIME _ PUMPING CYCLE YR. - 2004 8.00-FT. DIA. 122.20 FT. MSL 124.70 FT. MSL 116.60 FT. MSL 113.00 FT. MSL 112.50 FT. MSL 112.00 FT. MSL 109.00 FT. MSL 108.50 FT. MSL 107.50> FT. MSL 1127.39 GAL. 142.00 FT. MSL 140.10 FT. MSL 1.84 MIN. 12.99 MIN. 14.83 MIN. 81" D.I.P. 8." D.I.P. 10!" PVC 18000; FT. 700 GPM 50.24 770 GPM 2.86 FPS 3.21 FT. 3.15 FPS 3.83 FT. YR. - 2024 8; 00' FT. DIA. 46 FT. MSL 70L FT. MSL .60, FT. MSL 116.10 FT. MSL 115.60 FT. MSL 115.10 FT. MSL 109.00 FT. MSL 108.50 FT. MSL 107.50 FT. MSL 2292.35 GAL. 142.00 FT. MSL I40..10'FT. MSL 4.94 MIN. 7.50 MIN. 12.44 MIN. (INITIAL SERVICE) (END OF SERVICE) (INITIAL SERVICE) (END OF SERVICE) 50.24 SF r I g, , ,. '111 ` ,6 1 3. STATIC HEAD: FORCE MAIN MAX. ELEV. PUMP OFF ELEV. TOTAL STATIC LIFT 4. FRICTION LOSSES' A. PUMP STATION PIPING 142.00 FT. 109.00 FT. 33.00 FT. NOMINAL FITTING / VALVE DIAMETER DESCRIPTION EQUIVALENT LENGTH TOTAL EQUIVALENT # PER FITTING / VALVE LENGTH (FT. / EA.) (FT.) SUCTION SIDE ,S-INCH . STRAIGHT PIPE -25.00 '` 8- INvcH SWING CHECK VALVE: I ` : 90 00.=u 90.00 NCH. `' .90 ; DEGREE: BEND 2 I"2' 00 :: 24.00 .INCH STRAIGHT PIPE` SWING' CRECK: PLUG VALV VE, 90 - DEGREE BEND B. FORCE MAIN PIPING: SUBTOTAL SUCTION PIPING 4 12.00 ' SUBTOTAL DISCHARGE PIPING 139.00 90.00 4.00 48.00 162.00 1 TOTAL 8" DIA. STATION PIPING NOMINAL DIAMETER FITTING / VALVE DESCRIPTION EQUIVALENT LENGTH PER FITTING / VALVE (FT. / EA.) TOTAL EQUIVALENT LENGTH (FT.) I0-INCH-' 10,-INCH' STRAIGIT''PIPE (PVC)) 90 - DEGREE:. BENDS 6 17.00 18,000 102.00 ICH>= bEGREE:YBENDS 6 9.70 58.20 INCH` PLUG VALVE 6 4.00 24.00 TOTAL 6" DIA. PIPING 18,184.20 5. NET POSITIVE SUCTION HEAD (AVAILABLE) 301.00 NPSH(A) = P(ATM.) - (SUCTION LIFT + SUCTION FRICTION + VAPOR PRESSURE) = 16.18 FT. STATIC SUCTION LIFT = MAX PER MANUFACTURER 15.70 FT 20.00 FT Cn o 0c)0000000000.0 r Cn r 0 GI cn CA 0 N cn N o — n o Es Ul o `0 Cn `D 0 ' 850 co 10 o V Cn 0 N o 0 Cr cn 0 Cr 0 0 Cn Cn o 01 o O Cl v 3 FLOW (Q) CN GI 0000 o CA CA o CA CN 0 GI CN 0 33.00 CA CN 000 000 CA GI W GI 33.00 I C1 GI 00000000 00000000 CN GI CA C.N GI CN CA CA GI GI GI CA Cq Col 33.00 j GI CA b Cal 33.00 GI CA 0:-I O -n s-- STATIC HEADLOSS N=-o`o.DO 0. cm co 0` _ — W .D 0' .D O — LA O` 7.72 I V •_ — O`alCnrrCNCNC.4NN-- Cn CN .o O, L N ;o — r N .O Cn cn 0 0 Co Cr .0 cN N :D V Os. Cn `. PUMP STATION (BEGIN SERVICE) FRICTION HEADLOSS N c,,N—.00VcnrCNN—o•o0'+Osv1CTIrCA(A Ai) cN —O` N r0CrCNOaoO`rCN�'NCNv+rOspo0CN v N o` rCACno — 'ND — o` — Oo — CA V — LA CDCN — COCD60 — — — U+o— — 0` COO O iN Co(.,rCNoCrl i' .o 'o• V• - - CA (FT.) FORCE MAIN (BEGIN SERVICE) .D V No Cr .o Cn r r CN N N- cN V O Cn O O` .D — 0 o V IV Cr V Cn Os C)1 •o o, r CDco.O O` 3.50 N CO N (n 0 �1 --Iao ;_. V PUMP STATION (END SERVICE) 0''O' so- 0)3` 286.92 I c000 N- CnOT 232.65 1 al`A0CAcoCC• VCNO` CN.0On—Or r Noo`(.+3o`N'o.o.ADON .i0v.DCorUI(N6343v N0ao.DN`D.Drr—`-' -n • FORCE MAIN (END SERVICE) 0.58 pop CJn— -a 0.44 o00o00 -v�C—.NOON` — 0.23 J 000000000 ^—•o7+c • nCA=.0ccooOO`��. r .n VELOCITY HEADLOSS CO U10cn 01 N V -N V Cn O. 240.80 N O`cNo"U1CN^>—�rvCr V 0 N N— — NO O co rNCnN 01 V Cn Cr N Cn co r r 0` CN -- CA N N`OO co _ N O CN CN `O Ca A coV Os vcNro r .0 r V ()I as V -n ... TOTAL HEAD (BEGIN SERVICE) co 357.62 337.22 N -75i70.71 Coo°�r.�-o V w£-0W0'N-N0' N r- VCA — —coo�lo �— ` c O 0`�1 co o 78.27 '1 ... TOTAL HEAD (END SERVICE) .D V al.D O CD F. r co r Co O CN r O` N - --.I 3 co `0 V co Cr N V Cr O O` *+ '4 Cn `O — cm N OV r Cn N CA .D CN CA S.N Oa N CO Co N r r N Cp CN .O I (50% EFF.) 1 FLUID HORSEPOWER (INITIAL) Cr S3A8fJ W31SAS 03103f ONd M • oar r �� r • •► I C. PUMP SELECTION 1 DUPLEX NON -CLOG SUBMERSIBLE SEWAGE PUMPS A. B. C. D. E. F. G. H. SELECTED PUMP PUMP DISCHARGE MOTOR HORSEPOWER MOTOR SPEED ELECTRICAL SERVICE IMPELLER DIAMETER SOLIDS TARGET Q V. HD.: 6C3B SMITH a LOVELESS, INC. 8 INCHES 30 HP 1760RPM 460 VOLT 3 PHASE 10 I/2 INCHES 3 INCHES 700 GPM @ 94.64 FT. TDH 2. ESTIMATED PUMPING RATE (ONE PUMP RUNNING) PUMP CAPACITY: 700 GPM 3. ESTIMATED PUMPING RATE (TWO PUMPS RUNNING) PUMP CAPACITY: 200 190 180 170 160 150 140 130 a 120 = 110 100 I- 90 80 70 60 50 40 30 20 10 0 95.00 FT. TDH 770 GPM/EA. @ 108 00'..,'.FT. TDH PUMP CURVE (Q) FLOW (GPM) 2(Q) FLOW (GPM) TOTAL HD. (FT.) 0 0 128.00' 200 400 117.00 400 600 800 1200 108.00 100.00 0 1400 9500 800,`K� 1000: 1200' 1600 2000 2400 8900 8.00 6200 200 400 600 800 GALLONS / MINUTE 1000 140 120 100 80 60 40 20 0 1200 HORSEPOWER @ 50% EFF. SMITH LOVELESS 4B3B SYSTEM CURVE (INITIAL) TWO PUMPS IN PARALLEL SYSTEM CURVE (END) 'HORSEPOWER @ 60% EFF. V . p •TAL HEAD IN FE • �mueru7u7rx7:•�u7nx7rplla�g7u7yu�,xrw7��iii I � ..0 xw. ' 31111��7::1:11.'.7Y 10: ,at•Y Ii�F.' i -- Rf ., "�f:1191:111: rrrrfllfxrrr r1ifM !win_ NUI i11Ac7`,p','•1•i"'jw7 'Liwi 01 -A wEr WELL MOUNTED PUMP STATION I40tll'I•f�laaxiii4� �^ 20 •,� ° .E� is>ti� �;-es M SG =. .�:r4�..pep.:-a,h.........=...-���,�-x:.i��� �g�a�fs /Oh x+x7ualf�r7rww7ux .:a�'���=ate //,r ::.•$ .. 00�1,71.41.14x �;- ���z�rM���- �'� -- M'Q•i: �' '%ate.-.'��s'. - �:c...xiiiiiPi ' 'ie �.7-.ia � � T —r xrx�fa mi` A..a-`rlliff�111" �- ._.._-•_ ��� � � eo iy�11MF��jMfi119LM1 rl�iii� 14 �Z.K-� h- � 3_ ai'rL----1:= " uesiv%sr4E2 sr' ' w=k1 sil:i'x, ,a !S -: 60 7r_�,i�•!�ru711711fk1t111��•,j�'�fti(o� — - ."�,e- •.a..._ t,. • SNU INN 1760 R.P. M. S6M31 IMPELLER MAXIMUM SOLID - 3" SPHERE _'111N •�• •R1hw.!. 711F �11a� �� .e _:�. T' ..�t"� -- - �•::.� r:' �•' L : 1-o•�.^_ • :: •1C:iY:^::t!••"' L2h: t: i .: (�. «:- / /C mix........ .. _ _'#a.ic MEleg A••..: =yla - :°.�„ .4 ., i. •49 CI n7x xx niwirit iw"st7' ��^ .•:x ea_ :::• A __.' O.-. wa7axfaw-aar �wlfri xra,� a iasi n — - :•,,; = ?.:.._ rwx„�"l��al 8EfLtd If6'Va7nriw — ➢fis �1/II�i1V11iP nrwxr - a i�.1 I ' ...�°S'• 7wrwcwr7C � : ••e:�:;* omit rr x 111aG� raa: 2 6838-SC38-6038 NON -CLOG PUMP CONSTANT SPEED PERFORMANCE .r. !r knew YZ�' 1:::•,-.,. i..::: ..:;'�•.- :3:+ ^ ii „► ,o - ^?= .._...._ice: MAX. FLOW '-'7 8- SUCTION •- ..... ........ .........-�:i 400 MIN. FLOW 500 G.P.M. MAX.: FLOW 6" S CTION• 8 10 U.S. GALLONS PER MINUTE x 100 alto 12 14 16 <:s:s ".41ee�:.•:::w::>:i?:::::::::::.nQi:oE:i::9a:e•7 ....... 6838-6C38-6038 +1�,R;a7.2sf:eiiaiiiiir xfiiiinieflliiiiinriFo. WET WELL MOUNTED PUMP STATION dr. =•:;;sr.�:_ -":. NON- CLOG PUMP 30 '' _-tom r�� :0 =9::•• '•- —' �;•;z ;,,• CONSTANT SPEED PERFORMANCE if�w' 7a f�fffill::;:f irn!!!!I Ernmil I• ; a== =..... 1470 R.P.M. S �f�ua►:fr �' `xfK:�wfeifi>fn!�if'' S6 M 31 IMPELLER aiidet taYa a,i EF :1 EE• - -- — m?-.-z—I�`.:�w mi— !:.i.:: mac ariii . � ...:'IC+..i'—-2=� SEaob�.•M —r .fa sa• ISarfama'�ewaE�w.MI-EM •S a . t.�- :, _ iEgli= —_=aL_; az,T.� � -110 _ y --= -- .ia�=i..':�.-.rtti7..K� :7wji : .a. .... -m = _- iP. m�: E: ll-_:-.—"..fi• aea7afif��e7i,>♦«1i. • wiell _i s reumYMnM :aT„TrgALi7. _ x..71fo ...... IlliiIIIMMs ma �lfa. � n::: . 1. ernfill i:I.- ' Ix IIII a ,c" MAX.FLow n - • 1<ji,AX.FLOW . «:=•:..«::'• ..... ..i....::5:::::' - :. 37.9 I.I/S a 1 1 76.5 L/S : •s:::s..; :=1yN a:::s: �.. Wrr i 6' (52(M.) : Wrr' 6"(20.3r'M) 6:";:li 1::n :1lu4Y 111:1 s :s..7i SUCTION SucnoN y�3.n it afIwiuisannir ..1::.:fin 20 40 60 00 i00 LITERS PER SECOND S ' :sue=: «:."S �'?�!-,.' - MAXIMUM SOLID-7.62 CM. SPHERE �.��Ki�'.ie�ff ,��i��'w�f�rafxf�ff ma e: -o::�a �a• `?t::= ' ' r, 'm_ 111111 °;aft •aiffif nal Wafer & Wastewater Wet Well Mounted Pump Station Smith & Loveless, Inc. November 1995 REQUIREMENTS & SPECIFICATIONS FOR SEWER MAIN EXTENSIONS FOR THE PUBLIC WORKS COMMISSION FAYETTEVILLE, NORTH CAROLINA CUMBERLAND COUNTY PROJECT: �s5- cc-tj'y 1°Y�D �U\ P DATE SUBMITTED 7- /a- 63