Loading...
HomeMy WebLinkAboutNCG100247_DMR_20210520Stormwater Discharge Monitoring Reoort for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG100000 Date submitted CERTIFICATE OF COVERAGE NO. NCG10 Q 2 4 7 SAMPLE COLLECTION YEAR 2021 FACILITY NAME T&MAuto sates. Inc. REef!1V PLE PERIOD * Jan -June ❑ Juiy-Dec COUNTY Cleveland or ❑ Monthly' (monk_ SUN 14 PERSON COLLECTING SAMPLES Marty Robbins 202DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY ALs Glottal Lab Cert. H 624-2021 CENTRAL FILES ❑Zero -flow ❑Water Supply ❑SA Comments on sample collection or analysis: LJWR SECTION WOtherws-IV Part A: StorMW24er Benchmarks and Monitoring Results PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -7� Total event rainfalls 0.35 or ❑ No discharge this period?' I Date pH, Total Suspended Non -polar Lead, Total Total Toxic New Motor or Outfali Sample Standard Solids (TSS) O&G/TPH Ethylene Glycol, Recoverable 3 0r Organics Hydraulic Oil No. Collected, Units mg/L (Method 1664 mg/L mg/L mg/L Usage, mo/dd/year SGT-HEM), mg/L gal/mo Benchmark - 6.0 — 9.01 100 or 502 15 8,000 (Tiers 2 and 3) 0.075 1.0 - Parameter Code 1 - 00400 C0530 00552 77023 01051 78141 NCOIL 001 +OS/03/2021 6.7 6.35 2.0 < 1.0 <0.002 Exempt I Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier 1 or Tier 2 responses in the General Permit. 'If pH values outside this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were belmv the benchmark pH range of 6-9 2See General Permit Table 1, identifying the especially sensitive receiving waters classifications where the more protective benchmark applies. 3For purposes of this permit the definition of Total Toxic Organics is that list as stated in Appendix D, Table II of Chapter 40 Code of Federal Regulations (CFR) Part 122. °Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. sTotal precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 6For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. Permit Date: 11/1/2018-05/31/2021 Form 5WU-251, Last Revised 11/1/2018 Page 1 of 2 J7. ki Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DEMLR waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used along with other requirements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: Solvent Management Plan Certification Statement "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or Stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) Signature Mail Original to: Division of Water Quality Attn: Central Files 1617 Mail Service Center North Carolina 27699-1617 Date "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." r ?4"200/ Date Permit Date: 11/1/2018-05/31/2021 Form SWU-251, Last Revised 11/1/2018 Page 2 of 2 .r � r +i r .r , .._ r.♦'! .'. .� a �.:.� t% . .. .. .. :1'�• .. .. .. n � .� i- � � .. ... •: .. is .. .:1� .�•. . .. .i s Oyu I r. ... ., "fi.l .. ..i 'r`.:i "!.r•�_y.' t� i .. :'fLl .:t.. '.)t r7 .. s' . . . ,_I. f,.. _ . ... .. AT,, .. ........ ... ter.. 'i .. -. ...... r�.:'�.'� a.-•pr � ilt:;Ji•:"' .. :.... .•} Pon WMA 1 i